CN109944133A - A kind of prefabricated assembled component of mountainous region photovoltaic project road draining device - Google Patents

A kind of prefabricated assembled component of mountainous region photovoltaic project road draining device Download PDF

Info

Publication number
CN109944133A
CN109944133A CN201910168681.5A CN201910168681A CN109944133A CN 109944133 A CN109944133 A CN 109944133A CN 201910168681 A CN201910168681 A CN 201910168681A CN 109944133 A CN109944133 A CN 109944133A
Authority
CN
China
Prior art keywords
profile
cabin
plate body
profile cabin
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910168681.5A
Other languages
Chinese (zh)
Inventor
姬建翔
惠炜
李培煊
刘植
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Northwest Architecture Design and Research Institute Co Ltd
Original Assignee
China Northwest Architecture Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Northwest Architecture Design and Research Institute Co Ltd filed Critical China Northwest Architecture Design and Research Institute Co Ltd
Priority to CN201910168681.5A priority Critical patent/CN109944133A/en
Publication of CN109944133A publication Critical patent/CN109944133A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of prefabricated assembled components of mountainous region photovoltaic project road draining device, including the first profile cabin and the second profile cabin, in " upper pressure ", overlapping mode is connected first profile cabin, and the second profile cabin is pressed on the first profile cabin with the second profile cabin.It is connected with the first profile plate body in first profile cabin, groove is set along the first profile plate body longitudinal centre line, the first profile cabin approaching device drain-side offers through-hole, and through-hole is connected with groove;The second profile plate body is connected in second profile cabin, the second profile plate body, which is pressed on the first profile plate body, to be also connected in the overlapping mode of " upper pressure ".It is longitudinal at interval of 100-200m one of prefabricated assembled component of the invention of arrangement along road according to the difference and local average annual rainfall intensity of road longitudinal grade degree, to meet factory road dewatering needs, while the project amount of drainage system is largely saved again.

Description

A kind of prefabricated assembled component of mountainous region photovoltaic project road draining device
Technical field
The invention belongs to road draining device technical field, it is related to a kind of the prefabricated of mountainous region photovoltaic project road draining device Prefabricated member.
Background technique
Currently, country constantly weakens the support on policy dynamics of photovoltaic industry, the competition of photovoltaic market is more fierce, simultaneously Requirement of the country to environmental protection in engineering construction is higher and higher, and the duration how is protected in engineering construction, spells quality, cost declining, shield The requirements such as ecology gradually become one of the important innovations thinking for breaking through current photovoltaic market Current Competition.
Appurtenant work of plant area's drainage system as entire photovoltaic project, although too late electrical, civil engineering in status etc., Its project amount is larger thus entire project in its cost accounting be also not allow to despise.
The traditional method of photovoltaic project plant area drainage system is that road excavation side longitudinally elongated setting ladder is overhauled along photovoltaic area Shape section concrete gutter, but photovoltaic project occupied area is larger, and road is overhauled in field and usually prolongs several kilometers continuous, drainer Gutter path is longer in journey, and engineering cost is higher;Construction quality is difficult to be guaranteed;It is not easy to entire project drainer Quality, duration, the cost of journey carry out whole control;Conventional discharge gutter is in use easily by mud, weeds congestion;Tradition Frost heave crack and deformation crack easily occur for gutter, and durability is poor;Conventional discharge gutter need to be equipped with sump, cause work The invisible increase of Cheng Chengben;Conventional discharge gutter can not reuse, and easily damage to plant area's ecological environment.
Summary of the invention
The object of the present invention is to provide a kind of prefabricated assembled components of mountainous region photovoltaic project road draining device, solve Pumping equipment arrangement existing in the prior art easily clashes and drainage structures work with place current collection line cord ditch arrangement The big problem of journey amount.
The technical scheme adopted by the invention is that a kind of prefabricated assembled structure of mountainous region photovoltaic project road draining device The section of part, including the first profile cabin and the second profile cabin, the first profile cabin and the second profile cabin is in " under going up greatly It is small " it is trapezoidal, overlapping mode is connected, and the second profile cabin in " upper pressure " for the first profile cabin and the second profile cabin It is pressed on the first profile cabin, the first profile plate body is connected in the first profile cabin, it is longitudinal along the first profile plate body Groove is arranged in center line, and the first profile cabin approaching device drain-side offers through-hole, and through-hole is connected with groove;
The second profile plate body is connected in second profile cabin, the second profile plate body is pressed on the first profile plate body Also it is connected in the overlapping mode of " upper pressure ", further includes having drainpipe, drainpipe is connected to through hole.
The features of the present invention also characterized in that
The first preformed groove is offered on first profile cabin longitudinal direction two sides inner wall, the first profile plate body passes through the first preformed groove It is interspersed in the first profile cabin.
The second preformed groove is offered on second profile cabin longitudinal direction two sides inner wall, the second profile plate body passes through the second preformed groove It is interspersed in the second profile cabin.
First profile cabin, the second profile cabin, the first profile plate body and the second profile plate body are equal in length.
The beneficial effects of the present invention are:
The prefabricated assembled component of mountainous region photovoltaic project road draining device of the invention, it is prefabricated according to road foundation width The first profile cabin, the second profile cabin, the first profile plate body and the second profile plate body of processing criterion element length, to reality The granular-type road different in width demand of making it is adaptable;Structural modeling is simple, and can save entrucking and bank up space, reduces fortune Defeated cost;Combination, mounting means are simple and easy, require construction personnel's technical level lower, reduction cost of labor;It is a whole set of prefabricated Component is reusable;Convenient for carrying out whole control to the quality of project drainage system, duration, cost, engineering is further decreased Cost guarantees engineering total quality.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of the prefabricated assembled component of mountainous region photovoltaic project road draining device of the present invention;
Fig. 2 is the first profile cabin in a kind of prefabricated assembled component of mountainous region photovoltaic project road draining device of the present invention Cross-sectional view;
Fig. 3 is the first profile cabin in a kind of prefabricated assembled component of mountainous region photovoltaic project road draining device of the present invention 1-1 sectional view;
Fig. 4 is the second profile cabin in a kind of prefabricated assembled component of mountainous region photovoltaic project road draining device of the present invention Cross-sectional view;
Fig. 5 is the second profile cabin in a kind of prefabricated assembled component of mountainous region photovoltaic project road draining device of the present invention 2-2 sectional view;
Fig. 6 is profile cabin inner wall in a kind of prefabricated assembled component of mountainous region photovoltaic project road draining device of the present invention The structural schematic diagram of preformed groove;
Fig. 7 is a kind of prefabricated assembled component of mountainous region photovoltaic project road draining device of the present invention in plant area's granular-type road On plan view.
In figure, 1. first profile cabins, 2. second profile cabins, 3. first profile plate bodys, 4. second profile plate bodys, 5. One profile cabin preformed groove, 6. second profile cabin preformed grooves, 7. grooves, 8. through-holes, 9. drainpipes, 10. roads, 11. excavations Side slope, 12. embankment side slopes.
Specific embodiment
The following describes the present invention in detail with reference to the accompanying drawings and specific embodiments.
A kind of prefabricated assembled component of mountainous region photovoltaic project road draining device, as shown in Figure 1, including the first profile cabin Body 1, the second profile cabin 2, the first profile plate body 3 and the second profile plate body 4 are that producer is prefabricated and length is consistent Standard block.Wherein, (the second profile cabin presses the first profile cabin in " upper pressure " for the first profile cabin 1 and the second profile cabin 2 Body) overlapping mode be connected.Engineering construction is in application, taking by adjusting the first profile cabin 1 and the second profile cabin 2 Spreading degree is adapted prefabricated assembled Component composition length of the invention with 10 width of subgrade of road.As shown in Figures 2 and 3, First profile cabin 1 is flexibly connected the first profile plate body 3 by wears groove mode, long to being provided with semicircle along the first profile plate body 3 Connected in star 7,1 approaching device drain-side of the first profile cabin (i.e. the side A indicated in Fig. 1) offer semi-circular through hole 8, semicircle Through-hole 8 is connected with groove 7, and in engineering construction example, in 8 external connection drainpipe 9 of through-hole, the length of drainpipe 9 needs to combine The setting of the outer side slope actual conditions of road 10, to guarantee to stretch out outer side slope by drainpipe 9, that rainwater is emitted into topography on the outside of side slope is low Depression, in order to avoid cause side slope slump.As shown in Figures 4 and 5, the second profile cabin 2 is flexibly connected second type by wears groove mode Material plate body 4, the height of the first profile plate body 3 are slightly below the height of the second profile plate body 4, to guarantee after the completion of the present apparatus is assembled the One profile plate body 3 and the second profile plate body 4 are also in the overlapping mode of " upper pressure " (the second profile plate body presses the first profile plate body) It is connected.
Preferably, the material of the first profile cabin 1, the second profile cabin 2, the first profile plate body 3 and the second profile plate body 4 For PE material or other alternative materials, drainpipe 9 is PVC drain pipe.
First profile cabin 1, the second profile cabin 2, the first profile plate body 3 and the second profile plate body 4 are prefabricated by producer It processes, answers strict control plate body thickness in production process, plate body size, stay groove location, stay the indexs such as slot size.In order to control Work certificate should be arranged in its product qualified rate, same batch, the goods acceptance of inspection and construction site when to dispatch from the factory.
As shown in fig. 6, offering the first preformed groove 5, the first profile plate body 3 on 1 two sides longitudinal direction inner wall of the first profile cabin It is connected in the first profile cabin 1 by the first preformed groove 5, specifically, the first profile plate body 3 is interspersed by the first preformed groove 5 In the first profile cabin 1.
The second preformed groove 6 is offered on second profile cabin, 2 two sides longitudinal direction inner wall, the second profile plate body 4 is pre- by second Slot 6 is stayed to be connected in the second profile cabin 2.Specifically, the second profile plate body 4 is interspersed in the second profile by the second preformed groove 6 In cabin 2.
The section of first profile cabin 1 and the second profile cabin 2 is trapezoidal in " up big and down small ".
The application method of the prefabricated assembled component of mountainous region photovoltaic project road draining device of the invention is as follows:
As shown in fig. 7, first laterally being excavated according to the first profile cabin 1 and 2 size of the second profile cabin along broken stone road roadbed The bottom of trench longitudinal slope not less than 0.5% need to be arranged in foundation pit, foundation pit, then by the smooth compacting of bottom of foundation ditch loosened soil;Measure present apparatus institute In the practical width of subgrade of road 10, two are determined according to the standard paragraphs length computation of the first profile cabin 1 and the second profile cabin 2 The lap of splice of person;The first profile cabin 1, the second profile cabin 2 are sequentially placed in foundation pit again, make the first profile cabin 1 A be placed on 12 side of embankment side slope, the side B of the second profile cabin 2 is located at 11 side of execavated rockmass;According to the road 10 actually built Width of subgrade and the lap of splice of determining the first profile cabin 1 and the second profile cabin 2 is computed by the two in " upper pressure " Overlap joint (i.e. the second profile cabin 2 presses the first profile cabin 1), foundation pit and gap filling between the two is closely knit;In the first profile Cabin 1,2 bottom of the second profile cabin pour plain concrete and vibration compacting, plastering molding, by the first profile plate body 3 and second Profile plate body 4 successively interts into corresponding cabin, guarantees the under-filled closely knit no hollowing phenomenon of each cabin;In the first profile cabin Pervious concrete and vibration compacting, plastering molding are poured at the top of body 1, the second profile cabin 2;To the first profile cabin 1, second type Plain concrete and pervious concrete in material cabin 2 are conserved, and curing cycle is not less than 15 days, are conserved to cabin inner concrete After the unified laying for carrying out macadam pavement.According to the difference and local average annual rainfall intensity of 10 top rake of road, along road Road 10 is longitudinal to arrange one of prefabricated assembled component of the invention at interval of 100-200m, so that meeting factory road 10 drains need It asks, while largely saving the project amount of drainage system again.
In the above manner, the prefabricated assembled component of mountainous region photovoltaic project road draining device of the invention, according to road Prefabricated processing the first profile cabin, the second profile cabin, the first profile plate body and the second profile plate body of road width of subgrade, and along road Road transverse lap arrangement, according to above-mentioned application method, spatially intersects with the high pressure collection electric line being set on the inside of road, saves Road performance width and earth volume;It is filled along longitudinal drained at interval of 100-200m transverse direction one of assembled of the invention of laying of road It sets, can accelerate construction progress, largely save template and concrete amount, reduce engineering cost.

Claims (4)

1. a kind of prefabricated assembled component of mountainous region photovoltaic project road draining device, which is characterized in that including the first profile cabin The section of body (1) and the second profile cabin (2), the first profile cabin (1) and the second profile cabin (2) is in " up big and down small " It is trapezoidal, the first profile cabin (1) and the second profile cabin (2) are connected in " upper pressure " overlapping mode, and described Second profile cabin (2) is pressed on the first profile cabin (1), is connected with the first type in the first profile cabin (1) Groove (7) are arranged along the first profile plate body (3) longitudinal centre line in material plate body (3), and the first profile cabin (1) is close Device drain-side offers through-hole (8), and the through-hole (8) is connected with groove (7), and the first profile cabin (1) passes through through-hole (8) It is externally connected to drainpipe (9);
It is connected with the second profile plate body (4) in the second profile cabin (2), the second profile plate body (4) is pressed on the Also it is connected in the overlapping mode of " upper pressure " on one profile plate body (3).
2. a kind of prefabricated assembled component of mountainous region photovoltaic project road draining device as described in claim 1, feature exist In being offered the first preformed groove (5) on the longitudinal two sides inner wall of the first profile cabin (1), the first profile plate body (3) is logical The first preformed groove (5) is crossed to be interspersed in the first profile cabin (1).
3. a kind of prefabricated assembled component of mountainous region photovoltaic project road draining device as described in claim 1, feature exist In being offered the second preformed groove (6) on the longitudinal two sides inner wall of the second profile cabin (2), the second profile plate body (4) is logical The second preformed groove (6) is crossed to be interspersed in the second profile cabin (2).
4. a kind of prefabricated assembled structure of mountainous region photovoltaic project road draining device as claimed in any one of claims 1-3 Part, which is characterized in that the first profile cabin (1), the second profile cabin (2), the first profile plate body (3) and the second profile Plate body (4) are equal in length.
CN201910168681.5A 2019-03-06 2019-03-06 A kind of prefabricated assembled component of mountainous region photovoltaic project road draining device Pending CN109944133A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910168681.5A CN109944133A (en) 2019-03-06 2019-03-06 A kind of prefabricated assembled component of mountainous region photovoltaic project road draining device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910168681.5A CN109944133A (en) 2019-03-06 2019-03-06 A kind of prefabricated assembled component of mountainous region photovoltaic project road draining device

Publications (1)

Publication Number Publication Date
CN109944133A true CN109944133A (en) 2019-06-28

Family

ID=67009307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910168681.5A Pending CN109944133A (en) 2019-03-06 2019-03-06 A kind of prefabricated assembled component of mountainous region photovoltaic project road draining device

Country Status (1)

Country Link
CN (1) CN109944133A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5645367A (en) * 1995-07-11 1997-07-08 Abt, Inc. Drainage system having an embedded conduit connector
DE19643175A1 (en) * 1996-10-18 1998-04-23 Niedlich Thorsten Reconstruction method for stacks of e.g. water pipes
JP2002146797A (en) * 2000-11-16 2002-05-22 Nisshoku Corp Structure for water collecting/draining gutter
DE202004015063U1 (en) * 2004-09-28 2005-02-24 Bpi-Consult Gmbh Device for constructing crossings for cables and/or drainage pipes, in particular, under a road surface comprises a crossing pipe consisting of joinable bottom and top sections
EP1437447A3 (en) * 2003-01-13 2006-12-06 ABT, Inc. Method and apparatus for aligning channel sections with an adjustable alignment key
KR100829496B1 (en) * 2007-02-21 2008-05-16 주식회사 청우엔지니어링 Assembly water channel
CN201068542Y (en) * 2007-02-27 2008-06-04 梁耀德 Side hill sideditch, ditch drainage structure
FR2953865A1 (en) * 2009-12-16 2011-06-17 F2F Sas Prefabricated open gutter element for use in e.g. roadways, has series of fastening screws associated with inserts and introduced into openings oblong bored in grid and extrusions with right sides of cross members of body
CN203393537U (en) * 2013-07-17 2014-01-15 中国十七冶集团有限公司 Assembling-type highway embankment drainage chute
CN109083125A (en) * 2018-07-18 2018-12-25 五冶集团上海有限公司 Temporary drainage ditch construction method under the conditions of a kind of subgrade

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5645367A (en) * 1995-07-11 1997-07-08 Abt, Inc. Drainage system having an embedded conduit connector
DE19643175A1 (en) * 1996-10-18 1998-04-23 Niedlich Thorsten Reconstruction method for stacks of e.g. water pipes
JP2002146797A (en) * 2000-11-16 2002-05-22 Nisshoku Corp Structure for water collecting/draining gutter
EP1437447A3 (en) * 2003-01-13 2006-12-06 ABT, Inc. Method and apparatus for aligning channel sections with an adjustable alignment key
DE202004015063U1 (en) * 2004-09-28 2005-02-24 Bpi-Consult Gmbh Device for constructing crossings for cables and/or drainage pipes, in particular, under a road surface comprises a crossing pipe consisting of joinable bottom and top sections
KR100829496B1 (en) * 2007-02-21 2008-05-16 주식회사 청우엔지니어링 Assembly water channel
CN201068542Y (en) * 2007-02-27 2008-06-04 梁耀德 Side hill sideditch, ditch drainage structure
FR2953865A1 (en) * 2009-12-16 2011-06-17 F2F Sas Prefabricated open gutter element for use in e.g. roadways, has series of fastening screws associated with inserts and introduced into openings oblong bored in grid and extrusions with right sides of cross members of body
CN203393537U (en) * 2013-07-17 2014-01-15 中国十七冶集团有限公司 Assembling-type highway embankment drainage chute
CN109083125A (en) * 2018-07-18 2018-12-25 五冶集团上海有限公司 Temporary drainage ditch construction method under the conditions of a kind of subgrade

Similar Documents

Publication Publication Date Title
CN108797249A (en) The construction method of soft soil roadbed high roadbed steep slope road section Foam lightweight soil
CN105256876A (en) Siphon type draining system of superhigh excavation section of road
CN104060631B (en) A kind of manhole mouth elevation Dynamic controlling structure
CN107700299B (en) Overpass lower-layer ground road structure and construction method thereof
CN111648383A (en) Internal drainage method for loess high-fill side slope
CN108086087A (en) A kind of construction method of porous pavement
CN206016853U (en) Base plate anchors restricted type tunnel lining structure
CN205134481U (en) Highway superelevation excavation highway section hydrocone type drainage system
CN202627166U (en) Novel water-discharging ecological zone for town road
CN110042723A (en) The construction method of the permeable road of full precast splice type
CN207568626U (en) A kind of tunnel structure for expansive stratum
CN107724201A (en) A kind of novel water permeable brick structure and method for paving
CN207552833U (en) A kind of elevated bridge basal perimeter ground road structure
CN208023406U (en) A kind of asphalt bridge floor discharge structure
CN207469190U (en) A kind of infitration galleries structure of efficient draining
US20120269573A1 (en) Systems and Methods for Diverting Sub-surface Water
CN109944133A (en) A kind of prefabricated assembled component of mountainous region photovoltaic project road draining device
CN111501959B (en) Combined cast-in-situ drainage ditch and construction method
CN204551521U (en) The cast-in-place construction structure of board wall between a kind of antislide pile stake
CN107386053A (en) A kind of construction method on pavement
CN209443368U (en) The overhead anti-ponding structure in bridge floor edge
CN109811612B (en) Gutter treatment permanent-temporary combined channel structure and construction method thereof
CN207525575U (en) A kind of novel water permeable brick structure
CN209873485U (en) Permanent temporary combined toilet structure for gully treatment
CN109944132A (en) A kind of assembled road draining device of mountainous region photovoltaic project

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190628

RJ01 Rejection of invention patent application after publication