thin
bar support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710102341.3A
Other languages
Chinese (zh)
Inventor
陈玲风
安增强
康鹏举
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA SIXTH METALLURGICAL CONSTRUCTION Co Ltd
Original Assignee
CHINA SIXTH METALLURGICAL CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA SIXTH METALLURGICAL CONSTRUCTION Co Ltd filed Critical CHINA SIXTH METALLURGICAL CONSTRUCTION Co Ltd
Priority to CN201710102341.3A priority Critical patent/CN108505442A/en
Publication of CN108505442A publication Critical patent/CN108505442A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention provides a kind of thin-wall hollow high-pier reinforcing bar support for shuttering, including:Three reinforced slabs, it is spaced apart from high to low to be arranged in parallel to be rectangular;Column, respectively with the corresponding endpoint vertical connection of three reinforced slabs;Reinforcing bar spider, level binding is on column;It is correspondingly arranged the reinforced hole penetrated for reinforcing bar up and down on three reinforced slabs;The bottom end of the top of vertical reinforcement vertical reinforcement adjacent thereto is connected to each other by oblique reinforcing bar;The present invention provides thin-wall hollow high-pier reinforcing bar support for shuttering construction method, and step includes:1) according to the size design size of thin-wall hollow high-pier;2) thin-wall hollow high-pier reinforcing bar support for shuttering is made;3) reinforcing bar support for shuttering is transported to scene;4) the pre-buried installation reinforcing bar support for shuttering on cushion cap;5) cushion cap is poured;6) Pier Formwork is installed;7) pier stud is poured.The present invention has simple in structure, low manufacture cost, time saving and energy saving, and production efficiency is high, the advantages of capable of improving reinforcing bar support for shuttering binding quality, ensure construction quality.

Description

A kind of thin-wall hollow high-pier reinforcing bar support for shuttering and construction method
Technical field
The present invention relates to a kind of reinforcing bar support for shuttering and construction method, especially a kind of thin-wall hollow high-pier reinforcing bar support for shuttering and Construction method.
Background technology
For highway to mountain development, the bridge across mountains and rivers reservoir is more and more, and due to geographical relationship, pier stud is higher, It is often designed as high pier Thin-wall Hollow Pier, and the reinforcing bar that towering Thin-wall Hollow Pier turns over method constructing and overhanging model binds hardly possible there are one installations Topic.Because there are two types of conventional construction methods:One is set up steel pipe support and stair activity and reinforcement installation in pier stud surrounding Workbench, and the steel pipe support set up is higher than the height of installation reinforcing bar length every time, then in the bracket between, i.e. thin-walled Hollow pier position, longitudinal and transverse direction, which connects with steel tube, sets up into groined type shape, i.e. reinforcing bar periphery dead size, then installs assembling reinforcement, The cover to reinforcement of the method is not easy to control, and the construction time is longer, costly, and there are security risks;Another method is every It is secondary to set up steel pipe groined type simple rack along rollover board surrounding, then be laid with flitch in groined type holder and make construction working platform, Then assembling reinforcement is installed, once construction all needs the circulating process removed, installed, the cover to reinforcement of the method per overmolded Difficult to control, labour cost is higher, and there are security risks.
Invention content
The problem of for being previously mentioned, the present invention provides a kind of thin-wall hollow high-pier reinforcing bar support for shuttering, including:
Three reinforced slabs, it is spaced apart from high to low to be arranged in parallel to be rectangular, respectively top bars plate, in Layer reinforced slab and lower layer's reinforced slab, the line of centres of three reinforced slabs is perpendicular to ground;
Column, respectively with the corresponding endpoint vertical connection of three reinforced slabs, the column constitutes pier stud reinforcing bar Vertical pillar is bound, bottom end and the set shaped steel formwork of the column are bolted to connection;
The distance level of reinforcing bar spider, 10~20cm of interval is bound on the column;
It is correspondingly arranged the reinforcing bar penetrated for reinforcing bar up and down on the top bars plate, middle level reinforced slab and lower layer's reinforced slab Hole penetrates reinforcing bar in the corresponding through-hole, and for the reinforcing bar by three reinforced slab vertical connections, which is vertical steel Muscle;
The bottom end of the top of vertical reinforcement vertical reinforcement adjacent thereto is connected to each other by oblique reinforcing bar;
Supporting rod, one end are connect with the middle and lower part of the column, and the other end is fixed with ground, the supporting rod and ground In 30~50 °.
Preferred embodiment is:The column is welded to connect with three reinforced slabs.
Preferred embodiment is:The reinforced hole is blind hole or open pore.
Preferred embodiment is:The column is square steel.
Preferred embodiment is:The supporting rod is in 30 ° with ground.
A kind of thin-wall hollow high-pier reinforcing bar support for shuttering construction method, step include:
1) according to the size of three reinforced slabs and column of the size design of thin-wall hollow high-pier;
2) according to the accurate blanking of design drawing, thin-wall hollow high-pier reinforcing bar support for shuttering is made;
3) strong reinforcing bar support for shuttering is transported to scene;
4) the pre-buried installation reinforcing bar support for shuttering on cushion cap;
5) cushion cap is poured;
6) Pier Formwork is installed;
7) pier stud is poured.
The present invention has simple in structure, low manufacture cost, time saving and energy saving, and production efficiency is high, can improve reinforcing bar support for shuttering and tie up The advantages of pricking quality, ensureing construction quality.The advantages of present invention is relative to traditional construction technique:(1), production efficiency is improved; (2), the input of manual machine is reduced;(3), the binding quality of reinforcing bar is improved;(4), ensure that steel bar stress spacing is met the requirements.
Description of the drawings
Fig. 1 is the structural diagram of the present invention.
Specific implementation mode
Present invention will be described in further detail below with reference to the accompanying drawings, to enable those skilled in the art with reference to specification text Word can be implemented according to this.
It should be appreciated that such as " having ", "comprising" and " comprising " term used herein do not allot one or more The presence or addition of a other elements or combinations thereof.
Embodiment 1
A kind of thin-wall hollow high-pier reinforcing bar support for shuttering is present embodiments provided, including:Three reinforced slabs, to be rectangular, from It is high to Low it is spaced apart be arranged in parallel, respectively top bars plate 1, middle level reinforced slab 2 and lower layer's reinforced slab 3, described three The line of centres of a reinforced slab is perpendicular to ground;Column 4, respectively with the corresponding endpoint vertical welding of three reinforced slabs Connection, the column constitute pier stud reinforcing bar and bind vertical pillar, and bottom end and the set shaped steel formwork of the column 4 are bolted Connection, the column 4 are square steel;The distance level of reinforcing bar spider 5, interval 10cm is bound on the column 4;The upper layer The reinforced hole penetrated for reinforcing bar is correspondingly arranged on reinforced slab 1, middle level reinforced slab 2 and lower layer's reinforced slab 3 up and down, it is described corresponding logical Reinforcing bar is penetrated in hole, three reinforced slab vertical connections, the reinforcing bar are vertical reinforcement 6 by the reinforcing bar, and the reinforced hole is Blind hole;The bottom end of the top of the vertical reinforcement 6 vertical reinforcement 6 adjacent thereto is connected to each other by oblique reinforcing bar 7;Support Bar, one end are connect with the middle and lower part of the column 4, and the other end is fixed with ground, and the supporting rod is in 30 ° with ground.
Embodiment 2
A kind of thin-wall hollow high-pier reinforcing bar support for shuttering is present embodiments provided, including:Three reinforced slabs, to be rectangular, from It is high to Low it is spaced apart be arranged in parallel, respectively top bars plate 1, middle level reinforced slab 2 and lower layer's reinforced slab 3, described three The line of centres of a reinforced slab is perpendicular to ground;Column 4, respectively with the corresponding endpoint vertical welding of three reinforced slabs Connection, the column 4 constitute pier stud reinforcing bar and bind vertical pillar, and the bottom end of the column 4 and set shaped steel formwork are solid by bolt Fixed connection, the column 4 are square steel;The distance level of reinforcing bar spider 5, interval 20cm is bound on the column 4;On described It is correspondingly arranged the reinforced hole penetrated for reinforcing bar up and down on layer reinforced slab 1, middle level reinforced slab 2 and lower layer's reinforced slab 3, it is described corresponding Reinforcing bar is penetrated in through-hole, for the reinforcing bar by three reinforced slab vertical connections, which is vertical reinforcement 6, the reinforced hole For open pore;The bottom end of the top of the vertical reinforcement 6 vertical reinforcement 6 adjacent thereto is connected to each other by oblique reinforcing bar 7;Branch Strut, one end are connect with the middle and lower part of the column 4, and the other end is fixed with ground, and the supporting rod is in 50 ° with ground.
Embodiment 3
The present embodiment provides a kind of thin-wall hollow high-pier reinforcing bar support for shuttering construction method, step includes:1) according to thin-walled sky The size of size design three reinforced slabs and column of the high pier of the heart;2) according to the accurate blanking of design drawing, it is high to make thin-walled hollow Pier reinforcing bar support for shuttering;3) reinforcing bar support for shuttering is transported to scene;4) the pre-buried installation reinforcing bar support for shuttering on cushion cap;5) it pours and holds Platform;6) Pier Formwork is installed;7) pier stud is poured.
Although the embodiments of the present invention have been disclosed as above, but its is not only in the description and the implementation listed With it can be fully applied to various fields suitable for the present invention, for those skilled in the art, can be easily Realize other modification, therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is simultaneously unlimited In specific details and legend shown and described herein.

Claims (6)

1. a kind of thin-wall hollow high-pier reinforcing bar support for shuttering, which is characterized in that including:
Three reinforced slabs, spaced apart from high to low to be arranged in parallel to be rectangular, respectively top bars plate, middle level steel Gusset and lower layer's reinforced slab, the line of centres of three reinforced slabs is perpendicular to ground;
Column, respectively with the corresponding endpoint vertical connection of three reinforced slabs, the column constitutes the binding of pier stud reinforcing bar Vertical pillar, bottom end and the set shaped steel formwork of the column are bolted to connection;
The distance level of reinforcing bar spider, 10~20cm of interval is bound on the column;
It is correspondingly arranged the reinforced hole penetrated for reinforcing bar, institute up and down on the top bars plate, middle level reinforced slab and lower layer's reinforced slab It states and penetrates reinforcing bar in corresponding through-hole, for the reinforcing bar by three reinforced slab vertical connections, which is vertical reinforcement;
The bottom end of the top of vertical reinforcement vertical reinforcement adjacent thereto is connected to each other by oblique reinforcing bar;
Supporting rod, one end are connect with the middle and lower part of the column, and the other end is fixed with ground, and the supporting rod is in 30 with ground ~50 °.
2. thin-wall hollow high-pier reinforcing bar support for shuttering according to claim 1, which is characterized in that the column and described three Reinforced slab is welded to connect.
3. thin-wall hollow high-pier reinforcing bar support for shuttering according to claim 1, which is characterized in that the reinforced hole is blind hole Or open pore.
4. thin-wall hollow high-pier reinforcing bar support for shuttering according to claim 1, which is characterized in that the column is square steel.
5. thin-wall hollow high-pier reinforcing bar support for shuttering according to claim 1, which is characterized in that the supporting rod is in ground 30°。
6. thin-wall hollow high-pier reinforcing bar support for shuttering construction method according to claim 1, which is characterized in that step includes:
1) according to the size of three reinforced slabs and column of the size design of thin-wall hollow high-pier;
2) according to the accurate blanking of design drawing, thin-wall hollow high-pier reinforcing bar support for shuttering is made;
3) reinforcing bar support for shuttering is transported to scene;
4) the pre-buried installation reinforcing bar support for shuttering on cushion cap;
5) cushion cap is poured;
6) Pier Formwork is installed;
7) pier stud is poured.
CN201710102341.3A 2017-02-24 2017-02-24 A kind of thin-wall hollow high-pier reinforcing bar support for shuttering and construction method Pending CN108505442A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710102341.3A CN108505442A (en) 2017-02-24 2017-02-24 A kind of thin-wall hollow high-pier reinforcing bar support for shuttering and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710102341.3A CN108505442A (en) 2017-02-24 2017-02-24 A kind of thin-wall hollow high-pier reinforcing bar support for shuttering and construction method

Publications (1)

Publication Number Publication Date
CN108505442A true CN108505442A (en) 2018-09-07

Family

ID=63373701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710102341.3A Pending CN108505442A (en) 2017-02-24 2017-02-24 A kind of thin-wall hollow high-pier reinforcing bar support for shuttering and construction method

Country Status (1)

Country Link
CN (1) CN108505442A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111455837A (en) * 2020-05-06 2020-07-28 中国建筑土木建设有限公司 Thin-wall hollow pier pouring connection structure and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA996708A (en) * 1971-07-08 1976-09-14 Morris Schupack Segmental precast concrete post-tensioned over-pass bridges with cantilevered abutment
CN102995560A (en) * 2011-09-09 2013-03-27 五冶集团上海有限公司 Thin-wall hollow pier lifting frame and use method thereof
CN103306206A (en) * 2013-06-13 2013-09-18 浙江金筑交通建设有限公司 Reinforcing steel formwork supporting rack for thin-walled hollow high pier and construction method
CN103510469A (en) * 2012-06-28 2014-01-15 中铁二十五局集团建筑安装工程有限公司 Construction method for manufacturing thin-walled hollow pier

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA996708A (en) * 1971-07-08 1976-09-14 Morris Schupack Segmental precast concrete post-tensioned over-pass bridges with cantilevered abutment
CN102995560A (en) * 2011-09-09 2013-03-27 五冶集团上海有限公司 Thin-wall hollow pier lifting frame and use method thereof
CN103510469A (en) * 2012-06-28 2014-01-15 中铁二十五局集团建筑安装工程有限公司 Construction method for manufacturing thin-walled hollow pier
CN103306206A (en) * 2013-06-13 2013-09-18 浙江金筑交通建设有限公司 Reinforcing steel formwork supporting rack for thin-walled hollow high pier and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111455837A (en) * 2020-05-06 2020-07-28 中国建筑土木建设有限公司 Thin-wall hollow pier pouring connection structure and construction method thereof
CN111455837B (en) * 2020-05-06 2022-03-25 中国建筑土木建设有限公司 Thin-wall hollow pier pouring connection structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN105951579B (en) A kind of preparation method of preform lid beam steel moulding bed and prefabricated bent cap reinforcement cage
CN105525753A (en) Method and structure for simultaneously constructing constructional column and main body structure
CN205100399U (en) Precast shear wall connection structure
CN105625186A (en) Method for constructing large-section concrete Y-shaped column
CN107435335A (en) Brick retaining wall steel bar girder hardened system and method on foundation pit enclosure top beam
CN105649330A (en) External formwork system utilizing steel reinforcement cage as framework
CN205688332U (en) A kind of preform lid beam steel moulding bed
CN103669720A (en) Precast beam and reinforced concrete structure with tenon anchor system
CN102505849A (en) Construction method of membrane shell ribbed floor formwork supporting system
CN203808249U (en) Column stirrup cage assembly for beam-column joint core region
CN214939185U (en) Prefabricated stand
CN210918296U (en) Square steel pipe sleeve fixing device
CN108505442A (en) A kind of thin-wall hollow high-pier reinforcing bar support for shuttering and construction method
CN207891714U (en) Abdomen packet bottom is trapezoidal/corrugated sheet steel combined box beam
CN112160247B (en) Construction method of asynchronous hydraulic creeping formwork for hollow high pier of limited space pier group
CN109208823A (en) It is a kind of can quick assembling built-in steel-case formula steel core concrete column and its production technology
CN206589121U (en) It is a kind of to be used for precast beam, the diaphragm plate horizontal reinforcement mounting and positioning device of plate
CN204715764U (en) The structure that a kind of constructional column and agent structure are constructed simultaneously
CN203080955U (en) Structure for adding corbels on reinforced concrete column
CN204000885U (en) Metro Deep Excavation concrete support hangs mould mould
CN104797762A (en) Building and construction method thereof
CN103821541B (en) The assemble method of the ingate template of large scale special-shaped structure
CN111719773B (en) Floor type support for roof and construction method thereof
CN110805141B (en) A connection device and method for a steel pipe column and a seismic isolation support after a building is jacked up
CN109989425A (en) The method for constructing underground automatic garage structures

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180907

RJ01 Rejection of invention patent application after publication