CN109989470A - The encapsulating method that precast concrete well is connect with steel band bellows - Google Patents
The encapsulating method that precast concrete well is connect with steel band bellows Download PDFInfo
- Publication number
- CN109989470A CN109989470A CN201910337862.6A CN201910337862A CN109989470A CN 109989470 A CN109989470 A CN 109989470A CN 201910337862 A CN201910337862 A CN 201910337862A CN 109989470 A CN109989470 A CN 109989470A
- Authority
- CN
- China
- Prior art keywords
- precast concrete
- concrete well
- steel band
- bellows
- band bellows
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/06—Methods of, or installations for, laying sewer pipes
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/02—Manhole shafts or other inspection chambers; Snow-filling openings; accessories
- E03F5/021—Connection of sewer pipes to manhole shaft
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F5/00—Sewerage structures
- E03F5/04—Gullies inlets, road sinks, floor drains with or without odour seals or sediment traps
- E03F5/0401—Gullies for use in roads or pavements
Abstract
The present invention is a kind of encapsulating method that precast concrete well is connect with steel band bellows, belong to the water supply and drainage construction method of architectural engineering, it is characterized in that after the installation of precast concrete well is in place, adjustment, connecting portion between fixed steel band bellows and precast concrete well, the inside hole of reserving hole is blocked using baffle and support, waterproof material is filled from the outside of precast concrete well again, it is tightly connected the space at position, the periphery that steel band bellows are located at the inside and outside hole of reserving hole is subjected to shell nosing treatment with waterproof mortar, the construction procedure of the encapsulating method is: one, adjustment, the position of fixed precast concrete well and bellows, two, the temporary plugging at hole on the inside of the well of reserving hole, three, fill waterproof material, four, waterproof mortar closes up, five, closed-water test, detection;It wherein uses cement, asbestos and water to mix and stir into waterproof material according to percentage for the ratio of 1:4:0.5 to be filled, improves sealing effect and construction quality, saved the duration.
Description
Technical field
The invention belongs to the water supply and drainage construction methods of architectural engineering, more particularly, to a kind of precast concrete well and steel band wave
The construction method of line pipe connection.
Background technique
Currently, rainfall and sewage pipes road and the connection of precast concrete well are close in the outdoor drainage engineering of Collapsible Loess District
The construction method of envelope is general are as follows: pre- on the borehole wall of prefabricated reinforced concrete well (abbreviation precast concrete well) when well room is constructed
Radial hole (abbreviation reserving hole) is stayed, one end section of rainfall and sewage pipes road (usually steel band bellows) is inserted into reserved
In hole, the connecting portion of the borehole wall of rainfall and sewage pipes road and precast concrete well fills real using waterproof mortar, in connecting portion
Concrete pack is arranged in outside;This method existing defects: first, waterproof mortar fills real not in place, and not can be carried out effective vibration
Construction is smash, easily there is gap, well room is caused to leak;Second, concrete pack setting only serves fixed function, not can guarantee waterproof
Quality.
Summary of the invention
The purpose of the present invention is to propose to a kind of encapsulating methods that precast concrete well is connect with steel band bellows, guarantee steel band
The sealing waterproof performance of bellows connection, improves construction quality, reduces construction cost, reduces the construction period, realizes quality and ring
Protect synchronous improve.
A kind of the object of the present invention is achieved like this: sealing side that precast concrete well is connect with steel band bellows
Method, it is characterized in that: after precast concrete well and steel band bellows (abbreviation bellows) installation (inserting) are in place, adjustment is fixed
Connecting portion between steel band bellows and precast concrete well, by the inside hole of the reserving hole on the precast concrete well borehole wall
It mouthful is blocked using baffle and support, then from the outside of the reserving hole on precast concrete well by free of contamination waterproof material
Steel band bellows, are finally located at the periphery waterproof at the medial and lateral hole of reserving hole by filling, the space for being tightly connected position
Mortar carries out shell nosing treatment.
A kind of encapsulating method that precast concrete well is connect with steel band bellows, construction procedure is:
One, adjust, the position of fixed precast concrete well and bellows, two, on the inside of reserving hole hole temporary plugging,
Three, waterproof material, four, waterproof mortar closing in, five, closed-water test, detection are filled.
Wherein:
One) it, adjusts, the position of fixed precast concrete well and bellows: (see Fig. 1)
After precast concrete well 1 is in place according to the absolute altitude installation of drawing, according to design, steel band bellows 2, this steel are installed
Right section with bellows 2 reserving hole put on 1 borehole wall of precast concrete well and the inner wall for stretching out precast concrete well 1 are adjusted
The position of whole precast concrete well 1 and steel band bellows 2 in reserving hole will close on the left-external side well of precast concrete well 1
One section of steel band bellows 2 on side take general bracket to be temporarily fixed, and reserve the outer of steel band bellows 2 in reserving hole
The space of the filling waterproof layer 5 on wall periphery.
Two), the temporary plugging at reserving hole inside hole: (see Fig. 1)
1), according to the diameter of the reserving hole on 1 borehole wall of the caliber of steel band bellows 2 and precast concrete well, steel is made
The baffle 3 of matter, the baffle 3 are the disc-shaped plate in arc surface, and the disc radius of the baffle 3 should be bigger than the radius of reserving hole
The ㎜ of 150mm~200,3 available thickness of baffle are made of the steel plate of 4 ㎜, the radius and precast concrete of the arc surface of the baffle 3
The inside radius of well 1 is consistent, opens up centre bore on baffle 3, the outer radius phase of the radius and steel band bellows 2 of this centre bore
Together, this baffle 3 is sleeved in the well inner end section of steel band bellows 2, while this baffle 3 is blocked on precast concrete well 1
Reserving hole inside hole on.
2), radial support 4 is installed in the inner cavity of precast concrete well 1, reinforcing is supported to baffle 3, the support 4
It can be made of the lumps of wood, which is respectively corresponded and is arranged on upper and lower, forward and backward four positions of 2 periphery of steel band bellows,
The vertical lumps of wood is added in left part positioned at two supports 4 in front and back of 2 periphery of steel band bellows, to enhance the reinforcing to baffle 3
Effect, meanwhile, while each support 4 is fixed using timber wedge.
Three) waterproof material: (see Fig. 1), is filled
Waterproof layer 5 is filled in the peripheral space of steel band bellows 2 in reserving hole, which is to use
Ordinary cement: asbestos: water according to (percentage) ratio: 1:4:0.5 is mixed and stirred, which divides five layers of filling to ram
It is real, using hand compaction, make tight between the reserving hole wall on steel band bellows 2 and precast concrete well 1.
Four), waterproof mortar closes up:
After waterproof layer 5 is filled, after conserving 2~3 hours, baffle 3 and each support 4 are removed, using logical
Outside portion of the waterproof mortar course 6 to the inside and outside hole for the reserving hole of steel band bellows 2 being located on precast concrete well 1
Position is sealed, and is then conserved according to conventional.
5), closed-water test, detection:
After waterproof mortar course 6 conserves qualification, using conventional method, to precast concrete well 1 and steel band bellows 2 according to
Section carries out closing water experiment detection, and whether observation precast concrete well 1 and the connecting portion of steel band bellows 2 have infiltration phenomenon,
Observation 30 minutes, no infiltration phenomenon, sealing are qualified.
The encapsulating method that precast concrete well proposed by the invention is connect with steel band bellows is reduced using reliable
The consumption and waste of sealing material, reduce construction cost, improve the effect of sealing waterproof.
The sealing that precast concrete well proposed by the invention is connect with steel band bellows now in conjunction with drawings and examples
Method is described further.
Detailed description of the invention
Fig. 1 is the vertical view when encapsulating method that precast concrete well proposed by the invention is connect with steel band bellows uses
Schematic diagram (cross-sectional view).
In Fig. 1:
1, precast concrete well 2, steel band bellows 3, baffle 4, support 5, waterproof layer 6, waterproof mortar course
Embodiment
In certain garden construction work, used between outdoor rainfall and sewage pipes road (steel band bellows) and precast concrete well
This method is sealed, altogether installation 810, precast concrete well, outdoor rainfall and sewage pipes road (steel band bellows) and concrete
Airtight quality between native well is disposable qualification 810, and disposable qualification rate 100% saves the duration 20 days, obtains management list
Position favorable comment consistent with owner's.
Claims (3)
1. a kind of encapsulating method that precast concrete well is connect with steel band bellows, it is characterized in that: in precast concrete well and steel
Band bellows installation is the connecting portion after inserting in place, between adjustment, fixed steel band bellows and precast concrete well, will be pre-
The inside hole of reserving hole on the concrete well borehole wall processed is blocked using baffle and support, then from precast concrete well
The outside of reserving hole free of contamination waterproof material is filled, is tightly connected the space at position, finally by steel band bellows position
Shell nosing treatment is carried out with waterproof mortar in the periphery at the medial and lateral hole of reserving hole;
A kind of encapsulating method that precast concrete well is connect with steel band bellows, construction procedure is:
One, adjust, the position of fixed precast concrete well and bellows, two, on the inside of reserving hole hole temporary plugging, three,
Fill waterproof material, four, waterproof mortar closing in, five, closed-water test, detection;
Wherein:
One) it, adjusts, the position of fixed precast concrete well and bellows:
After precast concrete well (1) is in place according to the absolute altitude installation of drawing, according to design, install steel band bellows (2), this steel
Right section with bellows (2) reserving hole put on precast concrete well (1) borehole wall simultaneously stretches out the interior of precast concrete well (1)
Wall adjusts the position of precast concrete well (1) and steel band bellows (2) in reserving hole, will close on precast concrete well (1)
One section of steel band bellows (2) on left-external side well side take general bracket to be temporarily fixed, reserve steel in reserving hole
The space of the filling waterproof layer (5) on the outer wall periphery with bellows (2);
Two), the temporary plugging at reserving hole inside hole:
1), according to the diameter of the reserving hole on the caliber of steel band bellows (2) and precast concrete well (1) borehole wall, steel is made
The baffle (3) of matter, the baffle (3) are the disc-shaped plate in arc surface, and the disc radius of the baffle (3) should be than the half of reserving hole
The radius of the diameter ㎜ of big 150mm~200, the arc surface of the baffle (3) are consistent with the inside radius of precast concrete well (1), are keeping off
Plate opens up centre bore on (3), and the radius of this centre bore is identical as the outer radius of steel band bellows (2), this baffle (3) is sleeved on
In the well inner end section of steel band bellows (2), while this baffle (3) is blocked into the reserving hole on precast concrete well (1)
On the hole of inside;
2) radial support (4), is installed in the inner cavity of precast concrete well (1), reinforcing is supported to baffle (3), by this
Support (4), which respectively corresponds, to be arranged on upper and lower, forward and backward four positions of steel band bellows (2) periphery, and steel strip corrugated is being located at
The vertical lumps of wood is added in the left part for managing two supports (4) in front and back of (2) periphery, to enhance the consolidation effect to baffle (3), together
When, while each support (4) is fixed using timber wedge;
Three) waterproof material, is filled:
Waterproof layer (5) are filled in the peripheral space of steel band bellows (2) in reserving hole, which is to use
Ordinary cement: asbestos: water according to percentage ratio: 1:4:0.5 is mixed and stirred, points of five layers fillings rammer of the waterproof layer (5)
It is real, using hand compaction, make tight between the reserving hole wall on steel band bellows (2) and precast concrete well (1);
Four), waterproof mortar closes up:
After waterproof layer (5) is filled, baffle (3) and each support (4) are removed after conserving 2~3 hours, using logical
Inside and outside hole of the waterproof mortar course (6) to the reserving hole of steel band bellows (2) being located on precast concrete well (1)
Outside left is sealed, and is then conserved according to conventional;
5), closed-water test, detection:
After waterproof mortar course (6) maintenance is qualified, using conventional method, precast concrete well (1) and steel band bellows (2) are pressed
It carries out closing water experiment detection according to section, whether observation precast concrete well (1) and the connecting portion of steel band bellows (2) have infiltration
Phenomenon is observed 30 minutes, no infiltration phenomenon, and sealing is qualified.
2. the encapsulating method that precast concrete well according to claim 1 is connect with steel band bellows, it is characterised in that should
Baffle (3) is made of the steel plate with a thickness of 4 ㎜.
3. the encapsulating method that precast concrete well according to claim 1 is connect with steel band bellows, it is characterised in that should
Support (4) is made of the lumps of wood.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910337862.6A CN109989470A (en) | 2019-04-25 | 2019-04-25 | The encapsulating method that precast concrete well is connect with steel band bellows |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910337862.6A CN109989470A (en) | 2019-04-25 | 2019-04-25 | The encapsulating method that precast concrete well is connect with steel band bellows |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109989470A true CN109989470A (en) | 2019-07-09 |
Family
ID=67135226
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910337862.6A Pending CN109989470A (en) | 2019-04-25 | 2019-04-25 | The encapsulating method that precast concrete well is connect with steel band bellows |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109989470A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113445609A (en) * | 2021-07-13 | 2021-09-28 | 中国建筑第四工程局有限公司 | Well chamber prefabricated by municipal rainwater and sewage and well chamber pipe orifice plugging construction method |
CN113833085A (en) * | 2021-11-12 | 2021-12-24 | 中建七局安装工程有限公司 | Maintenance method for inspection well without stopping water supply |
CN114382157A (en) * | 2021-12-30 | 2022-04-22 | 上海市机械施工集团有限公司 | Construction method of concrete ventilation well |
CN114382157B (en) * | 2021-12-30 | 2024-04-23 | 上海市机械施工集团有限公司 | Construction method of concrete gas permeable well |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070024959A (en) * | 2005-08-31 | 2007-03-08 | 황요안 | Method of connecting manhole and water stopping pipe using water-swelled rubber ring |
CN204001724U (en) * | 2014-07-30 | 2014-12-10 | 西安市建筑工程总公司 | Mould constructing structure is hung in a kind of drainage pipe preformed hole sizing |
CN205090098U (en) * | 2015-09-30 | 2016-03-16 | 中国建筑第八工程局有限公司 | Pipeline hangs hole block structure |
CN205088748U (en) * | 2015-11-11 | 2016-03-16 | 四川亿欣新材料有限公司 | Tank sealing device |
CN107956246A (en) * | 2017-11-08 | 2018-04-24 | 中国葛洲坝集团三峡建设工程有限公司 | A kind of large-scale inspection shaft segmentation prefabricating construction method of installation |
-
2019
- 2019-04-25 CN CN201910337862.6A patent/CN109989470A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20070024959A (en) * | 2005-08-31 | 2007-03-08 | 황요안 | Method of connecting manhole and water stopping pipe using water-swelled rubber ring |
CN204001724U (en) * | 2014-07-30 | 2014-12-10 | 西安市建筑工程总公司 | Mould constructing structure is hung in a kind of drainage pipe preformed hole sizing |
CN205090098U (en) * | 2015-09-30 | 2016-03-16 | 中国建筑第八工程局有限公司 | Pipeline hangs hole block structure |
CN205088748U (en) * | 2015-11-11 | 2016-03-16 | 四川亿欣新材料有限公司 | Tank sealing device |
CN107956246A (en) * | 2017-11-08 | 2018-04-24 | 中国葛洲坝集团三峡建设工程有限公司 | A kind of large-scale inspection shaft segmentation prefabricating construction method of installation |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113445609A (en) * | 2021-07-13 | 2021-09-28 | 中国建筑第四工程局有限公司 | Well chamber prefabricated by municipal rainwater and sewage and well chamber pipe orifice plugging construction method |
CN113833085A (en) * | 2021-11-12 | 2021-12-24 | 中建七局安装工程有限公司 | Maintenance method for inspection well without stopping water supply |
CN114382157A (en) * | 2021-12-30 | 2022-04-22 | 上海市机械施工集团有限公司 | Construction method of concrete ventilation well |
CN114382157B (en) * | 2021-12-30 | 2024-04-23 | 上海市机械施工集团有限公司 | Construction method of concrete gas permeable well |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5002438A (en) | Method of rehabilitating manholes by custom lining/relining | |
CN105178344B (en) | The construction method of the built-in anti-float anchor rod plugging structure of sole plate precipitation of deep well | |
CN202580323U (en) | Two-side flexible waterproof sleeve pipe | |
CN206706791U (en) | Base pit dewatering well plugging structure | |
CN112832279B (en) | Waterproof structure and method for dewatering well of underground foundation pit | |
CN109989470A (en) | The encapsulating method that precast concrete well is connect with steel band bellows | |
CN203145029U (en) | Plugging structure for deep foundation pit dewatering well | |
CN207298095U (en) | Concordant type flexibility wall bushing structure | |
CN104878771A (en) | Construction method for vacuum tube well dewatering system | |
CN101781935B (en) | Method for substituting pre-embedded waterproof casing pipe in concrete structure | |
CN212837843U (en) | IV-class and V-class surrounding rock tunnel concrete lining anti-cracking structure | |
CN210562162U (en) | Prefabricated tubular pile crackle prosthetic devices | |
CN110080796B (en) | Tunnel segment repairing process | |
CN103174154A (en) | Underground building bottom plate water burst well pit solid seal method and auxiliary water lowering device | |
CN203514332U (en) | Casing for blocking dewatering tube well of post-cast strip | |
CN211312769U (en) | Connecting member of plastic pipe and concrete prefabricated inspection well | |
CN110056012B (en) | Waterproof and drainage system of prefabricated open caisson structure | |
CN216920628U (en) | Novel precast concrete drainage inspection shaft | |
CN104975623A (en) | Non-excavation leaking inspection well repairing method and repairing structure | |
CN220725158U (en) | Device suitable for sealing off water of deep foundation pit dewatering well | |
CN104294846B (en) | A kind of underground pipe network inspection shaft concrete segment Quick well sinking method | |
CN204825970U (en) | Prefabricated assembled reinforced concrete inspection shaft | |
CN214423530U (en) | Pouring structure of precast concrete inspection well and precast concrete inspection well | |
CN220117251U (en) | Basement bottom plate dewatering well enclosed construction | |
CN219653866U (en) | Inspection shaft and HDPE winding reinforcing pipe connection structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190709 |