CN109986268A - The now localization method of the positioning device of school gathering pipe and existing school gathering pipe - Google Patents

The now localization method of the positioning device of school gathering pipe and existing school gathering pipe Download PDF

Info

Publication number
CN109986268A
CN109986268A CN201910295678.XA CN201910295678A CN109986268A CN 109986268 A CN109986268 A CN 109986268A CN 201910295678 A CN201910295678 A CN 201910295678A CN 109986268 A CN109986268 A CN 109986268A
Authority
CN
China
Prior art keywords
gathering pipe
tubulature
clip
positioning device
school
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910295678.XA
Other languages
Chinese (zh)
Inventor
袁海生
王晓君
严豪
王卫栋
颜正军
杨文超
张志强
范家银
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Waigaoqiao Shipbuilding Co Ltd
Original Assignee
Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Waigaoqiao Shipbuilding Co Ltd filed Critical Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority to CN201910295678.XA priority Critical patent/CN109986268A/en
Publication of CN109986268A publication Critical patent/CN109986268A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/0426Fixtures for other work
    • B23K37/0435Clamps
    • B23K37/0443Jigs

Landscapes

  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention discloses a kind of positioning device of existing school gathering pipe and the localization methods of existing school gathering pipe, and when for guaranteeing that gathering pipe and pre- tubulature are welded to connect, the gathering pipe does not misplace.The positioning device of the existing school gathering pipe includes clip, multiple supporting blocks and multiple first bolts, and the clip is for being fixed on the pre- tubulature;Multiple supporting blocks are connected to the outer ring of the clip, and multiple supporting blocks are arranged along the outer ring interval of the clip;Any first bolt is detachably connected with a supporting block, and a supporting block is only bolted with one described first, and the moving direction of first bolt is parallel to the radial direction of the gathering pipe.The present invention makes gathering pipe not misplace during welding with pre- tubulature by adjusting the position of multiple first bolts, the quality that working hour, raising gathering pipe and pre- tubulature needed for reducing the labor intensity of construction personnel, saving artificial correction are welded to connect.

Description

The now localization method of the positioning device of school gathering pipe and existing school gathering pipe
Technical field
The present invention relates to a kind of positioning device of existing school gathering pipe and the localization methods of existing school gathering pipe.
Background technique
Maritime platform gathering pipe largely uses the connection type of butt welding, and this connection type about accounts for closing up on platform The 78% of pipe sum.In gathering pipe tack welding, solder joint can generate internal stress in cooling procedure, due to the effect of stress, close The one end for holding together pipe welding can misplace with pre- tubulature, and construction personnel needs to correct the dislocation of gathering pipe using external force.Traditional When gathering pipe shows school, the operations such as employment lift, cucurbit drawing are needed, again it cannot be guaranteed that construction quality while labor intensity is high.
Summary of the invention
The technical problem to be solved by the present invention is in order to overcome, gathering pipe and pre- tubulature are welded to connect quality in the prior art Poor defect provides the localization method of a kind of now positioning device of school gathering pipe and existing school gathering pipe.
The present invention is to solve above-mentioned technical problem by following technical proposals:
A kind of positioning device of existing school gathering pipe, when for guaranteeing that gathering pipe and pre- tubulature are welded to connect, the gathering pipe It does not misplace, it is characterized in that, the positioning device of the existing school gathering pipe includes clip, multiple supporting blocks and multiple first spiral shells Bolt;
The clip is for being fixed on the pre- tubulature;
Multiple supporting blocks are connected to the outer ring of the clip, and multiple supporting blocks are between the outer ring of the clip Every setting;
Any first bolt is detachably connected with a supporting block, and a supporting block is only and described in one First is bolted, and the moving direction of first bolt is parallel to the radial direction of the gathering pipe.
In the present solution, by adjusting multiple first bolts position so that in the center line of gathering pipe and pre- tubulature The alignment of heart line, multiple first bolt presses gathering pipes to limit the movements of gathering pipe all directions, make gathering pipe with pre- tubulature It does not misplace during welding, on the one hand reduces the labor intensity of construction personnel, work needed for saving artificial correction When.On the other hand since the dislocation of manpower correction gathering pipe is it is possible to there are error, precision is not so good as the precision being mechanically fixed height, The quality that now gathering pipe can be improved in the positioning device of school gathering pipe and pre- tubulature is welded to connect.
Preferably, the positioning device of the existing school gathering pipe further includes two the second bolts, the clip passes through described the Two are bolted to be fixed in the pre- tubulature.
In the present solution, the second bolt enables clip to be stably fixed in pre- tubulature for fastening clamp.
Preferably, multiple supporting blocks are welded to connect in the clip.
Preferably, the supporting block is equipped with threaded hole far from one end of the clip, first bolt passes through the spiral shell Pit is detachably connected with the supporting block.
In the present solution, supporting block and the first bolt using being threadedly coupled, regulation is convenient, structure is simple, connection reliably.
Preferably, the positioning device of the existing school gathering pipe includes four supporting blocks and four first bolts.
In the present solution, adjusting the more accurate convenience in position of gathering pipe using four the first bolts.
Preferably, the positioning device of the existing school gathering pipe uses Steel material.
A kind of localization method of existing school gathering pipe, when for guaranteeing that gathering pipe and pre- tubulature are welded to connect, the gathering pipe It does not misplace, it is characterized in that, the localization method of the existing school gathering pipe utilizes the positioning device of above-mentioned existing school gathering pipe, The localization method of the existing school gathering pipe the following steps are included:
Step S1, the clip is fixed in the pre- tubulature;
Step S2, the nozzle of one end of the gathering pipe is tentatively overlapped with the nozzle of one end of the pre- tubulature;
Step S3, multiple its corresponding supporting block connections of first bolt, adjust multiple first bolts Position, multiple first bolts move along the radial direction of the gathering pipe, are pressed jointly by multiple first bolts The tight gathering pipe, to limit the movement of the gathering pipe in all directions;
Step S4, that the center line of the gathering pipe and the center line of the pre- tubulature are detected using measuring scale is overlapped feelings Condition.
In the present solution, clip and the second bolt fastening of use, general are arranged at the proper height on the outside of pre- tubulature outer circle The nozzle of one end that the nozzle of one end that gathering pipe is welded is welded with pre- tubulature is tentatively overlapped, will be multiple First bolt is threadedly coupled with supporting block, and the radial direction along gathering pipe adjusts the first bolt, is allowed to compress gathering pipe, with limitation The movement of gathering pipe in all directions is overlapped situation using what the center line of pipe and the center line of pre- tubulature were held together in measuring scale measurement, Whether welding requirements is met.
Preferably, in the step S4: if the center line of the gathering pipe and the center line of the pre- tubulature be not complete Full weight is closed, then repeatedly step S3, until the center line of the gathering pipe and the center line of the pre- tubulature are completely coincident.
In the present solution, construction personnel during adjusting the first bolt, to measure at any time the center line of gathering pipe with The coincidence situation of the center line of pre- tubulature can adjust the position of the first bolt according to actual measured results, reduce positioning gathering pipe The required time.
The positive effect of the present invention is that: the present invention by adjusting multiple first bolts position so that gathering pipe Center line be aligned with the center line of pre- tubulature, multiple first bolt presses gathering pipes are to limit the fortune of gathering pipe all directions It is dynamic, so that gathering pipe is not misplaced during welding with pre- tubulature, on the one hand reduce the labor intensity of construction personnel, saves Working hour needed for having saved artificial correction.On the other hand since the dislocation of manpower correction gathering pipe is it is possible to there are error, precision High, the matter that now gathering pipe can be improved in the positioning device of school gathering pipe and pre- tubulature is welded to connect not as good as the precision being mechanically fixed Amount.
Detailed description of the invention
Fig. 1 is the schematic perspective view of the positioning device of the existing school gathering pipe of one embodiment of the invention.
Fig. 2 is the overlooking structure diagram of the positioning device of the existing school gathering pipe of one embodiment of the invention.
Description of symbols:
10 pre- tubulatures
20 gathering pipes
30 clips
40 supporting blocks
50 first bolts
60 second bolts
Specific embodiment
The present invention is further illustrated below by the mode of embodiment, but does not therefore limit the present invention to the reality It applies among a range.
The present invention provides a kind of positioning device of existing school gathering pipe, when for guaranteeing that gathering pipe and pre- tubulature are welded to connect, Gathering pipe does not misplace.As shown in Figs. 1-2, now the positioning device of school gathering pipe 20 includes 30, four 40 and of supporting block of clip Four the first bolts 50.
Clip 30 is for being fixed on pre- tubulature 10, and four supporting blocks 40 are welded to connect in the outer ring of clip 30, and four Supporting block 40 is arranged along the outer ring interval of clip 30, and any first bolt 50 is detachably connected with a supporting block 40, a branch Bracer 40 is only connect with first bolt 50, and the moving direction of the first bolt 50 is parallel to the radial direction of gathering pipe 20, and four A first bolt 50 adjusts the more accurate convenience in position of gathering pipe 20.Now the positioning device of school gathering pipe 20 further includes two Two bolts 60, the second bolt 60 are arranged in a staggered manner with supporting block 40, avoid interfering with each other.Clip 30 is connected by the second bolt 60 It connects to be fixed in pre- tubulature 10, the second bolt 60 is used for fastening clamp 30, and clip 30 is enable to be stably fixed at pre- tubulature 10 On.In other alternative embodiments, the quantity of the quantity of supporting block 40 and the first bolt 50 is not limited to four, can root It is adjusted according to actual demand, a supporting block 40 is connect with first bolt 50.Clip 30 is also not limited to using second The fastening of bolt 60 is fixed in pre- tubulature 10 with realizing, other common fixed forms can be used, but need to guarantee that clip 30 is fixed Reliability.
The present invention makes the center line of gathering pipe 20 and the center of pre- tubulature 10 by adjusting the position of four the first bolts 50 Line alignment, four the first bolts 50 compress gathering pipes 20 to limit the movement of 20 all directions of gathering pipe, make gathering pipe 20 with Pre- tubulature 10 does not misplace during welding, and on the one hand reduces the labor intensity of construction personnel, saves artificial correction Required working hour.On the other hand since the dislocation of manpower correction gathering pipe 20 is it is possible to there are error, precision is not as good as mechanical solid Fixed precision is high, the quality that now gathering pipe 20 can be improved in the positioning device of school gathering pipe 20 and pre- tubulature 10 is welded to connect.
Supporting block 40 is equipped with threaded hole far from one end of clip 30, and the first bolt 50 is removable by threaded hole and supporting block 40 Unload connection.Supporting block 40 is with the first bolt 50 using being threadedly coupled, and regulation is convenient, structure is simple, connection is reliable, can be more convenient Ground adjusts the position of the first bolt 50 so as to adjust the center line of gathering pipe 20 and being overlapped for the center line of pre- tubulature 10.Now school is closed Hold together the positioning device of pipe 20 using common Steel material in construction, intensity is high, meets construction requirement.
The present invention also provides a kind of localization methods of existing school gathering pipe 20, for guaranteeing that gathering pipe 20 and pre- tubulature 10 weld When connecing in succession, gathering pipe 20 does not misplace, and now the localization method of school gathering pipe 20 is determined using above-mentioned existing school gathering pipe 20 Position device, now the localization method of school gathering pipe 20 the following steps are included:
Step S1, clip 30 is fixed in pre- tubulature 10;
Step S2, the nozzle of one end of gathering pipe 20 is tentatively overlapped with the nozzle of one end of pre- tubulature 10;
Step S3, its corresponding supporting block 40 of multiple first bolts 50 connects, and adjusts the position of multiple first bolts 50, Multiple first bolts 50 are moved along the radial direction of gathering pipe 20, compress gathering pipe 20 jointly by multiple first bolts 50, with Limit the movement of gathering pipe 20 in all directions;
Step S4, situation is overlapped using center line and the center line of pre- tubulature 10 of measuring scale detection gathering pipe 20.
Clip 30 is set at the proper height on the outside of pre- 10 outer circle of tubulature and is fastened using the second bolt 60, by gathering pipe The nozzle of 20 one end welded tentatively is overlapped with the nozzle of one end that pre- tubulature 10 is welded, by multiple One bolt 50 is threadedly coupled with supporting block 40, and the radial direction along gathering pipe 20 adjusts the first bolt 50, is allowed to compress gathering pipe 20, to limit the movement of gathering pipe 20 in all directions, the center line of pipe and the center of pre- tubulature 10 are held together using measuring scale measurement The coincidence situation of line, if meet welding requirements.
In step s 4, it if the center line of gathering pipe 20 and the center line of pre- tubulature 10 are not completely coincident, repeats to walk Rapid S3, until the center line of gathering pipe 20 and the center line of pre- tubulature 10 are completely coincident.Construction personnel is adjusting the first bolt 50 During, to measure the center line of gathering pipe 20 and the center line of pre- tubulature 10 at any time is overlapped situation, can be according to practical survey The position that result adjusts the first bolt 50 is measured, the time needed for reducing positioning gathering pipe 20.
Although specific embodiments of the present invention have been described above, it will be appreciated by those of skill in the art that this is only For example, protection scope of the present invention is to be defined by the appended claims.Those skilled in the art without departing substantially from Under the premise of the principle and substance of the present invention, many changes and modifications may be made, but these change and Modification each falls within protection scope of the present invention.

Claims (8)

1. a kind of positioning device of existing school gathering pipe, when for guaranteeing that gathering pipe and pre- tubulature are welded to connect, the gathering pipe is not It misplaces, which is characterized in that the positioning device of the existing school gathering pipe includes:
Clip, the clip is for being fixed on the pre- tubulature;
Multiple supporting blocks, multiple supporting blocks are connected to the outer ring of the clip, and multiple supporting blocks are along the clip Outer ring interval setting;
Multiple first bolts, any first bolt are detachably connected with a supporting block, and a supporting block is only It is bolted with one described first, the moving direction of first bolt is parallel to the radial direction of the gathering pipe.
2. showing the positioning device of school gathering pipe as described in claim 1, which is characterized in that the positioning dress of the existing school gathering pipe Setting further includes two the second bolts, and the clip is bolted to be fixed in the pre- tubulature by described second.
3. showing the positioning device of school gathering pipe as described in claim 1, which is characterized in that multiple supporting blocks are welded to connect In the clip.
4. showing the positioning device of school gathering pipe as described in claim 1, which is characterized in that the supporting block is far from the clip One end be equipped with threaded hole, first bolt is detachably connected by the threaded hole and the supporting block.
5. showing the positioning device of school gathering pipe as described in claim 1, which is characterized in that the positioning dress of the existing school gathering pipe It sets including four supporting blocks and four first bolts.
6. the positioning device of the existing school gathering pipe as described in any one of claim 1-5, which is characterized in that close in the existing school Hold together the positioning device of pipe using Steel material.
7. a kind of localization method of existing school gathering pipe, when for guaranteeing that gathering pipe and pre- tubulature are welded to connect, the gathering pipe is not It misplaces, which is characterized in that the localization method of the existing school gathering pipe is utilized as described in any one of claim 1-6 The now positioning device of school gathering pipe, the localization method of the existing school gathering pipe the following steps are included:
Step S1, the clip is fixed in the pre- tubulature;
Step S2, the nozzle of one end of the gathering pipe is tentatively overlapped with the nozzle of one end of the pre- tubulature;
Step S3, multiple its corresponding supporting block connections of first bolt, adjust the position of multiple first bolts It sets, multiple first bolts are moved along the radial direction of the gathering pipe, compress institute jointly by multiple first bolts Gathering pipe is stated, to limit the movement of the gathering pipe in all directions;
Step S4, that the center line of the gathering pipe and the center line of the pre- tubulature are detected using measuring scale is overlapped situation.
8. showing the localization method of school gathering pipe as claimed in claim 7, which is characterized in that in the step S4: if described The center line of gathering pipe and the center line of the pre- tubulature are not completely coincident, then repeatedly step S3, until the gathering pipe Center line and the center line of the pre- tubulature are completely coincident.
CN201910295678.XA 2019-04-12 2019-04-12 The now localization method of the positioning device of school gathering pipe and existing school gathering pipe Pending CN109986268A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910295678.XA CN109986268A (en) 2019-04-12 2019-04-12 The now localization method of the positioning device of school gathering pipe and existing school gathering pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910295678.XA CN109986268A (en) 2019-04-12 2019-04-12 The now localization method of the positioning device of school gathering pipe and existing school gathering pipe

Publications (1)

Publication Number Publication Date
CN109986268A true CN109986268A (en) 2019-07-09

Family

ID=67133472

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910295678.XA Pending CN109986268A (en) 2019-04-12 2019-04-12 The now localization method of the positioning device of school gathering pipe and existing school gathering pipe

Country Status (1)

Country Link
CN (1) CN109986268A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112113047A (en) * 2020-08-04 2020-12-22 中国一冶集团有限公司 Reinforcing device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201579575U (en) * 2009-12-25 2010-09-15 中国机械工业建设总公司 Axial pipe orifice counterpart mounting clamp
CN203062189U (en) * 2013-01-30 2013-07-17 中国十七冶集团有限公司 Adjusting device for butting installation of oxygen pipeline
CN103406711A (en) * 2013-09-09 2013-11-27 青岛港(集团)有限公司 Special tool for aligning butt joint of steel pipes
CN205600219U (en) * 2016-05-10 2016-09-28 中国能源建设集团安徽电力建设第一工程有限公司 Light -duty pipeline is to mouthpart based on large pipe welding
KR20170002687U (en) * 2016-01-19 2017-07-27 이광성 Laminate-type bracket welded pipe eccentric prevention
CN208246168U (en) * 2018-05-15 2018-12-18 江阴市博汇机械成套设备有限公司 A kind of pipeline butting tooling

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201579575U (en) * 2009-12-25 2010-09-15 中国机械工业建设总公司 Axial pipe orifice counterpart mounting clamp
CN203062189U (en) * 2013-01-30 2013-07-17 中国十七冶集团有限公司 Adjusting device for butting installation of oxygen pipeline
CN103406711A (en) * 2013-09-09 2013-11-27 青岛港(集团)有限公司 Special tool for aligning butt joint of steel pipes
KR20170002687U (en) * 2016-01-19 2017-07-27 이광성 Laminate-type bracket welded pipe eccentric prevention
CN205600219U (en) * 2016-05-10 2016-09-28 中国能源建设集团安徽电力建设第一工程有限公司 Light -duty pipeline is to mouthpart based on large pipe welding
CN208246168U (en) * 2018-05-15 2018-12-18 江阴市博汇机械成套设备有限公司 A kind of pipeline butting tooling

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112113047A (en) * 2020-08-04 2020-12-22 中国一冶集团有限公司 Reinforcing device

Similar Documents

Publication Publication Date Title
CN204183172U (en) A kind of hood type round steel pipe docking adjustment fixture
CN105598629B (en) A kind of flexible positioning device of thin-walled tube
CN109986268A (en) The now localization method of the positioning device of school gathering pipe and existing school gathering pipe
CN108049921B (en) A kind of assembly method of aero-engine low-pressure turbine shaft-disk component
CN205967981U (en) Be used for small -bore tubular product welded frock that is geared to needs of job fast
CN113148058B (en) Process for installing and positioning double rudder sleeve and tail casting in stage of sectional construction
CN106052619A (en) Device for detecting circular section profile of steel tube in power steel tube iron tower
CN104992738A (en) Nuclear island main equipment installation process based on three-dimensional high-precision measurement
CN107621259A (en) A kind of floading condition calibration system and method for immersed tube tunnel final joint
CN205967980U (en) Fixing device for pipe welding in construction
CN104831700B (en) A kind of spud leg and the attachment means of shoe and method of attachment
CN106181209A (en) In a kind of construction, movable pipeline fixes welding method
CN105945507A (en) Pipeline fixing welding method in building construction
CN206618633U (en) A kind of flexible frock fixture suitable for pipe fitting fatigue test
CN103926325A (en) Multi-probe flexible clamping device applied to ultrasonic testing
CN109590640A (en) Automobile component welding fixture location calibration device
CN109079418A (en) Directly buried pipeline is to pipe connection and attaching method thereof
CN104897702B (en) A kind of small diameter tube banjo fixing butt jointing gamma ray detection special tooling
CN208895490U (en) Directly buried pipeline is to pipe connection
CN205684891U (en) A kind of automatic spot surveys torquer
CN105643162B (en) Footing bonding machine
CN208903780U (en) A kind of structure guaranteeing double fuel tank feed-through collar position precisions
CN107225335A (en) Mud tube pipe collar automatic welding machine
CN207904749U (en) A kind of steel pipe support cross-connecting apparatus
CN209117141U (en) A kind of ultrasonic wave gas meter measuring device of energy automatic error correction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190709