CN208895490U - Directly buried pipeline is to pipe connection - Google Patents

Directly buried pipeline is to pipe connection Download PDF

Info

Publication number
CN208895490U
CN208895490U CN201821784955.0U CN201821784955U CN208895490U CN 208895490 U CN208895490 U CN 208895490U CN 201821784955 U CN201821784955 U CN 201821784955U CN 208895490 U CN208895490 U CN 208895490U
Authority
CN
China
Prior art keywords
ring body
pipe connection
fixed
pipeline
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821784955.0U
Other languages
Chinese (zh)
Inventor
张健
孟晶晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tangshan Caofeidian 22 Mcc Engineering Technology Co Ltd
Original Assignee
Tangshan Caofeidian 22 Mcc Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tangshan Caofeidian 22 Mcc Engineering Technology Co Ltd filed Critical Tangshan Caofeidian 22 Mcc Engineering Technology Co Ltd
Priority to CN201821784955.0U priority Critical patent/CN208895490U/en
Application granted granted Critical
Publication of CN208895490U publication Critical patent/CN208895490U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a kind of directly buried pipelines to pipe connection, including fixed ring body, the fixed ear being arranged in fixed ring body, setting fixed ear in interval in the fixation ring body, fixed ear is equipped with pedestal and clamping portion, diameter of a circle where the inner surface of clamping portion is greater than the outer diameter for the pipeline being clamped, clamping portion is equipped with threaded hole, adjusts bolt, and the internal diameter of fixed ring body is corresponding to the outer diameter of pipeline, and the fixation ring body is detachable ring body;Its connection method includes: to make on demand to pipe connection;It is laid with basic sand-gravel cushion, is excavated to pipe working pit;Down tube, using docking, adjust, fix to pipe connection;Pipeline point solid welding is fixed;It unloads to pipe connection, it is formal to weld.The device and attaching method thereof can carry out quick, stable fixation when connecting to pipe to junction, consistent with the axis for improving pipeline, improve welding quality and welding efficiency.

Description

Directly buried pipeline is to pipe connection
Technical field
The present invention relates to pipeline constructions, are exactly a kind of directly buried pipelines to pipe connection.
Background technique
It is closely bound up with people's lives due to the raw engineering of directly buried pipeline installing engineering major part national, in order to meet clothes The requirement of the business people, under the premise of guaranteeing construction quality and safety, the construction period according to schedule, which completes construction task, is also The condition, such as heat supply pipeline, gas pipeline etc. of construction team's organizational capacity are examined, these works having an impact to people's life Can journey complete on schedule will be important performance assessment criteria.
According to previous engineering construction empirical discovery, the construction speed of the pipeline groove earthwork and welding can be constructed by increasing The mechanical requirement for meeting project progress with operating personnel, it is still, inconvenient since self weight of pipeline is big, in the construction process Easily there is the quality and welding efficiency for causing to influence weld seam since axis is inclined.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of directly buried pipelines to pipe connection, the device and its connection side Method can carry out quick, stable fixation when connecting to pipe to junction, consistent with the axis for improving pipeline, improve welding matter Amount and welding efficiency.
In order to solve the above technical problems, the present invention adopts the following technical scheme:
A kind of directly buried pipeline is described including fixed ring body, the fixed ear being arranged in fixed ring body to pipe connection Interval setting fixed ear, fixed ear are equipped with pedestal and clamping portion, the diameter of a circle where the inner surface of clamping portion in fixed ring body Greater than the outer diameter for the pipeline being clamped, clamping portion is equipped with threaded hole, adjusts bolt, the internal diameter of fixed ring body and the outer diameter of pipeline Accordingly, fixed ring body is detachable ring body.
Clamping portion and pedestal can form overall structure in production, can also later period site welding.In pedestal and clamping portion After being installed, can installation and adjustment bolt, during to pipe, by adjust bolt carry out conduit axis adjustment, reach fast Speed, accurately to the purpose of pipe.Fixed ring body can unload after the completion of connecting to pipe.The internal diameter of fixed ring body and the outer diameter of pipeline Accordingly, fixed ring body is detachable ring body.
Compared with prior art, the feature protruded is:
The technical program is fastened in one of two pipelines to pipe connection by the way that fixed ring body is arranged, using fixed ring body End point is fastened in another end point of two pipelines to pipe connection using the fixed ear of fixed ring body, utilizes bolt What be can be convenient is finely adjusted the position of pipeline, the adjusting that adjustment pipeline location is equipped with after meeting the requirements using fixed ear The locking that bolt carries out position to another pipe head is fixed, and is carried out in the way of spot welding along the end point to two pipelines It is fixed, then lay down to pipe connection, it is welded, to improve the efficiency to pipe, and can be prevented in the welding process Dislocation improves welding quality and welding efficiency.
Further optimal technical scheme is as follows:
The fixation ring body is equipped with installation, disassembly buckle.By setting installation, disassembly buckle, fixed ring can be convenient The installation fixation and postorder disassembly of body, installing and dismounting buckle structure can choose identical as the buckle structure of watch chain.
The fixation ring body is equipped with detachable unit part.
The end point of the detachable unit part is equipped with connecting hole, and installation is fixedly connected with shank of bolt in connecting hole, removable The end point for unloading unit piece and detachable unit part passes through connection shank of bolt articulated connection.
By above-mentioned setting, the present apparatus is facilitated to be applied to the connection of the pipeline of different caliber sizes, connection can as needed Removable unit part.
Detailed description of the invention
Fig. 1 is the schematic perspective view of the embodiment of the present invention;
Fig. 2 is use state with reference to figure;
Connection schematic diagram when Fig. 3 is construction connection;
Fig. 4 is the perspective view of detachable unit part;
Description of symbols: the fixed ring body of 1-;2- fixed ear;The clamping portion 3-;4- adjusts bolt;5- pedestal;6- Installation, disassembly buckle;The basis 7- sand-gravel cushion;8- is to pipe working pit;9- connection shank of bolt;10- detachable unit part.
Specific embodiment
Below with reference to embodiment, the present invention is further illustrated.
Referring to Fig. 1, Fig. 2, pipe connection by fixed ring body 1, is arranged in fixed ring body 1 in a kind of directly buried pipeline Fixed ear 2 forms;Interval setting 4 fixed ears, 2,4 fixed ears 2 divide 2 groups to be symmetrical arranged in fixed ring body 1, and 2 groups of line hangs down Directly, in order to adjusting;Fixed ear 2 is equipped with pedestal 5 and clamping portion 3, and the diameter of a circle where the inner surface of clamping portion 3 is greater than by card The outer diameter of the pipeline connect, clamping portion 3 are equipped with threaded hole, adjust bolt 4, and the internal diameter of fixed ring body 1 is corresponding to the outer diameter of pipeline, Fixed ring body 1 is detachable ring body.
Fixed ring body 1 is equipped with installation, disassembly buckle 6.By setting installation, disassembly buckle 6, fixed ring body can be convenient 1 installation fixation and postorder disassembly, installing and dismounting buckle structure can choose identical as the buckle structure of watch chain.
Fixed ring body 1 is equipped with detachable unit part.
Referring to fig. 4, fixed ring body 1 is equipped with detachable unit part 10, and the end point of detachable unit part 10 is equipped with connecting hole, Installation is fixedly connected with shank of bolt 9 in connecting hole, and detachable unit part 10 and the end point of detachable unit part 10 pass through connection spiral shell Tightening latch 9 is articulated and connected.
In conjunction with Fig. 1, Fig. 2 and Fig. 3 it is found that connection method of the directly buried pipeline to pipe connection comprising the steps of:
(1) according to the size for the outer diameter for applying pipeline, production is to pipe connection, the high material production of material selection intensity ?;
(2) according to layout design pipeline mark high request, pipeline foundation sand-gravel cushion 7 of constructing, and excavated at pipe welding port To pipe working pit 8;
(3) pipeline down tube is carried out to pipe operation, outwardly by fixed ear 2, by 1 cutting ferrule of fixation ring body to pipe connection In the end of the pipeline connected to pipe, by the fixed installation of ring body 1 fastening, by the end for another pipeline for needing to connect pipe It is moved into the fixed ear 2 to pipe connection, the end of two pipelines is made to be adjacent to required position, adjusted in fixed ear 2 Bolt 4 is adjusted to adjust the scale error of pipe welding port to be welded, until meeting error allows to require;
(4) junction of fix pipe connection two pipelines to pipe spot welding is carried out to fix;
(5) it unloads to pipe connection, the junction of two fixed pipelines to pipe of spot welding is formally welded.
The working principle of the present embodiment is as follows:
In the construction process, an end point of two pipelines to pipe connection is fastened in using fixed ring body 1, using admittedly The fixed ear 2 for determining ring body 1 is fastened in another end point of two pipelines to pipe connection, pair that can be convenient using bolt The position of pipeline is finely adjusted, and the adjusting bolt 4 that adjustment pipeline location is equipped with after meeting the requirements using fixed ear 2 is to another The locking that a pipe head carries out position is fixed, and the end point of two pipelines is fixed in edge in the way of spot welding, then unloads Fall to pipe connection, welded, to improve the efficiency to pipe, and can prevent from misplacing in the welding process, improves Welding quality and welding efficiency.
Operation (test is managed with DN1200) after tested, the present embodiment has effect outstanding, has well solved pipeline pair The problems such as pipe welding procedure progress is slow and misalignment of axe, according to previous construction, per pass weld bond opposite joint, welding need nearly 3 hours It completes, 1 hour is only needed after using the present apparatus.Present apparatus material is easily purchased simultaneously, and price is low, can be made, It can be produced with producer.
The foregoing is merely preferably feasible embodiment of the invention, not thereby limiting the scope of the invention, It is all to change with equivalent structure made by description of the invention and accompanying drawing content, it is intended to be included within the scope of the present invention.

Claims (4)

1. a kind of directly buried pipeline is to pipe connection, including fixed ring body, the fixed ear being arranged in fixed ring body, feature exists In: setting fixed ear in interval in the fixation ring body, fixed ear is equipped with pedestal and clamping portion, where the inner surface of clamping portion Diameter of a circle is greater than the outer diameter for the pipeline being clamped, and clamping portion is equipped with threaded hole, adjusts bolt, the internal diameter and pipe of fixed ring body The outer diameter in road is corresponding, and fixed ring body is detachable ring body.
2. directly buried pipeline according to claim 1 is to pipe connection, it is characterised in that: the fixation ring body is equipped with peace Dress, disassembly buckle.
3. directly buried pipeline according to claim 1 is to pipe connection, it is characterised in that: the fixation ring body is equipped with can Removable unit part.
4. directly buried pipeline according to claim 3 is to pipe connection, it is characterised in that: the detachable unit part End point is equipped with connecting hole, and installation is fixedly connected with shank of bolt, the end of detachable unit part and detachable unit part in connecting hole Place passes through connection shank of bolt articulated connection.
CN201821784955.0U 2018-10-31 2018-10-31 Directly buried pipeline is to pipe connection Active CN208895490U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821784955.0U CN208895490U (en) 2018-10-31 2018-10-31 Directly buried pipeline is to pipe connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821784955.0U CN208895490U (en) 2018-10-31 2018-10-31 Directly buried pipeline is to pipe connection

Publications (1)

Publication Number Publication Date
CN208895490U true CN208895490U (en) 2019-05-24

Family

ID=66577212

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821784955.0U Active CN208895490U (en) 2018-10-31 2018-10-31 Directly buried pipeline is to pipe connection

Country Status (1)

Country Link
CN (1) CN208895490U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109079418A (en) * 2018-10-31 2018-12-25 唐山曹妃甸二十二冶工程技术有限公司 Directly buried pipeline is to pipe connection and attaching method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109079418A (en) * 2018-10-31 2018-12-25 唐山曹妃甸二十二冶工程技术有限公司 Directly buried pipeline is to pipe connection and attaching method thereof

Similar Documents

Publication Publication Date Title
CN204183172U (en) A kind of hood type round steel pipe docking adjustment fixture
CN109079418A (en) Directly buried pipeline is to pipe connection and attaching method thereof
CN208895490U (en) Directly buried pipeline is to pipe connection
CN208441842U (en) A kind of shield launching counter-force support system
CN206802577U (en) A kind of regulating flange structure
CN204855454U (en) High strength bolt defect detecting device
CN103406711A (en) Special tool for aligning butt joint of steel pipes
CN101767243A (en) Method for welding tuyere-cooler casing and blast furnace casing
CN219542173U (en) Water heater inner bag support location frock
CN203846044U (en) Device for rapidly determining hole location of air supply branch pipe on blast furnace hot blast pipe
CN109371188A (en) The blowpipe installation method of blast furnace
CN110270742A (en) Weld the gas supply welding mechanism and its construction method of all steel indirect cool tower tripod girder steel
CN106522985B (en) A kind of connection structure and its construction method of non-built-in type shield duct piece sliding slot pedestal
CN208360448U (en) A kind of portable attachment device of ultra-sonic depth finder
CN103527883A (en) Method for quickly drilling hole in steel pipe with water and connecting branch pipe to steel pipe
CN208535441U (en) A kind of solidify for collector pipe ultraviolet light repairs bundle head device used
CN202074166U (en) Saddle-shaped quick pipe joint
CN207347597U (en) A kind of converter oxygen gun specialized barrel
CN202614320U (en) Clamping device for ultrasonic flowmeter of nuclear power plant
CN209012560U (en) A kind of traversing device for gas pipeline
CN213299381U (en) Magnetic type roadway center line laser calibration device
CN203231005U (en) Automobile water return pipe
CN211740882U (en) Pressure test auxiliary tool for socket-and-spigot joint nodular cast iron pipe
CN205280666U (en) Ultrasonic probe
CN203849213U (en) Multi-probe flexible clamping device applied to ultrasonic detection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant