CN110029842A - Light body stage rapid construction construction - Google Patents

Light body stage rapid construction construction Download PDF

Info

Publication number
CN110029842A
CN110029842A CN201910200752.5A CN201910200752A CN110029842A CN 110029842 A CN110029842 A CN 110029842A CN 201910200752 A CN201910200752 A CN 201910200752A CN 110029842 A CN110029842 A CN 110029842A
Authority
CN
China
Prior art keywords
construction
gap
welded
light body
core base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910200752.5A
Other languages
Chinese (zh)
Inventor
李尊强
迟庆娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Hualian Decoration Engineering Co Ltd
Original Assignee
Qingdao Hualian Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Hualian Decoration Engineering Co Ltd filed Critical Qingdao Hualian Decoration Engineering Co Ltd
Priority to CN201910200752.5A priority Critical patent/CN110029842A/en
Publication of CN110029842A publication Critical patent/CN110029842A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H3/00Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons
    • E04H3/10Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons for meetings, entertainments, or sports
    • E04H3/22Theatres; Concert halls; Studios for broadcasting, cinematography, television or similar purposes
    • E04H3/24Constructional features of stages

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Multimedia (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses a kind of light body stage rapid construction constructions, including the following steps: (1) unwrapping wire positions;(2) corner brace is installed;(3) welded framework and adjustment, inspection;(4) lumber core base layer construction;(5) it pastes elastic plate and adjusts gap;(6) gap is welded.Engineering method passes through base's high intensity, high stability, highly-breathable, surface high closeness, drum phenomenon of having got damp caused by capable of being effectively prevented because of climate change, it is ensured that the aesthetics of resiliently-mounted floor;Construction precision is high, low material consumption, and later period maintenance expense is low, and cleaning, environmental protection have in public building and widely utilize space.

Description

Light body stage rapid construction construction
Technical field
The present invention relates to a kind of light body stage rapid construction constructions, belong to technical field of building construction.
Background technique
Academic hall is a collection discussion, convention, is active in integrated multifunctional hall, is directed to novel The construction of steel construction stage, traditional construction technique have the shortcomings that construction period length, complex procedures, and due to the weight of itself It is larger, considerably increase the load of building.
Summary of the invention
The technical problems to be solved by the present invention are: providing a kind of light body stage rapid construction construction.
In order to solve the above technical problems, the technical solution adopted by the present invention is that:
Light body stage rapid construction construction, including the following steps: (1) unwrapping wire positions;(2) corner brace is installed;(3) welded framework And adjustment, inspection;(4) lumber core base layer construction;(5) it pastes elastic plate and adjusts gap;(6) gap is welded.
Further, step (1) unwrapping wire positions: according to the datum mark of structure, being set at away from metope 450mm with laser Set control line.
(3) welded framework and adjustment, inspection: fixed keel, ground punching are fixed with bolt, weld vertical keel, upper layer Keel spacing is 300 ﹡ 450.
(4) lumber core base layer construction: installation lumber core base is fixed on skeleton with forked tail filament;
(5) paste elastic plate and adjust gap: after resiliently-mounted floor reaches scene, whether there is or not deformations, damage for inspection;Checking of dimensions And it is pre-splicing errorless, it can paste.
(6) gap is welded: after being installed, checking surface smoothness and to adjust slit width consistent, weld seam is carried out after stablizing Processing.
Engineering method feature of the invention
The engineering method is constructed compared with traditional construction technique, has that the construction period is short, process is simple, save the cost, and overall effect is prominent Out the advantages that, and since the weight of itself is smaller, the load of building can be effectively reduced.
The scope of application of the present invention
This engineering method is applicable in the large and medium-sized meeting room of the public building with more requirement such as hospital, school, auditorium etc..
Present invention process principle
The fixation position for determining corner brace and the cutting length of fashioned iron are positioned by unwrapping wire;According to design scheme, stage height is determined, Reasonable blanking, 30 angle steel of vertical keel, lateral keel are consolidated lumber core base with forked tail filament with after the completion of 40 angle steel, welding On keel, the direct paving resiliently-mounted floor on lumber core.
The utility model has the advantages that
In terms of quality: when this engineering method skeleton is fixed, the bolt of use squeezes into ground 60mm;It is fully welded between keel shoe, 300 ﹡ of spacing 450, therefore have enough support forces and pulling force, reliable in quality.
Secure context: this engineering method does not need big security capital only with small-sized machine.
Technical aspect: for this engineering method by base's high intensity, high stability, highly-breathable, surface high closeness can be effective Ground prevents drum phenomenon of having got damp caused by because of climate change, it is ensured that the aesthetics of resiliently-mounted floor.
Economic aspect: this engineering method construction precision is high, and low material consumption, later period maintenance expense is low, cleaning, environmental protection, in public building In have widely using space.
Specific embodiment
Embodiment 1
Light body stage rapid construction construction provided in this embodiment, including the following steps: (1) unwrapping wire positions;(2) established angle Code;(3) welded framework and adjustment, inspection;(4) lumber core base layer construction;(5) it pastes elastic plate and adjusts gap;(6) gap is welded It connects.
Further, step (1) unwrapping wire positions: according to the datum mark of structure, being set at away from metope 450mm with laser Set control line.
(3) welded framework and adjustment, inspection: fixed keel, ground punching are fixed with bolt, weld vertical keel, upper layer Keel spacing is 300 ﹡ 450.
(4) lumber core base layer construction: installation lumber core base is fixed on skeleton with forked tail filament;
(5) paste elastic plate and adjust gap: after resiliently-mounted floor reaches scene, whether there is or not deformations, damage for inspection;Checking of dimensions And it is pre-splicing errorless, it can paste.
(6) gap is welded: after being installed, checking surface smoothness and to adjust slit width consistent, weld seam is carried out after stablizing Processing.
2 application example of embodiment
1 project profile
Qingdao City's specialized health Center Project is located at Qingdao City Shibei District He Feilu, which constructed in 2009,2012 by Hospital's Decorating Project is accepted by Hua Lian decoration engineering corporation, Ltd.
2 condition of construction
Resiliently-mounted floor is positioned from selection approved sample to unwrapping wire determines fixed position;Theory is made according to standardization, modular design drop, The specification of keel is discharged, constructs according to the process flow in this engineering method.This engineering construction is since in September, 2012 to 2012 Construction in October in year finishes.
3 application effects
It after the completion of the construction of this engineering fire proof veneer, checks and accepts, meets jointly by design, supervision, management, construction, unit in charge of construction Design, overall effect are good.

Claims (2)

1. light body stage rapid construction construction, characterized in that it comprises the following steps:
(1) unwrapping wire positions;(2) corner brace is installed;(3) welded framework and adjustment, inspection;(4) lumber core base layer construction;(5) it pastes Elastic plate simultaneously adjusts gap;(6) gap is welded.
2. light body stage rapid construction construction according to claim 1, which is characterized in that
The positioning of step (1) unwrapping wire:
According to the datum mark of structure, with laser away from setting control line at metope 450mm;
Step (3) welded framework and adjustment, inspection
Fixed keel, ground punching are fixed with bolt, weld vertical keel, and upper layer keel spacing is 300 ﹡ 450;
Step (4) lumber core base layer construction:
Lumber core base is installed, is fixed on skeleton with forked tail filament;
Step (5) pastes elastic plate and adjusts gap:
After resiliently-mounted floor reaches scene, examines whether there is or not deformation, damages;Checking of dimensions is simultaneously pre-splicing errorless, can paste;
The welding of step (6) gap:
After being installed, checks surface smoothness and to adjust slit width consistent, commissure reason is carried out after stablizing.
CN201910200752.5A 2019-03-17 2019-03-17 Light body stage rapid construction construction Pending CN110029842A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910200752.5A CN110029842A (en) 2019-03-17 2019-03-17 Light body stage rapid construction construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910200752.5A CN110029842A (en) 2019-03-17 2019-03-17 Light body stage rapid construction construction

Publications (1)

Publication Number Publication Date
CN110029842A true CN110029842A (en) 2019-07-19

Family

ID=67236205

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910200752.5A Pending CN110029842A (en) 2019-03-17 2019-03-17 Light body stage rapid construction construction

Country Status (1)

Country Link
CN (1) CN110029842A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10169224A (en) * 1996-12-06 1998-06-23 Hitachi Zosen Corp Stage
CN204715685U (en) * 2015-06-15 2015-10-21 珠海丽日帐篷有限公司 Stage floor
CN205688755U (en) * 2016-06-18 2016-11-16 青岛海川建设集团有限公司 A kind of steel construction flexible base layer floor
CN207363330U (en) * 2017-10-19 2018-05-15 河北翔宇体育设施制造有限公司 A kind of assembled stage of activity

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10169224A (en) * 1996-12-06 1998-06-23 Hitachi Zosen Corp Stage
CN204715685U (en) * 2015-06-15 2015-10-21 珠海丽日帐篷有限公司 Stage floor
CN205688755U (en) * 2016-06-18 2016-11-16 青岛海川建设集团有限公司 A kind of steel construction flexible base layer floor
CN207363330U (en) * 2017-10-19 2018-05-15 河北翔宇体育设施制造有限公司 A kind of assembled stage of activity

Similar Documents

Publication Publication Date Title
CN204212070U (en) Can the inspection platform of way moving under uninterrupted traffic condition
CN204126230U (en) Assembly scaffold unit
CN104070316B (en) A kind of assembled group of welded H section steel is to device and using method thereof
CN102979312A (en) Indoor aluminum honeycomb board suspended ceiling reverse installation technology
CN204676899U (en) Two column is outstanding draws pin-connected panel reinforcing bar protection canopy
CN202280266U (en) Dismounting type wind-proof shed for full-automatic welding operation
CN104477791B (en) Novel tower crane attached wall attachment lattice bracing frame auxiliary device
CN107100283A (en) A kind of assembled wallboard connector and its installation method
CN209099196U (en) A kind of reusable bridge assembled closure section rigid connection component
CN107792774B (en) Integral hoisting method and hoisting tool for multiple steel platform secondary beams
CN202000265U (en) Concrete construction formwork for high pier of bridge
CN110029842A (en) Light body stage rapid construction construction
CN202430827U (en) Adjustable connecting support for super high-rise building curtain wall unit type stone decorative lines
CN205348415U (en) Steel frame structure H type beam column node
CN109868963A (en) Stage steel construction flexible base layer floor construction engineering method
CN209653548U (en) A kind of horizontal protective device of modularization for construction
CN107511613A (en) A kind of reverse assembling method of power station gates of segmental shape gate flap and special tooling
CN204059976U (en) Overhanging type elevator floor platform
CN211597657U (en) Elevator shaft operation supporting and protecting structure
CN208023608U (en) A kind of post-cast strip can have enough to meet the need steel channel formwork system
CN203808258U (en) Adjustable steel truss connecting device
CN203641693U (en) Pipe hanger fixing device
CN210134340U (en) Assembled landing stage guardrail
CN208329667U (en) A kind of horizontal hard protection system of integrated form floor edge
CN207144152U (en) A kind of socket joint attachment structure for burst steel skeleton integral assembling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190719

RJ01 Rejection of invention patent application after publication