CN103527883A - Method for quickly drilling hole in steel pipe with water and connecting branch pipe to steel pipe - Google Patents
Method for quickly drilling hole in steel pipe with water and connecting branch pipe to steel pipe Download PDFInfo
- Publication number
- CN103527883A CN103527883A CN201310511949.3A CN201310511949A CN103527883A CN 103527883 A CN103527883 A CN 103527883A CN 201310511949 A CN201310511949 A CN 201310511949A CN 103527883 A CN103527883 A CN 103527883A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- water
- branch
- pipe
- drill bit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L41/00—Branching pipes; Joining pipes to walls
- F16L41/08—Joining pipes to walls or pipes, the joined pipe axis being perpendicular to the plane of the wall or to the axis of another pipe
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Branch Pipes, Bends, And The Like (AREA)
- Drilling And Boring (AREA)
Abstract
The invention discloses a method for quickly drilling a hole in a steel pipe with water and connecting a branch pipe to the steel pipe. The method aims to overcome the defects that in the prior art, a hole cannot be drilled in a steel pipe with a large amount of water, then a branch steel pipe cannot be connected to the steel pipe, waiting time is long and water supply to other branch pipes is affected if hole drilling and butt joint are conducted after the water is discharged, and waste is caused when the water is discharged. The method comprises the steps of manufacturing a hollow water drill bit, welding a water drill bit locating pipe at the position, where the hole needs to be drilled, in the main steel pipe, welding the branching steel pipe at the position, outside the locating pipe, of the main steel pipe concentrically, installing a ball valve on the branch steel pipe, opening the ball valve, drilling the hole between the branch steel pipe and the locating pipe through the water drill bit, taking out the cut portion of the locating pipe, closing the ball valve and connecting the branch pipe. According to the method, the water inside the main steel pipe does not need to be discharged, the hole is drilled in the pipe wall without electric welding or gas welding, time used for connecting the branch steel pipe is saved by four to five hours compared with that spent in the prior art, the working efficiency is high, welding quality can be ensured, water waste is reduced, and water usage of other places is not affected in the process of connecting the branch pipe.
Description
Technical field
The invention belongs to adapting method, specifically a kind of on the steel pipe main pipeline with water perforate connect the method for arm.
Background technique
Along with the continuous expansion of business, the goods yard area of port and pier is in continuous expansion; The raising of environmental protection requirement also constantly increases the water consumption in stockyard and water place, and therefore, the stockyard water after expansion, just need to increase lateral from main pipeline and satisfy the demand.
While installing the branch steel pipe of new system additional on the steel pipe of main pipeline, because there being a large amount of water in main pipeline, if first open the branched hole adapter that discharges water again from main pipeline, from the perforate welding branch steel pipe that discharges water, complete and often need 5-6 hour, the adapter time, long not only impact newly increased the use of part, but also can affect the water of other existing goods yard arms, the water of these outflows causes very large waste because depositing nowhere.
If take over electric welding or gas welding punching on the steel pipe of main pipeline that has water, just reaming again after main pipeline has water to ooze out, still will wait for that the water of pipeline middle and upper part flows out, and has living space and could continue perforate welding in pipe, does like this and still exists above-mentioned problem.
Summary of the invention
Technical problem to be solved by this invention is, overcome prior art and cannot connect branch's steel pipe by opening on the steel pipe that has the large water gaging of water, if open butt joint again after discharging water, the water supply of other arms is grown, affected to stand-by period, and the wasting shortcoming that discharges water, providing a kind of is having on water steel pipe perforate fast connect the method for arm.
The problems referred to above that exist in order to solve prior art, the present invention adopts following technical proposals to realize:
One, select water drill bit:
Select its external diameter to be slightly less than at the water drill bit of steel pipe supervisor Shang Xujie branch pipe diameter standby;
Two, water drill bit location when the steel pipe that needs perforate is responsible for boring:
On steel pipe supervisor, determine behind the position of perforate, centered by the docking point on described steel pipe supervisor, weld the positioning pipe that one section of diameter is less than described water drill bit internal diameter;
San, welded and installed branch steel pipe, prepare punching:
(1) branch's steel pipe of top band mounting flange, with the concentric external diameter that is greater than water drill bit at the internal diameter of steel pipe supervisor's tube wall Shang, branch steel pipe that welds of described positioning pipe;
(2) by the flange plate abutting joint on the mounting flange on ball valve and described branch steel pipe, and ball valve is located to whole open modes;
Four, punching connecting branch:
(1) in described branch steel pipe, add water, with jackhammer, clamp described water drill bit, water drill bit, by the ball valve orifice of opening, extend into the space between described positioning pipe and branch's steel pipe simultaneously, the punching of spudding on steel pipe supervisor's tube wall, until beat tube wall;
(2) extract water drill bit out, by cutting down from steel pipe supervisor, take out rapidly and close ball valve with the tube wall of positioning pipe in branch's steel pipe, on the flange plate of the ball valve the other end, connect the water pipe that can guide place to use into.
Originally return and there is following technical characteristics:
The described branch's steel pipe length being welded on steel pipe supervisor tube wall is 95-110 millimeters;
The described branch's steel pipe length being welded on steel pipe supervisor tube wall is 100 millimeters;
The length of described positioning pipe is 45-55 millimeters;
The length of described positioning pipe is 50 millimeters.
Advantage of the present invention and good effect are, with said method, in the steel pipe supervisor tube wall perforate with water, dock branch's steel pipe, owing to the water in steel pipe supervisor need not being emitted, also without electric welding or gas welding, on tube wall, punch, first weld branch's steel pipe, after installing ball valve, open ball valve water drill bit band water boring again, whole boring connects the process of branch's steel pipe and only uses 0.5-1 hour, than prior art, connect branch's steel pipe, from perforate, discharge water and reach welding condition, connecing each branch's steel pipe will save time more than 4---5 hour, greatly improved working efficiency, and can guarantee weld seam welding quality, reduced the waste of water, in adapter process, do not affect other local waters in stockyard yet.
Accompanying drawing explanation
Fig. 1 is the cross-sectional schematic that fast opening of the present invention connects arm.
Embodiment
Below in conjunction with drawings and Examples, the invention will be further described.
Fig. 1, for perforate on the tube wall steel pipe supervisor 1 connects the schematic diagram of branch's steel pipe 2, is that minute following steps realize:
One, select water drill bit 5:
Select its external diameter to be slightly less than to be responsible for the water drill bit 5 of 1 Shang Xujie branch steel pipe 2 internal diameters at steel pipe standby;
Two, location when the steel pipe that needs perforate is responsible on 1 tube wall 5 boring of water drill bit:
On steel pipe supervisor 1, determine the position of perforate, centered by described steel pipe is responsible for the docking point on 1 tube wall, weld the positioning pipe 3 that one section of diameter is less than described water drill bit 5 internal diameters, as the drilling rod 5.1 Internal hole positionings uses of perforate water drill bit 5;
San, welded and installed branch steel pipe, prepare punching:
(1) branch's steel pipe 2 of top band mounting flange 2.1,, nothing concentric with described positioning pipe 3 leaked on the tube wall that is welded on steel pipe supervisor 1, the internal diameter of branch's steel pipe 2 is greater than the external diameter of water drill bit 5, and the cutter head 5.2 when punching on water drill bit 5 touches less than the inwall of branch's steel pipe 2 is advisable;
(2) mounting flange on ball valve 6 6.1 is docked with the flange plate 2.1 on described branch steel pipe 2, with bolt 4, be fixedly connected with installation, and ball valve 6 is located to whole open modes;
Four, punching connecting branch:
(1) in described branch steel pipe 1, add water, with jackhammer, clamp described water drill bit 5, water drill bit 5, through the hole on the ball valve 6 of opening, extend into the space between described positioning pipe 3 and branch's steel pipe 2 simultaneously, the punching of spudding on steel pipe supervisor 1 tube wall, until beat tube wall;
(2) extract water drill bit 5 out, by cutting down from steel pipe supervisor, with the tube wall of positioning pipe 3, from the interior rapid taking-up of branch's steel pipe 2 and close ball valve 6, then on the flange plate of ball valve 6 the other ends, connect the water pipe that can guide place to use into.
Above-mentioned whole boring connects the overall process of branch's steel pipe and only uses 0.5-1 hour, has greatly improved working efficiency, has also reduced the waste of water resources simultaneously.
For the convenience of installing, through test, described in be welded on the branch's steel pipe 2 on steel pipe supervisor 1 length be 95-110 millimeters and be advisable, optimum length is 100 millimeters.
For water drill bit 5 being had good positioning when holing, through test, the suitable length of described positioning pipe 2 is 45-55 millimeters, and optimum length is 50 millimeters.
Claims (5)
1. there iing on water steel pipe perforate fast connect a method for arm, it is characterized in that: the present invention adopts following step and method to carry out:
One, select water drill bit:
Select its external diameter to be slightly less than at the water drill bit of steel pipe supervisor Shang Xujie branch pipe diameter standby;
Two, water drill bit location when the steel pipe that needs perforate is responsible for boring:
On steel pipe supervisor, determine behind the position of perforate, centered by the docking point on described steel pipe supervisor, weld the positioning pipe that one section of diameter is less than described water drill bit internal diameter;
San, welded and installed branch steel pipe, prepare punching:
(1) branch's steel pipe of top band mounting flange, with the concentric external diameter that is greater than water drill bit at the internal diameter of steel pipe supervisor's tube wall Shang, branch steel pipe that welds of described positioning pipe;
(2) by the flange plate abutting joint on the mounting flange on ball valve and described branch steel pipe, and ball valve is located to whole open modes;
Four, punching connecting branch:
(1) in described branch steel pipe, add water, with jackhammer, clamp described water drill bit, water drill bit, by the ball valve orifice of opening, extend into the space between described positioning pipe and branch's steel pipe simultaneously, the punching of spudding on steel pipe supervisor's tube wall, until beat tube wall;
(2) extract water drill bit out, by cutting down from steel pipe supervisor, take out rapidly and close ball valve with the tube wall of positioning pipe in branch's steel pipe, on the flange plate of the ball valve the other end, connect the water pipe that can guide place to use into.
2. as claimed in claim 1 having on water steel pipe perforate fast connect the method for arm, it is characterized in that: described in branch's steel pipe length of being welded on steel pipe supervisor tube wall be 95-110 millimeters.
3. as claimed in claim 1 having on water steel pipe perforate fast connect the method for arm, it is characterized in that: described in branch's steel pipe length of being welded on steel pipe supervisor tube wall be 100 millimeters.
4. as claimed in claim 1 there being on water steel pipe perforate fast connect the method for arm, it is characterized in that: the length of described positioning pipe is 45-55 millimeters.
5. as claimed in claim 1 there being on water steel pipe perforate fast connect the method for arm, it is characterized in that: the length of described positioning pipe is 50 millimeters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310511949.3A CN103527883B (en) | 2013-10-28 | 2013-10-28 | Method for quickly drilling hole in steel pipe with water and connecting branch pipe to steel pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310511949.3A CN103527883B (en) | 2013-10-28 | 2013-10-28 | Method for quickly drilling hole in steel pipe with water and connecting branch pipe to steel pipe |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103527883A true CN103527883A (en) | 2014-01-22 |
CN103527883B CN103527883B (en) | 2015-07-15 |
Family
ID=49930114
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310511949.3A Active CN103527883B (en) | 2013-10-28 | 2013-10-28 | Method for quickly drilling hole in steel pipe with water and connecting branch pipe to steel pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103527883B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107542998A (en) * | 2016-06-28 | 2018-01-05 | 中国二十冶集团有限公司 | Increase the construction method of branch line newly on original buried pipeline |
CN110005893A (en) * | 2019-04-22 | 2019-07-12 | 五邑大学 | A kind of duct frame connection mechanism |
CN112324930A (en) * | 2020-09-28 | 2021-02-05 | 上海至诚锅炉设备有限公司 | Eccentric water interception valve and installation method thereof |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS51336B2 (en) * | 1972-04-12 | 1976-01-07 | ||
FR2551833B1 (en) * | 1983-09-13 | 1987-02-27 | Sonoprec Sarl | APPARATUS FOR MOUNTING A MEMBER ON A PIPELINE |
KR100337135B1 (en) * | 1999-07-26 | 2002-05-18 | 이우각 | Horizontal tapping machine |
CN101876238A (en) * | 2009-11-28 | 2010-11-03 | 中煤第五建设公司 | Anti-spraying connector for long-distance horizontal drilling |
CN102493628A (en) * | 2011-12-09 | 2012-06-13 | 韩敏杰 | Anti-slip positioning drill device |
-
2013
- 2013-10-28 CN CN201310511949.3A patent/CN103527883B/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107542998A (en) * | 2016-06-28 | 2018-01-05 | 中国二十冶集团有限公司 | Increase the construction method of branch line newly on original buried pipeline |
CN110005893A (en) * | 2019-04-22 | 2019-07-12 | 五邑大学 | A kind of duct frame connection mechanism |
CN112324930A (en) * | 2020-09-28 | 2021-02-05 | 上海至诚锅炉设备有限公司 | Eccentric water interception valve and installation method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN103527883B (en) | 2015-07-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102147033B (en) | Non-excavation directional traversing construction method for thermal power pipeline | |
CN103527883B (en) | Method for quickly drilling hole in steel pipe with water and connecting branch pipe to steel pipe | |
CN107829723B (en) | Mine rock mass mining damage range integrated detection equipment and detection method | |
CN102635749A (en) | Pipe jointing process without gas delivery stopping | |
CN208804392U (en) | A kind of novel system split tube method and repair underground piping | |
CN103669898B (en) | A kind of method of collar extension casing reinforcement Welded Node of Steel Pipe Truss | |
CN203257349U (en) | Ocean module drill rig slurry backflow device | |
CN201130168Y (en) | Ultrasound wave detecting tube | |
CN109322621B (en) | Broken layer pipe fixing and grouting method | |
CN205689242U (en) | One is bowed hole drainage arrangement | |
CN204040966U (en) | A kind of drilling sampling device | |
CN2931757Y (en) | Double dual-flow channel drill bit for exploratory boring bergol | |
CN102134970A (en) | Device for accurately positioning deep hole in process of testing ground stress | |
CN102278067B (en) | Whipstock | |
CN109113603A (en) | A kind of exploration dustproof drill | |
CN209100043U (en) | A kind of hard rock push pipe motor spindle sediment cleaning plant | |
CN203157154U (en) | Hole expander for plastic pipe fitting | |
CN203258292U (en) | Pipeline hot tapping support device | |
CN203571317U (en) | Pup-joint type pipeline on-line coupon combined device | |
CN201090247Y (en) | Filling pipe for stope by lower direction consolidated filling mining means | |
CN113513285A (en) | Large-drop mountain directional drilling mud plugging system and method and electronic equipment | |
CN207701079U (en) | A kind of non-excavation-use high intensity time expansion device | |
CN101892486B (en) | Construction method of feed device for large-diameter pipeline for trenchless construction | |
CN206035427U (en) | Fill water pressurize cooling and creep into device of getting coal core | |
CN217270266U (en) | Drill bit water-cooling structure of mining stock |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |