CN109989425A - Method for constructing underground automatic garage structure - Google Patents

Method for constructing underground automatic garage structure Download PDF

Info

Publication number
CN109989425A
CN109989425A CN201711497396.5A CN201711497396A CN109989425A CN 109989425 A CN109989425 A CN 109989425A CN 201711497396 A CN201711497396 A CN 201711497396A CN 109989425 A CN109989425 A CN 109989425A
Authority
CN
China
Prior art keywords
reinforced concrete
flat
upper plate
frame
jacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711497396.5A
Other languages
Chinese (zh)
Inventor
张春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou Jitian Patent Operation Co ltd
Original Assignee
Zhengzhou Jitian Patent Operation Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Jitian Patent Operation Co ltd filed Critical Zhengzhou Jitian Patent Operation Co ltd
Priority to CN201711497396.5A priority Critical patent/CN109989425A/en
Priority to CN202210427589.8A priority patent/CN116791669A/en
Publication of CN109989425A publication Critical patent/CN109989425A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

A method for constructing an underground automatic garage structure comprises the following steps: the method comprises the following steps: prefabricating Contraband type reinforced concrete members, wherein Contraband type reinforced concrete members are provided with supporting grooves at the suspended side ends of the upper plates, and Contraband type reinforced concrete members are respectively provided with an upright column between the two sides of the suspended side ends of the upper plates and the lower plates; prefabricating a flat T-shaped reinforced concrete upper plate and a rectangular reinforced concrete lower plate; closing the suspended side end of the prefabricated Contraband-type reinforced concrete member to form a frame-type jacking pipe I; sealing two ends of the flat T-shaped reinforced concrete upper plate and the rectangular reinforced concrete lower plate to form a frame-shaped jacking pipe II; setting a working well; firstly, jacking a frame-shaped jacking pipe I to be communicated; the other side pipe jacking channel is symmetrically arranged at a certain distance; jacking a frame-shaped jacking pipe II between the two side-edge jacking pipe channels to form a middle channel in a penetrating manner; the extension end of the flat T-shaped reinforced concrete upper plate is matched with the support groove of the Contraband-shaped reinforced concrete member, and the support closed member is removed to form the underground automatic garage structure.

Description

构筑地下自动车库构筑物的方法Method of constructing underground automatic garage structure

技术领域technical field

本发明属于城市地下工程施工技术领域,具体涉及一种构筑地下自动车库构筑物的方法。The invention belongs to the technical field of urban underground engineering construction, and particularly relates to a method for constructing an underground automatic garage structure.

背景技术Background technique

随着汽车工业的迅速发展和我国城市化进程的加速,国内很多城市遇到了停车难的问题。比较节约土地资源的方法是建立地下车库。其中,地下自动车库因为其无人操作、自动化程度高,占用空间小得到越来越广泛的应用。地下自动车库一般包括升降通道,汽车搬运架平移通道,以及平移通道两侧的停车位形成的两条停车位通道。目前构筑地下车库、停车场的方法是根据停车场、车库的设计情况,采用矩形顶管机顶进矩形顶管构筑出若干条相邻的隧道,矩形顶管采用预制混凝土和型钢混合结构; 最后,分部顶进施工完成后,对左右相邻两矩形顶管间的型钢部分进行拆除,施做钢筋混凝土立柱、梁、底板,完成地下停车库施工。With the rapid development of the automobile industry and the acceleration of urbanization in my country, many cities in China have encountered the problem of parking difficulties. The way to save land resources is to build underground garages. Among them, the underground automatic garage is more and more widely used because of its unmanned operation, high degree of automation, and small footprint. The underground automatic garage generally includes a lift channel, a translation channel for the car carrier, and two parking space channels formed by the parking spaces on both sides of the translation channel. At present, the method of constructing underground garages and parking lots is to construct several adjacent tunnels by using a rectangular pipe jacking machine to jack into the rectangular jacking pipe according to the design of the parking lot and the garage. The rectangular jacking pipe adopts a mixed structure of precast concrete and section steel; , After the branch jacking construction is completed, the section steel between the two adjacent rectangular jacking pipes on the left and right is removed, and reinforced concrete columns, beams, and bottom plates are installed to complete the construction of the underground parking garage.

这种方法需要先顶进若干条隧道,然后构筑柱子、横梁、再拆除左右相邻两矩形顶管间的型钢部分,工序相对繁琐。This method needs to jack into several tunnels first, then construct columns and beams, and then remove the section steel between the left and right adjacent rectangular jacking pipes, which is a relatively cumbersome process.

发明内容SUMMARY OF THE INVENTION

本发明的目的是提供一种节约工序、工时、成本的的构筑地下自动车库构筑物的方法。The purpose of the present invention is to provide a method for constructing an underground automatic garage structure that saves processes, man-hours and costs.

本发明的目的是以下述方式实现的:一种构筑地下自动车库构筑物的方法:包括以下步骤:The purpose of this invention is to realize in the following manner: a kind of method of constructing underground automatic garage structure: comprise the following steps:

(1)预制匚型钢筋混凝土构件,匚型钢筋混凝土构件上板悬空侧端头设置支撑槽,匚型钢筋混凝土构件上、下板的悬空测端头两侧之间分别设置一个立柱;(1) Prefabricated reinforced concrete members, support grooves are set at the suspended side ends of the upper plates of the reinforced concrete members, and a column is respectively set between the two sides of the suspended ends of the upper and lower plates of the reinforced concrete members;

(2)预制扁T型钢筋混凝土上板、矩形钢筋混凝土下板;(2) Prefabricated flat T-shaped reinforced concrete upper plate and rectangular reinforced concrete lower plate;

(3)将预制匚型钢筋混凝土构件悬空侧端头由支撑封闭构件封闭制成框型顶管Ⅰ;(3) The end of the suspended side of the prefabricated reinforced concrete member is closed by the supporting and closing member to form a frame-type jacking pipe I;

(4)将扁T型钢筋混凝土上板较短的两端、矩形钢筋混凝土下板两端之间由支撑封闭构件封闭制成框型顶管Ⅱ;其中扁T型钢筋混凝土上板伸长端伸出框型顶管Ⅱ;(4) The short ends of the flat T-shaped reinforced concrete upper plate and the two ends of the rectangular reinforced concrete lower plate are closed by supporting and closing members to form a frame-type jacking pipe II; among them, the elongated end of the flat T-shaped reinforced concrete upper plate Extend the frame type jacking pipe II;

(5)设置工作井,即设置顶进井和接受井;(5) Set up working wells, that is, set up jacking wells and receiving wells;

(6)首先顶入框型顶管Ⅰ,贯通形成侧边顶管通道; 按照设计间隔一定距离对称设置另一条侧边顶管通道;(6) First, insert the frame-type jacking pipe I to form a side pipe jacking channel; set another side pipe jacking channel symmetrically at a certain distance according to the design;

(7)在两条侧边顶管通道之间顶入框型顶管Ⅱ,贯通形成中间通道;其中扁T型钢筋混凝土上板的伸长端与匚型钢筋混凝土构件的支撑槽配合;(7) The frame-type jacking pipe II is inserted between the two side pipe jacking channels to form a middle channel; the elongated end of the flat T-shaped reinforced concrete upper plate is matched with the support groove of the reinforced concrete member;

(8)拆除支撑封闭构件;(8) Remove the supporting and closing members;

(9) 固定相邻的立柱成为一个整体,形成地下自动车库构筑物;(9) Fix the adjacent columns into a whole to form an underground automatic garage structure;

(10)根据需求重复以上步骤直到完成其余施工。(10) Repeat the above steps as required until the rest of the construction is completed.

步骤(7)中扁T型钢筋混凝土上板伸长端的下表面与支撑槽上表面之间间隙为1到3毫米;扁T型钢筋混凝土上板伸长端左右两侧与支撑槽侧边之间也存在间隙。Step (7) The gap between the lower surface of the elongated end of the flat T-shaped reinforced concrete upper plate and the upper surface of the support groove is 1 to 3 mm; the left and right sides of the elongated end of the flat T-shaped reinforced concrete upper plate and the side of the support groove There are also gaps in between.

本发明的有益效果是:立柱与匚型钢筋混凝土构件一体预制,框型顶管Ⅰ推进完成后将相邻立柱固定即可,不用在制成顶管通道后再现场浇筑立柱。框型顶管Ⅱ的扁T型钢筋混凝土上板与匚型钢筋混凝土构件上板的支撑槽配合,其配合位置位于立柱的上方,相当于横梁,也不用再设置横梁。只需要推入管片、拆除支撑封闭构件、再固定柱子即可完成基本的构筑工作,节省时间和工序。The beneficial effect of the invention is that the column and the reinforced concrete member are integrally prefabricated, and the adjacent column can be fixed after the frame-shaped pipe jacking I is pushed forward, instead of pouring the column on site after making the pipe jacking channel. The flat T-shaped reinforced concrete upper plate of the frame-type pipe jacking II is matched with the support groove of the upper plate of the reinforced concrete member, and its matching position is located above the column, which is equivalent to a beam, and there is no need to set a beam. Only need to push in the segment, remove the supporting and closing member, and then fix the column to complete the basic construction work, saving time and work.

附图说明Description of drawings

图1是匚型钢筋混凝土构件示意图。Figure 1 is a schematic diagram of a reinforced concrete member.

图2为框型顶管Ⅰ示意图。Figure 2 is a schematic diagram of the frame-type jacking pipe I.

图3为侧边顶管通道。Figure 3 shows the side jacking pipe channel.

图4为对称设置的两条侧边顶管通道。Figure 4 shows two side pipe jacking channels arranged symmetrically.

图5为扁T型钢筋混凝土上板。Figure 5 is a flat T-shaped reinforced concrete upper plate.

图6为框型顶管Ⅱ示意图。Figure 6 is a schematic diagram of the frame-type jacking pipe II.

图7为三条通道示意图。Figure 7 is a schematic diagram of three channels.

图8为拆除支撑封闭构件后地下车库完成示意图。Figure 8 is a schematic diagram of the completion of the underground garage after removing the supporting and closing members.

图9为图4之后直接只顶入扁T型钢筋混凝土上板示意图。FIG. 9 is a schematic diagram of directly pushing into the flat T-shaped reinforced concrete upper plate after FIG. 4 .

图10为顶入扁T型钢筋混凝土上板直到贯穿示意图。Fig. 10 is a schematic diagram of pushing into the flat T-shaped reinforced concrete upper plate until it penetrates.

图11为挖去扁T型钢筋混凝土上板下方土并打完地平地下车库完成示意图。Figure 11 is a schematic diagram of the completion of excavating the soil below the flat T-shaped reinforced concrete upper slab and leveling the underground garage.

其中1为匚型钢筋混凝土构件,2为支撑槽,3为立柱,4为扁T型钢筋混凝土上板,5为矩形钢筋混凝土下板,6为支撑封闭构件,7为框型顶管Ⅰ,8为框型顶管Ⅱ,9为伸长端,10为侧边顶管通道,11为中间通道,12为底板。Among them, 1 is the reinforced concrete member of the squat type, 2 is the support groove, 3 is the column, 4 is the upper plate of the flat T-shaped reinforced concrete, 5 is the lower plate of the rectangular reinforced concrete, 6 is the supporting closed member, and 7 is the frame-type jacking pipe I, 8 is the frame type jacking pipe II, 9 is the extension end, 10 is the side jacking pipe channel, 11 is the middle channel, and 12 is the bottom plate.

具体实施方式Detailed ways

如图1-8所示,一种构筑地下自动车库构筑物的方法:包括以下步骤:As shown in Figure 1-8, a method for constructing an underground automatic garage structure includes the following steps:

(1)预制匚型钢筋混凝土构件1,匚型钢筋混凝土构件1上板悬空侧端头设置支撑槽2,匚型钢筋混凝土构件1上、下板的悬空测端头两侧之间分别设置一个立柱3。(1) Prefabricated reinforced concrete member 1, a support groove 2 is set at the end of the suspended side of the upper plate of the reinforced concrete member 1, and a support groove 2 is set between the two sides of the suspended end of the upper and lower plates of the reinforced concrete member 1. Column 3.

(2)预制扁T型钢筋混凝土上板4、矩形钢筋混凝土下板5。(2) Prefabricated flat T-shaped reinforced concrete upper plate 4 and rectangular reinforced concrete lower plate 5.

(3)将预制匚型钢筋混凝土构件1悬空侧端头由支撑封闭构件6封闭制成框型顶管Ⅰ7。框型顶管Ⅰ7内部空间的宽度为6米,适应于小型家用车辆。支撑封闭构件6可以为钢结构,与预制匚型钢筋混凝土构件1之间可拆卸。(3) The end of the suspended side of the prefabricated reinforced concrete member 1 is closed by the supporting and closing member 6 to form a frame-shaped jacking pipe I7. The width of the inner space of the frame-type top pipe I7 is 6 meters, which is suitable for small domestic vehicles. The supporting and closing member 6 can be a steel structure and can be disassembled from the prefabricated reinforced concrete member 1 .

(4)将扁T型钢筋混凝土上板4较短的两端、矩形钢筋混凝土下板5两端之间由支撑封闭构件6封闭制成框型顶管Ⅱ8;其中扁T型钢筋混凝土上板4伸长端伸出框型顶管Ⅱ8。框型顶管Ⅱ8之间空间的宽度由设计的汽车搬运架的尺寸决定。(4) The shorter ends of the flat T-shaped reinforced concrete upper plate 4 and the two ends of the rectangular reinforced concrete lower plate 5 are closed by the supporting and closing members 6 to form a frame-type jacking pipe II8; among them, the flat T-shaped reinforced concrete upper plate 4. The extension end extends out of the frame-type top tube II8. The width of the space between the frame top pipes II8 is determined by the size of the designed car carrier.

(5)设置工作井,即设置顶进井和接受井。(5) Set up working wells, that is, set up jacking wells and receiving wells.

(6)首先顶入框型顶管Ⅰ7,贯通形成侧边顶管通道10。按照设计间隔一定距离对称设置另一条侧边顶管通道10。侧边顶管通道10的空间为停车位通道。(6) First, the frame-type jacking pipe I7 is pushed into it, and the side jacking pipe channel 10 is formed through it. Another side pipe jacking channel 10 is symmetrically arranged at a certain distance according to the design. The space of the side top pipe channel 10 is a parking space channel.

(7)在两条侧边顶管通道10之间顶入框型顶管Ⅱ8,贯通形成中间通道11。其中扁T型钢筋混凝土上板4的伸长端9与匚型钢筋混凝土构件1的支撑槽2配合。扁T型钢筋混凝土上板4的伸长端9搭在支撑槽2上,支撑槽2对应空间的土已经被打通侧边顶管通道10的矩形盾构机挖出。中间通道11对应汽车搬运架的平移通道。(7) The frame-type jacking pipe II8 is inserted between the two side jacking pipe passages 10, and the middle passage 11 is formed through it. The elongated end 9 of the flat T-shaped reinforced concrete upper plate 4 is matched with the support groove 2 of the reinforced concrete member 1 . The elongated end 9 of the flat T-shaped reinforced concrete upper plate 4 is placed on the support groove 2, and the soil in the space corresponding to the support groove 2 has been excavated by the rectangular shield machine that has penetrated the side pipe jacking channel 10. The middle channel 11 corresponds to the translation channel of the vehicle carrier.

(8)拆除支撑封闭构件6。(8) Remove the support closing member 6 .

(9)固定相邻立柱3成为一个整体,形成地下自动车库构筑物。可以用胶固定立柱。之后可以打理底面和整修墙面。(9) Fix the adjacent columns 3 into a whole to form an underground automatic garage structure. The posts can be fixed with glue. Afterwards, you can take care of the underside and refinish the walls.

(10)根据需求重复以上步骤直到完成其余施工。(10) Repeat the above steps as required until the rest of the construction is completed.

步骤(7)中扁T型钢筋混凝土上板4伸长端9的下表面与支撑槽2上表面之间间隙为1到3毫米。扁T型钢筋混凝土上板4伸长端9左右两侧与支撑槽2侧边之间也存在间隙。防止推进过程中,摩擦力过大或者直接卡住。去掉支撑封闭构件6后,上下之间间隙可以自动消除,左右之间间隙不影响结构性能。In step (7), the gap between the lower surface of the elongated end 9 of the flat T-shaped reinforced concrete upper plate 4 and the upper surface of the support groove 2 is 1 to 3 mm. There are also gaps between the left and right sides of the elongated end 9 of the flat T-shaped reinforced concrete upper plate 4 and the sides of the support groove 2 . Prevent the friction force from being too large or directly stuck during the propulsion process. After the support and closing member 6 is removed, the gap between the upper and lower sides can be automatically eliminated, and the gap between the left and right does not affect the structural performance.

使用这种构筑方法构筑地下自动车库的好处;第一:立柱3与匚型钢筋混凝土构件1一体预制,框型顶管Ⅰ7推进完成后将相邻立柱3固定即可,不用在制成顶管通道后再现场浇筑立柱3。第二:框型顶管Ⅱ8的扁T型钢筋混凝土上板4与匚型钢筋混凝土构件1上板的支撑槽2配合,其配合位置位于立柱3的上方,相当于横梁,也不用再设置横梁。只需要推入管片、拆除支撑封闭构件6、再固定立柱3即可完成基本的构筑工作,节省时间和工序。The advantages of using this construction method to build an underground automatic garage; first: the column 3 and the reinforced concrete member 1 are prefabricated in one piece, and the adjacent column 3 can be fixed after the frame-type jacking pipe I7 is pushed forward, and there is no need to make the jacking pipe. After the passage, the column 3 is poured on site. Second: the flat T-shaped reinforced concrete upper plate 4 of the frame-type jacking pipe II8 cooperates with the support groove 2 of the upper plate of the reinforced concrete member 1, and its matching position is located above the column 3, which is equivalent to a beam, and there is no need to set the beam. . Only need to push in the segment, remove the supporting and closing member 6, and then fix the upright column 3 to complete the basic construction work, saving time and processes.

使用上述方法构筑的地下自动车库构筑物,包括两列对称的预制匚型钢筋混凝土构件1,其间为一列扁T型钢筋混凝土上板4,其中预制匚型钢筋混凝土构件1上板悬空侧端头设置的支撑槽2与扁T型钢筋混凝土上板4的伸长端9配合,匚型钢筋混凝土构件1上、下板的悬空测端头两侧之间为立柱3;扁T型钢筋混凝土上板4下方为矩形钢筋混凝土下板5。The underground automatic garage structure constructed using the above-mentioned method comprises two rows of symmetrical prefabricated reinforced concrete members 1, between which is a row of flat T-shaped reinforced concrete upper plates 4, wherein the end of the upper plate of the prefabricated reinforced concrete members 1 is set on the suspended side. The supporting groove 2 cooperates with the elongated end 9 of the flat T-shaped reinforced concrete upper plate 4, and between the two sides of the suspended measuring ends of the upper and lower plates of the flat T-shaped reinforced concrete member 1 is a column 3; the flat T-shaped reinforced concrete upper plate Below 4 is a rectangular reinforced concrete lower plate 5 .

如图1-5、9-11所示另一种与上述方法发明思路相似的构筑地下自动车库构筑物的方法:包括以下步骤:As shown in Figures 1-5 and 9-11, another method for constructing an underground automatic garage structure similar to the above-mentioned method of invention includes the following steps:

(1)预制匚型钢筋混凝土构件1,匚型钢筋混凝土构件1上板悬空侧端头设置支撑槽2,匚型钢筋混凝土构件1上、下板的悬空测端头两侧之间分别设置一个立柱3。(1) Prefabricated reinforced concrete member 1, a support groove 2 is set at the end of the suspended side of the upper plate of the reinforced concrete member 1, and a support groove 2 is set between the two sides of the suspended end of the upper and lower plates of the reinforced concrete member 1. Column 3.

(2)预制扁T型钢筋混凝土上板4。(2) Prefabricated flat T-shaped reinforced concrete upper plate 4.

(3)将预制匚型钢筋混凝土构件1悬空侧端头由支撑封闭构件6封闭制成框型顶管Ⅰ7。(3) The end of the suspended side of the prefabricated reinforced concrete member 1 is closed by the supporting and closing member 6 to form a frame-shaped jacking pipe I7.

(4)设置工作井,即设置顶进井和接受井。(4) Set up working wells, that is, set up jacking wells and receiving wells.

(5)首先顶入框型顶管Ⅰ7,贯通形成侧边顶管通道10;按照设计间隔一定距离对称设置另一条侧边顶管通道10。(5) First, the frame-type jacking pipe I7 is pushed into the frame to form a side jacking channel 10; another side jacking channel 10 is symmetrically arranged at a certain distance according to the design.

(6)从一端依次拆除框型顶管Ⅰ7的支撑封闭构件6,然后顶入扁T型钢筋混凝土上板4,直到贯通;其中扁T型钢筋混凝土上板4的伸长端9与匚型钢筋混凝土构件1的支撑槽2配合。扁T型钢筋混凝土上板4的伸长端9搭在支撑槽2上,支撑槽2对应空间的土已经被矩形盾构机挖出。拆掉框型顶管Ⅰ7的支撑封闭构件6后,两个侧边顶管通10之间的土从空隙流到两侧的侧边顶管通道10,中间部分土变松,可以不使用盾构机挖土,直接在后方顶入扁T型钢筋混凝土上板4。扁T型钢筋混凝土上板4可以设置在通道外的支架上,使其处于合适的高度和位置方便推入。)(6) Remove the supporting and closing member 6 of the frame-type jacking pipe I7 from one end in turn, and then push into the flat T-shaped reinforced concrete upper plate 4 until it penetrates; wherein the elongated end 9 of the flat T-shaped reinforced concrete upper plate 4 is connected to the flat T-shaped reinforced concrete upper plate 4. The supporting groove 2 of the reinforced concrete member 1 is matched. The elongated end 9 of the flat T-shaped reinforced concrete upper plate 4 is placed on the support groove 2, and the soil in the space corresponding to the support groove 2 has been excavated by the rectangular shield machine. After removing the supporting and closing member 6 of the frame-type jacking pipe I7, the soil between the two side pipe jacking passages 10 flows from the gap to the side pipe jacking channels 10 on both sides, and the soil in the middle part becomes loose, so the shield can not be used. Excavate the soil by the mechanism, and directly push the flat T-shaped reinforced concrete upper plate 4 at the rear. The flat T-shaped reinforced concrete upper plate 4 can be set on the bracket outside the channel, so that it is at a suitable height and position for easy pushing. )

(7)挖出扁T型钢筋混凝土上板4下方的土,然后浇筑底板12,形成中间通道11。(7) Dig out the soil below the flat T-shaped reinforced concrete upper plate 4 , and then pour the bottom plate 12 to form the intermediate channel 11 .

(8) 固定相邻的立柱3成为一个整体,形成地下自动车库构筑物。(8) Fix the adjacent columns 3 into a whole to form an underground automatic garage structure.

(9)根据需求重复以上步骤直到完成其余施工。(9) Repeat the above steps as required until the rest of the construction is completed.

步骤(7)中扁T型钢筋混凝土上板4伸长端9的下表面与支撑槽2上表面之间间隙为1到3毫米。扁T型钢筋混凝土上板4伸长端9左右两侧与支撑槽2侧边之间也存在间隙。防止推进过程中,摩擦力过大或者直接卡住。去掉支撑封闭构件6后,上下之间间隙可以自动消除,左右之间间隙不影响结构性能。本方法中未提到的部分与图1-8所示的方法一致。In step (7), the gap between the lower surface of the elongated end 9 of the flat T-shaped reinforced concrete upper plate 4 and the upper surface of the support groove 2 is 1 to 3 mm. There are also gaps between the left and right sides of the elongated end 9 of the flat T-shaped reinforced concrete upper plate 4 and the sides of the support groove 2 . Prevent the friction force from being too large or directly stuck during the propulsion process. After the support and closing member 6 is removed, the gap between the upper and lower sides can be automatically eliminated, and the gap between the left and right does not affect the structural performance. The parts not mentioned in this method are consistent with the methods shown in Figures 1-8.

使用这种构筑方法构筑地下自动车库的好处;第一:立柱3与匚型钢筋混凝土构件1一体预制,框型顶管Ⅰ7推进完成后将相邻立柱3固定即可,不用在制成顶管通道后再现场浇筑立柱3。第二:框型顶管Ⅱ8的扁T型钢筋混凝土上板4与匚型钢筋混凝土构件1上板的支撑槽2配合,其配合位置位于立柱3的上方,相当于横梁,也不用再设置横梁。只需要推入管片、拆除支撑封闭构件6、再固定立柱3即可完成基本的构筑工作,节省时间和工序。第三:中间通道不需要使用盾构机,不需要组装管片及之后拆卸组合管片的支撑封闭构件6;只需要推入扁T型钢筋混凝土上板4,贯通后,挖出其中土即可。极大的节省了时间、提高了工作效率并降低成本。The advantages of using this construction method to build an underground automatic garage; first: the column 3 and the reinforced concrete member 1 are prefabricated in one piece, and the adjacent column 3 can be fixed after the frame-type jacking pipe I7 is pushed forward, and there is no need to make the jacking pipe. After the passage, the column 3 is poured on site. Second: the flat T-shaped reinforced concrete upper plate 4 of the frame-type jacking pipe II8 cooperates with the support groove 2 of the upper plate of the reinforced concrete member 1, and its matching position is located above the column 3, which is equivalent to a beam, and there is no need to set the beam. . Only need to push in the segment, remove the supporting and closing member 6, and then fix the upright column 3 to complete the basic construction work, saving time and processes. Third: there is no need to use a shield machine in the middle passage, and there is no need to assemble the segment and then disassemble the supporting and closing member 6 of the combined segment; it is only necessary to push in the upper plate 4 of the flat T-shaped reinforced concrete. Can. Greatly save time, improve work efficiency and reduce costs.

使用上述方法构筑的地下自动车库构筑物,包括两列对称的预制匚型钢筋混凝土构件1,其间为一列扁T型钢筋混凝土上板4,其中预制匚型钢筋混凝土构件1上板悬空侧端头设置的支撑槽2与扁T型钢筋混凝土上板4的伸长端9配合,匚型钢筋混凝土构件1上、下板的悬空测端头两侧之间为立柱3;扁T型钢筋混凝土上板4下方浇筑底板12。The underground automatic garage structure constructed using the above-mentioned method comprises two rows of symmetrical prefabricated reinforced concrete members 1, between which is a row of flat T-shaped reinforced concrete upper plates 4, wherein the end of the upper plate of the prefabricated reinforced concrete members 1 is set on the suspended side. The supporting groove 2 cooperates with the elongated end 9 of the flat T-shaped reinforced concrete upper plate 4, and between the two sides of the suspended measuring ends of the upper and lower plates of the flat T-shaped reinforced concrete member 1 is a column 3; the flat T-shaped reinforced concrete upper plate 4. The bottom plate 12 is poured below.

Claims (2)

1. a kind of method for constructing underground automatic garage structures: it is characterized by comprising following steps:
(1) prefabricated Contraband steel bar concrete component, the hanging side head setting support slot of Contraband steel bar concrete component upper plate, Contraband type A column is respectively set between the hanging survey end two sides of the upper and lower plate of reinforced concrete member;
(2) prefabricated flat T-steel reinforced concrete upper plate, rectangle armored concrete lower plate;
(3) frame-type push pipe I is made by the closing of support closure member in the hanging side head of prefabricated Contraband steel bar concrete component;
(4) structure will be closed by support between the shorter both ends of flat T-steel reinforced concrete upper plate, rectangle armored concrete lower plate both ends Frame-type push pipe II is made in part closing;Wherein flat T-steel reinforced concrete upper plate elongation end stretches out frame-type push pipe II;
(5) active well is set, that is, jacking well is set and receives well;
(6) frame-type push pipe I is headed into first, is formed through side push pipe channel;It is spaced apart arranged symmetrically another according to designing One side push pipe channel;
(7) frame-type push pipe II is headed between the push pipe channel of two sides, is formed through intermediate channel;Wherein flat T-steel muscle is mixed The elongation end of solidifying soil upper plate and the support slot of Contraband steel bar concrete component cooperate;
(8) support closure member is removed;
(9) fixed adjacent column becomes an entirety, forms underground automatic garage structures;
(10) above step is repeated according to demand until completing remaining construction.
2. constructing the method for underground automatic garage structures according to claim 1: it is characterized by: flat T-type in step (7) Gap is 1 to 3 millimeters between the lower surface and support slot upper surface of armored concrete upper plate elongation end;Flat T-steel reinforced concrete There is also gaps between support slot side at left and right sides of upper plate elongation end.
CN201711497396.5A 2017-12-31 2017-12-31 Method for constructing underground automatic garage structure Withdrawn CN109989425A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201711497396.5A CN109989425A (en) 2017-12-31 2017-12-31 Method for constructing underground automatic garage structure
CN202210427589.8A CN116791669A (en) 2017-12-31 2017-12-31 Method for constructing underground automatic garage structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711497396.5A CN109989425A (en) 2017-12-31 2017-12-31 Method for constructing underground automatic garage structure

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN202210427589.8A Division CN116791669A (en) 2017-12-31 2017-12-31 Method for constructing underground automatic garage structure

Publications (1)

Publication Number Publication Date
CN109989425A true CN109989425A (en) 2019-07-09

Family

ID=67110950

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201711497396.5A Withdrawn CN109989425A (en) 2017-12-31 2017-12-31 Method for constructing underground automatic garage structure
CN202210427589.8A Withdrawn CN116791669A (en) 2017-12-31 2017-12-31 Method for constructing underground automatic garage structure

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN202210427589.8A Withdrawn CN116791669A (en) 2017-12-31 2017-12-31 Method for constructing underground automatic garage structure

Country Status (1)

Country Link
CN (2) CN109989425A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109989603A (en) * 2017-12-31 2019-07-09 郑州吉田专利运营有限公司 Underground automatic garage structure
CN110453947A (en) * 2019-08-27 2019-11-15 赵伟忠 Site-assembled machinery garage frame based on a kind of reinforced concrete precast member

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19641744C1 (en) * 1996-10-10 1998-01-22 Bremer Gmbh Modular construction multistorey garage
CN102277965A (en) * 2011-05-06 2011-12-14 杭州岩土工程有限公司 Method for building underground garage through non-surface excavation on open space
CN105257034A (en) * 2015-09-09 2016-01-20 重庆杰渝建筑机械有限公司 Method of building garage
CN105370287A (en) * 2015-10-10 2016-03-02 中铁工程装备集团有限公司 Mechanical underground excavation construction method for large underground parking lot
CN205557574U (en) * 2016-03-30 2016-09-07 张楸长 Underground pipe gallery with adjustable prestressing force divides to add assembles well storehouse
CN206298906U (en) * 2016-12-27 2017-07-04 哈尔滨市市政工程设计院 Precast splice type underground pipe gallery

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19641744C1 (en) * 1996-10-10 1998-01-22 Bremer Gmbh Modular construction multistorey garage
CN102277965A (en) * 2011-05-06 2011-12-14 杭州岩土工程有限公司 Method for building underground garage through non-surface excavation on open space
CN105257034A (en) * 2015-09-09 2016-01-20 重庆杰渝建筑机械有限公司 Method of building garage
CN105370287A (en) * 2015-10-10 2016-03-02 中铁工程装备集团有限公司 Mechanical underground excavation construction method for large underground parking lot
CN205557574U (en) * 2016-03-30 2016-09-07 张楸长 Underground pipe gallery with adjustable prestressing force divides to add assembles well storehouse
CN206298906U (en) * 2016-12-27 2017-07-04 哈尔滨市市政工程设计院 Precast splice type underground pipe gallery

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109989603A (en) * 2017-12-31 2019-07-09 郑州吉田专利运营有限公司 Underground automatic garage structure
CN110453947A (en) * 2019-08-27 2019-11-15 赵伟忠 Site-assembled machinery garage frame based on a kind of reinforced concrete precast member

Also Published As

Publication number Publication date
CN116791669A (en) 2023-09-22

Similar Documents

Publication Publication Date Title
CN100591862C (en) Foundation Pit Construction Method Using Prefabricated Support
CN103696429B (en) A kind of concrete of special-shaped foundation ditch supports the combined support system and the construction method that add fish belly sill
CN113062354A (en) Assembly method for prefabricated subway station of open-cut pile support system
CN104131565B (en) A kind of against making the construction method that the earthwork is just made to excavate
CN101418577B (en) Construction Method of Covering and Excavating Underground Space Pavement in Soft Soil Area
CN110985042B (en) Urban comprehensive pipe gallery and underground shallow-buried underground tunnel combined supporting system and process
CN103244143B (en) A kind of underground construction excavating construction method and underground station
CN105256836A (en) Construction method for fast restoring road traffic in construction of underground project
CN105041348B (en) A kind of underground space tunneling construction method of use compound roof
CN105986578A (en) Ejecting pipe construction method of roadside tubular underground garage
CN204825867U (en) As composite pile structure of secretly digging garage stand
CN105065040B (en) A kind of prefabricated underground space tunneling construction method of top plate
CN116791669A (en) Method for constructing underground automatic garage structure
CN115012982A (en) A water-passing box culvert structure and construction method spanning the subway shield section and overlapping with the tunnel
KR101358471B1 (en) architecture using a complex steel pile
CN105298147A (en) Ultra-deep foundation pit spiral descending quick material transportation passage and construction method thereof
CN105863649A (en) Underground space construction technique adopting underground excavation and causing little ruin to land surface
CN108086996B (en) The underground parking that pipe jacking tunnel is constructed the method for underground parking and constructed
CN109989603A (en) Underground automatic garage structure
CN105986830B (en) The tunneling method of construction of roadside strip underground garage
CN204456131U (en) A kind of structural floor that utilizes is as the structural system of horizontal support
CN107905800B (en) Underground parking garage constructed by pipe-jacking tunnel
CN207633149U (en) A kind of auxiliary system of underpass construction
CN109989424A (en) A method of constructing underground automatic garage structures
CN109972725B (en) Method for constructing underground automatic garage structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190709