CN109971903A - A kind of metallurgy iron-smelting furnace preheating device - Google Patents

A kind of metallurgy iron-smelting furnace preheating device Download PDF

Info

Publication number
CN109971903A
CN109971903A CN201910206517.9A CN201910206517A CN109971903A CN 109971903 A CN109971903 A CN 109971903A CN 201910206517 A CN201910206517 A CN 201910206517A CN 109971903 A CN109971903 A CN 109971903A
Authority
CN
China
Prior art keywords
smelting furnace
iron
preheating cabinet
inner cavity
fumer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910206517.9A
Other languages
Chinese (zh)
Other versions
CN109971903B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingshuihe County Hongyude Chemical Co.,Ltd.
Original Assignee
Chong Aijun
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chong Aijun filed Critical Chong Aijun
Priority to CN201910206517.9A priority Critical patent/CN109971903B/en
Publication of CN109971903A publication Critical patent/CN109971903A/en
Application granted granted Critical
Publication of CN109971903B publication Critical patent/CN109971903B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D17/00Arrangements for using waste heat; Arrangements for using, or disposing of, waste gases
    • F27D17/004Systems for reclaiming waste heat
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B11/00Making pig-iron other than in blast furnaces
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B9/00Stoves for heating the blast in blast furnaces
    • C21B2100/04

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Furnace Details (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The invention discloses a kind of metallurgy iron-smelting furnace preheating devices, including iron-smelting furnace, the positive bottom of iron-smelting furnace is fixedly installed with preheating cabinet, and the escape pipe of iron-smelting furnace through preheating cabinet and extends in the inner cavity of preheating cabinet, it is provided through air-exhausting duct at the top of preheating cabinet, and is provided with control valve on air-exhausting duct, the side of preheating cabinet is provided through air inlet pipe, and the inside of preheating cabinet is bolted and is equipped with inlet box, one end of air inlet pipe through inlet box and extends in the inner cavity of inlet box.The present invention passes through setting preheating cabinet, and by the way that the inner cavity of preheating cabinet is connected to the inner cavity of iron-smelting furnace, it is provided with air-exhausting duct and pneumatic control valve simultaneously, to make the high temperature hot gas in iron-smelting furnace be emitted into the inside of preheating cabinet, and by inlet box, the cooperation of heating pipe fumer and exhaust pipe carries out preheating heating to the air in iron-smelting furnace is entered by preheating cabinet, to reach UTILIZATION OF VESIDUAL HEAT IN, energy-saving and environment-friendly effect.

Description

A kind of metallurgy iron-smelting furnace preheating device
Technical field
The present invention relates to metallurgical technology equipment technical field, specially a kind of metallurgy iron-smelting furnace preheating device.
Background technique
Iron-smelting furnace is one of metallurgical equipment, iron-smelting furnace be it is a kind of by metallic iron from iron-bearing mineral (the predominantly oxygen of iron Compound) in the equipment that extract, iron-smelting furnace at work, needs to be aerated, and enters ironmaking to reduce outside air After in furnace, minor impact is caused to the temperature in furnace, needs to heat the air for entering iron-smelting furnace.
A hot wind room can be all arranged in existing iron-smelting furnace, and hot wind room is a closed device, and hot wind is inside distributed with It manages, the air being passed through in hot air pipe in iron-smelting furnace, is the high-temp waste gas being discharged out of iron-smelting furnace, when air is in warm outside hot air pipe In hot air pipe in wind room when flowing, the heat that flies up being discharged in iron-smelting furnace is absorbed, and temperature increases, but existing hot wind room It is interior, it is low into the air heat transference efficiency in iron-smelting furnace, cause pre-heat effect poor, influences pre- thermal effect when air enters iron-smelting furnace Fruit causes to be affected to the temperature in furnace.
Summary of the invention
The purpose of the present invention is to provide a kind of metallurgy iron-smelting furnace preheating devices, have rapidly pre-warming, while energy-saving ring The advantages of guarantor, solves in the existing hot wind room mentioned in background technique, low into the air heat transference efficiency in iron-smelting furnace, Cause pre-heat effect poor, influences pre-heat effect when air enters iron-smelting furnace, lead to the problem of being affected to the temperature in furnace.
To achieve the above object, the invention provides the following technical scheme: it is a kind of metallurgy use iron-smelting furnace preheating device, including refining Iron furnace, the positive bottom of iron-smelting furnace are fixedly installed with preheating cabinet, and the escape pipe of the iron-smelting furnace through preheating cabinet and extends Into the inner cavity of preheating cabinet, air-exhausting duct is provided through at the top of the preheating cabinet, and control valve is provided on air-exhausting duct.
The side of the preheating cabinet is provided through air inlet pipe, and the inside of preheating cabinet is bolted and is equipped with air inlet Case, one end of the air inlet pipe is through inlet box and extends in the inner cavity of inlet box, the inlet box far from air inlet pipe one End is fixedly installed with the heating pipe communicated with air inlet box cavity, and the inside of the preheating cabinet is fixedly installed with fumer, described The top and bottom of fumer are fixedly connected at the top and bottom of preheating chamber interior wall respectively, and heating pipe is far from inlet box One end is run through the side of fumer and extended in the inner cavity of fumer to be connected to the inner cavity of fumer, the side of the fumer Be inlaid with heat-conducting plate, and the side of heat-conducting plate through fumer and extends the outside of child's fumer, the heat-conducting plate it is another Side is fixedly connected with one end of heat conducting bar, and the other end of the heat conducting bar extends in the inner cavity of heating pipe, and in the shape of a spiral It is arranged in the inner cavity of heating pipe, the front of the fumer is provided through exhaust pipe, and one end of the exhaust pipe is run through Preheating cabinet simultaneously extends in the inner cavity of iron-smelting furnace.
Preferably, thermal insulation layer is fitted on the inner wall of the preheating cabinet, the thermal insulation layer is by nanometer micropore thermal insulation board, ceramics Fiberboard is bonded and insulating moulding coating has been smeared on surface.
Preferably, the side that the heat-conducting plate extends exhaust box cavity offers the groove of roughness, and groove Slot bottom be provided with spherical convex block.
Preferably, the heat-conducting plate, which is located on the side of exhaust box cavity, is inlaid with copper sheet.
Preferably, the side of the inlet box is provided through connecting tube, and the heating pipe passes through connecting tube and air inlet The inner cavity of case is connected to, and connecting tube is internally provided with fixed plate, through-hole is offered in the fixed plate, and the quantity of through-hole is not It circularizes and is arranged in fixed plate less than 3.
Preferably, the quantity of the heating pipe is four, and four heating pipes are successively spaced substantially equidistant from top to bottom.
Compared with prior art, beneficial effects of the present invention are as follows:
1, the present invention is arranged simultaneously by setting preheating cabinet, and by the way that the inner cavity of preheating cabinet to be connected to the inner cavity of iron-smelting furnace Air-exhausting duct and pneumatic control valve, so that the high temperature hot gas in iron-smelting furnace be made to be emitted into the inside of preheating cabinet, and pass through air inlet Case, the cooperation of heating pipe fumer and exhaust pipe carry out preheating heating to the air in iron-smelting furnace is entered by preheating cabinet, To reach UTILIZATION OF VESIDUAL HEAT IN, energy-saving and environment-friendly effect.
2, the present invention is entered in preheating cabinet by the way that fumer, heat-conducting plate and heating pipe, the exhaust gas in iron-smelting furnace is arranged Afterwards, the temperature in preheating cabinet can be made to increase, and after exhaust gas is contacted with heat-conducting plate, the temperature of heat-conducting plate can be made to increase, by Groove is opened up on heat-conducting plate and convex block is set, so that the contact area with exhaust gas is increased, to improve the thermally conductive of heat-conducting plate Efficiency, and by the way that heat conducting bar and copper sheet is arranged, when passing through heating pipe in air, can sufficiently it be connect with spiral helicine heat conducting bar Touching, and when air enters in the inner cavity of fumer, meeting be contacted with copper sheet, to increase the efficiency of air heating, be avoided Occur, air preheat is not enough affected to the temperature in iron-smelting furnace.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the sectional view of preheating cabinet of the present invention;
Fig. 3 is the sectional view of fumer of the present invention and heating pipe;
Fig. 4 is the sectional view of inlet box of the present invention.
In figure: 1 iron-smelting furnace, 2 preheating cabinets, 3 air-exhausting ducts, 4 pneumatic control valves, 5 air inlet pipe, 6 inlet boxs, 7 heating pipes, 8 Fumer, 9 heat-conducting plates, 10 heat conducting bars, 11 exhaust pipes, 12 thermal insulation layers, 13 grooves, 14 convex blocks, 15 copper sheets, 16 connecting tubes, 17 are consolidated Fixed board, 18 through-holes.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-4, a kind of energy-saving type iron-smelting furnace preheating device, including iron-smelting furnace 1 are please referred to, the positive bottom of iron-smelting furnace 1 is solid Dingan County is equipped with preheating cabinet 2, and thermal insulation layer 12 is fitted on the inner wall of preheating cabinet 2, and for thermal insulation layer 12 by nanometer micropore thermal insulation board, ceramics are fine Dimension plate is bonded and insulating moulding coating has been smeared on surface, and the escape pipe of iron-smelting furnace 1 through preheating cabinet 2 and extends to preheating cabinet In 2 inner cavity, the top of preheating cabinet 2 is provided through air-exhausting duct 3, and pneumatic control valve 4 is provided on air-exhausting duct 3, by setting Pneumatic control valve 4 is set, to control the air pressure size inside preheating cabinet 2, exhaust gas is avoided to be lost too fast cause inside preheating cabinet 2 Temperature is not high, while being also avoided that the air pressure inside preheating cabinet 2 is excessively high, causes to have an accident, and produces when smelting iron in iron-smelting furnace 1 Raw exhaust gas is entered the inside of preheating cabinet 2 by air-exhausting duct 3, after exhaust gas enters the inside of preheating cabinet 2, is contained in exhaust gas A large amount of heat will be preheated case 2 and preheated using to air, to reach energy-saving and environment-friendly effect, and The exhaust gas in preheating cabinet 2 is discharged by setting air-exhausting duct 3.
The side of preheating cabinet 2 is provided through air inlet pipe 5, by the way that air inlet pipe 5 is arranged, to admit air into preheating cabinet 2 inside, and the inside of preheating cabinet 2 is bolted and is equipped with inlet box 6, one end of air inlet pipe 5 through inlet box 6 and is prolonged In the inner cavity for extending to inlet box 6, inlet box 6 is fixedly installed with the heating communicated with 6 inner cavity of inlet box far from one end of air inlet pipe 5 Pipeline 7, the quantity of heating pipe 7 is four, after air is entered in inlet box 6 by air inlet pipe 5, can be dispersed by inlet box 6 It is heated by four heating pipes 7, the particular number of heating pipe 7 can be set according to demand, to make sky Gas dispersed-heated, pre-heat effect is more preferable, and preheating is more efficient, and four heating pipes 7 are successively spaced substantially equidistant from top to bottom, into The side of gas tank 6 is provided through connecting tube 16, and heating pipe is connected to by connecting tube 16 with the inner cavity of inlet box 6, and is connected Pipe 16 is internally provided with fixed plate 17, through-hole 18 is offered in fixed plate 17, and the quantity of through-hole 18 is no less than 3 and circularizes It is arranged in fixed plate 17, by the way that connecting tube 16 is arranged, so that heating pipe 7 be made to be connected to inlet box 6, when connection, general Heating pipe 7 is inserted into the inside of connecting tube 16, and passes through encapsulation process, thus complete to connect, due to being provided with fixed plate 17, And through-hole 18 is opened up in fixed plate 17, to increase the air pressure of air, admit air into it is more chaotic when heating pipe 7, from And air draught is heated more sufficiently, the inside of preheating cabinet 2 is fixedly installed with fumer 8, the top of fumer 8 and Bottom is fixedly connected at the top and bottom of 2 inner wall of preheating cabinet respectively, and the one end of heating pipe 7 far from inlet box 6 is through row The side of gas tank 8 and extending in the inner cavity of fumer 8 is connected to the inner cavity of fumer 8, and the side of fumer 8 is inlaid with thermally conductive Plate 9, heat-conducting plate 9, which is located on the side of 8 inner cavity of fumer, is inlaid with copper sheet 15, and fumer 8 casees is run through simultaneously in the side of heat-conducting plate 9 Extending the outside of child's fumer 8, the side that heat-conducting plate 9 extends 8 inner cavity of fumer offers the groove 13 of roughness, And the slot bottom of groove 13 is provided with spherical convex block 14, the other side of heat-conducting plate 9 is fixedly connected with one end of heat conducting bar 10, thermally conductive The other end of bar 10 extends in the inner cavity of heating pipe 7, and is arranged in the inner cavity of heating pipe 7 in the shape of a spiral, works as exhaust gas After being discharged into the inner cavity of preheating cabinet 2, increase the temperature in preheating cabinet 2, heat-conducting plate 9 is metal production, and heat transference efficiency is strong, and And due to being provided with groove 13 and convex block 14, the contact area of heat-conducting plate 9 Yu exhaust gas is increased, to increase heat-conducting plate 9 Heat transfer efficiency, after exhaust gas and heat-conducting plate 9 contact, heat-conducting plate 9 by the heat transfer in exhaust gas to copper sheet 15 and heat conducting bar 10, from And the temperature of copper sheet 15 and heat conducting bar 10 is increased, when air passes through heating pipe 7, can be carried out by spiral helicine heat conducting bar 10 Heating, and can be by reheating after air enters in fumer 8, to increase the effect of preheating, fumer 8 is just Face is provided through exhaust pipe 11, and one end of exhaust pipe 11 through preheating cabinet 2 and extends in the inner cavity of iron-smelting furnace 1, into row Air in gas tank 8 can enter the inside of iron-smelting furnace 1 by exhaust pipe 11.
In summary: the present invention is by setting preheating cabinet 2, and by by the inner cavity of the inner cavity of preheating cabinet 2 and iron-smelting furnace 1 Connection, while it being provided with air-exhausting duct 3 and pneumatic control valve 4, so that the high temperature hot gas in iron-smelting furnace 1 be made to be emitted into preheating cabinet 2 Inside, and by inlet box 6, the cooperation of heating pipe 7 fumer 8 and exhaust pipe 11 enters ironmaking to by preheating cabinet 2 Air in furnace 1 carries out preheating heating, thus reached UTILIZATION OF VESIDUAL HEAT IN, energy-saving and environment-friendly effect.
Also, the present invention enters pre- by the way that fumer 8, heat-conducting plate 9 and heating pipe 7, the exhaust gas in iron-smelting furnace 1 is arranged After in hot tank 2, the temperature in preheating cabinet 2 can be made to increase, and after exhaust gas is contacted with heat-conducting plate 9, the temperature liter of heat-conducting plate 9 can be made Height, by opening up groove 13 on heat-conducting plate 9 and convex block 14 being arranged, so that the contact area with exhaust gas is increased, to mention The heat transfer efficiency of high thermal conductivity plate 9, and by the way that heat conducting bar 10 and copper sheet 15 is arranged, when passing through heating pipe 7 in air, meeting and spiral shell The heat conducting bar 10 of rotation shape comes into full contact with, and when air enters in the inner cavity of fumer 8, meeting be contacted with copper sheet 15, to increase The efficiency for having added air to heat, avoids the occurrence of, air preheat is not enough affected to the temperature in iron-smelting furnace 1.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, method, article or equipment for including a series of elements not only includes those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or equipment institute it is intrinsic Element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (4)

1. a kind of metallurgy iron-smelting furnace preheating device, including iron-smelting furnace (1), it is characterised in that: the positive bottom of the iron-smelting furnace (1) Portion is fixedly installed with preheating cabinet (2), and the escape pipe of the iron-smelting furnace (1) through preheating cabinet (2) and extends to the interior of preheating cabinet (2) In chamber, it is provided through air-exhausting duct (3) at the top of the preheating cabinet (2), and pneumatic control valve (4) are provided on air-exhausting duct (3);
The side of the preheating cabinet (2) is provided through air inlet pipe (5), and the inside of preheating cabinet (2) is bolted installation Have inlet box (6), one end of the air inlet pipe (5) is through inlet box (6) and extends in the inner cavity of inlet box (6), it is described into Gas tank (6) is fixedly installed with the heating pipe (7) communicated with inlet box (6) inner cavity, the preheating far from the one end of air inlet pipe (5) The inside of case (2) is fixedly installed with fumer (8), the top and bottom of the fumer (8) respectively with preheating cabinet (2) inner wall Top and bottom are fixedly connected, and side and extension of the one end of heating pipe (7) far from inlet box (6) through fumer (8) It being connected into the inner cavity of fumer (8) with the inner cavity of fumer (8), the side of the fumer (8) is inlaid with heat-conducting plate (9), And the side of heat-conducting plate (9) runs through fumer (8) and extends the outside of child's fumer (8), the other side of the heat-conducting plate (9) It being fixedly connected with one end of heat conducting bar (10), the other end of the heat conducting bar (10) extends in the inner cavity of heating pipe (7), and It is arranged in the inner cavity of heating pipe (7) in the shape of a spiral, the front of the fumer (8) is provided through exhaust pipe (11), institute One end of exhaust pipe (11) is stated through preheating cabinet (2) and is extended in the inner cavity of iron-smelting furnace (1);
It is fitted with thermal insulation layer (12) on the inner wall of the preheating cabinet (2), the thermal insulation layer (12) is by nanometer micropore thermal insulation board, ceramics Fiberboard is bonded and insulating moulding coating has been smeared on surface;
The side that the heat-conducting plate (9) extends fumer (8) inner cavity offers the groove (13) of roughness, and groove (13) slot bottom is provided with spherical convex block (14).
2. a kind of metallurgy iron-smelting furnace preheating device according to claim 1, it is characterised in that: heat-conducting plate (9) position In being inlaid with copper sheet (15) on the side of fumer (8) inner cavity.
3. a kind of metallurgy iron-smelting furnace preheating device according to claim 1, it is characterised in that: the inlet box (6) Side is provided through connecting tube (16), and the heating pipe (7) is connected to by connecting tube (16) with the inner cavity of inlet box (6), And connecting tube (16) is internally provided with fixed plate (17), is offered through-hole (18) on the fixed plate (17), and through-hole (18) Quantity be no less than 3 and circularize and be arranged on fixed plate (17).
4. a kind of metallurgy iron-smelting furnace preheating device according to claim 1, it is characterised in that: the heating pipe (7) Quantity be four, and four heating pipes (7) are successively spaced substantially equidistant from top to bottom.
CN201910206517.9A 2017-11-02 2017-11-02 Preheating device of metallurgical iron-making furnace Active CN109971903B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910206517.9A CN109971903B (en) 2017-11-02 2017-11-02 Preheating device of metallurgical iron-making furnace

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201711064547.8A CN107816897B (en) 2017-11-02 2017-11-02 A kind of energy-saving type iron-smelting furnace preheating device
CN201910206517.9A CN109971903B (en) 2017-11-02 2017-11-02 Preheating device of metallurgical iron-making furnace

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201711064547.8A Division CN107816897B (en) 2017-11-02 2017-11-02 A kind of energy-saving type iron-smelting furnace preheating device

Publications (2)

Publication Number Publication Date
CN109971903A true CN109971903A (en) 2019-07-05
CN109971903B CN109971903B (en) 2020-10-30

Family

ID=61603750

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201711064547.8A Active CN107816897B (en) 2017-11-02 2017-11-02 A kind of energy-saving type iron-smelting furnace preheating device
CN201910206518.3A Active CN109971904B (en) 2017-11-02 2017-11-02 Preheating device of iron-smelting furnace for metallurgy
CN201910206517.9A Active CN109971903B (en) 2017-11-02 2017-11-02 Preheating device of metallurgical iron-making furnace

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN201711064547.8A Active CN107816897B (en) 2017-11-02 2017-11-02 A kind of energy-saving type iron-smelting furnace preheating device
CN201910206518.3A Active CN109971904B (en) 2017-11-02 2017-11-02 Preheating device of iron-smelting furnace for metallurgy

Country Status (1)

Country Link
CN (3) CN107816897B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114540609B (en) * 2022-01-14 2024-05-03 湖州中合鑫顺特钢股份有限公司 Inclined bottom heating process based on heat recovery

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1237639A (en) * 1999-05-31 1999-12-08 宝山钢铁(集团)公司 High air-temperature high furnace space gas preheating method
US20080202736A1 (en) * 2007-02-22 2008-08-28 Thomas & Betts International, Inc. Multi-channel heat exchanger
CN203382777U (en) * 2013-06-20 2014-01-08 马亚典 Hot-blast furnace
CN203656965U (en) * 2013-11-25 2014-06-18 洛阳安拓窑炉环保有限公司 Air preheating device of kiln
CN106399612A (en) * 2016-11-07 2017-02-15 上海铁戈炉业有限公司 Preheating energy saving system and preheating method
CN106765285A (en) * 2016-12-20 2017-05-31 靖江博鑫柯曼燃烧器制造有限公司 A kind of combustion air heat exchanger with space spiral type spiral preheating channel

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201355049Y (en) * 2009-02-26 2009-12-02 厦门铭光机械制造有限公司 Hot-air furnace air and gas double preheating all-welded plate-type heat exchanger
CN203159649U (en) * 2013-03-15 2013-08-28 湘潭步洋能源科技有限公司 Blast furnace blast negative energy dehumidification device
CN106224932B (en) * 2016-07-26 2018-11-02 苏州必信空调有限公司 Boiler waste heat recovery system with vertical lower resistance cooling system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1237639A (en) * 1999-05-31 1999-12-08 宝山钢铁(集团)公司 High air-temperature high furnace space gas preheating method
US20080202736A1 (en) * 2007-02-22 2008-08-28 Thomas & Betts International, Inc. Multi-channel heat exchanger
CN203382777U (en) * 2013-06-20 2014-01-08 马亚典 Hot-blast furnace
CN203656965U (en) * 2013-11-25 2014-06-18 洛阳安拓窑炉环保有限公司 Air preheating device of kiln
CN106399612A (en) * 2016-11-07 2017-02-15 上海铁戈炉业有限公司 Preheating energy saving system and preheating method
CN106765285A (en) * 2016-12-20 2017-05-31 靖江博鑫柯曼燃烧器制造有限公司 A kind of combustion air heat exchanger with space spiral type spiral preheating channel

Also Published As

Publication number Publication date
CN109971903B (en) 2020-10-30
CN109971904A (en) 2019-07-05
CN107816897B (en) 2019-04-23
CN109971904B (en) 2020-10-16
CN107816897A (en) 2018-03-20

Similar Documents

Publication Publication Date Title
CN103889154B (en) A kind of cold-hot integrated formula copper foil conduction pressing machine
CN107816897B (en) A kind of energy-saving type iron-smelting furnace preheating device
WO2012016482A1 (en) Wind-energy heating device and wind-energy heating and drying equipment
CN201434600Y (en) Strong cyclic rapid cooling chamber
CN101372390A (en) Forced heated air circulation convection glass tempering technology
CN103759363A (en) Evaporative cooling air conditioner system combining passive cooling and heating
CN206477011U (en) A kind of tempering furnace hot air circulating system
CN203999686U (en) A kind of isothermal normalizing furnace of energy optimization
CN202808604U (en) Device for drying glass by infrared radiation
CN203857595U (en) Evaporative cooling air conditioner unit combining cooling and heating
CN202046996U (en) Compressed air heating and jet flow mechanism
CN203798174U (en) Circulating cooling device for elevator furnace
CN102261857A (en) Combined device for recovering waste heat of shower bath waste hot water
CN207403322U (en) Composition metal board processing device
CN206799426U (en) A kind of heating module of the 3D glass hot-press forming devices of curl
CN206613680U (en) A kind of waste heat recovery and baking finish drying device
CN201762236U (en) Heating furnace for glass tempering
CN110567286A (en) High-temperature steam waste heat recycling device based on lead plaster smelting
CN206310893U (en) Drying oven hot air circulation structure
CN203812650U (en) Energy-saving environment-friendly single-furnace vertical type enamelling machine
CN201246972Y (en) Energy-saving heat energy exchange device
CN203814045U (en) Cooling and heating integrated copper foil conductive pressing machine
CN204138701U (en) Annealing furnace refrigerating unit
CN207775064U (en) A kind of novel reinforced glass production facility
CN106746505A (en) A kind of pyroceram disk circulation production device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200930

Address after: 314000 Yunan village, Yuxin Town, Jiaxing City, Zhejiang Province

Applicant after: JIAXING QUANSHUN TOURIST PRODUCT Co.,Ltd.

Address before: 213000 Hohai University, Jiangsu, Changzhou

Applicant before: Chong Aijun

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Preheating device for metallurgical ironmaking furnace

Effective date of registration: 20211216

Granted publication date: 20201030

Pledgee: Zhejiang Hecheng Rural Commercial Bank Co.,Ltd.

Pledgor: JIAXING QUANSHUN TOURIST PRODUCT Co.,Ltd.

Registration number: Y2021330002555

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230404

Granted publication date: 20201030

Pledgee: Zhejiang Hecheng Rural Commercial Bank Co.,Ltd.

Pledgor: JIAXING QUANSHUN TOURIST PRODUCT Co.,Ltd.

Registration number: Y2021330002555

PC01 Cancellation of the registration of the contract for pledge of patent right
TR01 Transfer of patent right

Effective date of registration: 20230921

Address after: 011618 Dongjiagou Village, Lamawan Town, Qingshuihe County, Hohhot City, Inner Mongolia Autonomous Region

Patentee after: Qingshuihe County Hongyude Chemical Co.,Ltd.

Address before: 314000 Yunan Village, Yuxin Town, Jiaxing City, Zhejiang Province

Patentee before: JIAXING QUANSHUN TOURIST PRODUCT Co.,Ltd.

TR01 Transfer of patent right