CN110005223A - It is a kind of with heating, cooling, fire-fighting steel pipeline movable plank house - Google Patents

It is a kind of with heating, cooling, fire-fighting steel pipeline movable plank house Download PDF

Info

Publication number
CN110005223A
CN110005223A CN201910283448.1A CN201910283448A CN110005223A CN 110005223 A CN110005223 A CN 110005223A CN 201910283448 A CN201910283448 A CN 201910283448A CN 110005223 A CN110005223 A CN 110005223A
Authority
CN
China
Prior art keywords
pipe
steel
steel pipe
movable plank
plank house
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910283448.1A
Other languages
Chinese (zh)
Inventor
张湘平
郭子冉
高杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201910283448.1A priority Critical patent/CN110005223A/en
Publication of CN110005223A publication Critical patent/CN110005223A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/02Dwelling houses; Buildings for temporary habitation, e.g. summer houses
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/12Tube and panel arrangements for ceiling, wall, or underfloor heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F5/00Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater
    • F24F5/0046Air-conditioning systems or apparatus not covered by F24F1/00 or F24F3/00, e.g. using solar heat or combined with household units such as an oven or water heater using natural energy, e.g. solar energy, energy from the ground
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/40Geothermal heat-pumps
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/54Free-cooling systems

Abstract

The invention discloses one kind with heating, cooling, the movable plank house of fire-fighting steel pipeline, including movable plank house and a plurality of reinforcing steel pipe being set in the movable plank house, the a plurality of steel pipe is interconnected to constitute circulation steel pipeline, the one end for recycling steel conduit is hot water pipe, the other end is return pipe, the hot water pipe and the return pipe are connect with boiler, a cold water flow pipe and cold-water return pipe are also led on the circulation steel conduit, the cold water flow pipe is connected to the cold-water return Guan Junyu underground water, deep water well water pump is additionally provided on the cold water flow pipe;Provided by the invention to have heating, cool down, the movable plank house of fire-fighting steel pipeline, the reinforcing steel pipe being arranged in movable plank house can be good at the safety of heating in guarantee movable plank house in short summer and cooling-down air conditioner pipeline in long winter and heating pipeline.

Description

It is a kind of with heating, cooling, fire-fighting steel pipeline movable plank house
Technical field
The present invention relates to temporary building room technical fields, more particularly to one kind with heating, cooling, fire-fighting steel pipe The movable plank house in road.
Background technique
Northwest China area certain high speed certain bid section, overall length 13.1km.Shared 17, bridge, wherein 15, main line bridge/ 5159.5m, 2/282.5m of ramp bridge;3,040,000 m3 of roadbed excavation;15/the 533.8m such as armoured concrete slab box culvert;Tunnel 1 Seat/(left line 1532m, right line 1609.6m).
Project management department's lid temporary fire-resistant rock wool movable plank house, wherein double-decker 5, are mainly used for office, stay, meeting room And hostel, 9, a floor, for laboratory, concrete agitation station, material depot, processing workshop etc..
Yan'an area weather belongs to the continental middle temperate zone~warm temperate zone monsoon climate in plateau, and the north belongs to semiarid zone, south Belong to Semi-humid area, differences between the south and the north are significant.The engineering is located at the north, and dried in spring is short of rain, and summer is burning hot and rainy, and autumn cooling is fast Speed, winter rainfall are rare.Water 542.6mm is fallen in annual, and the dry spell is often in 400mm or so in recent years.Average temperature of the whole year 9.4 DEG C, January most -21.4 DEG C of bottom, July 38.3 DEG C of highest, annual range of temperature be 29.4 DEG C.Time teletostage is long, the average frost and snow phase 200~225 It.Therefore, it is necessary to which emphasis considers safety heating problem in teletostage movable plank house.
The unit subsidiary/member companies once helps Weihe hydraulic engineering building site drawing the Chinese, and it is a certain to be located at 108 national highway, 38 kilometers of yellow grass slopes sections Mesh portion living area, mono- three floor color steel plate structure movable plank house of Gai Liao, overall floorage is about 1400 square metres, is mainly used for agriculture Civilian worker stays, and has 173 beds.Time teletostage is long, and temperature is again low, and heating is mainly using Electric stove, point tungsten lamp, bed upper berth electric heating Blanket is also heated up water with electric heater.Security risk is very big.
It is maximum the disadvantage is that do not account for teletostage safety heating, civilian worker faces harsh climate, it has to use method for distinguishing Heating, there are severe compromises.
About morning 5:30 October 10 in 2012 point, the movable plank house catching fire that the rural migrant worker of this three floor stays is dense Cigarette is billowing, and collapses rapidly, and most of civilian worker is sleeping, and somebody does not wake up, although project management department shouts to put out a fire, still has Many people do not have enough time escaping.Accident causes 12 people dead, and 1 people is missing, and 24 people are injured.Through verifying, electric furnace is used in dormitory The high-power electric appliances such as son, kilowatt electrical bar and lamps and lanterns cause on fire.
Currently, being not provided with the good warming installation of safety heating effect in most of movable plank house, workpeople can only It is warmed oneself by means of high-power electric appliance, security risk is more serious.
Summary of the invention
The object of the present invention is to provide it is a kind of with heating, cooling, fire-fighting steel pipeline movable plank house, it is above-mentioned to solve Problem of the existing technology, the interior reinforcing steel pipe being arranged of movable plank house, in long winter and heating pipeline, in short summer and cooling-down air conditioner Pipeline can be good at the safety for guaranteeing to warm oneself in movable plank house.
To achieve the above object, the present invention provides following schemes:
The present invention provide it is a kind of with heating, cooling, fire-fighting steel pipeline movable plank house, including movable plank house and setting In a plurality of reinforcing steel pipe in the movable plank house, a plurality of steel pipe is interconnected to constitute circulation steel pipeline, recycles steel pipe The one end in road is hot water pipe, and the other end is return pipe, and the hot water pipe and the return pipe are connect with boiler, institute It states and also leads to a cold water flow pipe and cold-water return pipe, the cold water flow pipe and the cold-water return on circulation steel conduit Guan Junyu underground water is connected to, and is additionally provided with deep water well water pump on the cold water flow pipe.
Multiple water flowing gate valves are provided on the circulating line being preferably located in each floor of the movable plank house, It is mating at each water flowing gate valve to be provided with fire hose.
Preferably, a plurality of steel pipe includes the first steel pipe, the second steel pipe, third steel pipe, the 4th steel pipe and the 5th steel pipe; Two first steel pipes are fixed on the inside of every fan gable roof truss of the movable plank house, two first steel pipes connect on top It connects;Be provided with second steel pipe on the inside of every column of the movable plank house, the bottom end of two first steel pipes with The top of its opposite second steel pipe connects;
Side is provided with one to two gables inside, facade wall inside and the reverse side of each floor of the movable plank house within the walls Third steel pipe described in item, second steel pipe at four third steel pipes adjacent end and corner on the inside of column pass through Tee tube connection;
The side of partition wall between each room of each floor of the movable plank house is provided with the 4th steel pipe, institute It states and is connected between the end of the 4th steel pipe and the third steel pipe and its opposite described second steel pipe by tee tube;
Two bars of the 5th steel pipes, the end of the 5th steel pipe are horizontally arranged on each floor of the movable plank house It is connected between portion and the third steel pipe and its opposite described second steel pipe by tee tube, and the two of one of floor One article of the 5th steel pipe is hot water pipe described in article, and in addition one is return pipe.
Preferably, first steel pipe is fixed on the gable roof truss by pipe collar;Second steel pipe passes through pipe collar It is fixed on the column.
Preferably, there are three the water flowing gate valve settings, three water flowing gate valves are respectively arranged on the inside of facade wall The middle part and both ends of the third steel pipe.
Two described one article of 5th steel pipe of the movable plank house Stall is preferably located at as hot water pipe, in addition one Item is return pipe, and the cold water flow pipe and cold-water return pipe on wherein one bar the 5th steel pipe then respectively by drawing.
Preferably, the diameter of first steel pipe, second steel pipe, the third steel pipe and the 4th steel pipe is 50mm, the diameter of the 5th steel pipe are 108mm.
Preferably, for escape is installed between the bottom and ground of the guard rail of the attic of the movable plank house Six steel pipes.
Preferably, a fire cistern is each provided on the ground of the movable plank house both sides external.
Preferably, fire extinguisher is equipped on every floor of the movable plank house.
The present invention achieves following advantageous effects compared with the existing technology:
1, provided by the invention with warming oneself, cooling down, the movable plank house of fire-fighting steel pipeline, a plurality of steel pipe is in movable plank house Interior composition recycles steel pipeline, and being connected to when using with boiler can use as steam heating pipe, effectively change long-term winter quilt It forces and is warmed oneself with high-power electric appliances such as electric furnace, point tungsten lamp, electric blankets, not only solve heating problem, be also effectively guaranteed and take Warm safety;Being connected to underground water can use as cooling-down air conditioner pipe, compared with purchasing and installing air-conditioning and its electricity cost, Cost is relatively low, economizes on resources.
2, it is provided by the invention with heating, cooling, fire-fighting steel pipeline movable plank house, a plurality of steel pipe and be fixed on people On word roof truss, column or metope, it can play the role of reinforcing movable plank house, it being capable of safety load-bearing when room is full to be moved in; Especially under conditions of it's always windy for teletostage warp, it is fully able to wind resistance.
3, provided by the invention to have heating, cool down, the movable plank house of fire-fighting steel pipeline, the circulation that a plurality of steel pipe is constituted Steel pipeline can double as fire-fighting water service pipe, easy to use, and not need to rearrange pipeline, save the cost.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is to have heating in the present invention, cool down, the forward structure schematic diagram of the movable plank house of fire-fighting steel pipeline;
Fig. 2 is to have heating in the present invention, cool down, the sectional view of the movable plank house of fire-fighting steel pipeline;
Fig. 3 is to have heating in the present invention, cool down, the plane of one of floor of the movable plank house of fire-fighting steel pipeline Layout drawing;
Fig. 4 is the partial enlarged view in Fig. 3 at A;
Fig. 5 is the partial enlarged view in Fig. 3 at B;
In figure: the first steel pipe of 101-, the second steel pipe of 102-, 103- third steel pipe, the 4th steel pipe of 104-, the 5th steel of 105- Pipe, the 6th steel pipe of 106-, 107- water flowing gate valve, 108- cold water flow pipe, 109- deep water well water pump;
201- gable roof truss, 202- column, 203- gable, 204- facade wall, 205- reverse side wall, 206- partition wall 207- protection Railing, 208- stair.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The object of the present invention is to provide it is a kind of with heating, cooling, fire-fighting steel pipeline movable plank house, it is existing to solve Technology there are the problem of.
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing and specific real Applying mode, the present invention is described in further detail.
Present embodiments provide it is a kind of with heating, cooling, fire-fighting steel pipeline movable plank house, as shown in Figs. 1-5, packet The a plurality of reinforcing steel pipe for including movable plank house and being set in movable plank house, a plurality of steel pipe are interconnected to constitute circulation steel pipeline, The one end for recycling steel conduit is hot water pipe, and the other end is return pipe, and hot water pipe and return pipe connect with boiler, follow Also lead to a cold water flow pipe 108 and cold-water return pipe (not shown) on ring steel conduit, cold water flow pipe 108 and cold Water return pipe is connected to underground water, and deep water well water pump 109 is additionally provided on cold water flow pipe 108;Pass through what is connect with boiler It recycles steel conduit and realizes Winter safety heating, and the cold water flow pipe 108 and cold-water return pipe energy drawn on circulation steel conduit Enough realize introduces underground water to room temperature lowering during the broiling summer.
In the present embodiment, in order to realize the fire-fighting effect of steel conduit, in the circulating line being located in each floor of movable plank house On be provided with multiple water flowing gate valves 107, it is mating at each water flowing gate valve 107 to be provided with fire hose, when needing to put out a fire Fire hose is connected, opening water flowing gate valve 107 can sprinkle water to fire extinguishing point.
Currently, existing movable plank house is mostly two floor structures, thus, by taking two layers of movable plank house as an example, this is specific real It applies in example, selection fire prevention rock wool, angle bar etc. meet the material of technical specification and safety requirements, two layers of movable plank house of Gai Cheng, and every layer 5 Between, upper layer and lower layer stair 208 are built at every long × wide=3.2m × 4.2m, house both ends.
Steel pipe is added while building and constitutes circulation steel conduit, and a plurality of steel pipe includes the first steel pipe 101, the second steel pipe 102, third steel pipe 103, the 4th steel pipe 104 and the 5th steel pipe 105;201 inside of every fan gable roof truss of movable plank house is fixed Two the first steel pipes 101, two the first steel pipes 101 are fixedly connected by pipe collar with gable roof truss 201, two the first steel pipes 101 Also it constitutes chevron shaped and is attached on top by bend pipe;The inside of every column 202 of movable plank house is provided with second The top of steel pipe 102, the second steel pipe 102 of the bottom end of two the first steel pipes 101 corresponding thereto is connected by bend pipe;
It is all provided on the inside of two gables 203 of each floor of movable plank house, on the inside of 204 inside of facade wall and reverse side wall 205 It is equipped with a third steel pipe 103, the second steel pipe of 202 inside of column at four third steel pipes 103 adjacent end and corner 102 are connected by tee tube;
The side of partition wall 206 between each room of each floor of movable plank house is provided with the 4th steel pipe 104, and the 4th Steel pipe 104 is located at, fourth steel vertical with third steel pipe 103 between facade wall 204 and two third steel pipes 103 of reverse side wall 205 It is connected between the end of pipe 104 and third steel pipe 103 and its second opposite steel pipe 102 by tee tube;
It is horizontally arranged with two article of the 5th steel pipe 105 on each floor of movable plank house, the end of the 5th steel pipe 105 and the It is connected between three steel pipes 103 and its second opposite steel pipe 102 by tee tube, and two article of the 5th steel of one of floor Pipe 105 1 are hot water pipe, and in addition one is return pipe.
Specifically, three water flowing gate valves 107 are respectively arranged at front in the present embodiment there are three the settings of water flowing gate valve 107 The middle part and both ends of third steel pipe 103 on the inside of inner cavity.
In this specific embodiment, 105 1 articles of two the 5th steel pipes positioned at movable plank house Stall are hot water pipe, separately Outer one is return pipe, and cold water flow pipe 108 in hot water pipe by drawing, and cold-water return pipe is drawn by return pipe, in winter It is connected to boiler and the 5th steel pipe 105 (hot water pipe and return pipe), realizes warming function;In summer, underground is opened Underground water is introduced the 5th steel pipe 105 by cold water flow pipe 108 by deep water well water pump 109, by cold water after recycling in movable plank house Return pipe flows back to underground, realizes the kinetic energy of cooling in summer.
In this specific embodiment, the first steel pipe 101, the second steel pipe 102, third steel pipe 103 and the 4th steel pipe 104 it is straight Diameter is 50mm, and the diameter of the 5th steel pipe 105 is 108mm.
In this specific embodiment, the bottom of the guard rail 207 of the attic (being second floor in the present embodiment) of movable plank house The 6th steel pipe 106 for escape is installed between ground, the diameter of the 6th steel pipe 106 is 108mm, and personnel can be by the 6th Steel pipe 106 slides realization escape.
In this specific embodiment, a fire cistern, fire cistern are each provided on the ground of movable plank house both sides external Length × wide × depth=3.5m × 2.5m × 1.5m;Among every floor, both ends difference it is mating 2, fire extinguisher, a flooring is mating Sandbox, bucket, poker, spade etc.;It can be with mating air switch, charging plug, overcurrent open circuit in the room of movable plank house Device etc..
Invention applies a specific example illustrates the principle and implementation of the invention, above embodiments are said It is bright to be merely used to help understand method and its core concept of the invention;At the same time, for those skilled in the art, foundation Thought of the invention, there will be changes in the specific implementation manner and application range.To sum up, the content of the present specification should not manage Solution is limitation of the present invention.

Claims (10)

1. it is a kind of with heating, cooling, fire-fighting steel pipeline movable plank house, it is characterised in that: including movable plank house and setting In a plurality of reinforcing steel pipe in the movable plank house, a plurality of steel pipe is interconnected to constitute circulation steel pipeline, recycles steel pipe The one end in road is hot water pipe, and the other end is return pipe, and the hot water pipe and the return pipe are connect with boiler, institute It states and also leads to a cold water flow pipe and cold-water return pipe, the cold water flow pipe and the cold-water return on circulation steel conduit Guan Junyu underground water is connected to, and is additionally provided with deep water well water pump on the cold water flow pipe.
2. according to claim 1 have heating, cool down, the movable plank house of fire-fighting steel pipeline, it is characterised in that: be located at It is provided with multiple water flowing gate valves on the circulating line in each floor of movable plank house, it is equal at each water flowing gate valve It is mating to be provided with fire hose.
3. according to claim 2 have heating, cool down, the movable plank house of fire-fighting steel pipeline, it is characterised in that: a plurality of The steel pipe includes the first steel pipe, the second steel pipe, third steel pipe, the 4th steel pipe and the 5th steel pipe;Every fan of the movable plank house Two first steel pipes are fixed on the inside of gable roof truss, two first steel pipes connect on top;The movable plank house Second steel pipe, second steel of the bottom end of two first steel pipes corresponding thereto are provided on the inside of every column The top of pipe connects;
Side is provided with an institute to two gables inside, facade wall inside and the reverse side of each floor of the movable plank house within the walls Third steel pipe is stated, second steel pipe at four third steel pipes adjacent end and corner on the inside of column passes through threeway Pipe connection;
The side of partition wall between each room of each floor of the movable plank house is provided with the 4th steel pipe, and described It is connected between the end of four steel pipes and the third steel pipe and its opposite described second steel pipe by tee tube;
Be horizontally arranged with two bars of the 5th steel pipes on each floor of the movable plank house, the end of the 5th steel pipe with It is connected between the third steel pipe and its opposite described second steel pipe by tee tube, and two institutes of one of floor One article of the 5th steel pipe is stated as hot water pipe, in addition one is return pipe.
4. according to claim 3 have heating, cool down, the movable plank house of fire-fighting steel pipeline, it is characterised in that: described First steel pipe is fixed on the gable roof truss by pipe collar;Second steel pipe is fixed on the column by pipe collar.
5. according to claim 3 have heating, cool down, the movable plank house of fire-fighting steel pipeline, it is characterised in that: described Water flowing gate valve setting there are three, three water flowing gate valves be respectively arranged at the third steel pipe on the inside of facade wall middle part and Both ends.
6. according to claim 3 have heating, cool down, the movable plank house of fire-fighting steel pipeline, it is characterised in that: be located at Described one article of 5th steel pipe of two of the movable plank house Stall is hot water pipe, and in addition one is return pipe, the cold water Flow pipe and cold-water return pipe on wherein one bar the 5th steel pipe then respectively by drawing.
7. according to claim 3 have heating, cool down, the movable plank house of fire-fighting steel pipeline, it is characterised in that: described First steel pipe, second steel pipe, the third steel pipe and the 4th steel pipe diameter be 50mm, the 5th steel pipe it is straight Diameter is 108mm.
8. according to claim 7 have heating, cool down, the movable plank house of fire-fighting steel pipeline, it is characterised in that: described The 6th steel pipe for escape is installed between the bottom and ground of the guard rail of the attic of movable plank house.
9. according to claim 1 have heating, cool down, the movable plank house of fire-fighting steel pipeline, it is characterised in that: described A fire cistern is each provided on the ground of movable plank house both sides external.
10. according to claim 1 have heating, cool down, the movable plank house of fire-fighting steel pipeline, it is characterised in that: institute It states and is equipped with fire extinguisher on every floor of movable plank house.
CN201910283448.1A 2019-04-10 2019-04-10 It is a kind of with heating, cooling, fire-fighting steel pipeline movable plank house Pending CN110005223A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910283448.1A CN110005223A (en) 2019-04-10 2019-04-10 It is a kind of with heating, cooling, fire-fighting steel pipeline movable plank house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910283448.1A CN110005223A (en) 2019-04-10 2019-04-10 It is a kind of with heating, cooling, fire-fighting steel pipeline movable plank house

Publications (1)

Publication Number Publication Date
CN110005223A true CN110005223A (en) 2019-07-12

Family

ID=67170721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910283448.1A Pending CN110005223A (en) 2019-04-10 2019-04-10 It is a kind of with heating, cooling, fire-fighting steel pipeline movable plank house

Country Status (1)

Country Link
CN (1) CN110005223A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102179020A (en) * 2011-04-28 2011-09-14 何多平 Multi-functional water room fire-preventing and fire-distinguishing system
CN103727623A (en) * 2014-01-26 2014-04-16 陈科 Non-consumable-energy living room cooling device
CN105155870A (en) * 2015-09-30 2015-12-16 河南易博联城规划建筑设计有限公司洛阳分公司 New-energy portable house
KR20160026083A (en) * 2014-08-29 2016-03-09 서선덕 A movable toilet
CN105735678A (en) * 2016-04-22 2016-07-06 申保军 Energy-saving light steel movable room
CN106642296A (en) * 2016-12-01 2017-05-10 浙江海洋大学 Intelligent house temperature control system
CN107965158A (en) * 2017-12-10 2018-04-27 柳州市力万科技有限公司 Temperature controllable movable plank house

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102179020A (en) * 2011-04-28 2011-09-14 何多平 Multi-functional water room fire-preventing and fire-distinguishing system
CN103727623A (en) * 2014-01-26 2014-04-16 陈科 Non-consumable-energy living room cooling device
KR20160026083A (en) * 2014-08-29 2016-03-09 서선덕 A movable toilet
CN105155870A (en) * 2015-09-30 2015-12-16 河南易博联城规划建筑设计有限公司洛阳分公司 New-energy portable house
CN105735678A (en) * 2016-04-22 2016-07-06 申保军 Energy-saving light steel movable room
CN106642296A (en) * 2016-12-01 2017-05-10 浙江海洋大学 Intelligent house temperature control system
CN107965158A (en) * 2017-12-10 2018-04-27 柳州市力万科技有限公司 Temperature controllable movable plank house

Similar Documents

Publication Publication Date Title
CN102494383B (en) Method for ventilating and dehumidifying underground garage
CN209277334U (en) A kind of prefabricated combined assembled insulation construction integrated wallboard
CN106592430A (en) Cast-in-place winter construction method for hanging basket cantilever
CN100513723C (en) Method for constructing aeration curtain wall, and curtain wall
CN106480977A (en) Passive type house
CN106171652A (en) A kind of actively accumulation of heat phase transformation solidified earth heliogreenhouse and phase transformation firming agent
CN2537782Y (en) Environment protection energy saving civil residential building
CN204492227U (en) Assembling House on stilts
CN107310045A (en) A kind of totally-enclosed ground heating heat insulation formula concrete plant
CN205024919U (en) Roofing system
CN106945158A (en) A kind of concrete prefabricated element automatic maintenance device
CN205919447U (en) Floor heat radiation new trend system structure
CN110005223A (en) It is a kind of with heating, cooling, fire-fighting steel pipeline movable plank house
AU2021102636A4 (en) Method for facilitating steel pipe columns of prefabricated house to realize heating, cooling and firefighting
CN201125542Y (en) Green building
CN203940565U (en) Building pipe well formula ventilating system
CN212201049U (en) Roof parapet inlet for stom water cold bridge prevention structure
CN201424731Y (en) Insulating, temperature-adjusting and ventilating roof structure
CN210067146U (en) Simple passive house with environmental protection, energy saving and safety
CN101545322B (en) Novel energy-saving method of high-storey business building and common residential building
CN208329313U (en) The ceiling heating refrigeration structure being mounted on the downside of floor
CN207376987U (en) Go out roofing exhaust pipeline structure suitable for Passive low-energy building
CN102912942B (en) Natural cross ventilation device arranged on roofs
CN207686125U (en) A kind of prefabricated non-combined sandwich electric heating heat-insulation wall plate
CN207405889U (en) Suitable for the deformation joint of roof structure of Passive low-energy building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190712