CN110053173A - A kind of full angle wall intelligence puncher for building - Google Patents

A kind of full angle wall intelligence puncher for building Download PDF

Info

Publication number
CN110053173A
CN110053173A CN201910426788.5A CN201910426788A CN110053173A CN 110053173 A CN110053173 A CN 110053173A CN 201910426788 A CN201910426788 A CN 201910426788A CN 110053173 A CN110053173 A CN 110053173A
Authority
CN
China
Prior art keywords
switch
block
electrically
controlled valve
control cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910426788.5A
Other languages
Chinese (zh)
Other versions
CN110053173B (en
Inventor
王邦民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chuzhou Tianli Construction And Installation Engineering Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910426788.5A priority Critical patent/CN110053173B/en
Publication of CN110053173A publication Critical patent/CN110053173A/en
Application granted granted Critical
Publication of CN110053173B publication Critical patent/CN110053173B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/14Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by boring or drilling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D7/00Accessories specially adapted for use with machines or devices of the preceding groups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D7/00Accessories specially adapted for use with machines or devices of the preceding groups
    • B28D7/005Devices for the automatic drive or the program control of the machines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28DWORKING STONE OR STONE-LIKE MATERIALS
    • B28D7/00Accessories specially adapted for use with machines or devices of the preceding groups
    • B28D7/04Accessories specially adapted for use with machines or devices of the preceding groups for supporting or holding work or conveying or discharging work

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Branch Pipes, Bends, And The Like (AREA)
  • Transmission Devices (AREA)

Abstract

The present invention relates to a kind of wall puncher more particularly to a kind of full angle wall intelligence puncheres for building.Technical problem: providing one kind can make staff lighter, not influence the full angle wall intelligence puncher for building of staff's operation.Technical solution is as follows: a kind of full angle wall intelligence puncher for building, includes mounting rack, the first holding rod, first bearing seat, the first bull stick, worm gear, second bearing seat, worm screw, decelerating motor, installation set etc.;It is connected with the first holding rod at left and right sides of mounting rack lower part, the equal installation by adhering in mounting rack top front and rear sides has first bearing seat, is mounted on the first bull stick in two first bearing seats.The present invention can control drill bit to be moved to the left by control module, punches to wall, so, it is possible to be punched automatically, enable staff more light;The present apparatus can be fixed in the fixed object on wall side by fixed device, drill slipping is avoided to influence staff's operation.

Description

A kind of full angle wall intelligence puncher for building
Technical field
The present invention relates to a kind of wall puncher more particularly to a kind of full angle wall intelligence puncheres for building.
Background technique
In building trade, in order to preferably install some facilities, needs to punch on wall, be typically now staff It holds electric drill to punch wall, but electric drill is that can generate biggish vibration, and staff needs to push in work Electric drill, such staff is relatively more tired, and when beating inclined hole, and drill bit is easy to skid, and influences staff's operation, so work Personnel can first hold a slot on wall, then punched again, be easily damaged metope in this way.
Summary of the invention
Wall is punched in order to overcome staff to hold electric drill, staff is relatively more tired, may will affect work The shortcomings that personnel punch, technical problem: providing one kind can make staff lighter, not influence building for staff's operation It builds with full angle wall intelligence puncher.
Technical solution is as follows: a kind of full angle wall intelligence puncher for building, include mounting rack, the first holding rod, First bearing seat, the first bull stick, worm gear, second bearing seat, worm screw, decelerating motor, installation set, the second holding rod, the first control Case, battery main switch, the first ship type switch, first switch, second switch, connection frame, installs case, cylinder, piston, the first sealing Ring, push rod, downtake pipe, the first electrically-controlled valve, second exhaust pipe, the second electrically-controlled valve, the first air inlet pipe, third electrically-controlled valve, Two air inlet pipe, the 4th electrically-controlled valve, high-pressure gas box, gas-guide tube, baroceptor, air pump, elbow, sliding block, movable case, sliding rail, rubber Rubber ring, first stroke switch, second stroke switch, movable stand, the second sealing ring, driving motor, collet, drill bit, gripping mechanism, Link block and fixed device, the mounting rack lower part left and right sides are connected with the first holding rod, and mounting rack top front and rear sides are embedding Enter formula and first bearing seat is installed, the first bull stick, the first bull stick front installation of front side are mounted in two first bearing seats There is worm gear, second bearing seat is two, is divided into the left and right sides of mounting rack forward upper, installs between two second bearing seats There are worm screw, worm and wheel engagement, mounting rack front side upper right quarter bolt has decelerating motor, the output of worm screw right end and decelerating motor Axis is fixedly connected, and installation set is connected between two the first bull sticks, and installation set middle part is respectively connected with the second holding rod in two sides up and down, Installation set top left side is equipped with the first control cabinet, includes control module and power module, control module in the first control cabinet There is connection with power module, upper left quarter is equipped with battery main switch, battery main switch and power supply mould on front side of the first control cabinet Block has connection, and lower left quarter is equipped with the first ship type switch on front side of the first control cabinet, and right part is equipped on front side of the first control cabinet First switch and the second switch, first switch are located above second switch, and connection frame is connected to right side in installation set, and connection frame is left Side bolt has installs case, and middle part is equipped with cylinder in installs case, and piston, the embedded connection of cylinder left side central portion are placed in cylinder There is the first sealing ring, piston left side central portion is connected with push rod, and push rod passes through the first sealing ring, is connected with first on the right side of cylinder head Exhaust pipe, downtake pipe is interior to be equipped with the first electrically-controlled valve, is connected with second exhaust pipe on the left of cylinder head, sets in second exhaust pipe There is the second electrically-controlled valve, the first air inlet pipe is connected on the right side of cylinder bottom, is equipped with third electrically-controlled valve, cylinder bottom in the first air inlet pipe Left side is connected with the second air inlet pipe, and the 4th electrically-controlled valve is equipped in the second air inlet pipe, be equipped among cylinder bottom high-pressure gas box and Air pump, high-pressure gas box are located on rear side of air pump, are connected with gas-guide tube on rear side of high-pressure gas box, the first air inlet pipe and the second air inlet pipe all and Gas-guide tube connection, high-pressure gas box left side are equipped with baroceptor, are connected with elbow on air pump, and elbow is connect with high-pressure gas box, peace Vanning left part is mounted on the sliding block playing the guiding role in two sides up and down, is equipped with movable case in installation set, two sides up and down in movable case Equal installation by adhering has the sliding rail playing the guiding role, and sliding rail is in sliding fit with sliding block, and left part is connected with rubber on the outside of movable case Ring, rubber ring are contacted with installation set inner wall, and first stroke is equipped on the left of the sliding block of top and is switched, and the is equipped on the right side of the sliding block of top Two travel switches, movable stand are fixed in push rod left end, and movable stand is connect with mobile chamber interior wall, embedded on the left of movable case to be connected with The second sealing ring of protective action is played, driving motor is bolted to left part in movable case, folder is equipped on the output shaft of driving motor Head, collet pass through the second sealing ring, and collet is equipped with drill bit, and mounting rack bottom is equipped with gripping mechanism, and gripping mechanism, which is equipped with, to be connected Connect block, link block bottom is equipped with fixed device, decelerating motor, the first ship type switch, first switch, second switch, first automatically controlled Valve, the second electrically-controlled valve, third electrically-controlled valve, the 4th electrically-controlled valve, baroceptor, air pump, first stroke switch, second stroke are opened Pass, movable stand, the second sealing ring and driving motor all have connection with the control module in the first control cabinet.
Preferably, gripping mechanism includes fixing sleeve, fixed block and the first fastening bolt, mounting rack bottom is connected with Determine block, fixed block is equipped with fixing sleeve, is equipped with the first fastening bolt on the left of fixing sleeve, link block is connected to fixing sleeve bottom.
Preferably, fixed device includes N shape frame, the first guide rail, the first guide sleeve, gripping block, 3rd bearing seat, second Bull stick, dual-axle motor, screw rod, nut, the second control cabinet and the second ship type switch, link block is connected with N shape frame, under N shape frame is interior Portion is horizontally installed with the first guide rail, and for set there are two the first guide sleeve, gripping block is two on the first guide rail, is divided into two first and leads Bottom is covered, the left and right sides installation by adhering has 3rd bearing seat in N shape frame, is mounted on second turn in two 3rd bearing seats Bar is mounted on screw rod on two the second bull sticks, is screwed with nut on two screw rods, two nut bottoms respectively with two first It is fixedly connected at the top of guide sleeve, dual-axle motor is bolted among N shape frame inner top, the second bull stick inner end and dual-axle motor output shaft Both ends connection, the second control cabinet are installed on the right side of N shape top of the trellis, include control module and power module in the second control cabinet, Control module and power module have connection, are equipped with the second ship type on front side of the second control cabinet and switch, dual-axle motor and second ship Type switch all has connection with the control module in the second control cabinet.
Preferably, further include have supporting block, the second guide rail, the second guide sleeve, mobile bar, contact block, spring, scale plate, Sliding sleeve, the second fastening bolt and contact-making switch, movable case top left side are connected with supporting block, and supporting block left lower is equipped with Two guide rails, are cased with the second guide sleeve on the second guide rail, and on the right side of the second guide sleeve and supporting block is connected with spring, and spring is wound on second and leads Rail, mobile bar are fixed in the second guide sleeve bottom, and mobile bar left end is connected with contact block, and supporting block left upper portion is connected with scale Plate, slidingtype is equipped with sliding sleeve on scale plate, and the second fastening bolt is equipped at the top of sliding sleeve, and sliding sleeve left lower is equipped with contact-making switch, Control module in contact-making switch and the first control cabinet has connection.
Compared with prior art, the invention has the following advantages that the present invention can control drill bit to move to the left by control module It is dynamic, wall is punched, so, it is possible to be punched automatically, enables staff more light;Pass through fixed device The present apparatus can be fixed in the fixed object on wall side, drill slipping is avoided to influence staff's operation;It is opened by contact The effect of pass can adjust the depth of punching according to different needs.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the invention.
Fig. 2 is part schematic view of the front view of the invention.
Fig. 3 is main view schematic cross-sectional view of the present invention.
Fig. 4 is the first enlarged schematic partial view of the invention.
Fig. 5 is second of enlarged schematic partial view of the invention.
Fig. 6 is the third enlarged schematic partial view of the invention.
Fig. 7 is the 4th kind of enlarged schematic partial view of the invention.
Fig. 8 is circuit diagram of the invention.
Fig. 9 is circuit diagram of the invention.
Drawing reference numeral: 1, mounting rack, the 2, first holding rod, 3, first bearing seat, the 4, first bull stick, 5, worm gear, 6, second Bearing block, 7, worm screw, 8, decelerating motor, 9, installation set, the 10, second holding rod, the 11, first control cabinet, 111, battery main switch, 112, the first ship type switchs, 113, first switch, 114, second switch, 12, connection frame, 13, installs case, 14, cylinder, 141, work Plug, the 142, first sealing ring, 143, push rod, 144, downtake pipe, the 145, first electrically-controlled valve, 146, second exhaust pipe, 147, Second electrically-controlled valve, the 148, first air inlet pipe, 149, third electrically-controlled valve, the 1410, second air inlet pipe, the 1411, the 4th electrically-controlled valve, 1412, high-pressure gas box, 1413, gas-guide tube, 1414, baroceptor, 1415, air pump, 1416, elbow, 15, sliding block, 16, movement Case, 17, sliding rail, 18, rubber ring, 19, first stroke switch, 20, second stroke switch, 21, movable stand, the 22, second sealing ring, 23, driving motor, 24, collet, 25, drill bit, 30, gripping mechanism, 301, fixing sleeve, 302, fixed block, the 303, first fastening spiral shell Bolt, 31, link block, 32, fixed device, 321, N shape frame, the 322, first guide rail, the 323, first guide sleeve, 324, gripping block, 325, 3rd bearing seat, the 326, second bull stick, 327, dual-axle motor, 328, screw rod, 329, nut, the 3210, second control cabinet, 3211, Second ship type switch, 331, supporting block, the 332, second guide rail, the 333, second guide sleeve, 334, mobile bar, 335, contact block, 336, Spring, 337, scale plate, 338, sliding sleeve, the 339, second fastening bolt, 3310, contact-making switch.
Specific embodiment
In order to make the objectives, technical solutions and advantages of the present invention clearer, With reference to embodiment and join According to attached drawing, the present invention is described in more detail.It should be understood that these descriptions are merely illustrative, and it is not intended to limit this hair Bright range.In addition, in the following description, descriptions of well-known structures and technologies are omitted, to avoid this is unnecessarily obscured The concept of invention.
Embodiment 1
A kind of full angle wall intelligence puncher for building includes as shown in figs 1-9 mounting rack 1, the first holding rod 2, first Bearing block 3, the first bull stick 4, worm gear 5, second bearing seat 6, worm screw 7, decelerating motor 8, installation set 9, the second holding rod 10, first Control cabinet 11, battery main switch 111, the first ship type switch 112, first switch 113, second switch 114, connection frame 12, installation Case 13, cylinder 14, piston 141, the first sealing ring 142, push rod 143, downtake pipe 144, the first electrically-controlled valve 145, second row Tracheae 146, the second electrically-controlled valve 147, the first air inlet pipe 148, third electrically-controlled valve 149, the second air inlet pipe 1410, the 4th electrically-controlled valve 1411, high-pressure gas box 1412, gas-guide tube 1413, baroceptor 1414, air pump 1415, elbow 1416, sliding block 15, movable case 16, sliding rail 17, rubber ring 18, first stroke switch 19, second stroke switch 20, movable stand 21, the second sealing ring 22, driving electricity Machine 23, collet 24, drill bit 25, gripping mechanism 30, link block 31 and fixed device 32,1 lower part of the mounting rack left and right sides are affixed There is the first holding rod 2, mounting rack 1 is connect by way of welded connecting with the first holding rod 2,1 top front and rear sides of mounting rack Equal installation by adhering has first bearing seat 3, and the first bull stick 4, the first bull stick 4 of front side are mounted in two first bearing seats 3 Front is equipped with worm gear 5, and second bearing seat 6 is two, is divided into the left and right sides of 1 forward upper of mounting rack, two the second axis It holds and worm screw 7 is installed between seat 6, worm screw 7 engages with worm gear 5, and 1 front side upper right quarter of mounting rack bolt has decelerating motor 8, worm screw 7 Right end is fixedly connected with the output shaft of decelerating motor 8, is connected with installation set 9 between two the first bull sticks 4, on 9 middle part of installation set Lower two sides are respectively connected with the second holding rod 10, and 9 top left side of installation set is equipped with the first control cabinet 11, and installation set 9 passes through bolt The mode of connection is connect with the first control cabinet 11, includes control module and power module, control module in the first control cabinet 11 There is connection with power module, 11 front side upper left quarter of the first control cabinet is equipped with battery main switch 111, battery main switch 111 There is connection with power module, 11 front side lower left quarter of the first control cabinet is equipped with the first ship type switch 112, the first control cabinet 11 Front side right part is equipped with first switch 113 and second switch 114, and first switch 113 is located at 114 top of second switch, connection frame 12 are connected to right side in installation set 9, and bolt has installs case 13 on the left of connection frame 12, and middle part is equipped with cylinder 14 in installs case 13, Piston 141 is placed in cylinder 14,14 left side central portion of cylinder is embedded to be connected with the first sealing ring 142,141 left side central portion of piston It is connected with push rod 143, push rod 143 passes through the first sealing ring 142, and 14 top right side of cylinder is connected with downtake pipe 144, and first The first electrically-controlled valve 145 is equipped in exhaust pipe 144,14 top left side of cylinder is connected with second exhaust pipe 146, second exhaust pipe 146 It is inside equipped with the second electrically-controlled valve 147,14 bottom right of cylinder is connected with the first air inlet pipe 148, is equipped with third in the first air inlet pipe 148 Electrically-controlled valve 149,14 bottom left of cylinder are connected with the second air inlet pipe 1410, are equipped with the 4th electrically-controlled valve in the second air inlet pipe 1410 1411, high-pressure gas box 1412 and air pump 1415 are installed among 14 bottom of cylinder, high-pressure gas box 1412 and air pump 1415 pass through Bolted mode is connect with cylinder 14, and high-pressure gas box 1412 is located at 1415 rear side of air pump, is connected on rear side of high-pressure gas box 1412 There is gas-guide tube 1413, the first air inlet pipe 148 and the second air inlet pipe 1410 are all connected with gas-guide tube 1413,1412 left side of high-pressure gas box Equipped with baroceptor 1414, elbow 1416 is connected on air pump 1415, elbow 1416 is connect with high-pressure gas box 1412, installs case 13 left parts are mounted on the sliding block 15 playing the guiding role in two sides up and down, are equipped with movable case 16 in installation set 9, in movable case 16 up and down The equal installation by adhering in two sides has the sliding rail 17 playing the guiding role, and movable case 16 is connect with sliding rail 17 by bolted connection, Sliding rail 17 is in sliding fit with sliding block 15, and 16 outside left part of movable case is connected with rubber ring 18, rubber ring 18 and 9 inner wall of installation set It contacts, first stroke switch 19 is equipped on the left of the sliding block 15 of top, second stroke switch 20 is equipped on the right side of the sliding block 15 of top, moves Moving frame 21 is fixed in 143 left end of push rod, and movable stand 21 is connect with 16 inner wall of movable case, and 16 left side of movable case is embedded to be connected with Second sealing ring 22 of protective action, driving motor 23 are bolted to left part in movable case 16, pacify on the output shaft of driving motor 23 Equipped with collet 24, collet 24 passes through the second sealing ring 22, and collet 24 is equipped with drill bit 25, and 1 bottom of mounting rack is equipped with gripping mechanism 30, gripping mechanism 30 is equipped with link block 31, and 31 bottom of link block is equipped with fixed device 32, decelerating motor 8, the first ship type switch 112, first switch 113, second switch 114, the first electrically-controlled valve 145, the second electrically-controlled valve 147, the 149, the 4th electricity of third electrically-controlled valve Control valve 1411, baroceptor 1414, air pump 1415, first stroke switch 19, second stroke switch 20, movable stand 21, second Sealing ring 22 and driving motor 23 all have connection with the control module in the first control cabinet 11.
Embodiment 2
A kind of full angle wall intelligence puncher for building includes as shown in figs 1-9 mounting rack 1, the first holding rod 2, first Bearing block 3, the first bull stick 4, worm gear 5, second bearing seat 6, worm screw 7, decelerating motor 8, installation set 9, the second holding rod 10, first Control cabinet 11, battery main switch 111, the first ship type switch 112, first switch 113, second switch 114, connection frame 12, installation Case 13, cylinder 14, piston 141, the first sealing ring 142, push rod 143, downtake pipe 144, the first electrically-controlled valve 145, second row Tracheae 146, the second electrically-controlled valve 147, the first air inlet pipe 148, third electrically-controlled valve 149, the second air inlet pipe 1410, the 4th electrically-controlled valve 1411, high-pressure gas box 1412, gas-guide tube 1413, baroceptor 1414, air pump 1415, elbow 1416, sliding block 15, movable case 16, sliding rail 17, rubber ring 18, first stroke switch 19, second stroke switch 20, movable stand 21, the second sealing ring 22, driving electricity Machine 23, collet 24, drill bit 25, gripping mechanism 30, link block 31 and fixed device 32,1 lower part of the mounting rack left and right sides are affixed There is the first holding rod 2, the 1 equal installation by adhering in top front and rear sides of mounting rack has a first bearing seat 3, in two first bearing seats 3 It is mounted on the first bull stick 4,4 front of the first bull stick of front side is equipped with worm gear 5, and second bearing seat 6 is two, is divided into installation The left and right sides of 1 forward upper of frame is equipped with worm screw 7 between two second bearing seats 6, and worm screw 7 engages with worm gear 5, mounting rack 1 Upper right quarter bolt in front side has decelerating motor 8, and 7 right end of worm screw is fixedly connected with the output shaft of decelerating motor 8, two the first bull sticks 4 Between be connected with installation set 9, two sides are respectively connected with the second holding rod 10, the installation of 9 top left side of installation set up and down at installation set 9 middle part There is the first control cabinet 11, include control module and power module in the first control cabinet 11, control module and power module are wired Road connection, 11 front side upper left quarter of the first control cabinet are equipped with battery main switch 111, and battery main switch 111 and power module are wired Road connection, 11 front side lower left quarter of the first control cabinet are equipped with the first ship type switch 112, and 11 front side right part of the first control cabinet is equipped with First switch 113 and second switch 114, first switch 113 are located at 114 top of second switch, and connection frame 12 is connected to installation set 9 Interior right side, bolt has installs case 13 on the left of connection frame 12, and middle part is equipped with cylinder 14 in installs case 13, is placed with work in cylinder 14 Plug 141,14 left side central portion of cylinder is embedded to be connected with the first sealing ring 142, and 141 left side central portion of piston is connected with push rod 143, pushes away Bar 143 passes through the first sealing ring 142, and 14 top right side of cylinder is connected with downtake pipe 144, is equipped in downtake pipe 144 First electrically-controlled valve 145,14 top left side of cylinder are connected with second exhaust pipe 146, are equipped with the second electrically-controlled valve in second exhaust pipe 146 147,14 bottom right of cylinder is connected with the first air inlet pipe 148, is equipped with third electrically-controlled valve 149, cylinder 14 in the first air inlet pipe 148 Bottom left is connected with the second air inlet pipe 1410, is equipped with the 4th electrically-controlled valve 1411 in the second air inlet pipe 1410, in 14 bottom of cylinder Between high-pressure gas box 1412 and air pump 1415 be installed, high-pressure gas box 1412 is located at 1415 rear side of air pump, 1412 rear side of high-pressure gas box It is connected with gas-guide tube 1413, the first air inlet pipe 148 and the second air inlet pipe 1410 are all connected with gas-guide tube 1413, high-pressure gas box 1412 Left side is equipped with baroceptor 1414, is connected with elbow 1416 on air pump 1415, and elbow 1416 is connect with high-pressure gas box 1412, peace 13 left parts of casing are mounted on the sliding block 15 playing the guiding role in two sides up and down, are equipped with movable case 16 in installation set 9, in movable case 16 The equal installation by adhering in upper and lower two sides has the sliding rail 17 playing the guiding role, and sliding rail 17 is in sliding fit with sliding block 15, outside movable case 16 Side left part is connected with rubber ring 18, and rubber ring 18 is contacted with 9 inner wall of installation set, opens on the left of the sliding block 15 of top equipped with first stroke Close 19, be equipped with second stroke switch 20 on the right side of the sliding block 15 of top, movable stand 21 is fixed in 143 left end of push rod, movable stand 21 and The connection of 16 inner wall of movable case, 16 embedded the second sealing ring 22 for being connected with protective action in left side of movable case, driving motor 23 It is bolted to left part in movable case 16, collet 24 is installed on the output shaft of driving motor 23, collet 24 passes through the second sealing ring 22, Collet 24 is equipped with drill bit 25, and 1 bottom of mounting rack is equipped with gripping mechanism 30, and gripping mechanism 30 is equipped with link block 31, link block 31 bottoms are equipped with fixed device 32, decelerating motor 8, the first ship type switch 112, first switch 113, the 114, first electricity of second switch Control valve 145, the second electrically-controlled valve 147, third electrically-controlled valve 149, the 4th electrically-controlled valve 1411, baroceptor 1414, air pump 1415, the One stroke switch 19, second stroke switch 20, movable stand 21, the second sealing ring 22 and driving motor 23 all with the first control cabinet 11 Interior control module has connection.
Gripping mechanism 30 includes that fixing sleeve 301, fixed block 302 and the first fastening bolt 303,1 bottom of mounting rack are affixed There is fixed block 302, mounting rack 1 is connect by way of welded connecting with fixed block 302, and fixed block 302 is equipped with fixing sleeve 301, fixed block 302 is connect by way of welded connecting with fixing sleeve 301, and the first fastening bolt is equipped on the left of fixing sleeve 301 303, link block 31 is connected to 301 bottom of fixing sleeve, and link block 31 is connect by way of welded connecting with fixing sleeve 301.
Embodiment 3
A kind of full angle wall intelligence puncher for building includes as shown in figs 1-9 mounting rack 1, the first holding rod 2, first Bearing block 3, the first bull stick 4, worm gear 5, second bearing seat 6, worm screw 7, decelerating motor 8, installation set 9, the second holding rod 10, first Control cabinet 11, battery main switch 111, the first ship type switch 112, first switch 113, second switch 114, connection frame 12, installation Case 13, cylinder 14, piston 141, the first sealing ring 142, push rod 143, downtake pipe 144, the first electrically-controlled valve 145, second row Tracheae 146, the second electrically-controlled valve 147, the first air inlet pipe 148, third electrically-controlled valve 149, the second air inlet pipe 1410, the 4th electrically-controlled valve 1411, high-pressure gas box 1412, gas-guide tube 1413, baroceptor 1414, air pump 1415, elbow 1416, sliding block 15, movable case 16, sliding rail 17, rubber ring 18, first stroke switch 19, second stroke switch 20, movable stand 21, the second sealing ring 22, driving electricity Machine 23, collet 24, drill bit 25, gripping mechanism 30, link block 31 and fixed device 32,1 lower part of the mounting rack left and right sides are affixed There is the first holding rod 2, the 1 equal installation by adhering in top front and rear sides of mounting rack has a first bearing seat 3, in two first bearing seats 3 It is mounted on the first bull stick 4,4 front of the first bull stick of front side is equipped with worm gear 5, and second bearing seat 6 is two, is divided into installation The left and right sides of 1 forward upper of frame is equipped with worm screw 7 between two second bearing seats 6, and worm screw 7 engages with worm gear 5, mounting rack 1 Upper right quarter bolt in front side has decelerating motor 8, and 7 right end of worm screw is fixedly connected with the output shaft of decelerating motor 8, two the first bull sticks 4 Between be connected with installation set 9, two sides are respectively connected with the second holding rod 10, the installation of 9 top left side of installation set up and down at installation set 9 middle part There is the first control cabinet 11, include control module and power module in the first control cabinet 11, control module and power module are wired Road connection, 11 front side upper left quarter of the first control cabinet are equipped with battery main switch 111, and battery main switch 111 and power module are wired Road connection, 11 front side lower left quarter of the first control cabinet are equipped with the first ship type switch 112, and 11 front side right part of the first control cabinet is equipped with First switch 113 and second switch 114, first switch 113 are located at 114 top of second switch, and connection frame 12 is connected to installation set 9 Interior right side, bolt has installs case 13 on the left of connection frame 12, and middle part is equipped with cylinder 14 in installs case 13, is placed with work in cylinder 14 Plug 141,14 left side central portion of cylinder is embedded to be connected with the first sealing ring 142, and 141 left side central portion of piston is connected with push rod 143, pushes away Bar 143 passes through the first sealing ring 142, and 14 top right side of cylinder is connected with downtake pipe 144, is equipped in downtake pipe 144 First electrically-controlled valve 145,14 top left side of cylinder are connected with second exhaust pipe 146, are equipped with the second electrically-controlled valve in second exhaust pipe 146 147,14 bottom right of cylinder is connected with the first air inlet pipe 148, is equipped with third electrically-controlled valve 149, cylinder 14 in the first air inlet pipe 148 Bottom left is connected with the second air inlet pipe 1410, is equipped with the 4th electrically-controlled valve 1411 in the second air inlet pipe 1410, in 14 bottom of cylinder Between high-pressure gas box 1412 and air pump 1415 be installed, high-pressure gas box 1412 is located at 1415 rear side of air pump, 1412 rear side of high-pressure gas box It is connected with gas-guide tube 1413, the first air inlet pipe 148 and the second air inlet pipe 1410 are all connected with gas-guide tube 1413, high-pressure gas box 1412 Left side is equipped with baroceptor 1414, is connected with elbow 1416 on air pump 1415, and elbow 1416 is connect with high-pressure gas box 1412, peace 13 left parts of casing are mounted on the sliding block 15 playing the guiding role in two sides up and down, are equipped with movable case 16 in installation set 9, in movable case 16 The equal installation by adhering in upper and lower two sides has the sliding rail 17 playing the guiding role, and sliding rail 17 is in sliding fit with sliding block 15, outside movable case 16 Side left part is connected with rubber ring 18, and rubber ring 18 is contacted with 9 inner wall of installation set, opens on the left of the sliding block 15 of top equipped with first stroke Close 19, be equipped with second stroke switch 20 on the right side of the sliding block 15 of top, movable stand 21 is fixed in 143 left end of push rod, movable stand 21 and The connection of 16 inner wall of movable case, 16 embedded the second sealing ring 22 for being connected with protective action in left side of movable case, driving motor 23 It is bolted to left part in movable case 16, collet 24 is installed on the output shaft of driving motor 23, collet 24 passes through the second sealing ring 22, Collet 24 is equipped with drill bit 25, and 1 bottom of mounting rack is equipped with gripping mechanism 30, and gripping mechanism 30 is equipped with link block 31, link block 31 bottoms are equipped with fixed device 32, decelerating motor 8, the first ship type switch 112, first switch 113, the 114, first electricity of second switch Control valve 145, the second electrically-controlled valve 147, third electrically-controlled valve 149, the 4th electrically-controlled valve 1411, baroceptor 1414, air pump 1415, the One stroke switch 19, second stroke switch 20, movable stand 21, the second sealing ring 22 and driving motor 23 all with the first control cabinet 11 Interior control module has connection.
Gripping mechanism 30 includes that fixing sleeve 301, fixed block 302 and the first fastening bolt 303,1 bottom of mounting rack are affixed There is fixed block 302, fixed block 302 is equipped with fixing sleeve 301, is equipped with the first fastening bolt 303, link block on the left of fixing sleeve 301 31 are connected to 301 bottom of fixing sleeve.
Fixed device 32 includes N shape frame 321, the first guide rail 322, the first guide sleeve 323, gripping block 324,3rd bearing seat 325, the second bull stick 326, dual-axle motor 327, screw rod 328, nut 329, the second control cabinet 3210 and the second ship type switch 3211, Link block 31 is connected with N shape frame 321, and link block 31 is connect by way of welded connecting with N shape frame 321, under N shape frame 321 is interior Portion is horizontally installed with the first guide rail 322, and for set there are two the first guide sleeve 323, gripping block 324 is two on the first guide rail 322, sets up separately In two 323 bottoms of the first guide sleeve, gripping block 324 is connect by way of welded connecting with the first guide sleeve 323, in N shape frame 321 The equal installation by adhering in the left and right sides has 3rd bearing seat 325, is mounted on the second bull stick 326 in two 3rd bearing seats 325, and two It is mounted on screw rod 328 on a second bull stick 326, nut 329, two 329 bottom of nut difference are screwed on two screw rods 328 It is fixedly connected at the top of two the first guide sleeves 323, dual-axle motor 327 is bolted among 321 inner top of N shape frame, the second bull stick 326 Inner end is connect with the both ends of 327 output shaft of dual-axle motor, and the second control cabinet 3210 is installed on 321 top right side of N shape frame, the second control Case 3210 processed is connect with N shape frame 321 by bolted connection, includes control module and power supply in the second control cabinet 3210 Module, control module and power module have connection, are equipped with the second ship type switch 3211, twin shaft on front side of the second control cabinet 3210 Motor 327 and the second ship type switch 3211 all have connection with the control module in the second control cabinet 3210.
Embodiment 4
A kind of full angle wall intelligence puncher for building includes as shown in figs 1-9 mounting rack 1, the first holding rod 2, first Bearing block 3, the first bull stick 4, worm gear 5, second bearing seat 6, worm screw 7, decelerating motor 8, installation set 9, the second holding rod 10, first Control cabinet 11, battery main switch 111, the first ship type switch 112, first switch 113, second switch 114, connection frame 12, installation Case 13, cylinder 14, piston 141, the first sealing ring 142, push rod 143, downtake pipe 144, the first electrically-controlled valve 145, second row Tracheae 146, the second electrically-controlled valve 147, the first air inlet pipe 148, third electrically-controlled valve 149, the second air inlet pipe 1410, the 4th electrically-controlled valve 1411, high-pressure gas box 1412, gas-guide tube 1413, baroceptor 1414, air pump 1415, elbow 1416, sliding block 15, movable case 16, sliding rail 17, rubber ring 18, first stroke switch 19, second stroke switch 20, movable stand 21, the second sealing ring 22, driving electricity Machine 23, collet 24, drill bit 25, gripping mechanism 30, link block 31 and fixed device 32,1 lower part of the mounting rack left and right sides are affixed There is the first holding rod 2, the 1 equal installation by adhering in top front and rear sides of mounting rack has a first bearing seat 3, in two first bearing seats 3 It is mounted on the first bull stick 4,4 front of the first bull stick of front side is equipped with worm gear 5, and second bearing seat 6 is two, is divided into installation The left and right sides of 1 forward upper of frame is equipped with worm screw 7 between two second bearing seats 6, and worm screw 7 engages with worm gear 5, mounting rack 1 Upper right quarter bolt in front side has decelerating motor 8, and 7 right end of worm screw is fixedly connected with the output shaft of decelerating motor 8, two the first bull sticks 4 Between be connected with installation set 9, two sides are respectively connected with the second holding rod 10, the installation of 9 top left side of installation set up and down at installation set 9 middle part There is the first control cabinet 11, include control module and power module in the first control cabinet 11, control module and power module are wired Road connection, 11 front side upper left quarter of the first control cabinet are equipped with battery main switch 111, and battery main switch 111 and power module are wired Road connection, 11 front side lower left quarter of the first control cabinet are equipped with the first ship type switch 112, and 11 front side right part of the first control cabinet is equipped with First switch 113 and second switch 114, first switch 113 are located at 114 top of second switch, and connection frame 12 is connected to installation set 9 Interior right side, bolt has installs case 13 on the left of connection frame 12, and middle part is equipped with cylinder 14 in installs case 13, is placed with work in cylinder 14 Plug 141,14 left side central portion of cylinder is embedded to be connected with the first sealing ring 142, and 141 left side central portion of piston is connected with push rod 143, pushes away Bar 143 passes through the first sealing ring 142, and 14 top right side of cylinder is connected with downtake pipe 144, is equipped in downtake pipe 144 First electrically-controlled valve 145,14 top left side of cylinder are connected with second exhaust pipe 146, are equipped with the second electrically-controlled valve in second exhaust pipe 146 147,14 bottom right of cylinder is connected with the first air inlet pipe 148, is equipped with third electrically-controlled valve 149, cylinder 14 in the first air inlet pipe 148 Bottom left is connected with the second air inlet pipe 1410, is equipped with the 4th electrically-controlled valve 1411 in the second air inlet pipe 1410, in 14 bottom of cylinder Between high-pressure gas box 1412 and air pump 1415 be installed, high-pressure gas box 1412 is located at 1415 rear side of air pump, 1412 rear side of high-pressure gas box It is connected with gas-guide tube 1413, the first air inlet pipe 148 and the second air inlet pipe 1410 are all connected with gas-guide tube 1413, high-pressure gas box 1412 Left side is equipped with baroceptor 1414, is connected with elbow 1416 on air pump 1415, and elbow 1416 is connect with high-pressure gas box 1412, peace 13 left parts of casing are mounted on the sliding block 15 playing the guiding role in two sides up and down, are equipped with movable case 16 in installation set 9, in movable case 16 The equal installation by adhering in upper and lower two sides has the sliding rail 17 playing the guiding role, and sliding rail 17 is in sliding fit with sliding block 15, outside movable case 16 Side left part is connected with rubber ring 18, and rubber ring 18 is contacted with 9 inner wall of installation set, opens on the left of the sliding block 15 of top equipped with first stroke Close 19, be equipped with second stroke switch 20 on the right side of the sliding block 15 of top, movable stand 21 is fixed in 143 left end of push rod, movable stand 21 and The connection of 16 inner wall of movable case, 16 embedded the second sealing ring 22 for being connected with protective action in left side of movable case, driving motor 23 It is bolted to left part in movable case 16, collet 24 is installed on the output shaft of driving motor 23, collet 24 passes through the second sealing ring 22, Collet 24 is equipped with drill bit 25, and 1 bottom of mounting rack is equipped with gripping mechanism 30, and gripping mechanism 30 is equipped with link block 31, link block 31 bottoms are equipped with fixed device 32, decelerating motor 8, the first ship type switch 112, first switch 113, the 114, first electricity of second switch Control valve 145, the second electrically-controlled valve 147, third electrically-controlled valve 149, the 4th electrically-controlled valve 1411, baroceptor 1414, air pump 1415, the One stroke switch 19, second stroke switch 20, movable stand 21, the second sealing ring 22 and driving motor 23 all with the first control cabinet 11 Interior control module has connection.
Gripping mechanism 30 includes that fixing sleeve 301, fixed block 302 and the first fastening bolt 303,1 bottom of mounting rack are affixed There is fixed block 302, fixed block 302 is equipped with fixing sleeve 301, is equipped with the first fastening bolt 303, link block on the left of fixing sleeve 301 31 are connected to 301 bottom of fixing sleeve.
Fixed device 32 includes N shape frame 321, the first guide rail 322, the first guide sleeve 323, gripping block 324,3rd bearing seat 325, the second bull stick 326, dual-axle motor 327, screw rod 328, nut 329, the second control cabinet 3210 and the second ship type switch 3211, Link block 31 is connected with N shape frame 321, and lower horizontal is equipped with the first guide rail 322 in N shape frame 321, is cased on the first guide rail 322 Two the first guide sleeves 323, gripping block 324 are two, are divided into two 323 bottoms of the first guide sleeve, the left and right sides in N shape frame 321 Equal installation by adhering has 3rd bearing seat 325, is mounted on the second bull stick 326 in two 3rd bearing seats 325, and two second turn Be mounted on screw rod 328 on bar 326, be screwed with nut 329 on two screw rods 328, two 329 bottoms of nut respectively with two It is fixedly connected at the top of one guide sleeve 323, dual-axle motor 327 is bolted among 321 inner top of N shape frame, 326 inner end of the second bull stick and double The both ends of 327 output shaft of spindle motor connect, and the second control cabinet 3210 is installed on 321 top right side of N shape frame, the second control cabinet 3210 It inside include control module and power module, control module and power module have connection, set on front side of the second control cabinet 3210 Have the second ship type switch 3211, dual-axle motor 327 and the second ship type switch 3211 all with the control mould in the second control cabinet 3210 Block has connection.
It further include having supporting block 331, the second guide rail 332, the second guide sleeve 333, mobile bar 334, contact block 335, spring 336, scale plate 337, sliding sleeve 338, the second fastening bolt 339 and contact-making switch 3310,16 top left side of movable case are connected with branch Bracer 331, movable case 16 are connect by way of welded connecting with supporting block 331, and 331 left lower of supporting block is equipped with second Guide rail 332 is cased with the second guide sleeve 333 on second guide rail 332, and 333 right side of the second guide sleeve and supporting block 331 are connected with spring 336, Spring 336 is wound on the second guide rail 332, and mobile bar 334 is fixed in 333 bottom of the second guide sleeve, and mobile bar 334 passes through welded connecting Mode is connect with the second guide sleeve 333, and 334 left end of mobile bar is connected with contact block 335, and 331 left upper portion of supporting block is connected with quarter Plate 337 is spent, supporting block 331 is connect with scale plate 337 by bolted connection, and slidingtype is equipped with sliding sleeve on scale plate 337 338, the second fastening bolt 339 is equipped at the top of sliding sleeve 338,338 left lower of sliding sleeve is equipped with contact-making switch 3310, contact-making switch 3310 and the first control module in control cabinet 11 have connection.
When needing to punch wall, staff controls fixed device 32 and the present apparatus is fixed on wall side In fixed object, then controls gripping mechanism 30 and unclamps mounting rack 1, be rotated further by the first holding rod 2, mounting rack 1 is driven to rotate, Installation set 9 is driven to rotate by first bearing seat 3 and the first bull stick 4, drill bit 25 rotates with it, and the angle of drill bit 25 is adjusted Degree.After regulating, staff stops operating the first holding rod 2, and it is fixed by mounting rack 1 then to control gripping mechanism 30, then Battery main switch 111 is pressed, the present apparatus is powered, baroceptor 1414 is started to work, and is then programmed and is set high pressure gas Highest atmospheric pressure value and barometric minimum value in case 1412, then second switch 114 is pressed, second switch 114 issues signal, controls mould Control air pump 1415 works after block receives signal, then the work of air pump 1415 can lead in extraneous air suction elbow provided 1416 Elbow 1416 to be crossed to flow into high-pressure gas box 1412, baroceptor 1414 can detect the air pressure in high-pressure gas box 1412, When the atmospheric pressure value in high-pressure gas box 1412 is higher than highest atmospheric pressure value, baroceptor 1414 issues signal, and control module receives The power that air pump 1415 is reduced after signal, flows into air slowly in high-pressure gas box 1412, the gas in high-pressure gas box 1412 When pressure value is lower than barometric minimum value, baroceptor 1414 issues signal, and control module improves air pump 1415 after receiving signal Power flows into air quickly in high-pressure gas box 1412, so that enough air pressures are able to maintain in high-pressure gas box 1412, if It needs that drill bit 25 is made to be upturned, staff just presses the No.1 gear on the first ship type switch 112, the first ship type switch 112 issue signal, and control decelerating motor 8 rotates counterclockwise after control module receives signal, and worm screw 7 is driven to rotate counterclockwise, from And worm gear 5 is driven to rotate clockwise, it drives installation set 9 to rotate clockwise by the first bull stick 4 of front side, keeps drill bit 25 upward It sticks up, the angle of drill bit 25 is adjusted.After regulating, staff presses the No.1 shelves on the first ship type switch 112 again Position, the first ship type switch 112 issue signal, and the control stopping of decelerating motor 8 rotates counterclockwise after control module receives signal, if It needs that drill bit 25 is made to let droop, staff just presses No. two gears on the first ship type switch 112, the first ship type switch 112 Signal is issued, control decelerating motor 8 rotates clockwise after control module receives signal, drives worm screw 7 to rotate clockwise, thus band Dynamic worm gear 5 rotates counterclockwise, and drives installation set 9 to rotate counterclockwise by the first bull stick 4 of front side, drill bit 25 is made to let droop, into Row adjusts the angle of drill bit 25.After regulating, staff presses No. two gears on the first ship type switch 112 again, the One ship type switch 112 issues signal, and the control stopping of decelerating motor 8 rotates clockwise after control module receives signal, so, it is possible The angle for adjusting punching according to demand, after regulating, staff holds the second holding rod 10, then presses first switch 113, first switch 113 issues signal, and control driving motor 23 rotates after control module receives signal, and collet 24 is driven to rotate, To drive drill bit 25 to rotate, while control module controls the second electrically-controlled valve 147 and third electrically-controlled valve 149 is opened, high-pressure gas box Air in 1412 is flowed into cylinder 14 by gas-guide tube 1413 and the first air inlet pipe 148, and air push piston 141 is to moving to left Dynamic, extra air is discharged from second exhaust pipe 146, and piston 141, which is moved to the left, drives push rod 143 to be moved to the left, to drive Movable stand 21 and movable case 16 are moved to the left, so drive driving motor 23 be moved to the left, by collet 24 drive drill bit 25 to It moves left, wall is punched, so, it is possible to be punched automatically, enable staff more light, movable case 16 It is moved to the left and also sliding rail 17 is driven to be moved to the left, sliding rail 17 slides on sliding block 15, when the cunning of second stroke switch 20 and top When rail 17 contacts, second stroke switch 20 issues signal, and control module controls the second electrically-controlled valve 147 and third electricity after receiving signal It controls valve 149 to close, while control module controls the first electrically-controlled valve 145 and the 4th electrically-controlled valve 1411 is opened, in high-pressure gas box 1412 Air flowed into cylinder 14 by gas-guide tube 1413 and the second air inlet pipe 1410, air push piston 141 moves right, extra Air from downtake pipe 144 be discharged, piston 141, which moves right, drives push rod 143 to move right, to drive movable stand 21 Move right with movable case 16, drill bit 25 moves right therewith, and sliding rail 17 slides on sliding block 15, when first stroke switch 19 with When the sliding rail 17 of top contacts, first stroke switch 19 issues signal, and control module controls the first electrically-controlled valve 145 after receiving signal It is closed with the 4th electrically-controlled valve 1411, at this point, wall has had openning hole, people can press first switch 113, first switch again 113 issue signal, and control driving motor 23 stops operating after control module receives signal, then press second switch 114 again, Second switch 114 issues signal, and control air pump 1415 is closed after control module receives signal, then presses battery main switch 111, will Present apparatus power-off, baroceptor 1414 stops working, and finally controls fixed device 32 for the present apparatus from the fixation on wall side It is removed on object.
Staff unscrews the first fastening bolt 303, and fixed block 302 is unclamped, so as to which mounting rack 1 is unclamped, work Personnel are i.e. rotatably first-hand to hold bar 2, drives drill bit 25 to rotate, the angle of drill bit 25 is adjusted.After regulating, work people Member stops operating the first holding rod 2, then tightens the first fastening bolt 303, and fixed block 302 is fixed, so as to by mounting rack 1 It is fixed.
Staff is located at the fixed object on wall side between two gripping blocks 324, then presses the second ship type and opens The No.1 gear on 3211 is closed, the second ship type switch 3211 issues signal, and control module controls dual-axle motor 327 after receiving signal It rotates clockwise, the second bull stick 326 is driven to rotate clockwise, so that screw rod 328 be driven to rotate clockwise, and then drive nut 329 move inward, and drive gripping block 324 to move inward by the first guide sleeve 323.Gripping block 324 is moved inward wall side On fixed object when clamping, staff presses the No.1 gear on the second ship type switch 3211, the second ship type switch again 3211 issue signal, and the control stopping of dual-axle motor 327 rotates clockwise after control module receives signal, in this way, can be by the present apparatus It is fixed in the fixed object on wall side, avoiding drill bit 25 from skidding influences staff's operation.When do not need to wall carry out When punching, staff presses No. two gears on the second ship type switch 3211, and the second ship type switch 3211 issues signal, control Control dual-axle motor 327 rotates counterclockwise after module receives signal, drives the second bull stick 326 to rotate counterclockwise, to drive silk Bar 328 rotates counterclockwise, and then nut 329 is driven to be displaced outwardly, and gripping block 324 is displaced outwardly therewith.When gripping block 324 is outside When being moved to initial position, staff presses No. two gears on the second ship type switch 3211, the second ship type switch again 3211 issue signal, and the control stopping of dual-axle motor 327 rotates counterclockwise after control module receives signal.
Staff stirs sliding sleeve 338 to the left or to the right, drives contact-making switch 3310 to be moved to the left or right, is adjusted The distance between contact-making switch 3310 and the second guide sleeve 333, so as to adjust the depth of punching, staff observes scale again Plate 337 learns the mobile distance of sliding sleeve 338, so as to more accurate adjusting contact-making switch 3310 and the second guide sleeve 333 it Between distance, after regulating, staff stop stir sliding sleeve 338, when movable case 16 is moved to the left, drive supporting block 331 are moved to the left, and drive the second guide sleeve 333 to be moved to the left by spring 336, so that mobile bar 334 be driven to be moved to the left, contact Block 335 is moved to the left therewith, and when contact block 335, which is moved to the left, to be contacted with wall, the stopping of contact block 335 is moved to the left, and is supported Block 331 continues to be moved to the left, and spring 336 is compressed, and supporting block 331, which is moved to the left, drives scale plate 337 to be moved to the left, thus band Dynamic sliding sleeve 338 is moved to the left, and then contact-making switch 3310 is driven to be moved to the left, and is led when contact-making switch 3310 is moved to the left with second When 333 contact of set, contact-making switch 3310 issues signal, and control module controls the second electrically-controlled valve 147 and third electricity after receiving signal It controls valve 149 to close, while control module controls the first electrically-controlled valve 145 and the 4th electrically-controlled valve 1411 is opened, in high-pressure gas box 1412 Air flowed into cylinder 14 by gas-guide tube 1413 and the second air inlet pipe 1410, air push piston 141 moves right, extra Air from downtake pipe 144 be discharged, piston 141, which moves right, drives push rod 143 to move right, to drive movable stand 21 It moves right with movable case 16, drill bit 25 moves right therewith, and movable case 16, which moves right, can also drive supporting block 331 to move right Dynamic, spring 336 is gradually recovered original state, and sliding rail 17 slides on sliding block 15, when first stroke switch 19 and the sliding rail 17 of top connect When touching, first stroke switch 19 issues signal, and control module controls the first electrically-controlled valve 145 and the 4th electrically-controlled valve after receiving signal 1411 close.It so, it is possible the depth for adjusting punching according to different needs.
The above description is only an embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair Equivalent structure or equivalent flow shift made by bright description is applied directly or indirectly in other relevant technology necks Domain is included within the scope of the present invention.

Claims (4)

1. a kind of full angle wall intelligence puncher for building, includes mounting rack, the first holding rod, first bearing seat, first Bull stick, worm gear, second bearing seat, worm screw, decelerating motor, installation set, the second holding rod, the first control cabinet, battery main switch, One ship type switch, first switch and the second switch, the mounting rack lower part left and right sides are connected with the first holding rod, mounting rack top The equal installation by adhering in front and rear sides has first bearing seat, is mounted on the first bull stick in two first bearing seats, and the first of front side Bull stick front is equipped with worm gear, and second bearing seat is two, is divided into the left and right sides of mounting rack forward upper, two the second axis Hold and worm screw be installed between seat, worm and wheel engagement, upper right quarter bolt has a decelerating motor on front side of mounting rack, worm screw right end with subtract The output shaft of speed motor is fixedly connected, and installation set is connected between two the first bull sticks, and installation set middle part is all connected with two sides up and down There is the second holding rod, it includes control module and power supply in the first control cabinet that installation set top left side, which is equipped with the first control cabinet, Module, control module and power module have connection, and upper left quarter is equipped with battery main switch on front side of the first control cabinet, and power supply is total Switch and power module have connection, and lower left quarter is equipped with the first ship type and switchs on front side of the first control cabinet, before the first control cabinet Side right part is equipped with first switch and the second switch, and first switch is located above second switch, which is characterized in that further includes having company Connect frame, installs case, cylinder, piston, the first sealing ring, push rod, downtake pipe, the first electrically-controlled valve, second exhaust pipe, the second electricity Control valve, the first air inlet pipe, third electrically-controlled valve, the second air inlet pipe, the 4th electrically-controlled valve, high-pressure gas box, gas-guide tube, baroceptor, Air pump, elbow, sliding block, movable case, sliding rail, rubber ring, first stroke switch, second stroke switch, movable stand, the second sealing Ring, driving motor, collet, drill bit, gripping mechanism, link block and fixed device, connection frame are connected to right side in installation set, connection Bolt has installs case on the left of frame, and middle part is equipped with cylinder in installs case, piston is placed in cylinder, cylinder left side central portion is embedded It is connected with the first sealing ring, piston left side central portion is connected with push rod, and push rod passes through the first sealing ring, is connected on the right side of cylinder head Downtake pipe, downtake pipe is interior to be equipped with the first electrically-controlled valve, is connected with second exhaust pipe, second exhaust pipe on the left of cylinder head It is inside equipped with the second electrically-controlled valve, the first air inlet pipe is connected on the right side of cylinder bottom, is equipped with third electrically-controlled valve, cylinder in the first air inlet pipe Bottom left is connected with the second air inlet pipe, and the 4th electrically-controlled valve is equipped in the second air inlet pipe, is equipped with high pressure gas among cylinder bottom Case and air pump, high-pressure gas box are located on rear side of air pump, are connected with gas-guide tube, the first air inlet pipe and the second air inlet pipe on rear side of high-pressure gas box It is all connected with gas-guide tube, baroceptor is equipped on the left of high-pressure gas box, elbow is connected on air pump, elbow and high-pressure gas box connect It connects, installs case left part is mounted on the sliding block playing the guiding role in two sides up and down, is equipped with movable case in installation set, in movable case up and down The equal installation by adhering in two sides has the sliding rail playing the guiding role, and sliding rail is in sliding fit with sliding block, and left part is connected on the outside of movable case Rubber ring, rubber ring are contacted with installation set inner wall, and first stroke is equipped on the left of the sliding block of top and is switched, is set on the right side of the sliding block of top There is second stroke switch, movable stand is fixed in push rod left end, and movable stand is connect with mobile chamber interior wall, embedded company on the left of movable case It is connected to the second sealing ring of protective action, driving motor is bolted to left part in movable case, installs on the output shaft of driving motor There is collet, collet passes through the second sealing ring, and collet is equipped with drill bit, and mounting rack bottom is equipped with gripping mechanism, sets on gripping mechanism There is link block, link block bottom is equipped with fixed device, decelerating motor, the first ship type switch, first switch, second switch, first Electrically-controlled valve, the second electrically-controlled valve, third electrically-controlled valve, the 4th electrically-controlled valve, baroceptor, air pump, first stroke switch, second stroke Switch, movable stand, the second sealing ring and driving motor all have connection with the control module in the first control cabinet.
2. a kind of full angle wall intelligence puncher for building according to claim 1, which is characterized in that gripping mechanism packet Fixing sleeve, fixed block and the first fastening bolt have been included, mounting rack bottom is connected with fixed block, and fixed block is equipped with fixing sleeve, Gu Fixed set left side is equipped with the first fastening bolt, and link block is connected to fixing sleeve bottom.
3. a kind of full angle wall intelligence puncher for building according to claim 2, which is characterized in that fixed device packet N shape frame, the first guide rail, the first guide sleeve, gripping block, 3rd bearing seat, the second bull stick, dual-axle motor, screw rod, nut, are included Two control cabinets and the second ship type switch, link block are connected with N shape frame, and lower horizontal is equipped with the first guide rail in N shape frame, and first leads For set there are two the first guide sleeve, gripping block is two on rail, is divided into two the first guide sleeve bottoms, the left and right sides is embedding in N shape frame Enter formula and 3rd bearing seat is installed, the second bull stick is mounted in two 3rd bearing seats, is mounted on two the second bull sticks Screw rod is screwed with nut on two screw rods, and two nut bottoms are fixedly connected at the top of two the first guide sleeves respectively, dual-axle motor It is bolted among N shape frame inner top, the second bull stick inner end is connect with the both ends of dual-axle motor output shaft, and the second control cabinet is installed on It include control module and power module in the second control cabinet, control module and power module have route company on the right side of N shape top of the trellis Connect, the second ship type be equipped on front side of the second control cabinet and is switched, dual-axle motor and the second ship type switch all with the control in the second control cabinet Molding block has connection.
4. a kind of full angle wall intelligence puncher for building according to claim 3, which is characterized in that further include having branch Bracer, the second guide rail, the second guide sleeve, mobile bar, contact block, spring, scale plate, sliding sleeve, the second fastening bolt and contact-making switch, Movable case top left side is connected with supporting block, and supporting block left lower is equipped with the second guide rail, and second is cased on the second guide rail and is led Set, the second guide sleeve right side and supporting block are connected with spring, and spring is wound on the second guide rail, and mobile bar is fixed in the second guide sleeve bottom, Mobile bar left end is connected with contact block, and supporting block left upper portion is connected with scale plate, and slidingtype is equipped with sliding sleeve, sliding sleeve on scale plate Top is equipped with the second fastening bolt, and sliding sleeve left lower is equipped with contact-making switch, the control mould in contact-making switch and the first control cabinet Block has connection.
CN201910426788.5A 2019-05-22 2019-05-22 Full angle wall intelligence puncher for building Expired - Fee Related CN110053173B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910426788.5A CN110053173B (en) 2019-05-22 2019-05-22 Full angle wall intelligence puncher for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910426788.5A CN110053173B (en) 2019-05-22 2019-05-22 Full angle wall intelligence puncher for building

Publications (2)

Publication Number Publication Date
CN110053173A true CN110053173A (en) 2019-07-26
CN110053173B CN110053173B (en) 2021-04-13

Family

ID=67323901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910426788.5A Expired - Fee Related CN110053173B (en) 2019-05-22 2019-05-22 Full angle wall intelligence puncher for building

Country Status (1)

Country Link
CN (1) CN110053173B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110405588A (en) * 2019-08-07 2019-11-05 安现杰 A kind of workpiece intelligence beveler
CN110757271A (en) * 2019-10-11 2020-02-07 罗冬梅 Intelligent polishing equipment for building wood pole
CN111673566A (en) * 2020-06-21 2020-09-18 江西坚德实业有限公司 Intelligent chamfering equipment for iron workpieces on construction site
CN111687965A (en) * 2020-06-20 2020-09-22 江西省润华教育装备集团有限公司 Wood working is with hand-held type milling frame
CN113334584A (en) * 2020-09-22 2021-09-03 怀化永晟建设工程有限公司 Wall body drilling equipment for construction

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001162616A (en) * 1999-12-08 2001-06-19 Nihon Meccs Kk Self-cooling type rotary drill
CN106003433A (en) * 2016-06-29 2016-10-12 成都聚立汇信科技有限公司 Novel decorating wall drilling device
CN205651523U (en) * 2016-04-24 2016-10-19 陈小梅 Full -automatic wall body drilling machine
CN207359375U (en) * 2017-08-26 2018-05-15 新昌县勤振机械制造有限公司 A kind of drill hole on wall device easy to use
CN207616924U (en) * 2017-12-18 2018-07-17 张文斌 A kind of wall adjustable drilling aperture apparatus for building
CN108544671A (en) * 2018-05-10 2018-09-18 南安市创培电子科技有限公司 A kind of wall perforating device
CN108789875A (en) * 2018-09-03 2018-11-13 渠衍飞 A kind of building wall mounting hole is drilled with device
CN108858809A (en) * 2018-06-27 2018-11-23 佛山新籁工程科技有限公司 A kind of building wall drilling equipment

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001162616A (en) * 1999-12-08 2001-06-19 Nihon Meccs Kk Self-cooling type rotary drill
CN205651523U (en) * 2016-04-24 2016-10-19 陈小梅 Full -automatic wall body drilling machine
CN106003433A (en) * 2016-06-29 2016-10-12 成都聚立汇信科技有限公司 Novel decorating wall drilling device
CN207359375U (en) * 2017-08-26 2018-05-15 新昌县勤振机械制造有限公司 A kind of drill hole on wall device easy to use
CN207616924U (en) * 2017-12-18 2018-07-17 张文斌 A kind of wall adjustable drilling aperture apparatus for building
CN108544671A (en) * 2018-05-10 2018-09-18 南安市创培电子科技有限公司 A kind of wall perforating device
CN108858809A (en) * 2018-06-27 2018-11-23 佛山新籁工程科技有限公司 A kind of building wall drilling equipment
CN108789875A (en) * 2018-09-03 2018-11-13 渠衍飞 A kind of building wall mounting hole is drilled with device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110405588A (en) * 2019-08-07 2019-11-05 安现杰 A kind of workpiece intelligence beveler
CN110757271A (en) * 2019-10-11 2020-02-07 罗冬梅 Intelligent polishing equipment for building wood pole
CN111687965A (en) * 2020-06-20 2020-09-22 江西省润华教育装备集团有限公司 Wood working is with hand-held type milling frame
CN111673566A (en) * 2020-06-21 2020-09-18 江西坚德实业有限公司 Intelligent chamfering equipment for iron workpieces on construction site
CN113334584A (en) * 2020-09-22 2021-09-03 怀化永晟建设工程有限公司 Wall body drilling equipment for construction

Also Published As

Publication number Publication date
CN110053173B (en) 2021-04-13

Similar Documents

Publication Publication Date Title
CN110053173A (en) A kind of full angle wall intelligence puncher for building
CN204085470U (en) Vehicle air conditioning outlet general assembly pick-up unit
CN107553397B (en) A kind of motor vehicle diesel fuel pump fuel tank cap replacer
CN107775328A (en) Bull screw locking machine
CN208584170U (en) Main beating cap indenter device
CN105057432B (en) Hydraulic extension cushion with planetary roller screw driven by alternating-current servo synchronous motor
CN110421355A (en) A kind of automation screw rod tapping deburring equipment
CN111250583A (en) Spinning machine for machining and use method thereof
CN208880120U (en) Screw locking machine structure
CN216343097U (en) Prepressing type supercharging device of improved automatic equipment
CN109339826A (en) A kind of tunnel trolley template monoblock type self-checking device
CN202323056U (en) Anode rod aligning and centering device
CN109877200A (en) A kind of stainless steel protection pipe slot rolling forming machine and slot rolling manufacturing process
CN204490418U (en) Bay-lift Level Change device
CN113391673B (en) Key device and application tester thereof
CN212794079U (en) Clamp for numerical control machining center
CN204321001U (en) The inner reed of a kind of fuel sucking pipe detects and corrects and mouth of pipe closing device
CN102814383B (en) Automobile instrument desk punching machine
CN208276911U (en) A kind of three axis full-automatic mechanical arm mechanisms
CN209091622U (en) A kind of operating robot that can dismount cutter head automatically
CN102490158A (en) Assembling workbench for valve rod of liquefied petroleum gas cylinder valve
CN108015645B (en) Motorcycle parts processing equipment
CN218640262U (en) Injection molding machine workpiece taking mechanical arm convenient for adjusting working distance
CN210087589U (en) Air compressor inlet guide vane cylinder position control device
CN109899684A (en) The working method of the driving device of pipe detector

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Lin Xionghui

Inventor before: Wang Bangmin

CB02 Change of applicant information

Address after: 510000 Room 301, No.163, Yuexiu South Road, Yuexiu District, Guangzhou City, Guangdong Province

Applicant after: Wang Bangmin

Address before: Beijing Jianzhu University, No.1 zhanzhanguan Road, Xicheng District, Beijing 100044

Applicant before: Wang Bangmin

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220809

Address after: No. 1088-20, Ziwei North Road, Chuzhou City, Anhui Province 239000

Patentee after: Chuzhou Tianli Construction and Installation Engineering Co., Ltd.

Address before: 510000 Room 301, No.163, Yuexiu South Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee before: Wang Bangmin

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210413