CN109932198A - Circulating water supply system is used in a kind of test of water purifier - Google Patents

Circulating water supply system is used in a kind of test of water purifier Download PDF

Info

Publication number
CN109932198A
CN109932198A CN201910124117.3A CN201910124117A CN109932198A CN 109932198 A CN109932198 A CN 109932198A CN 201910124117 A CN201910124117 A CN 201910124117A CN 109932198 A CN109932198 A CN 109932198A
Authority
CN
China
Prior art keywords
water
tank
solenoid valve
test
outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910124117.3A
Other languages
Chinese (zh)
Other versions
CN109932198B (en
Inventor
刘挺
王统帅
鲁建国
林思建
王小谦
李晓敏
南倩
潘�清
张志达
周彤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA DOMESTIC ELECTRICAL EQUIPMENT INST
Original Assignee
CHINA DOMESTIC ELECTRICAL EQUIPMENT INST
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA DOMESTIC ELECTRICAL EQUIPMENT INST filed Critical CHINA DOMESTIC ELECTRICAL EQUIPMENT INST
Priority to CN201910124117.3A priority Critical patent/CN109932198B/en
Publication of CN109932198A publication Critical patent/CN109932198A/en
Application granted granted Critical
Publication of CN109932198B publication Critical patent/CN109932198B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)
  • Water Treatment By Sorption (AREA)

Abstract

The invention discloses a kind of water purifier test circulating water supply systems, it mainly include water source, steam generator, two water tanks, liquid reserve tank, water feeding tank, test station and recovery pond, wherein water tank, water feeding tank, test station, recovery pond and the connecting line between them constitute circulating water supply system;Water tank, liquid reserve tank, water feeding tank and the connecting line between them constitute automatic solution proportioning apparatus;Steam generator passes through piping connection to water tank, liquid reserve tank, water feeding tank, the high-temperature sterilization system of constituent apparatus.The present invention realizes automatic liquid matching, lasting water supply by automatic solution proportioning apparatus, and the water after water purifier test is recycled, is handled, cycling and reutilization, realize the water-saving of water purifier test, while guaranteeing to detect quality, more energy-saving and environmental protection have high economic benefit, environmental benefit and social benefit.

Description

Circulating water supply system is used in a kind of test of water purifier
Technical field
The present invention relates to household electrical appliance detection fields, and in particular to circulating water supply system is used in a kind of test of water purifier.
Background technique
With the development of society, large amount of organic and heavy metal are entered in water source by different modes, drinking water source by Serious pollution is arrived.In recent years, living standards of the people were gradually increased, and health perception also constantly improves and enhances, and drinking-water is asked It inscribes receive more and more attention.In order to guarantee healthy water, many family's selections are mounted with water purifier.
Water purifier product inspection method is mainly according to NSF42, NSF53, QB/T 4143, QB/T 4144, GB/T at present 30306, the standards such as GB/T30307, GB 34914, water purifier and water process inner core health official written reply, water effect, A+ certification and removal rate It is required to provide a set of water system etc. a variety of tests.
Such as water imitate detection test in, the detection of water purifier total water purification amount, net water flux and water purification producing water ratio, need for Water purifier provides the constant temperature and pressure test water of (25 ± 1) DEG C, (0.24 ± 0.02) Mpa, investigates according to certain third party testing agency, Laboratory is averaged daily requirement 20 tons of water of consumption for water purifier test experiments, and accounting is got off, and will be consumed 5000 tons every year and is used water.
So it is scientific for guarantee test data, accurate to research and develop a kind of circulating water supply system for water purifier test Property, reduce water purifier testing cost practical value with higher.
Summary of the invention
The purpose of the present invention is to provide a kind of circulating water supply systems of water purifier test, can both guarantee test data Scientific, accuracy, and testing cost can be reduced, facilitate and is used for water purifier enterprise and quality inspection organization test water purifier.
In order to solve the above technical problems, the present invention adopts the following technical scheme that:
A kind of water purifier test circulating water supply system, mainly includes water source 36, recovery pond 38, water tank 39, water tank 40, steam generator 41, liquid reserve tank 42, water feeding tank 45, test station 50;
Water source 36 is connected to the first water inlet of water tank 39 by solenoid valve 3;
Water source 36 is connected to the water inlet of liquid reserve tank 42 by solenoid valve 3, solenoid valve 4;
The water outlet of water tank 39 is successively connect with solenoid valve 8, small pump 27, and one end of small pump 27 passes through solenoid valve 9 It is connected to the water return outlet of water tank 39, the other end is connected to the first water inlet of water feeding tank 45 by solenoid valve 10, flowmeter 43;
The water outlet of water tank 40 is successively connect with solenoid valve 17, small pump 28, and one end of small pump 28 passes through solenoid valve 18 are connected to the water return outlet of water tank 40, and the other end is connected to the first water inlet of water feeding tank 45 by solenoid valve 19, flowmeter 43 Mouthful;
The water outlet of liquid reserve tank 42 is connect with liquid pump 29, and one end with liquid pump 29 is connected to liquid reserve tank by solenoid valve 13 42 liquid return hole, the other end passes sequentially through solenoid valve 14, flowmeter 44 is connected to the second water inlet of water feeding tank 45;
Steam generator 41 is connected to one end of liquid reserve tank 42 by solenoid valve 5, is connected to feed pump 26 by solenoid valve 2 Side, one end of water feeding tank 45 is connected to by solenoid valve 11;
The water outlet of 45 side of water feeding tank passes sequentially through solenoid valve 23, feed pump 31, pressure sensor 48, temperature sensor 49 are connected to the depotition cock of test station 50, and the water outlet of the other side passes sequentially through solenoid valve 21, circulating pump 30, solenoid valve 20 It is connected to the water return outlet of water feeding tank 45;The top of the water feeding tank 45 is connected by the gas outlet of relief valve 25 and test station 50 It is logical;
50 bottom end of test station is connected to recovery pond 38 by recovery channel 51;
The water outlet of recovery pond 38 is successively connect with solenoid valve 1, fore filter 37, feed pump 26, and the one of feed pump 26 End is by the second water inlet for dividing water solenoid valve 6 to be connected to water tank 39, and the other end is by dividing water solenoid valve 15 to be connected to water storage The water inlet of case 40.
Preferably, the water tank 39, water tank 40, water feeding tank 45 are the water tank with heat preservation sandwich layer;
Preferably, the side of the recovery pond 38, water tank 39, water tank 40, water feeding tank 45 is equipped with liquid level biography Sensor;
Preferably, the bottom of the recovery pond 38, water tank 39, water tank 40, liquid reserve tank 42, water feeding tank 45 is all provided with There is discharge outlet;
Preferably, the side of the water feeding tank 45 is equipped with electric heater unit 46 and temperature control module 47.
The beneficial effects of the present invention are:
1, water system realizes closed-loop control, and temperature, the pressure of water system pass through temperature control module 47, pressure sensor 48 acquire, and the temperature, pressure sensor in water supply pipe are compared with the water temperature of experiment setting, hydraulic pressure, execute pid algorithm tune Section realizes water system and adjusts to the Real-time Feedback of water temperature hydraulic pressure, thus really by controlling electric heater unit, variable frequency pump The response speed and robustness of system have been protected, and then ensure that the accuracy and science of test data;
2, level of integrated system and automatization level are high, safe and stable, reliable, realize the Centralized Monitoring pipe of system equipment Reason, inspector is easy to use, improves work efficiency;
3, the test of water system realizes circulation sustainable use with water, improves water utilization rate, reduces net Hydrophone product test cost has high economic benefit, environmental benefit and social benefit.
Detailed description of the invention
Fig. 1 is process structure figure of the invention.
Description of symbols: 1-24 solenoid valve, 25 relief valves, 26 feed pumps, 27-28 small pump, 29 match liquid pump, 30 circulations Pump, 31 water supply pumps, 32-35 liquid level sensor, 36 water sources, 37 fore filters, 38 recovery ponds, 39-40 water tank, 41 steam hair Raw device, 42 liquid reserve tanks, 43-44 flowmeter, 45 water feeding tanks, 46 electric heater units, 47 temperature control modules, 48 pressure sensors, 49 temperature Spend sensor, 50 test stations, 51 recovery channels
Specific embodiment
Explanation is further explained to the present invention with reference to the accompanying drawings and detailed description, so that feature of the invention It is easier to be understood, to make clearer define to protection scope of the present invention.
As shown in Figure 1, a kind of water purifier test circulating water supply system, including water source, recovery pond, water tank, water feeding tank, Connecting tube in steam generator, liquid reserve tank, liquid level sensor, electric heater unit, temperature control module, test station and system Road, pipeline include the first to the 24th solenoid valve, relief valve, fore filter, feed pump, small pump, match liquid pump, circulation Pump, water supply pump, flowmeter, pressure sensor, temperature sensor and connecting line.
As shown in Figure 1, water source 36 connects solenoid valve 3, the side of solenoid valve 3 is connected to the first water inlet of water tank 39, The other end is connected to the water inlet of liquid reserve tank 42 by solenoid valve 4, provides initial water source for whole system.
The water outlet of water tank 39 is successively connect with solenoid valve 8, small pump 27, and one end of small pump 27 passes through solenoid valve 9 It is connected to the water return outlet of water tank 39, realizes liquid self circulation in water tank 39, it is ensured that liquid is uniform;The other end of small pump 27 It is connected to the first water inlet of water feeding tank 45 by solenoid valve 10, flowmeter 43, supplies water for water feeding tank 45.
The water outlet of water tank 40 is successively connect with solenoid valve 17, small pump 28, and one end of small pump 28 passes through solenoid valve 18 are connected to the water return outlet of water tank 40, realize liquid self circulation in water tank 40, it is ensured that liquid is uniform;Small pump 28 it is another End is connected to the first water inlet of water feeding tank 45 by solenoid valve 19, flowmeter 43, supplies water for water feeding tank 45.
Water tank 39, water tank 40 are used alternatingly, it can be achieved that uninterrupted water supply in 24 hours.
The water outlet of liquid reserve tank 42 is connect with liquid pump 29, and one end with liquid pump 29 is connected to liquid reserve tank by solenoid valve 13 42 liquid return hole realizes liquid self circulation in liquid reserve tank 42, it is ensured that liquid is uniform;The other end with liquid pump 29 passes sequentially through electromagnetism Valve 14, flowmeter 44 are connected to the second water inlet of water feeding tank 45, provide storing liquid for water feeding tank 45.
The storing liquid that the water that water tank 39, water tank 40 provide is provided with liquid reserve tank 42 is prepared in water feeding tank 45, The flow of water and storing liquid entrance is adjusted by flowmeter 43 and flowmeter 44, to realize the dense of the configuration liquid in water feeding tank 45 Degree reaches test requirements document.
Steam generator 41 is connected to one end of liquid reserve tank 42 by solenoid valve 5, is connected to feed pump 26 by solenoid valve 2 Side, one end of water feeding tank 45 is connected to by solenoid valve 11, by open connecting pipeline on solenoid valve, it can be achieved that whole A system water tank and pipeline carry out moise-heat sterilization.
The water outlet of 45 side of water feeding tank passes sequentially through solenoid valve 21, circulating pump 30, solenoid valve 20 and is connected to water feeding tank 45 Water return outlet, realize water feeding tank 45 in liquid self circulation, it is ensured that liquid is uniform;
The water outlet of 45 other side of water feeding tank passes sequentially through solenoid valve 23, feed pump 31, pressure sensor 48, temperature sensing Device 49 is connected to the depotition cock of test station 50, provides test water;Pass through relief valve 25 and test work at the top of water tank The gas outlet connection of position 50.
Whether pressure sensor 48, temperature sensor 49 meet test condition for detection system leaving water temperature, pressure, if It does not meet, realizes that leaving water temperature is adjusted by the way that the work of electric heater unit 46, temperature control module 47 of 45 side of water feeding tank is arranged in, Realize that discharge pressure is adjusted by adjusting relief valve 25.
The bottom end of test station 50 is connected to recovery pond 38 by recovery channel 51, realizes and uses the test after test Water is collected to recovery pond.
The water outlet of recovery pond 38 is successively connect with solenoid valve 1, fore filter 37, feed pump 26,26 one end of feed pump By the second water inlet for dividing water solenoid valve 6 to be connected to water tank 39, the other end is by dividing water solenoid valve 15 to be connected to water tank 40 water inlet.
Test water after the test being collected into recovery pond 38 is filtered processing by fore filter 37, is reached Required water quality requirement, treated, and water can enter in water tank 39 by feed pump 26, solenoid valve 6, and pass through feed pump 26, solenoid valve 15 enters in water tank 40, to realize the cycling and reutilization of water resource.
In certain specific embodiments, water tank 39, water tank 40, water feeding tank 45 are preferably the water with heat preservation sandwich layer Case, to reduce temperature losses when system operation.
In certain specific embodiments, recovery pond 38, water tank 39, water tank 40, water feeding tank 45 side be respectively equipped with Liquid level sensor 32,33,34,35 is used to monitor the liquid capacity in water tank.
In certain specific embodiments, the bottom of recovery pond 38, water tank 39, water tank 40, liquid reserve tank 42, water feeding tank 45 It is equipped with discharge outlet, is connect respectively with solenoid valve 24,7,16,12,22, realizes the drain function of Cistern flushing, disinfection.
Water tank 39 is prepared and is acted on water tank 40 and is identical in water purifier test circulating water supply system of the invention, under Face illustrates the application method of this system by taking water tank 39 as an example, comprising the following steps:
1, the depotition cock for closing solenoid valve 3 and test station 50, fills pure water for steam generator 41 and opens work, Make whole system full of high-temperature steam, is heated using flowing steam and kill microorganism, reach sterilizing purpose;Steam generator 41 is held Continuous work after sixty minutes, opens drain solenoid valve 24,7,12,16,22, exhausts recovery pond 38, water tank 39, water tank 40, storage The water formed after steam condensation in liquid case 42, water feeding tank 45 and pipeline, is then shut off above-mentioned drain solenoid valve.
2, water temperature, hydraulic pressure and the water tank 39 at setting depotition cock, the highest of water feeding tank 45, lowest water level;It opens Solenoid valve 3 supplies water to water tank 39, and opens solenoid valve 8,9, small pump 27, makes the liquid self circulation in water tank 39, it is ensured that Liquid is uniform;Reach maximum water level to 39 water level of water tank, opens solenoid valve 10, flowmeter 43 to water feeding tank 45 and water is provided Source.
3, solenoid valve 3,4 is opened, is supplied water to liquid reserve tank 42, while a certain amount of drug is added, the storage of compounding high concentration Liquid;To topped up with water in liquid reserve tank 42, solenoid valve 3,4 is closed, opening makes the solution in liquid reserve tank 42 certainly with liquid pump 29, solenoid valve 13 Circulation, it is ensured that solution is uniform;Solenoid valve 14, flowmeter 44 are opened, the storing liquid in liquid reserve tank 42 enters water feeding tank 45;
4, the storing liquid that the water that water tank 39 provides is provided with liquid reserve tank 42 is prepared in water feeding tank 45, to preparation water Sample is tested, and adjusts flowmeter 43 and 44 by test result, until the configuration liquid concentration in water feeding tank 45 meets test need It asks;Reach maximum water level to 45 water level of water feeding tank, opens solenoid valve 23, feed pump 31, solenoid valve 24, pressure sensor 48, Temperature sensor 49 provides test water to test station 50, is gone out by pressure sensor 48,49 detection system of temperature sensor Whether coolant-temperature gage, pressure meet test condition, if not meeting, are realized out by the work of electric heater unit 46, temperature control module 47 Coolant-temperature gage is adjusted, and realizes that discharge pressure is adjusted by adjusting relief valve 25;If detecting, leaving water temperature, pressure meet test-strips Part can carry out the test of water purifier.
5, the test water after the completion of testing is recycled to recovery pond 38 by recovery channel 51, the liquid level in recovery pond 38 When higher than lowest water level line, solenoid valve 1, fore filter 37, feed pump 26, solenoid valve 6 are opened, recovery pond 38 is to water tank 39 It supplies water, completes waterway circulating.
As described above, what the present invention protected is a kind of water purifier test circulating water supply system, system passes through acquisition pipeline The temperature of pressure and Water in Water Tank compares it with the water temperature of experiment setting, hydraulic pressure, by controlling electric heater unit, frequency conversion The closed loop Real-time Feedback that water pump realizes water temperature hydraulic pressure is adjusted, and ensure that the science and accuracy of water purifier test data;System Water after unified test examination flows into recovery pond by recovery channel, and water supply is to water tank after water treatment, according to recovery pond, two storages The liquid level sensor feedback of water tank, water feeding tank controls water pump and valve as a result, passing through, and realizes the switching in system water route, guarantees The water purifier test circulation sustainable use of water system.The system operatio is simple, using stabilization, reliable, can effectively drop The testing cost of low water purifier improves water utilization rate, has high economic benefit, environmental benefit and social benefit.
For those skilled in the art, above content is the preferred embodiment of the present invention, is not departing from the present invention Under the premise of principle, several improvements and modifications can also be made, these improvements and modifications also should be regarded as falling into the protection model of this case It encloses.

Claims (7)

1. a kind of water purifier test circulating water supply system mainly includes water source (36), recovery pond (38), water tank (39), storage Water tank (40), steam generator (41), liquid reserve tank (42), water feeding tank (45), test station (50);
Wherein, water source (36) connection solenoid valve (3), one end of solenoid valve (3) is connected to the first of the water tank (39) Water inlet, the other end are connected to the water inlet of liquid reserve tank (42) by solenoid valve (4);
The water outlet of the water tank (39) is successively connect with solenoid valve (8), small pump (27), and one end of small pump (27) passes through Solenoid valve (9) is connected to the water return outlet of water tank (39), and the other end is connected to water feeding tank by solenoid valve (10), flowmeter (43) (45) the first water inlet;
The water outlet of the water tank (40) is successively connect with solenoid valve (17), small pump (28), and one end of small pump (28) is logical The water return outlet that solenoid valve (18) is connected to water tank (40) is crossed, the other end is connected to confession by solenoid valve (19), flowmeter (43) First water inlet of water tank (45);
The water outlet of the liquid reserve tank (42) is connect with liquid pump (29), and one end with liquid pump (29) is connected by solenoid valve (13) To the liquid return hole of liquid reserve tank (42), the other end passes sequentially through solenoid valve (14), flowmeter (44) is connected to the of water feeding tank (45) Two water inlets;
The steam generator (41) is connected to one end of liquid reserve tank (42) by solenoid valve (5), is connected to by solenoid valve (2) The side of feed pump (26) is connected to one end of water feeding tank (45) by solenoid valve (11);
The water outlet of water feeding tank (45) side passes sequentially through solenoid valve (23), feed pump (31), pressure sensor (48), temperature Degree sensor (49) is connected to the depotition cock of test station (50), and the water outlet of the other side passes sequentially through solenoid valve (21), follows Ring pump (30), solenoid valve (20) are connected to the water return outlet of water feeding tank (45);Pass through relief valve at the top of the water feeding tank (45) (25) it is connect with the gas outlet of test station (50);
Test station (50) bottom end is connected to recovery pond (38) by recovery channel (51);
The water outlet of the recovery pond (38) is successively connect with solenoid valve (1), fore filter (37), feed pump (26), water supply The one end of (26) is pumped by the second water inlet for dividing water solenoid valve (6) to be connected to water tank (39), the other end is by dividing water power magnetic Valve (15) is connected to the water inlet of water tank (40).
2. a kind of water purifier test circulating water supply system according to claim 1, it is characterised in that water tank (39), storage Water tank (40), water feeding tank (45) are the water tank with heat preservation sandwich layer.
3. a kind of water purifier test circulating water supply system according to claim 1, it is characterised in that the recovery pond (38) side is equipped with liquid level sensor (32), and bottom is equipped with discharge outlet, connect with solenoid valve (24).
4. a kind of water purifier test circulating water supply system according to claim 1, it is characterised in that the water tank (39) side is equipped with liquid level sensor (33), and bottom is equipped with discharge outlet, connect with solenoid valve (7).
5. a kind of water purifier test circulating water supply system according to claim 1, it is characterised in that the water tank (40) side is equipped with liquid level sensor (34), and bottom is equipped with discharge outlet, connect with solenoid valve (16).
6. a kind of water purifier test circulating water supply system according to claim 1, it is characterised in that the liquid reserve tank (42) bottom is equipped with discharge outlet, connect with solenoid valve (12).
7. a kind of water purifier test circulating water supply system according to claim 1, it is characterised in that the water feeding tank (45) side is equipped with liquid level sensor (35), and the other side is equipped with electric heater unit (46) and temperature control module (47), and bottom is equipped with row The mouth of a river is connect with solenoid valve (22).
CN201910124117.3A 2019-02-19 2019-02-19 Circulating water supply system for water purifier testing Active CN109932198B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910124117.3A CN109932198B (en) 2019-02-19 2019-02-19 Circulating water supply system for water purifier testing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910124117.3A CN109932198B (en) 2019-02-19 2019-02-19 Circulating water supply system for water purifier testing

Publications (2)

Publication Number Publication Date
CN109932198A true CN109932198A (en) 2019-06-25
CN109932198B CN109932198B (en) 2020-09-25

Family

ID=66985746

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910124117.3A Active CN109932198B (en) 2019-02-19 2019-02-19 Circulating water supply system for water purifier testing

Country Status (1)

Country Link
CN (1) CN109932198B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112525575A (en) * 2020-11-23 2021-03-19 厦门安信优环保科技有限公司 Test system for detecting performance of water purification equipment and control method thereof
CN113252376A (en) * 2021-06-01 2021-08-13 中国家用电器研究院 Device for testing water purifier

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09253422A (en) * 1996-03-25 1997-09-30 Janome Sewing Mach Co Ltd Apparatus for purifying bathtub water
CN1223605A (en) * 1996-05-03 1999-07-21 普拉克水务系统公司 Drinking water filtration system
CN101875515A (en) * 2009-04-28 2010-11-03 株式会社大宇建设 A kind of water purification apparatus and method
CN201762156U (en) * 2010-07-02 2011-03-16 黄文山 Automatic detection dosing system used for water plant
CN202016921U (en) * 2011-01-28 2011-10-26 陈师楚 Vehicle-mounted water purifying equipment
CN102616954A (en) * 2011-07-28 2012-08-01 广州市市政工程设计研究院 Integrated water purification and supply method and system
CN105016556A (en) * 2015-07-31 2015-11-04 天津邦盛净化设备工程有限公司 Water supply system of medical purified water with high quality

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09253422A (en) * 1996-03-25 1997-09-30 Janome Sewing Mach Co Ltd Apparatus for purifying bathtub water
CN1223605A (en) * 1996-05-03 1999-07-21 普拉克水务系统公司 Drinking water filtration system
CN101875515A (en) * 2009-04-28 2010-11-03 株式会社大宇建设 A kind of water purification apparatus and method
CN201762156U (en) * 2010-07-02 2011-03-16 黄文山 Automatic detection dosing system used for water plant
CN202016921U (en) * 2011-01-28 2011-10-26 陈师楚 Vehicle-mounted water purifying equipment
CN102616954A (en) * 2011-07-28 2012-08-01 广州市市政工程设计研究院 Integrated water purification and supply method and system
CN105016556A (en) * 2015-07-31 2015-11-04 天津邦盛净化设备工程有限公司 Water supply system of medical purified water with high quality

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王统帅等: "净水厂改造中超滤工艺优化与工程应用", 《城镇给排水》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112525575A (en) * 2020-11-23 2021-03-19 厦门安信优环保科技有限公司 Test system for detecting performance of water purification equipment and control method thereof
CN113252376A (en) * 2021-06-01 2021-08-13 中国家用电器研究院 Device for testing water purifier

Also Published As

Publication number Publication date
CN109932198B (en) 2020-09-25

Similar Documents

Publication Publication Date Title
CN102288492B (en) High-temperature and high-pressure circulating water constant-load extension experimental device with acoustic emission testing function
CN202599943U (en) Water quality online inspection system
CN202159248U (en) Water treatment controller in recirculated cooling water system
CN109932198A (en) Circulating water supply system is used in a kind of test of water purifier
CN104150662B (en) Drinking water system and technique
CN207722641U (en) A kind of efficient reverse-osmosis membrane element test device
CN107098508B (en) Direct-drinking water-separating water supply equipment and water supply method thereof
CN210802988U (en) Special sampling device of pressurized water reactor nuclear power plant's primary circuit coolant
CN206970362U (en) Direct drinking sub-prime water work
CN103070132A (en) Temperature control device in seawater breeding pond water reflow treatment
CN108726636A (en) A kind of method and system of membrane distillation processing waste water
CN109138055A (en) Motor-operated control valve based on fluid sensor
CN212532563U (en) Solar energy sewage purification treatment wisdom management and control system
CN211316605U (en) Intelligent control system based on multiple hot water energy preparation modes
CN206858222U (en) A kind of experimental rig of multistage NACE tubular membranes condensed heavy metal waste water
CN204079673U (en) Drinking water system
RU110228U1 (en) INSTALLATION FOR CULTIVATION OF SEA HYDROBIONTS
CN203120738U (en) Temperature control device in seawater culture pond water backflow processing
CN209024340U (en) A kind of return water module in medical water treatment system
CN207528083U (en) Firepower electrical plant cooling water circulation medicine system
CN110713265A (en) Automatic dosing water-saving treatment system and method for absorption heat pump waste heat water
CN201272702Y (en) Automatic regulating device for inner cold water conductance and acidity of generator
CN220223896U (en) Air conditioner circulating water quality on-line detecting and processing system based on PLC
CN210261247U (en) Automatic control equipment for water treatment
CN218435151U (en) Fluorescent tracing method medicine adding device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant