CN107310045A - A kind of totally-enclosed ground heating heat insulation formula concrete plant - Google Patents

A kind of totally-enclosed ground heating heat insulation formula concrete plant Download PDF

Info

Publication number
CN107310045A
CN107310045A CN201710552421.9A CN201710552421A CN107310045A CN 107310045 A CN107310045 A CN 107310045A CN 201710552421 A CN201710552421 A CN 201710552421A CN 107310045 A CN107310045 A CN 107310045A
Authority
CN
China
Prior art keywords
feed bin
totally
boiler
heat insulation
canopy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710552421.9A
Other languages
Chinese (zh)
Other versions
CN107310045B (en
Inventor
李化超
程健
艾侠
宋阳
马景全
巩明
丁超
董钊
廉维彬
陈亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd MBEC
2nd Engineering Co Ltd of MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd MBEC
2nd Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd MBEC, 2nd Engineering Co Ltd of MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd MBEC
Priority to CN201710552421.9A priority Critical patent/CN107310045B/en
Publication of CN107310045A publication Critical patent/CN107310045A/en
Application granted granted Critical
Publication of CN107310045B publication Critical patent/CN107310045B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C9/00General arrangement or layout of plant
    • B28C9/02General arrangement or layout of plant for producing mixtures of clay or cement with other materials
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C7/00Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
    • B28C7/0007Pretreatment of the ingredients, e.g. by heating, sorting, grading, drying, disintegrating; Preventing generation of dust
    • B28C7/0023Pretreatment of the ingredients, e.g. by heating, sorting, grading, drying, disintegrating; Preventing generation of dust by heating or cooling
    • B28C7/003Heating, e.g. using steam
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C7/00Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
    • B28C7/0046Storage or weighing apparatus for supplying ingredients
    • B28C7/0053Storage containers, e.g. hoppers, silos, bins
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C7/00Controlling the operation of apparatus for producing mixtures of clay or cement with other substances; Supplying or proportioning the ingredients for mixing clay or cement with other substances; Discharging the mixture
    • B28C7/0046Storage or weighing apparatus for supplying ingredients
    • B28C7/0053Storage containers, e.g. hoppers, silos, bins
    • B28C7/0076Parts or details thereof, e.g. opening, closing or unloading means

Landscapes

  • Chemical & Material Sciences (AREA)
  • Dispersion Chemistry (AREA)
  • Building Environments (AREA)
  • Floor Finish (AREA)

Abstract

The invention discloses a kind of totally-enclosed ground heating heat insulation formula concrete plant, including totally enclosed feed bin canopy, mixing station and the heating system in feed bin canopy, mixing station includes the proportioning machine being arranged in feed bin canopy, and proportioning machine has heater;Several sandstone feed bins are provided with feed bin canopy, at least one of which sandstone feed bin orlop offers floor heating groove, heat supply pipeline is equipped with the floor heating groove, and steel deck-plate is covered with the floor heating groove;Heating system includes boiler, and boiler is connected by the first outlet pipe with the water inlet of heat supply pipeline, and boiler is connected by the second outlet pipe with the water inlet of heater.The present invention, to sand material heating and thermal insulation, had both met the construction demand under cold snap by hot-water line, it is not required that whole feed bin canopy heat supply is incubated, cost is saved, has evaded the potential safety hazard that traditional feed bin canopy is also easy to produce fire using burner;Using the feed bin canopy of full-closed structure, it is to avoid dust is boundless, the phenomenon of mud completely, is conducive to civilized construction.

Description

A kind of totally-enclosed ground heating heat insulation formula concrete plant
Technical field
The present invention relates to architectural engineering winter construction field, and in particular to a kind of totally-enclosed ground heating heat insulation formula concreter Factory.
Background technology
When carrying out site construction, the construction material such as mortar is all to be stirred mixing at the scene, and the mix of mortar is needed To consider the condition such as the temperature at scene and the water temperature of mixing water.
According to existing construction technology, when being constructed under conditions of subzero 30 DEG C -40 DEG C, if it cannot be guaranteed that concrete goes out Machine, molding temperature, concrete will be unable to construction;If constructed in the north, then the feed bin canopy of conventional design can not also expire Foot north high wind, the construction requirement of heavy snowfall.
In addition, common concrete plant is generally local covering, the air storage such as sand, building stones, or build steel structure canopy Frame, as the facility that keeps off the rain, so easily causes that dust is boundless, the phenomenon of mud completely occurs.
The content of the invention
For defect present in prior art, it is an object of the invention to provide a kind of totally-enclosed ground heating heat insulation formula coagulation Geotechnological factory, by disposing floor heating heating system in feed bin canopy, there is provided suitable mix temperature, it is ensured that construction is smoothed out.
To achieve the above objectives, the present invention is adopted the technical scheme that:A kind of totally-enclosed ground heating heat insulation formula concrete plant, It includes:
Several sandstone feed bins, sand material described at least one of which are provided with the feed bin canopy of closing, the feed bin canopy Storehouse orlop offers floor heating groove, and heat supply pipeline is equipped with the floor heating groove, and steel is covered with the floor heating groove Cover plate;
Mixing station, it includes the proportioning machine being installed in the feed bin canopy, and the proportioning machine has heater;
Heating system, it includes boiler, and the boiler is connected by the first outlet pipe with the water inlet of the heat supply pipeline, The boiler is connected by the second outlet pipe with the water inlet of the heater.
Preferably, the boiler is connected by the first return pipe with the delivery port of the heat supply pipeline, and the boiler passes through Second return pipe is connected with the delivery port of the heater.
Preferably, the S-type arrangement of the heat supply pipeline.
Preferably, some supports are provided with the floor heating groove, the heat supply pipeline is carried on the support.
Preferably, insulation reflecting layer is equipped with the floor heating groove.
Preferably, it is provided with by the boiler in mix water tank, the mix water tank and is provided with heating water tanks pipe, institute The two ends for stating heating water tanks pipe pass the mix water tank and are connected with the boiler.
Preferably, the mixing station also includes:
Stirring host, the stirring host is connected by belt feeder with the proportioning machine;
Powder tank, the powder tank is connected by screw machine with the stirring host;
The stirring host, the belt feeder and the screw machine are enclosed with glass fibre cotton color steel.
Preferably, the stirring host and the belt motor spindle are respectively connected with steel pipe column, and each steel pipe column is fixed In underground.
Preferably, the feed bin canopy gusset is enclosed provided with rock wool color plate, and the feed bin ceiling portion is equipped with glass fibre cotton Color steel.
Preferably, the feed bin ceiling portion is arranged at intervals with some transparent color steels.
Compared with prior art, the advantage of the invention is that:
(1) heating and thermal insulation is carried out to the sand material in sandstone feed bin by hot-water line, that is, meets the use under cold snap Material demand, it is not required that heat supply insulation is carried out to whole feed bin canopy, cost is saved;Heating and thermal insulation is carried out with heat supply pipeline, is advised The potential safety hazard that traditional feed bin canopy is also easy to produce fire using burner has been kept away, has also evaded the generation of CO poisonings, it is ensured that sand The safety of building stones and the person, using the feed bin canopy of full-closed structure, it is to avoid dust is boundless, the phenomenon of mud completely, is conducive to Civilized construction.
(2) by setting the first return pipe and the second return pipe, the water in heat supply pipeline and heater is made to return to pot respectively In stove, a circulatory system is formed, the purpose of cycling use of water, saving water resource has been reached.
(3) stirring host and belt feeder are fixed on underground by steel pipe column, are mixed using this steel pipe pile foundation is more conventional Solidifying earth foundation, with the advantage that inserting piling is convenient, applied widely, safe and reliable, after the completion of construction, steel-pipe pile can be pulled out back Receive and utilize, will not damage to land, be conducive to reclaiming for soil, steel-pipe pile can use circulation material, the extra throwing without increasing Enter.
(4) insulation material, high insulating effect, more conventional bubble are used as using rock wool color plate and glass fibre cotton color steel Foam color steel has good flame resistance, the low advantage of safe, thermal conductivity factor.Feed bin ceiling portion is arranged at intervals transparent color steel, Daylighting effect is good, need not use power lighting daytime, saves the energy.
Brief description of the drawings
Fig. 1 is the totally-enclosed ground heating heat insulation formula concrete plant top view of kind provided in an embodiment of the present invention.
Embodiment
The present invention is described in further detail below in conjunction with drawings and Examples.
Shown in Figure 1, the embodiment of the present invention provides a kind of totally-enclosed ground heating heat insulation formula concrete plant, and it includes:
Several sandstone feed bins 10, sand described at least one of which are provided with the feed bin canopy 1 of closing, the feed bin canopy 1 The orlop of building stones storehouse 10 offers floor heating groove, when sand material is needed to use, and orlop can not had to the material of the floor heating groove Sand material in storehouse is transferred in sandstone feed bin 10 of the orlop provided with the floor heating groove, can save construction cost, the institute State and heat supply pipeline 11 is equipped with floor heating groove, be covered with steel deck-plate on the floor heating groove, closed, with this to sandstone Material carries out heating and thermal insulation;
Mixing station 2, it includes the proportioning machine 20 being installed in the feed bin canopy 1, and the proportioning machine 20 has heater;By It is generally mounted in the proportioning machine 20 near the canopy wall of the feed bin canopy 1, is easily influenceed and turned cold by extraneous low temperature, therefore set The heater is put, the heater can use homemade hot water heat-conducting heater, make sand material in storage Sha Cang with Expect that carrying out second to sand in metering process heats up;
Heating system 3, it includes boiler 30, in addition, heating system also includes boiler room, the boiler 30 is placed in boiler In room, water is heated with coal, chimney is had at the top of boiler room, coal smoke is discharged outside the feed bin canopy 1 by chimney, the pot Pressure gauge and thermometer are installed on stove 30, monitors set on hydraulic pressure and water temperature in the boiler 30, the boiler 30 at any time Have and be provided with water supply tank by atmospheric communicating pipe, the boiler 30, moisturizing can be carried out at any time when water shortage in the boiler 30 Process, water supply tank bottom and the bottom of the boiler 30 are equipped with blow-off line and blowoff valve, and water supply tank is provided with overflow pipe, water-level gauge And filling pipe, filling pipe connects with the boiler 30;The boiler 30 passes through the first outlet pipe 31 and the heat supply pipeline 11 Water inlet is connected, and the boiler 30 is connected by the second outlet pipe 32 with the water inlet of the heater.
Heating and thermal insulation is carried out to the sand material in the sandstone feed bin 10 by the hot water in the boiler 30, both met Materials demand under cold snap, it is not required that heat supply insulation is carried out to the whole feed bin canopy 1, cost is saved;Pass through peace The boiler 30 is filled, heating and thermal insulation is carried out by the heat supply pipeline 11, has evaded traditional feed bin canopy and has been also easy to produce using burner The potential safety hazard of fire, has also evaded the generation of CO poisonings, it is ensured that the safety of sand material and the person, using full-closed structure The feed bin canopy 1, it is to avoid dust is boundless, the phenomenon of mud completely, is conducive to civilized construction.
It is shown in Figure 1, it is preferable that the delivery port that the boiler 30 passes through the first return pipe 33 and the heat supply pipeline 11 Connection, the boiler 30 is connected by the second return pipe 34 with the delivery port of the heater, by setting first backwater Pipe 33 and second return pipe 34, make the water in the heat supply pipeline 11 and the heater return to the boiler 30 respectively It is interior, a circulatory system is formed, the purpose of cycling use of water, saving water resource has been reached.
It is shown in Figure 1, it is preferable that the S-type arrangement of heat supply pipeline 11, the hot water in the heat supply pipeline 11 is existed Residence time in the floor heating groove is longer, makes full use of the heat of hot water to add sand material in the presence of heat transfer Heat insulation, improves the utilization ratio of heat energy, saves coal resource.
Preferably, some supports are provided with the floor heating groove, the heat supply pipeline 11 is carried on the support, led to Cross and the support is set, can both avoid the heat supply pipeline 11 because being contacted with bottom land by absorption heat, can also will be described Heat supply pipeline 11, which is held up, to be allowed to from sand material closer to making sand material absorb more heat energy, it is to avoid the waste of heat energy, improve heat Can utilization rate;Depending on direction of the setting direction of the support according to the heat supply pipeline 11, such as, and the heat supply pipeline 11 Bearing of trend is identical with the length direction of the floor heating groove, then the width of the bearing of trend of the support and the floor heating groove Direction is identical.
Preferably, insulation reflecting layer is equipped with the floor heating groove, the heating tube is reduced by being incubated reflecting layer Hot water heat in road 11 is by ground absorption, and the material in the insulation reflecting layer is all the common used material that in the market can be bought.
It is shown in Figure 1, it is preferable that to be provided with mix water tank 4, the mix water tank 4 and set by the boiler 30 Heating water tanks pipe is equipped with, the two ends of the heating water tanks pipe pass the mix water tank 4 and are connected with the boiler 30, with This is directly heated to mixing water, it is ensured that the mix process of sand material is normally carried out during construction, even if outdoor temperature is down to Subzero 30 DEG C, the water temperature of mixing water is up to 40 DEG C -60 DEG C, and the temperature in the feed bin canopy 1 is up to 15 DEG C.
It is shown in Figure 1, it is preferable that the mixing station 2 also includes:
Stirring host 21, the stirring host 21 is connected by belt feeder 22 with the proportioning machine 20, the belt feeder 22 Bidirectional belt conveyor can be used;
Powder tank 23, the powder tank 23 includes cementing tank and flyash silo etc., and the powder tank 23 is stirred by screw machine with described Main frame 21 is mixed to connect;
The stirring host 21, the belt feeder 22 and the screw machine are enclosed with glass fibre cotton color steel, it is ensured that Concrete goes out machine, molding temperature.
Preferably, stirring host 21 and the belt feeder 22 bottom is respectively connected with steel pipe column, and each steel pipe column is equal It is fixed on underground, it is preferable that the stirring host 21 and the belt feeder 22 use φ 600mm steel pipe Driven-in Pile Foundations, The depth that can be squeezed into according to geological conditions and load-bearing conditions difference adjustment steel pipe, using the more conventional concrete of steel pipe pile foundation Basis, with the advantage that inserting piling is convenient, applied widely, safe and reliable, after the completion of construction, steel-pipe pile can pull out recovery profit With, will not damage to land, be conducive to reclaiming for soil, steel-pipe pile can use circulation material, the extra input without increasing.
Preferably, the gusset of feed bin canopy 1 is enclosed provided with rock wool color plate, and the top of feed bin canopy 1 is equipped with glass fibre Cotton color steel, rock wool color plate and glass fibre cotton color steel high insulating effect, more conventional foam color steel have anti-flammability The low advantage of good, safe, thermal conductivity factor.
The feed bin canopy 1 is formed by multiple feed bin canopy unit spliceds, and feed bin canopy unit can be constructed as follows:
(1) two row's concretes basis is poured, it is preferable that the specification on the concrete basis is 1500mm × 1500 × 1800, Mei Gesuo Embedded built-in fitting on the basis of concrete is stated, column is installed on the basis of each concrete, column bottom is welded with the built-in fitting, preferably Ground, the column specification is φ 377mm.
(2) C14 type steel skeletons are welded between column described in adjacent the two of outermost, and are sealed with the rock wool color plate Close, it is preferable that the rock wool color plate thickness is 100mm.
Respectively be welded between a 2I32a shaped steel, 2I32a shaped steel described in two at the top of column described in (3) two rows be welded with it is multiple Arch truss, the arch truss uses 40 × 2.0mm of φ 48 × 3.0mm and φ steel-pipe welding, the two neighboring arch Truss is at a distance of 3m.
(4) many C14 shaped steel are laid on the arch truss, spacing is 1m, and it is color in laying glass fibre cotton thereon Steel plate is closed, it is preferable that the glass fibre cotton color steel thickness is 50mm.
The feed bin canopy 1 is with blast (0.4KN/m2), crushing by snow 0.45KN/m2) on the basis of, security performance is high.
Preferably, the head clearance of feed bin canopy 1 is provided with some transparent color steels, and daylighting effect is good, and daytime need not Using power lighting, the energy is saved, it is preferable that distance is 9m between two pieces of transparent color steels.
The present invention is not limited to the above-described embodiments, for those skilled in the art, is not departing from On the premise of the principle of the invention, some improvements and modifications can also be made, these improvements and modifications are also considered as the protection of the present invention Within the scope of.The content not being described in detail in this specification belongs to prior art known to professional and technical personnel in the field.

Claims (10)

1. a kind of totally-enclosed ground heating heat insulation formula concrete plant, it is characterised in that:A kind of totally-enclosed ground heating heat insulation formula concreter Factory, it is characterised in that it includes:
The feed bin canopy (1) of closing, is provided with several sandstone feed bins (10) in the feed bin canopy (1), described at least one of which Sandstone feed bin (10) orlop offers floor heating groove, is equipped with heat supply pipeline (11) in the floor heating groove, the floor heating Steel deck-plate is covered with groove;
Mixing station (2), it includes the proportioning machine (20) being installed in the feed bin canopy (1), and the proportioning machine (20) has heating Device;
Heating system (3), it includes boiler (30), and the boiler (30) passes through the first outlet pipe (31) and the heat supply pipeline (11) water inlet connection, the boiler (30) is connected by the second outlet pipe (32) with the water inlet of the heater.
2. a kind of totally-enclosed ground heating heat insulation formula concrete plant as claimed in claim 1, it is characterised in that:The boiler (30) Connected by the first return pipe (33) with the delivery port of the heat supply pipeline (11), the boiler (30) passes through the second return pipe (34) delivery port with the heater is connected.
3. a kind of totally-enclosed ground heating heat insulation formula concrete plant as claimed in claim 1, it is characterised in that:The heat supply pipeline (11) S-type arrangement.
4. a kind of totally-enclosed ground heating heat insulation formula concrete plant as claimed in claim 1, it is characterised in that:The floor heating groove Some supports are inside provided with, the heat supply pipeline (11) is carried on the support.
5. a kind of totally-enclosed ground heating heat insulation formula concrete plant as claimed in claim 1, it is characterised in that:The floor heating groove Inside it is equipped with insulation reflecting layer.
6. a kind of totally-enclosed ground heating heat insulation formula concrete plant as claimed in claim 1, it is characterised in that:The boiler (30) Side is provided with mix water tank (4), the mix water tank (4) and is provided with heating water tanks pipe, the two of the heating water tanks pipe End passes the mix water tank (4) and is connected with the boiler (30).
7. a kind of totally-enclosed ground heating heat insulation formula concrete plant as claimed in claim 1, it is characterised in that:The mixing station (2) also include:
Stirring host (21), the stirring host (21) is connected by belt feeder (22) with the proportioning machine (20);
Powder tank (23), the powder tank (23) is connected by screw machine with the stirring host (21);
The stirring host (21), the belt feeder (22) and the screw machine are enclosed with glass fibre cotton color steel.
8. a kind of totally-enclosed ground heating heat insulation formula concrete plant as claimed in claim 7, it is characterised in that:The stirring host (21) and the belt feeder (22) bottom is respectively connected with steel pipe column, each steel pipe column is both secured to underground.
9. a kind of totally-enclosed ground heating heat insulation formula concrete plant as claimed in claim 1, it is characterised in that:The feed bin canopy (1) gusset is enclosed provided with rock wool color plate, and glass fibre cotton color steel is equipped with the top of the feed bin canopy (1).
10. a kind of totally-enclosed ground heating heat insulation formula concrete plant as claimed in claim 1, it is characterised in that:The feed bin canopy (1) head clearance is provided with some transparent color steels.
CN201710552421.9A 2017-07-07 2017-07-07 Totally-enclosed ground heating heat preservation type concrete works Active CN107310045B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710552421.9A CN107310045B (en) 2017-07-07 2017-07-07 Totally-enclosed ground heating heat preservation type concrete works

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710552421.9A CN107310045B (en) 2017-07-07 2017-07-07 Totally-enclosed ground heating heat preservation type concrete works

Publications (2)

Publication Number Publication Date
CN107310045A true CN107310045A (en) 2017-11-03
CN107310045B CN107310045B (en) 2020-05-12

Family

ID=60178279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710552421.9A Active CN107310045B (en) 2017-07-07 2017-07-07 Totally-enclosed ground heating heat preservation type concrete works

Country Status (1)

Country Link
CN (1) CN107310045B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108266012A (en) * 2018-01-17 2018-07-10 中铁隆工程集团有限公司 A kind of sandstone feed bin for winter construction
CN108951636A (en) * 2018-07-13 2018-12-07 中国电建集团铁路建设有限公司 A kind of extremely frigid zones subway station concrete construction heat preserving method
CN109610894A (en) * 2018-12-10 2019-04-12 中交公局桥隧工程有限公司 A kind of blending station thermal insulation construction technique
CN110370452A (en) * 2019-07-31 2019-10-25 中交路桥北方工程有限公司 A kind of concrete mixing station heating heat preserving method
CN114474338A (en) * 2022-01-05 2022-05-13 中铁八局集团第七工程有限公司 Prefabrication production method for railway T beam in high-cold high-altitude area

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01214606A (en) * 1988-02-23 1989-08-29 Nikko Kk Manufacture of asphalt composite material and ready-mix concrete, and device therefor
CN202053382U (en) * 2011-05-05 2011-11-30 天津二十冶建设有限公司 Winter construction heating system for mixing plant
CN103291322A (en) * 2013-05-08 2013-09-11 中铁隧道集团有限公司 Anti-freezing heating method for concrete construction of double-track railway tunnels in winter
CN203345490U (en) * 2013-06-19 2013-12-18 方圆集团海阳建设机械有限公司 Water heating device used for aggregate hopper in winter
CN203876048U (en) * 2014-05-19 2014-10-15 三一汽车制造有限公司 Mixing station

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01214606A (en) * 1988-02-23 1989-08-29 Nikko Kk Manufacture of asphalt composite material and ready-mix concrete, and device therefor
CN202053382U (en) * 2011-05-05 2011-11-30 天津二十冶建设有限公司 Winter construction heating system for mixing plant
CN103291322A (en) * 2013-05-08 2013-09-11 中铁隧道集团有限公司 Anti-freezing heating method for concrete construction of double-track railway tunnels in winter
CN203345490U (en) * 2013-06-19 2013-12-18 方圆集团海阳建设机械有限公司 Water heating device used for aggregate hopper in winter
CN203876048U (en) * 2014-05-19 2014-10-15 三一汽车制造有限公司 Mixing station

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108266012A (en) * 2018-01-17 2018-07-10 中铁隆工程集团有限公司 A kind of sandstone feed bin for winter construction
CN108951636A (en) * 2018-07-13 2018-12-07 中国电建集团铁路建设有限公司 A kind of extremely frigid zones subway station concrete construction heat preserving method
CN109610894A (en) * 2018-12-10 2019-04-12 中交公局桥隧工程有限公司 A kind of blending station thermal insulation construction technique
CN110370452A (en) * 2019-07-31 2019-10-25 中交路桥北方工程有限公司 A kind of concrete mixing station heating heat preserving method
CN114474338A (en) * 2022-01-05 2022-05-13 中铁八局集团第七工程有限公司 Prefabrication production method for railway T beam in high-cold high-altitude area
CN114474338B (en) * 2022-01-05 2024-05-28 中铁八局集团第七工程有限公司 Prefabrication production method for railway T-beam in high-cold high-altitude area

Also Published As

Publication number Publication date
CN107310045B (en) 2020-05-12

Similar Documents

Publication Publication Date Title
CN107310045A (en) A kind of totally-enclosed ground heating heat insulation formula concrete plant
CN102200354A (en) Composite foam black ceramic solar heat accumulating plate and producing method as well as production applications thereof
CN106168418A (en) A kind of CCHP diaphram wall device and construction method thereof
Chaurasia Solar water heaters based on concrete collectors
CN106592430A (en) Cast-in-place winter construction method for hanging basket cantilever
CN107062474B (en) Near-zero energy consumption building system based on energy storage
CN206111210U (en) Freeze proof device of long tunnel concrete in winter of cold area heat preservation
CN202630200U (en) Dedicated underground heat reservoir for solar underground seasonal heat storage heating system
CN105779281B (en) Super-huge spiral automatic high-temperature anaerobic fermentation pond
CN109610894A (en) A kind of blending station thermal insulation construction technique
CN206690296U (en) A kind of circulating concrete curing device of hot-water bottle
CN102538117B (en) Ventilation drying system for tower range of underground garage of high-rise residential building
CN201000274Y (en) High efficiency energy conservation tunnel kiln
CN202709274U (en) Raised floor type fire tank radiation heating device
WO2011116625A1 (en) Composite solar heat collecting plate of foam and black ceramic and its manufacturing method and applications
CN211446464U (en) Asphalt mixing system utilizing light energy conversion heating
CN208329313U (en) The ceiling heating refrigeration structure being mounted on the downside of floor
CN209688970U (en) Solar energy is across the season heating water system of unique supplying heat source
CN206186109U (en) Mix building heating heat preservation device
CN113373041B (en) Large/ultra-large methane tank suitable for dry continuous fermentation
CN107306695A (en) Solar energy and underground heat composite greenhouse
CN101144651B (en) Ceramic solar board heat collector manufacture and mounting method
CN206993868U (en) Solar energy and underground heat composite greenhouse
CN201811330U (en) Solar energy and terrestrial heat composite heat source heating system
CN203279630U (en) Pig house with overhead pig bed structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant