CN110005169A - A kind of cracking resistance process with stressed seamless terrace - Google Patents

A kind of cracking resistance process with stressed seamless terrace Download PDF

Info

Publication number
CN110005169A
CN110005169A CN201910293911.0A CN201910293911A CN110005169A CN 110005169 A CN110005169 A CN 110005169A CN 201910293911 A CN201910293911 A CN 201910293911A CN 110005169 A CN110005169 A CN 110005169A
Authority
CN
China
Prior art keywords
terrace
steel strand
strand wires
laid
cracking resistance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910293911.0A
Other languages
Chinese (zh)
Inventor
于胜斌
韦晗
黄坤涛
于清明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Kai Yuan Engineering Design Research Institute Co Ltd
Original Assignee
China Kai Yuan Engineering Design Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Kai Yuan Engineering Design Research Institute Co Ltd filed Critical China Kai Yuan Engineering Design Research Institute Co Ltd
Priority to CN201910293911.0A priority Critical patent/CN110005169A/en
Publication of CN110005169A publication Critical patent/CN110005169A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/12Flooring or floor layers made of masses in situ, e.g. seamless magnesite floors, terrazzo gypsum floors

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to terrace technologies, the especially field that has higher requirements of terrace quality, it is exactly a kind of cracking resistance process with stressed seamless terrace, the present invention passes through stressed seamless terrace, using high-intensitive presstressed reinforcing steel (i.e. steel strand wires), certain prestressing force is established in ground floor structure by post stretching tensioned prestressing bar, enhances the cracking resistance of ground structure, and reduces the spacing at expansion joint.With post-tensioned pre-stressed technology, prevents the cutting seam of concrete, solve ground problem of Cracking, extend terrace service life.

Description

A kind of cracking resistance process with stressed seamless terrace
Technical field
The present invention relates to the fields that terrace technology, especially terrace quality have higher requirements, and are exactly a kind of tools There is the cracking resistance process of stressed seamless terrace.
The prior art
On the one hand transporting equipment air cushion vehicle running region will consider driving safety, while consider air bag maintenance cost, right High-level shelf fork truck running region and food processing workshop, since terrace to be considered cracking leads to bacteria breed, construction skill is wanted Ask very high.
In existing technique, according to ground situation, concrete base uses different soil properties such as: element soil, dirt, landfill is simultaneously It is tamped, different thick graded broken stones, compacting factor >=0.95, different concrete strengths is next laid with according to load requirement Bed course, finally carry out concreting work, wherein match double-layer double-direction steel mesh in concrete.
Existing problems and disadvantages:
(1) concrete the characteristics influence such as is crept from chemical shrinkage of experiencing, dry and wet contractions, temperature deformation, ground, will cause ground Differential settlement, situations such as leading to ground peeling, crack.
(2) ground cracking not only will affect use, also will increase the maintenance cost in later period.
(3) performance of concrete floor wear-resisting property and anti-heavy impact is poor, easy to wear, cracking.
Summary of the invention
The object of the present invention is to provide a kind of good manufacturability, the better performances of wear-resisting property and anti-heavy impact are not easy to grind The cracking resistance process with stressed seamless terrace of damage and cracking.
The object of the present invention is achieved like this, a kind of cracking resistance process with stressed seamless terrace, special Sign is: include at least following processing step:
(1) terrace is selected;
(2) basement process is carried out to selection terrace;
(3) rubble is carried out to ground treated terrace, sand bedding course is laid with;
(4) laying of PE film is carried out in rubble, sand bedding course laying;
(5) it carries out manufacturing template installation on PE thin film boundary;
(6) processing of anchorage and busting reinforcement construction and wall side column foot is fixed on its periphery after template installation;In template pair It answers position to open up anchorage fixation hole and busting reinforcement, insulation blocking is carried out to wall side column foot, part sets stiffener;
(7) bellows is laid;
(8) steel strand wires are laid, steel strand wires are placed in tray and unpack to steel strand wires, cut under steel strand wires using angle grinder Material;
(9) construction muscle is laid on steel strand wires;
(10) concreting is vibrated at the expansion joint of terrace, at busting reinforcement using hand-held vibrating head supplement;
(11) laser smoothing carries out laser smoothing construction using laser smoothing equipment, and laser smoothing equipment collection scraper is vibrated and whole Flat Yu Yiti, leveling coverage rate up to 95% or more, can not overlay area sufficiently vibrated using vibrating head, it is whole using floating rule It is flat;Absolute altitude must be checked using laser levelling system check at any time in flattening course;
(12) it is compacted, smoothes out, receives light and maintenance;
(13) tension steel strand carries out autofrettage;
(14) it is in the milk in the gap that terrace anchorage is formed.
The step (3) carries out rubble to ground treated terrace, sand bedding course laying includes:
Rubble carries out gradation, and same size classify, is removed containing sharp particle, sand mode is laid in, uses machine Tool compacting;Slope is looked on four side of monolithic concrete;Reach basement process flatness requirement.
The step (4) carries out the laying of PE film in rubble, sand bedding course laying
It is laid with using two layers 0.3mmPE film, upper layer uses fusion joining process, and lower layer is using adhesive tape processing, and upper and lower level PE film is along connecing Seam direction is vertically laid with;It checks that leakage is worn a little before casting concrete, wears to seal using adhesive tape if any leakage and mend.
The step (5) carries out manufacturing template installation on PE thin film boundary
Template is set according to designed elevation, with laser levelling system detection formwork elevation measuring, is adjusted at deviation using wedge block;It is all Angle steel is set at expansion joint, steel strand wires drawknot is fixed.
The step (7) lays bellows
Steel strand wires are placed in bellows, is then laid with and places steel strand wires bellows, and laying places steel strand wires bellows using vertical and horizontal Right-angled intersection is laid;Stirrup supporting is used at right-angled intersection, fixes infall, junction marine glue with tied silk or easy-to-draw band Band Seal treatment;The pipe U-shaped connection of slip casting is used between two adjacent bellowss of anchorage fixing end, is carried out after the pipe U-shaped connection of slip casting Encapsulation process.
The step (12) is compacted, smoothes out, receipts light and maintenance include:
The floating stage: having carried out slurry using hand-held finisher, and it is flat to carry out essence with floating rule;
It receives photophase: being compacted using drive type finisher, carry out smart levelling, the above-mentioned construction technology of repetition with floating rule again, Until receiving light terminates;
The maintenance stage: using full water curing method, and being overlapped with film and covered, as discovery water shortage should mend immediately in curing cycle Water.
Described step (13) tension steel strand, carrying out autofrettage includes:
Concreting complete 15 hours ± 30 points, carry out concrete slab base treatment, form removal takes out pre-buried plastics Box installs anchor ring, intermediate plate at plastic casing, applies 25% prestressing force at anchor ring, intermediate plate;
When concrete strength reaches requirement, prestressing force is applied using the concrete C40 of higher-strength;
Control stress for prestressing value, using the 80% of steel strand wires ultimate strength standard value, with single tendon stretch jack by root tensioning;
In tensioning construction, the theoretic elongation of presstressed reinforcing steel and the allowable error of actual elongation value should be controlled when tensioning Within ± 6%;
After the completion of tensioning work, using abrasive cutoff saw or the presstressed reinforcing steel of other machinery method cutting overlength part.
The step (14) is in the milk in the gap that terrace anchorage is formed,
After the completion of tension process, all presstressed reinforcing steels to be implemented to be in the milk, grouting is injected from one end, until slurry is full in pipeline, There is no a gas bubbles left, cement slurry flows out from slurry output end and until consistency and mud jacking end are essentially identical;
It is the design requirement of 40MPa that slurry, which should meet shrinkage-void and 28 days intensity,;
Slurry will carry out fluidity testing and strength test;
After grouting material solidification, extra Grouting Pipe is cut off, blocks anchorage position to concordant using concrete mortar.
The invention has the advantages that
(1) a certain number of presstressed reinforcing steels are added in engineering method of the present invention in concrete in advance, and are existed in advance by post-tensioning pull technology Certain tensile stress is established in floor structure, can overcome concrete itself chemical shrinkage, dry and wet contraction, temperature deformation, ground The problem of Cracking that the characteristics such as creep influence.
(2) engineering method of the present invention can prevent the construction joint of concrete, only a small amount of or jointless, avoid terrace and open It splits, reduces the maintenance cost in terrace later period, bring economic benefit for enterprise.
(3) engineering method of the present invention to using C35 or more concrete, guarantee its hardness and rigidity, have fine durability and The performance of anti-heavy impact.
The present invention passes through post stretching using high-intensitive presstressed reinforcing steel (i.e. steel strand wires) by stressed seamless terrace It draws presstressed reinforcing steel to establish certain prestressing force in ground floor structure, enhances the cracking resistance of ground structure, and reduce expansion joint Spacing.With post-tensioned pre-stressed technology, prevents the cutting seam of concrete, solve ground problem of Cracking, extend terrace and use the longevity Life.
Detailed description of the invention
Below with reference to concrete technology flow process figure, the invention will be further described:
Fig. 1 is process flow chart of the embodiment of the present invention.
Specific embodiment
As shown in Figure 1, a kind of cracking resistance process with stressed seamless terrace, it is characterized in that: including at least such as Lower processing step:
(1) terrace is selected;
(2) basement process is carried out to selection terrace;
(3) rubble is carried out to ground treated terrace, sand bedding course is laid with;
Rubble carries out gradation, removes containing sharp particle, uses mechanical ramming;
Sand mode is laid in;
Surface layer looks for slope mode: slope is looked on four side of monolithic concrete;
Smooth degree of layer requirement: with basement process flatness requirement.
(4) laying of PE film is carried out in rubble, sand bedding course laying;
Paving mode: being laid with using two layers of 0.3mmPE film, and upper layer uses fusion joining process, and lower layer is handled using adhesive tape, upper and lower level PE Film is vertically laid with along seam direction;
It needs to check that leakage is worn a little before casting concrete, wears to seal using adhesive tape if any leakage and mend.
(5) production template installation is carried out on PE thin film boundary;
Template is set according to designed elevation, with laser levelling system detection formwork elevation measuring, is adjusted at deviation using wedge block;
Angle steel is set at all expansion joints, steel strand wires drawknot is fixed.
(6) processing of anchorage and busting reinforcement construction and wall side column foot is fixed on its periphery after template installation;In mould Plate corresponding position opens up anchorage fixation hole and busting reinforcement, carries out insulation blocking to wall side column foot, part sets stiffener.
(7) bellows is laid;
The laying bellows includes:
A certain number of steel strand wires are placed in bellows, it is rear to be laid with;
It is laid using vertical and horizontal right-angled intersection;
Stirrup supporting is used at right-angled intersection, infall is fixed with tied silk or easy-to-draw band, at the adhesive waterproof tape closing of junction Reason;
The pipe U-shaped connection of slip casting is used between two adjacent bellowss of anchorage fixing end, is sealed place after the pipe U-shaped connection of slip casting Reason.
(8) steel strand wires are laid, steel strand wires are placed in tray and are unpacked to steel strand wires, twisted using angle grinder cutting of steel Line blanking;Steel strand wires are used to enhance ground structure crack resistance, overcome traditional terrace problem of Cracking.
(9) construction muscle is laid on steel strand wires;When constructing the laying of muscle, bellows, anchorage, template and PE must not be damaged Film;
(10) concreting:
Pour requirement: supplied frequency satisfaction pours requirement, and pumping length must not pour width lower than single storehouse;
It vibrates at the expansion joint of terrace, at busting reinforcement using hand-held vibrating head supplement.
(11) laser smoothing;
Laser smoothing construction is carried out using large laser levelling means, track needs to be laid with along casting track route;
Laser smoothing equipment integrates scraper, vibrates and flatten, leveling coverage rate up to 95% or more, can not overlay area adopt It is sufficiently vibrated with vibrating head, is flattened using floating rule;
Absolute altitude must be checked using laser levelling system check at any time in flattening course.
(12) it is compacted, smoothes out, receives light and maintenance;
The floating stage: having carried out slurry using hand-held finisher, and it is flat to carry out essence with floating rule;
It receives photophase: being compacted using drive type finisher, carry out smart levelling, the above-mentioned construction technology of repetition with floating rule again, Until receiving light terminates;
The maintenance stage: using full water curing method, and being overlapped with film and covered, as discovery water shortage should mend immediately in curing cycle Water.
(13) tension steel strand carries out autofrettage;
15 hours or so progress concrete slab base treatments are completed in concreting, and form removal takes out pre-buried plastic casing, Anchor ring, intermediate plate are installed at plastic casing, apply 25% prestressing force at anchor ring, intermediate plate;Concrete strength needs as early as possible when reaching requirement Apply whole prestressing force (using the concrete C40 of higher-strength);Control stress for prestressing value uses steel strand wires ultimate strength standard The 80% of value, with single tendon stretch jack by root tensioning;
In tensioning construction, the theoretic elongation of presstressed reinforcing steel and the allowable error of actual elongation value should be controlled when tensioning Within ± 6%;
After the completion of tensioning work, using abrasive cutoff saw or the presstressed reinforcing steel of other machinery method cutting overlength part, forbid using electricity Arc cutting.
(14) it is in the milk in the gap that terrace anchorage is formed.
In time all presstressed reinforcing steels should be implemented to be in the milk after the completion of tension process, grouting is injected from one end, until in pipeline Slurry is full, without gas bubbles left, cement slurry from slurry output end flow out and consistency and mud jacking end it is essentially identical until;
It is the design requirement of 40MPa that slurry, which should meet shrinkage-void and 28 days intensity,;
Slurry will carry out fluidity testing and strength test;
After grouting material solidification, extra Grouting Pipe is cut off, blocks anchorage position to concordant using concrete mortar.
The well-known components and common structure of component and the structure category industry that the present embodiment does not describe in detail or common hand Section, does not describe one by one here.

Claims (8)

1. a kind of cracking resistance process with stressed seamless terrace, it is characterized in that: including at least following processing step:
Select terrace;
Basement process is carried out to selection terrace;
(3) rubble is carried out to ground treated terrace, sand bedding course is laid with;
(4) laying of PE film is carried out in rubble, sand bedding course laying;
(5) it carries out manufacturing template installation on PE thin film boundary;
(6) processing of anchorage and busting reinforcement construction and wall side column foot is fixed on its periphery after template installation;In template pair It answers position to open up anchorage fixation hole and busting reinforcement, insulation blocking is carried out to wall side column foot, part sets stiffener;
(7) bellows is laid;
(8) steel strand wires are laid, steel strand wires are placed in tray and unpack to steel strand wires, cut under steel strand wires using angle grinder Material;
(9) construction muscle is laid on steel strand wires;
(10) concreting is vibrated at the expansion joint of terrace, at busting reinforcement using hand-held vibrating head supplement;
(11) laser smoothing carries out laser smoothing construction using laser smoothing equipment, and laser smoothing equipment collection scraper is vibrated and whole Flat Yu Yiti, leveling coverage rate up to 95% or more, can not overlay area sufficiently vibrated using vibrating head, it is whole using floating rule It is flat;Absolute altitude must be checked using laser levelling system check at any time in flattening course;
(12) it is compacted, smoothes out, receives light and maintenance;
(13) tension steel strand carries out autofrettage;
(14) it is in the milk in the gap that terrace anchorage is formed.
2. a kind of cracking resistance process with stressed seamless terrace according to claim 1, it is characterized in that: described The step of (3) carry out rubble to ground treated terrace, sand bedding course laying includes:
Rubble carries out gradation, and same size classify, is removed containing sharp particle, sand mode is laid in, uses machine Tool compacting;Slope is looked on four side of monolithic concrete;Reach basement process flatness requirement.
3. a kind of cracking resistance process with stressed seamless terrace according to claim 1, it is characterized in that: described The step of (4) in rubble, sand bedding course laying carry out PE film laying include:
It is laid with using two layers 0.3mmPE film, upper layer uses fusion joining process, and lower layer is using adhesive tape processing, and upper and lower level PE film is along connecing Seam direction is vertically laid with;It checks that leakage is worn a little before casting concrete, wears to seal using adhesive tape if any leakage and mend.
4. a kind of cracking resistance process with stressed seamless terrace according to claim 1, it is characterized in that: described The step of (5) carry out manufacturing template installation on PE thin film boundary and include:
Template is set according to designed elevation, with laser levelling system detection formwork elevation measuring, is adjusted at deviation using wedge block;It is all Angle steel is set at expansion joint, steel strand wires drawknot is fixed.
5. a kind of cracking resistance process with stressed seamless terrace according to claim 1, it is characterized in that: described The step of (7) lay bellows include:
Steel strand wires are placed in bellows, is then laid with and places steel strand wires bellows, and laying places steel strand wires bellows using vertical and horizontal Right-angled intersection is laid;Stirrup supporting is used at right-angled intersection, fixes infall, junction marine glue with tied silk or easy-to-draw band Band Seal treatment;The pipe U-shaped connection of slip casting is used between two adjacent bellowss of anchorage fixing end, is carried out after the pipe U-shaped connection of slip casting Encapsulation process.
6. a kind of cracking resistance process with stressed seamless terrace according to claim 1, it is characterized in that: described The step of (12) compacting, smooth out, receive light and maintenance and include:
The floating stage: having carried out slurry using hand-held finisher, and it is flat to carry out essence with floating rule;
It receives photophase: being compacted using drive type finisher, carry out smart levelling, the above-mentioned construction technology of repetition with floating rule again, Until receiving light terminates;
The maintenance stage: using full water curing method, and being overlapped with film and covered, as discovery water shortage should mend immediately in curing cycle Water.
7. a kind of cracking resistance process with stressed seamless terrace according to claim 1, it is characterized in that: described The step of (13) tension steel strand, carry out autofrettage include:
Concreting complete 15 hours ± 30 points, carry out concrete slab base treatment, form removal takes out pre-buried plastics Box installs anchor ring, intermediate plate at plastic casing, applies 25% prestressing force at anchor ring, intermediate plate;
When concrete strength reaches requirement, prestressing force is applied using the concrete C40 of higher-strength;
Control stress for prestressing value, using the 80% of steel strand wires ultimate strength standard value, with single tendon stretch jack by root tensioning;
In tensioning construction, the theoretic elongation of presstressed reinforcing steel and the allowable error of actual elongation value should be controlled when tensioning Within ± 6%;
After the completion of tensioning work, using abrasive cutoff saw or the presstressed reinforcing steel of other machinery method cutting overlength part.
8. a kind of cracking resistance process with stressed seamless terrace according to claim 1, it is characterized in that: described The step of (14) the gap that terrace anchorage is formed be in the milk,
After the completion of tension process, all presstressed reinforcing steels to be implemented to be in the milk, grouting is injected from one end, until slurry is full in pipeline, There is no a gas bubbles left, cement slurry flows out from slurry output end and until consistency and mud jacking end are essentially identical;
It is the design requirement of 40MPa that slurry, which should meet shrinkage-void and 28 days intensity,;
Slurry will carry out fluidity testing and strength test;
After grouting material solidification, extra Grouting Pipe is cut off, blocks anchorage position to concordant using concrete mortar.
CN201910293911.0A 2019-04-12 2019-04-12 A kind of cracking resistance process with stressed seamless terrace Pending CN110005169A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910293911.0A CN110005169A (en) 2019-04-12 2019-04-12 A kind of cracking resistance process with stressed seamless terrace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910293911.0A CN110005169A (en) 2019-04-12 2019-04-12 A kind of cracking resistance process with stressed seamless terrace

Publications (1)

Publication Number Publication Date
CN110005169A true CN110005169A (en) 2019-07-12

Family

ID=67171534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910293911.0A Pending CN110005169A (en) 2019-04-12 2019-04-12 A kind of cracking resistance process with stressed seamless terrace

Country Status (1)

Country Link
CN (1) CN110005169A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714591A (en) * 2019-09-18 2020-01-21 北京银泰建构预应力技术股份有限公司 Armor seam device suitable for whole terrace of prestressing force
CN110735513A (en) * 2019-10-24 2020-01-31 安徽四建控股集团有限公司 Construction method of prestressed terraces
CN111119445A (en) * 2020-01-03 2020-05-08 云南维度装饰工程有限公司 Construction method for building thin leveling layer based on prestress
CN111691640A (en) * 2020-06-29 2020-09-22 海通建设集团有限公司 Prestressed seamless terrace and construction method thereof
CN113107129A (en) * 2021-04-20 2021-07-13 中国建筑第七工程局有限公司 Super high-rise post-tensioning method bonded prestressed beamless floor construction method
CN113738062A (en) * 2021-09-13 2021-12-03 中铁十八局集团有限公司 Whole seamless terrace of prestressing force

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH678078A5 (en) * 1987-06-16 1991-07-31 Hartmut Zimmermann Tile covering for concrete floor
FR2663663B1 (en) * 1990-06-25 1993-10-15 Siplast Sa UNDERCOAT FOR LAYING TILES OR TILES.
CN102561381A (en) * 2011-12-29 2012-07-11 中国一冶集团有限公司 Method for preventing settling and cracking of large-area terrace by using bonded prestressed concrete beams in soft soil layer region
CN104947916A (en) * 2015-06-17 2015-09-30 重庆建工住宅建设有限公司 Extra-large area concrete floor structure shrinkage control construction technology
CN105781199A (en) * 2016-04-06 2016-07-20 北京市政建设集团有限责任公司 Construction method for bottom plate sliding layers of large ponds of water works
CN106988507A (en) * 2017-04-19 2017-07-28 中建七局安装工程有限公司 A kind of shielding prestressing force method for constructing terrace of suppression electromagnetic interference
CN109653511A (en) * 2019-01-18 2019-04-19 中如建工集团有限公司 Large-span bidirectional mixing prestressing force complete construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH678078A5 (en) * 1987-06-16 1991-07-31 Hartmut Zimmermann Tile covering for concrete floor
FR2663663B1 (en) * 1990-06-25 1993-10-15 Siplast Sa UNDERCOAT FOR LAYING TILES OR TILES.
CN102561381A (en) * 2011-12-29 2012-07-11 中国一冶集团有限公司 Method for preventing settling and cracking of large-area terrace by using bonded prestressed concrete beams in soft soil layer region
CN104947916A (en) * 2015-06-17 2015-09-30 重庆建工住宅建设有限公司 Extra-large area concrete floor structure shrinkage control construction technology
CN105781199A (en) * 2016-04-06 2016-07-20 北京市政建设集团有限责任公司 Construction method for bottom plate sliding layers of large ponds of water works
CN106988507A (en) * 2017-04-19 2017-07-28 中建七局安装工程有限公司 A kind of shielding prestressing force method for constructing terrace of suppression electromagnetic interference
CN109653511A (en) * 2019-01-18 2019-04-19 中如建工集团有限公司 Large-span bidirectional mixing prestressing force complete construction method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110714591A (en) * 2019-09-18 2020-01-21 北京银泰建构预应力技术股份有限公司 Armor seam device suitable for whole terrace of prestressing force
CN110714591B (en) * 2019-09-18 2021-06-01 北京银泰建构预应力技术股份有限公司 Armor seam device suitable for whole terrace of prestressing force
CN110735513A (en) * 2019-10-24 2020-01-31 安徽四建控股集团有限公司 Construction method of prestressed terraces
CN111119445A (en) * 2020-01-03 2020-05-08 云南维度装饰工程有限公司 Construction method for building thin leveling layer based on prestress
CN111691640A (en) * 2020-06-29 2020-09-22 海通建设集团有限公司 Prestressed seamless terrace and construction method thereof
CN111691640B (en) * 2020-06-29 2021-08-03 海通建设集团有限公司 Prestressed seamless terrace and construction method thereof
CN113107129A (en) * 2021-04-20 2021-07-13 中国建筑第七工程局有限公司 Super high-rise post-tensioning method bonded prestressed beamless floor construction method
CN113738062A (en) * 2021-09-13 2021-12-03 中铁十八局集团有限公司 Whole seamless terrace of prestressing force

Similar Documents

Publication Publication Date Title
CN110005169A (en) A kind of cracking resistance process with stressed seamless terrace
US2780150A (en) Method of laying prefabricated concrete slabs
CN108330835A (en) The construction method of setting bracket
CN105926470B (en) Elevated bridge remodeling method
CN109505229A (en) Highway high gradient slope stress equilibrium and vibration damping are taken precautions against natural calamities high bridge pier structure and construction method
CN102505709A (en) Concrete-formwork-precast foundation construction method
CN111074943A (en) Construction method for integrally casting inspection well shaping steel mould in situ
CN110863498A (en) Deep foundation pit combined supporting construction method next to subway station
CN100482993C (en) Lay out method of pipeline and synthetic pipeline with pipe frame component
CN111997066A (en) Manufacturing and construction method of assembled prestressed anchor cable frame beam for slope reinforcement
CN110552371A (en) Construction method for eliminating horizontal construction joints of annular lining wall based on reverse construction method
CN110747762A (en) Cement member crossing highway and its installation method
CN110747903A (en) Porous frame bridge and assembling construction method thereof
CN110184948A (en) A kind of Bridge beam construction method
CN114319611A (en) Horizontal installation method of rubber water stop
CN103866982B (en) A kind of petal art framework construction method
CN102635104A (en) Wedge-shaped Geocell cement reinforced soil structure for road-bridge connection and construction method thereof
CN109881592B (en) Trapezoidal drainage ditch construction method adopting single-side formwork
CN111042843A (en) Pre-anchoring method for underground excavated tunnel
CN111851155A (en) Steel spring floating plate construction method based on concentric tunnel of line tunnel
CN110374012A (en) A kind of prefabricated engineering method of T beam original position Support Method
CN110468729B (en) Construction method of frame bridge
CN109024670A (en) Underground pipe gallery protection reinforcement system and reinforcement means are worn on buried high-tension cable
CN105970838B (en) Deck Arch Bridges vault filler unloads and reinforced construction method and application
CN210712595U (en) Cement member crossing road

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190712