CN109944150A - Bridge - Google Patents

Bridge Download PDF

Info

Publication number
CN109944150A
CN109944150A CN201811386327.1A CN201811386327A CN109944150A CN 109944150 A CN109944150 A CN 109944150A CN 201811386327 A CN201811386327 A CN 201811386327A CN 109944150 A CN109944150 A CN 109944150A
Authority
CN
China
Prior art keywords
beam block
bloom
bridge
knucle
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811386327.1A
Other languages
Chinese (zh)
Other versions
CN109944150B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Linpu brothers (Sanya) Information Technology Co.,Ltd.
Original Assignee
Deng Meiqiang
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Deng Meiqiang filed Critical Deng Meiqiang
Priority to CN201811386327.1A priority Critical patent/CN109944150B/en
Publication of CN109944150A publication Critical patent/CN109944150A/en
Application granted granted Critical
Publication of CN109944150B publication Critical patent/CN109944150B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/08Damp-proof or other insulating layers; Drainage arrangements or devices ; Bridge deck surfacings
    • E01D19/086Drainage arrangements or devices
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections

Abstract

The present invention relates to a kind of bridges, including bridge pier and Liang Pian mechanism, Liang Pian mechanism is erected on bridge pier, Liang Pian mechanism includes beam block and bloom, and beam block has several pieces, and each beam block is arranged successively, concrete is filled between each beam block, the hole that walks is equipped in beam block, bloom, which is located at, to walk in hole, and bloom both ends are between two adjacent beam blocks.Structure of the invention is ingenious in design, can produce in batches in factory, easy to operate, at low cost.

Description

Bridge
Present patent application is for application No. is 2017105904260 divisional application, the applyings date of original application Are as follows: 2017-07-19, invention and created name are as follows: a kind of segmented splicing bridge and Bridge Erector.
Technical field
The present invention relates to a kind of bridges.
Background technique
Bridge Erector is exactly the equipment that prefabricated beam piece is placed into prefabricated bridge pier and is got on, and Bridge Erector belongs to crane Scope is put down after being then transported to position because its major function is to lift beam piece.
Existing beam piece general individual is larger, it has not been convenient to transport, need to be built in the place of construction bridge, delay The speed of duration, and the beam piece of heavier-weight difficulty in carrying and erection is higher, the Bridge Erector structural strength needed is high, cost It is high.
Summary of the invention
1. technical problems to be solved by the inivention
The technical problem to be solved by the present invention is for overcome the deficiencies in the prior art, providing a kind of bridge.
2. technical solution
The technical solution adopted by the present invention to solve the technical problems is: a kind of segmented splices bridge, including bridge pier and Liang Pian mechanism, the Liang Pian mechanism are erected on bridge pier, and the Liang Pian mechanism includes beam block and bloom, and the beam block has several Block, each beam block are arranged successively, and concrete is filled between each beam block, is equipped with the hole that walks in the beam block, the bloom is located to walk In the hole of position, the bloom both ends are between two adjacent beam blocks.
Preferably, being additionally provided with deflector hole and diversion trench, one end setting of the deflector hole on the beam block to reinforce The other end on the top of beam block, the deflector hole is connected to diversion trench, and the diversion trench circumferential array is in the periphery of bloom, institute It states to pour in deflector hole and diversion trench and is inoculated with molten iron.
Preferably, draining for convenience, the two sides including beam block are equipped with guiding gutter and water outlet, the water outlet Upper end is located at the top of beam block, and the lower end of the water outlet is located at the lower section of beam block.
Preferably, train passage, the bloom are rectangular box, the middle part of the downside inner wall of the bloom for convenience It is equipped with fender rod.
A kind of Bridge Erector of segmented splicing bridge as described above, including bracket institution, beam delivering machine structure and fixed mechanism, The bracket institution includes girder, the first leg support, the second leg support and third leg support, first leg support, the second leg support and third Leg support is arranged at the lower section of girder, and driving wheel is additionally provided in first leg support, is additionally provided with contraction in second leg support Mechanism, the third leg support are slidably connected with girder;The beam delivering machine structure includes fortune beam trolley, shaft, the first Knucle-gear, first Motor, the second Knucle-gear, hydraulic stem and grabbing assembly, the shaft are vertically arranged, and the shaft setting is on fortune beam trolley, institute It states first motor and drives the rotation of the first Knucle-gear, second Knucle-gear is set in shaft, first Knucle-gear and second The lower section of shaft is arranged in by hydraulic stem for Knucle-gear engagement, the grabbing assembly, and the grabbing assembly includes the second motor, silk Bar, walk block and handgrip, and there are two the screw rods, the coaxial arrangement of two screw rods, and the hand of spiral of two screw rods is on the contrary, described the The rotation of two motor driven screw rods, there are two the blocks that walks, and two blocks that walk are respectively sleeved on two screw rods, the block that walks The lower section for the block that walks is arranged in the matched internal screw thread of screw rod, the handgrip in interior be equipped with, the fixation kit include third motor, Third Knucle-gear, the 4th Knucle-gear, drum, fixed link and draught line, the third motor driven third Knucle-gear rotation are described Third Knucle-gear and the engagement of the 4th Knucle-gear, the 4th Knucle-gear and drum are coaxially disposed, and the draught line is coiled in drum On, the fixed link is connected on draught line, and the fixation kit has several, and each fixation kit is divided into two column and uniformly sets respectively It sets in the two sides of girder.
Preferably, being additionally provided with reinforcing bar in first leg support to reinforce, one end of the reinforcing bar and girder connect It connects, the other end of the reinforcing bar is connect with the first leg support.
Preferably, observing for convenience, on the girder, the first leg support, the second leg support, third leg support and grabbing assembly It is respectively provided with camera.
Preferably, communicating for convenience with controlling terminal, control system, the control system are additionally provided in the girder Inside it is additionally provided with wireless communication module.
Preferably, controlling for convenience, the first motor and the second motor are servo motor, the first motor Encoder is equipped with on the second motor.
Preferably, in order to increase the firmness of draught line, the making material of the draught line is reinforcing wire.
3. beneficial effect
The invention has the advantages that segmented splicing bridge and Bridge Erector smart structural design, beam block individual is small, just It in transport, can produce in batches, then be arranged in beam block by bloom, sound construction in factory, it is logical equipped with train in bloom Road increases transport capacity, beam block and bloom combination can be erected on bridge pier by beam delivering machine structure, easy to operate, at low cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the segmented splicing bridge of the present embodiment;
Fig. 2 is the structural schematic diagram of the beam block of the segmented splicing bridge of the present embodiment;
Fig. 3 is the structural schematic diagram of the Bridge Erector of the segmented splicing bridge of the present embodiment;
Fig. 4 is the portion the A enlarged drawing of Fig. 3;
Fig. 5 is the structural schematic diagram of the grabbing assembly of the Bridge Erector of the segmented splicing bridge of the present embodiment;
Fig. 6 is the structural schematic diagram of the fixed mechanism of the Bridge Erector of the segmented splicing bridge of the present embodiment.
In figure: 1. first leg supports, 2. reinforcing bars, 3. fortune beam trolleies, 4. second leg supports, 5. fixed mechanisms, 6. girders, 7. the Trivet, 8. driving wheels, 9. hydraulic stems, 10. grabbing assemblies, 11. shafts, 12. second Knucle-gears, 13. first Knucle-gears, It walks block 14. first motor, 15., 16. handgrips, 17. screw rods, 18. second motors, 19. fixed links, 20. draught lines, 21. lines Disk, 22. third Knucle-gears, 23. third motors, 24. beam blocks, 25. deflector holes, 26. walk hole, 27. diversion trenches, 28. blooms, 29. bridge pier, 30. the 4th Knucle-gears.
Specific embodiment
In conjunction with the accompanying drawings, the present invention is further explained in detail.These attached drawings are simplified schematic diagram, only with Illustration illustrates basic structure of the invention, therefore it only shows the composition relevant to the invention.
As shown in figures 1 to 6, a kind of segmented splices bridge, including bridge pier 29 and Liang Pian mechanism, and the Liang Pian mechanism is set up On bridge pier 29, the Liang Pian mechanism includes beam block 24 and bloom 28, and the beam block 24 has several pieces, and each beam block 24 is successively arranged It arranges, concrete is filled between each beam block 24, the hole 26 that walks is equipped in the beam block 24, the bloom 28 is located at the hole 26 that walks Interior, 28 both ends of bloom are between two adjacent beam blocks 24.
Preferably, deflector hole 25 and diversion trench 27 are additionally provided on the beam block 24 in order to reinforce, the deflector hole 25 The top of beam block 24 is arranged in one end, and the other end of the deflector hole 25 is connected to diversion trench 27, the circumferential row of the diversion trench 27 It is listed in the periphery of bloom 28, is poured in the deflector hole 25 and diversion trench 27 and is inoculated with molten iron.
Preferably, draining for convenience, the two sides including beam block 24 are equipped with guiding gutter and water outlet, the water outlet Upper end be located at the top of beam block 24, the lower end of the water outlet is located at the lower section of beam block 24.
Preferably, train passage, the bloom 28 are rectangular box for convenience, the downside inner wall of the bloom 28 Middle part is equipped with fender rod.
A kind of Bridge Erector of segmented splicing bridge as described above, including bracket institution, beam delivering machine structure and fixed mechanism 5, the bracket institution includes girder 6, the first leg support 1, the second leg support 4 and third leg support 7, first leg support 1, the second leg support 4 and third leg support 7 be arranged at the lower section of girder 6, driving wheel 8, second leg support 4 are additionally provided in first leg support 1 On be additionally provided with contracting mechanism, the third leg support 7 is slidably connected with girder 6;The beam delivering machine structure includes fortune beam trolley 3, shaft 11, the first Knucle-gear 13, first motor 14, the second Knucle-gear 12, hydraulic stem 9 and grabbing assembly 10, the shaft 11 are set vertically It sets, on fortune beam trolley 3, the first motor 14 drives the rotation of the first Knucle-gear 13, second circle for the setting of shaft 11 Gear 12 is set in shaft 11, and first Knucle-gear 13 and the engagement of the second Knucle-gear 12, the grabbing assembly 10 pass through liquid The lower section of shaft 11 is arranged in compression bar 9, and the grabbing assembly 10 includes the second motor 18, screw rod 17, walk block 15 and handgrip 16, There are two the screw rods 17, and two screw rods 17 are coaxially disposed, and the hand of spiral of two screw rods 17 is on the contrary, second motor 18 drives Dynamic screw rod 17 rotates, and there are two the blocks 15 that walks, and two blocks 15 that walk are respectively sleeved on two screw rods 17, the block that walks It is equipped in 15 and the lower section for the block 15 that walks is set with the matched internal screw thread of screw rod 17, the handgrip 16, the fixation kit includes Third motor 23, third Knucle-gear 22, the 4th Knucle-gear 30, drum 21, fixed link 19 and draught line 20, the third motor 23 Third Knucle-gear 22 is driven to rotate, the third Knucle-gear 22 and the engagement of the 4th Knucle-gear 30, the 4th Knucle-gear 30 and line Disk 21 is coaxially disposed, and the draught line 20 is coiled on drum 21, and the fixed link 19 is connected on draught line 20, the fixation Component has several, and each fixation kit is divided into the two sides that two column are uniformly arranged on girder 6 respectively.
Preferably, being additionally provided with reinforcing bar 2, one end of the reinforcing bar 2 and master in first leg support 1 to reinforce Beam 6 connects, and the other end of the reinforcing bar 2 is connect with the first leg support 1.
Preferably, observing for convenience, the girder 6, the first leg support 1, the second leg support 4, third leg support 7 and crawl group Camera is respectively provided on part 10.
Preferably, communicating for convenience with controlling terminal, control system, the control system are additionally provided in the girder 6 Wireless communication module is additionally provided in system.
Preferably, controlling for convenience, the first motor 14 and the second motor 18 are servo motor, described first Encoder is equipped on motor 14 and the second motor 18.
Preferably, in order to increase the firmness of draught line 20, the making material of the draught line 20 is reinforcing wire.
After building rear abutment 29, the first leg support 1, the second leg support 4 and the third leg support 7 of Bridge Erector are located at three bridge piers On 29, beam block 24 is transported the lower section of beam trolley 3, by the way that in grabbing assembly 10, the second motor 18 drives screw rod 17 to rotate, Because the hand of spiral of two screw rods 17 is on the contrary, be subjected to displacement two 15 relative directions of block that walk, handgrip 16 is made to fix beam block 6, then beam block 24 is lifted by hydraulic stem 9, then transport on bridge pier 29 by transporting beam trolley 3, because of the wider width of beam block 24, it is Convenient transportation, when grabbing assembly 10 grabs beam block 24, the hole 26 that walks on beam block 24 is vertical with the direction of bridge, then passes through the One motor 14 drives the rotation of the first Knucle-gear 13, the first Knucle-gear 13 and the engagement of the second Knucle-gear 12, makes shaft 11 and crawl group Part 10 rotates, and keeps the hole 26 that walks on beam block 24 parallel with bridge floor, then passes through the driving of third motor 23 in fixed mechanism 5 the The rotation of three Knucle-gears 22, third Knucle-gear 22 and the engagement of the 4th Knucle-gear 30, are fixed on draught line 20 on beam block 24, wherein solid Fixed pole 19 can pass through discharge outlet, facilitate fixation, then bloom 28 is moved to walking for first beam block 24 by beam delivering machine structure At hole 26, then fortune beam trolley 3 is driven, is displaced the half of bloom 28 and walks in hole 26, then poured by molten iron into diversion trench 27, it is fixed to make bloom 28, then second beam block 24 is set in the other end of bloom 28, so that bloom 28 is staggeredly set with beam block 24 It sets, forms bridge floor, fixed between two beam blocks 24 by concrete, after the bridge floor between two bridge piers 29 is set up, the Trivet 7 slides on girder 6, is moved to next bridge pier 29, then by driving vehicle that the first leg support 1 is made to be moved to the first leg In next bridge pier 29 where frame 1, to carry out the laying of next bridge floor.
Compared with prior art, segmented splicing bridge and Bridge Erector smart structural design, 24 individual of beam block is small, is convenient for Transport, can produce in batches in factory, then is arranged in beam block 24 by bloom 28, sound construction, and column are equipped in bloom 28 Vehicle passage increases transport capacity, beam block 24 and the combination of bloom 28 can be erected on bridge pier 29 by beam delivering machine structure, operation letter It is single, it is at low cost.

Claims (1)

1. bridge, which is characterized in that including bridge pier (28) and the Liang Pian mechanism, the Liang Pian mechanism is erected at bridge pier (29) On, the Liang Pian mechanism includes beam block (24) and bloom (28), and the beam block (24) has several pieces, and each beam block (24) is successively arranged It arranges, concrete is filled between each beam block (24), is equipped with and walks hole (26) in the beam block (24), the bloom (28) is located to walk In position hole (26), bloom (28) both ends are between two adjacent beam blocks (24).
CN201811386327.1A 2017-07-19 2017-07-19 Bridge Active CN109944150B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811386327.1A CN109944150B (en) 2017-07-19 2017-07-19 Bridge

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201710590426.0A CN107419652B (en) 2017-07-19 2017-07-19 A kind of segmented splicing bridge and Bridge Erector
CN201811386327.1A CN109944150B (en) 2017-07-19 2017-07-19 Bridge

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201710590426.0A Division CN107419652B (en) 2017-07-19 2017-07-19 A kind of segmented splicing bridge and Bridge Erector

Publications (2)

Publication Number Publication Date
CN109944150A true CN109944150A (en) 2019-06-28
CN109944150B CN109944150B (en) 2021-05-18

Family

ID=60430212

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201811386327.1A Active CN109944150B (en) 2017-07-19 2017-07-19 Bridge
CN201710590426.0A Active CN107419652B (en) 2017-07-19 2017-07-19 A kind of segmented splicing bridge and Bridge Erector
CN201811386295.5A Pending CN109944149A (en) 2017-07-19 2017-07-19 Bridge Erector

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201710590426.0A Active CN107419652B (en) 2017-07-19 2017-07-19 A kind of segmented splicing bridge and Bridge Erector
CN201811386295.5A Pending CN109944149A (en) 2017-07-19 2017-07-19 Bridge Erector

Country Status (1)

Country Link
CN (3) CN109944150B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100723229B1 (en) * 2005-12-22 2007-05-29 주식회사 포스코 Assembly for connecting the pipe
CN200992464Y (en) * 2006-12-30 2007-12-19 安徽朗讯科技有限公司 Lifting mechanical apparatus with position safety monitoring system
CN101476291A (en) * 2009-01-21 2009-07-08 中铁一局集团有限公司 Segment-assembling simply supported box girder movable falsework construction method
CN201746259U (en) * 2010-06-10 2011-02-16 南京晨光水山电液特装有限公司 Explosion-proof hoisting equipment
CN102286935A (en) * 2011-06-01 2011-12-21 中铁大桥勘测设计院有限公司 Brand-new construction method of cable-stayed bridge with hybrid composite beams
KR20140065338A (en) * 2012-11-21 2014-05-29 이현우 The continuous hybrid girder consist of concrete block and steel block which is can add prestress by gap difference between top and bottom of connection face of blocks
CN204185765U (en) * 2014-09-18 2015-03-04 湖南大学 The seam construction of steel-light-duty compound beam of very-high performance fibrous concrete
CN105397832A (en) * 2015-12-03 2016-03-16 无锡普天铁心股份有限公司 Complete-sequence iron core lamination robot gripper

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU383771A1 (en) * 1970-07-15 1973-05-23 SURFACE MACHINE
KR100729391B1 (en) * 2006-11-20 2007-06-15 주식회사 누리플랜 A temporary bridge and method for construting thereof
CN201534958U (en) * 2009-07-10 2010-07-28 邯郸中铁桥梁机械有限公司 Rotating mechanism for segment girder bridge erection machine
CN202039287U (en) * 2011-03-11 2011-11-16 张国信 Urban steel structure cross-street quickly-built bridge without red light
CN103513641A (en) * 2013-10-15 2014-01-15 陕西盛迈石油有限公司 Bridge erecting machine safety monitoring and management system
CN103926903A (en) * 2014-04-24 2014-07-16 中铁五局集团第四工程有限责任公司 Safety monitoring system for bridge girder erection machine
KR20150129399A (en) * 2014-05-12 2015-11-20 우경기술주식회사 PSC U-girder segment connecting structure and method
CN204151685U (en) * 2014-09-18 2015-02-11 中建交通建设集团有限公司 Rear feeding beam formula steel girder segment cantilever Bridge Erector
CN205000229U (en) * 2015-08-24 2016-01-27 安徽省交通规划设计研究总院股份有限公司 It assembles concrete box beam to become span festival section with general section size
CN106284088A (en) * 2016-08-31 2017-01-04 中国冶集团有限公司 Prefabricated arch bar lifting method of temporarily fixing

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100723229B1 (en) * 2005-12-22 2007-05-29 주식회사 포스코 Assembly for connecting the pipe
CN200992464Y (en) * 2006-12-30 2007-12-19 安徽朗讯科技有限公司 Lifting mechanical apparatus with position safety monitoring system
CN101476291A (en) * 2009-01-21 2009-07-08 中铁一局集团有限公司 Segment-assembling simply supported box girder movable falsework construction method
CN201746259U (en) * 2010-06-10 2011-02-16 南京晨光水山电液特装有限公司 Explosion-proof hoisting equipment
CN102286935A (en) * 2011-06-01 2011-12-21 中铁大桥勘测设计院有限公司 Brand-new construction method of cable-stayed bridge with hybrid composite beams
KR20140065338A (en) * 2012-11-21 2014-05-29 이현우 The continuous hybrid girder consist of concrete block and steel block which is can add prestress by gap difference between top and bottom of connection face of blocks
CN204185765U (en) * 2014-09-18 2015-03-04 湖南大学 The seam construction of steel-light-duty compound beam of very-high performance fibrous concrete
CN105397832A (en) * 2015-12-03 2016-03-16 无锡普天铁心股份有限公司 Complete-sequence iron core lamination robot gripper

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
龚益: "《纤维混凝土与纤维砂浆施工应用指南》", 30 June 2005, 中国建材工业出版社 *

Also Published As

Publication number Publication date
CN107419652A (en) 2017-12-01
CN107419652B (en) 2019-01-29
CN109944149A (en) 2019-06-28
CN109944150B (en) 2021-05-18

Similar Documents

Publication Publication Date Title
US11655600B2 (en) Method for installing steel tube arches
CN107059640B (en) Bridge girder erection machine for prefabricated segmental beam span-by-span construction and construction method thereof
CN104594918B (en) Split integrated underground passage steel mold plate trolley and construction method thereof
CN208087078U (en) A kind of boom hoisting of large span steel reinforced concrete combination beam Bridge Erector
CN107640706B (en) Hoisting equipment and construction method thereof
CN203412327U (en) Rotary lift type stereo garage
CN107363988B (en) Hydraulic internal mold toothed rail traveling system and traveling method for prefabricated box girder
CN104343263A (en) Rotary lifting type three-dimensional garage
CN107558378A (en) A kind of Bridge Erector and its bridging method for being used to set up full precast beam
CN110076889A (en) A kind of integral prefabricated immersed tube template system of dry-docking sequential method tunneling boring
CN112359730B (en) Steel pipe arch installation method
CN109025252A (en) The foldable seam template and construction method that assembled architecture connecting rod drives
CN108098982A (en) Large-span Precast box beam hydraulic deploying and retracting internal mold
CN108149589B (en) Bridge girder erection machine with large span and tunnel box girder
CN205638491U (en) Multi -functional platform truck
CN210827111U (en) Environment-friendly down self-propelled steel trestle structure
CN109944150A (en) Bridge
CN104060860A (en) Sectional telescopic rainproof shed and application method for prefabricating concrete T beam
CN104831638B (en) A kind of mobile formwork straddle truck and construction method thereof
CN203768817U (en) Equipment for erecting beams in tunnel
CN107254833B (en) A kind of bridge facilitating production and installation and installation equipment
CN208717748U (en) A kind of large span steel reinforced concrete combination beam Bridge Erector support leg device
CN210289796U (en) Self-propelled single-line tunnel hydraulic ditch cable trough trolley
CN111893896A (en) Tire type movable support for urban overhead cast-in-place box girder and construction method thereof
CN206681036U (en) The adaptive gradient gate-type end-blocking plate device of frame structure piping lane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210429

Address after: 572025 no.472, building 1, UFIDA Industrial Park, yazhouwan science and Technology City, Yazhou District, Sanya City, Hainan Province

Applicant after: Linpu brothers (Sanya) Information Technology Co.,Ltd.

Address before: 518000 manhole street, Shenzhen, Guangdong, Baoan District

Applicant before: Deng Meiqiang

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant