CN109932153A - The experimental rig and its manufacturing method of detachable concrete balancing weight suitable for pile-soil interaction test - Google Patents

The experimental rig and its manufacturing method of detachable concrete balancing weight suitable for pile-soil interaction test Download PDF

Info

Publication number
CN109932153A
CN109932153A CN201910296566.6A CN201910296566A CN109932153A CN 109932153 A CN109932153 A CN 109932153A CN 201910296566 A CN201910296566 A CN 201910296566A CN 109932153 A CN109932153 A CN 109932153A
Authority
CN
China
Prior art keywords
balancing weight
tube body
pile
concrete balancing
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910296566.6A
Other languages
Chinese (zh)
Inventor
薛俊青
傅睿焕
黄福云
布鲁诺.布里斯杰拉
陈宝春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou University
Original Assignee
Fuzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou University filed Critical Fuzhou University
Priority to CN201910296566.6A priority Critical patent/CN109932153A/en
Publication of CN109932153A publication Critical patent/CN109932153A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The present invention provides the experimental rig and its manufacturing method of a kind of detachable concrete balancing weight suitable for pile-soil interaction test, including the square module being enclosed by multiple panels, the square module center is fixed with the tube body being placed in inside square template, the bottom of the pipe closing, experiment forming module of the invention can be easily produced detachable concrete balancing weight, there is slot can carry out the concrete balancing weight installation during more scaled model stakes in proportion carry out pile-soil interaction test in the middle part of concrete balancing weight, when being changed to other Model Piles in proportion and being tested, the concrete balancing weight can be disassembled from master mould stake and be mounted in new model stake, concrete balancing weight is set to obtain duplicate utilization, reduce experimental cost, avoid material waste.

Description

The experimental rig of detachable concrete balancing weight suitable for pile-soil interaction test And its manufacturing method
Technical field
The present invention relates to it is a kind of suitable for pile-soil interaction test detachable concrete balancing weight experimental rig and Its manufacturing method.
Background technique
Currently, the simulating vibration table test for carrying out the researchs such as pile-soil interaction is research engineering shock resistance and breaks One of the important means of bad mechanism, by the concern of domestic and international academia and engineering field.But it is limited to effectively holding for shake table Loading capability, large scale structure can only be tested with scaled model.Therefore, to enable model test to be truly reflected original as far as possible The power character of type, it is necessary to consider the Physical similarity between model and prototype, this relates to the likelihood ratio value of each physical quantity Problem.For a long time, manual quality's law of similitude based on the foundation of Bockingham Buckingham theorem is once in engineering model shaketalle test Middle extensive use simultaneously adopts so far.In view of when carrying out shaking-table test, since model and prototype are at together In one gravitational field, therefore acceleration of gravity is equal.It is limited by the constraint condition, fully meeting for model likelihood just becomes It is extremely difficult, the similar of acceleration of gravity can be generally met by the method for additional bob-weight, imitates gravitational effect and inertia The deficiency answered is compensated.And then how clump weight is fixed in Model Pile by crucial be just changed into of problem, one of which is thought Road is to consider to extend the main reinforcement of Model Pile into concrete balancing weight, and also carry out certain arrangement of reinforcement in clump weight.This method Although clump weight and Model Pile can be fixed together well, if there is the scaled model stake of more same ratios, then Every Model Pile requires to connect clump weight with this method, causes to waste.In the pile-soil interaction test using reduced scale stake This problem will be faced, it is therefore necessary to be considered as economical rationality concrete balancing weight experimental rig come to Model Pile into Row self weight compensation.
Summary of the invention
The present invention improves the above problem, i.e., the technical problem to be solved by the present invention is to existing development stake soil phases Clump weight needs to repeat modeling in the simulating vibration table test of the researchs such as interaction.
Specific embodiments of the present invention are: a kind of detachable concrete balancing weight suitable for pile-soil interaction test Experimental rig, which is characterized in that including the square module being enclosed by multiple panels, the square module center is fixed with The tube body being placed in inside square template, the bottom of the pipe closing.
Further, the square module includes cope plate and lower template, is fixed between the cope plate and lower template The square shape side plate being enclosed, the upper end of tube body are concordant with cope plate.
Further, the material of the tube body is PVC.
Further, sandy soil are filled in the tube body.
The invention also includes a kind of detachable concrete matcheds that manufacture is tested suitable for pile-soil interaction as described above The method of pouring weight experimental rig, which is characterized in that specifically includes the following steps:
(1) a piece internal diameter of the insertion tube body equal with Model Pile diameter at middle at the top of the square module of casting concrete, Tube body does not penetrate square module, i.e., tube body upper horizontal plane and cope plate either flush and is shorter in length than side template height.
(2) it to prevent tube body to be subject to crushing in concreting process, is filled up and is compacted with sand in tube body.
(3) the cuboid coagulation for deducting one section of cylindrical body is made in casting concrete inside square module and outside tube body Native clump weight.
(4) it after the completion of concrete curing, removes square module and sand is poured out or dug out, detachable concrete weight coating Block completes.
Compared with prior art, the invention has the following advantages: experiment forming module of the invention can facilitate system There is slot can carry out in more scaled model stakes in proportion at detachable concrete balancing weight, in the middle part of concrete balancing weight The concrete balancing weight installation is carried out during pile-soil interaction test, is tested when being changed to other Model Piles in proportion When, which can be disassembled from master mould stake and be mounted in new model stake, obtain concrete balancing weight To duplicate utilization, reduces experimental cost and avoid material waste.
Detailed description of the invention
The detachable concrete balancing weight structural schematic diagram of Fig. 1;
Fig. 2 is applied to the detachable concrete balancing weight structural schematic diagram of Model Pile;
The detachable concrete weight coating formation of lots implementation steps schematic diagram one of Fig. 3;
The detachable concrete weight coating formation of lots implementation steps schematic diagram two of Fig. 4;
The detachable concrete weight coating formation of lots implementation steps schematic diagram three of Fig. 5;
The detachable concrete weight coating formation of lots implementation steps schematic diagram four of Fig. 6;
In figure: 10- square module, 20- tube body, 110- cope plate, 120- lower template, 210- sand, 101- Model Pile, 100- are solidifying Native clump weight, 30- concrete, 101- Model Pile, 100- concrete balancing weight.
Specific embodiment
The present invention will be further described in detail with reference to the accompanying drawings and detailed description.
As shown in figs. 1 to 6, a kind of test dress of the detachable concrete balancing weight suitable for pile-soil interaction test It sets, including the square module 10 being enclosed by multiple panels, the square module center, which is fixed with, to be placed in inside square template Tube body 20, bottom of the pipe closing is protruded into closed at one end inside square module 10.
In the present embodiment, the square module 10 include cope plate 110 and lower template 120, the cope plate and It is fixed with the square shape side template being enclosed between lower template, can pass through between cope plate 110, lower template 120 and side template Bolt or nail are fixed, and the upper end of tube body 20 is concordant with cope plate, and 110 top of cope plate has for inside square module 10 The opening of concrete is poured into space.
In the present embodiment, in the square module 10 manufactured, one is inserted by PVC material in the center of cope plate 110 The tube body 20 that material manufacture is formed, tube body 20 do not penetrate cope plate and are fixedly connected with cope plate, internal diameter and the stake soil phase of tube body 20 Interaction tests used 101 diameter of Model Pile and is consistent, can when forming groove use in molding clump weight to realize Easily it is inserted in 101 top of Model Pile.
Concreting molding is poured into when molding, into square module 10 to prevent pvc pipe body 20 in concreting It is subject to crushing in journey, can be filled up and be compacted with sand 210 in tube body 20.After concreting molding, sand is fallen from tube body 20 Out, that is, required detachable concrete balancing weight is made.
The material of actual design middle tube body 20 can also be other metals, thermoplasticity or nonmetallic materials manufacture.
The following steps can be used when Specific construction:
(1) insertion one and the isodiametric tube body 20 of Model Pile 101, pipe at middle at the top of the square module of casting concrete Body 20 does not penetrate square module 10, i.e., 20 upper horizontal plane of tube body and 110 either flush of cope plate and is shorter in length than side template height. Such as Fig. 3.
(2) it to prevent tube body 20 to be subject to crushing in concreting process, is filled up and is pressed with sand 210 in Yu Guanti 20 It is real.Such as Fig. 4.
(3) it in 10 inside of square module and 20 outside casting concrete 30 of tube body, is made and deducts the rectangular of one section of cylindrical body Body concrete clump weight 100.Such as Fig. 5.
(4) it after the completion of concrete curing, removes square module 10 and sand 210 is poured out or dug out, detachable coagulation Native clump weight 100 completes.Such as Fig. 6.
Any technical solution disclosed in aforementioned present invention unless otherwise stated, if it discloses numberical range, Disclosed numberical range is preferred numberical range, and any it should be appreciated by those skilled in the art preferred numberical ranges The only obvious or representative numerical value of technical effect in many enforceable numerical value.It, can not since numerical value is more Exhaustion, so the present invention just discloses technical solution of the component values to illustrate the present invention, also, the above-mentioned numerical value enumerated is not The limitation to the invention protection scope should be constituted.
If the present invention is open or relates to the components or structural member of connection fastened to each other, unless otherwise stated, It is fixedly connected it is to be understood that connection can be removedly fixed (such as using bolt or screw connection, such as composition side in the present invention Cope plate, lower template and the side template of shape module 10), it is understood that are as follows: it is non-removable be fixedly connected (such as riveting, weldering Connect), certainly, connection fastened to each other or integral structure (such as being manufactured using casting technique is integrally formed) institute Replace (obviously can not be using except integrally formed technique).
In addition, for indicating the art of positional relationship or shape applied in any technical solution disclosed in aforementioned present invention Its meaning includes approximate with its, similar or close state or shape to language unless otherwise stated.
Either component provided by the invention by multiple individual component parts either assembled, or one The separate part that forming technology manufactures.
Finally it should be noted that: the above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof;To the greatest extent The present invention is described in detail with reference to preferred embodiments for pipe, it should be understood by those ordinary skilled in the art that: still It can modify to a specific embodiment of the invention or some technical features can be equivalently replaced;Without departing from this hair The spirit of bright technical solution should all cover within the scope of the technical scheme claimed by the invention.

Claims (5)

1. a kind of experimental rig of the detachable concrete balancing weight suitable for pile-soil interaction test, which is characterized in that packet The square module being enclosed by multiple panels is included, the square module center is fixed with the tube body being placed in inside square template, The bottom of the pipe closing.
2. a kind of test of detachable concrete balancing weight suitable for pile-soil interaction test according to claim 1 Device, which is characterized in that the square module includes cope plate and lower template, is fixed with and encloses between the cope plate and lower template The square shape side plate formed is closed, the upper end of tube body is concordant with cope plate.
3. a kind of test of detachable concrete balancing weight suitable for pile-soil interaction test according to claim 1 Device, which is characterized in that the material of the tube body is PVC.
4. a kind of test of detachable concrete balancing weight suitable for pile-soil interaction test according to claim 1 Device, which is characterized in that sandy soil are filled in the tube body.
5. a kind of manufacture is as claimed in claim 2 suitable for the detachable concrete balancing weight test of pile-soil interaction test The method of device, which is characterized in that specifically includes the following steps:
(1) a piece internal diameter of the insertion tube body equal with Model Pile diameter at middle at the top of the square module of casting concrete, Tube body does not penetrate square module, i.e., tube body upper horizontal plane and cope plate either flush and is shorter in length than side template height;
(2) it to prevent tube body to be subject to crushing in concreting process, is filled up and is compacted with sand in tube body;
(3) the cuboid concrete matched for deducting one section of cylindrical body is made in casting concrete inside square module and outside tube body Pouring weight;
(4) it after the completion of concrete curing, removes square module and sand is poured out or dug out, detachable concrete balancing weight system It completes.
CN201910296566.6A 2019-04-13 2019-04-13 The experimental rig and its manufacturing method of detachable concrete balancing weight suitable for pile-soil interaction test Pending CN109932153A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910296566.6A CN109932153A (en) 2019-04-13 2019-04-13 The experimental rig and its manufacturing method of detachable concrete balancing weight suitable for pile-soil interaction test

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910296566.6A CN109932153A (en) 2019-04-13 2019-04-13 The experimental rig and its manufacturing method of detachable concrete balancing weight suitable for pile-soil interaction test

Publications (1)

Publication Number Publication Date
CN109932153A true CN109932153A (en) 2019-06-25

Family

ID=66989895

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910296566.6A Pending CN109932153A (en) 2019-04-13 2019-04-13 The experimental rig and its manufacturing method of detachable concrete balancing weight suitable for pile-soil interaction test

Country Status (1)

Country Link
CN (1) CN109932153A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111209708A (en) * 2020-04-22 2020-05-29 西南交通大学 Machine learning-based pile-soil interaction prediction analysis method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002286625A (en) * 2001-03-28 2002-10-03 Nippon Steel Corp Method for execution and loading test in model sand ground, device therefor, and ground creating method
CN203891084U (en) * 2014-05-16 2014-10-22 安徽省建筑工程质量监督检测站 Concrete counterweight for foundation pile detection
CN206784418U (en) * 2017-04-03 2017-12-22 宁迈杰 A kind of agricultural greenhouse concrete pipe base
CN207160091U (en) * 2017-09-05 2018-03-30 海南大学 A kind of Novel pile foundation static-load testing device
CN207436058U (en) * 2017-09-29 2018-06-01 广东广强基础工程有限公司 A kind of clump weight of hydraulic static pile pressing machine
CN209802618U (en) * 2019-04-13 2019-12-17 福州大学 Be suitable for experimental test device of dismantling concrete balancing weight of stake soil interaction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002286625A (en) * 2001-03-28 2002-10-03 Nippon Steel Corp Method for execution and loading test in model sand ground, device therefor, and ground creating method
CN203891084U (en) * 2014-05-16 2014-10-22 安徽省建筑工程质量监督检测站 Concrete counterweight for foundation pile detection
CN206784418U (en) * 2017-04-03 2017-12-22 宁迈杰 A kind of agricultural greenhouse concrete pipe base
CN207160091U (en) * 2017-09-05 2018-03-30 海南大学 A kind of Novel pile foundation static-load testing device
CN207436058U (en) * 2017-09-29 2018-06-01 广东广强基础工程有限公司 A kind of clump weight of hydraulic static pile pressing machine
CN209802618U (en) * 2019-04-13 2019-12-17 福州大学 Be suitable for experimental test device of dismantling concrete balancing weight of stake soil interaction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
山东省建筑工程总公司编: "《木工工艺学》", 30 November 1989, 山东科学技术出版社, pages: 235 *
陈忠范著: "《工业化村镇建筑》", 30 June 2017, 东南大学出版社, pages: 47 - 48 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111209708A (en) * 2020-04-22 2020-05-29 西南交通大学 Machine learning-based pile-soil interaction prediction analysis method

Similar Documents

Publication Publication Date Title
CN105277406B (en) Mould for making different angle class fissure rock test specimen and preparation method thereof
US20190204191A1 (en) Method and device for preparing karst caves based on 3d printing technology
CN105911257A (en) Multi-state undisturbed soil column infiltration simulation system and unsaturated osmotic coefficient determination method
CN206445931U (en) A kind of concrete test die
CN205898792U (en) Many states undisturbed soil column rainfall infiltration modularization analogue means
CN103938864A (en) Infilled wall constructional column construction method
CN106049557A (en) Indoor testing device for simulating grouting pile end post-grouting and testing method
KR20070040872A (en) Gabion, gabion production devices and gabion construction methods
CN203824861U (en) Testing device for studying seepage failure development of foundation pit soil
CN109932153A (en) The experimental rig and its manufacturing method of detachable concrete balancing weight suitable for pile-soil interaction test
CN111665017A (en) Landslide surge model test device and landslide surge test method
CN109916680A (en) Prepare the mold and method with the rocks sample for the Single Fracture for opening or being closed
CN106018747A (en) Coal gangue leachate infiltration soil column simulation system and characteristic parameter determination method
CN207363038U (en) A kind of assembly concrete wall connecting node apparatus
CN106248495A (en) The indoor long-term assay device of post grouting pile of simulated groundwater flowing and test method thereof
CN105510100A (en) Device used for manufacturing indoor slope model
CN205538384U (en) A device that is used for side slope model in make -up room
CN106124160B (en) A kind of Tunnel Base structure pump-absorb action simulator
CN104441203B (en) The preparation method and producing device of self-compacting concrete test specimen
CN206174295U (en) Steel pipe concrete assembly type structure concreting device
CN209802618U (en) Be suitable for experimental test device of dismantling concrete balancing weight of stake soil interaction
CN106383019A (en) Water immersion system for centrifugal model test and test method
CN208039331U (en) Dispersed pressure anchor anchor mechanism visible model testing device
CN215768563U (en) A similar test device for simulating karst area stratum
CN106050211A (en) Method for manufacturing test piece for simulating fracture-cavity type carbonate hydrocarbon reservoir volume fracturing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination