CN109914656B - Thin-wall steel plate PEC combined shear wall structure with PBL shear keys - Google Patents

Thin-wall steel plate PEC combined shear wall structure with PBL shear keys Download PDF

Info

Publication number
CN109914656B
CN109914656B CN201910294269.8A CN201910294269A CN109914656B CN 109914656 B CN109914656 B CN 109914656B CN 201910294269 A CN201910294269 A CN 201910294269A CN 109914656 B CN109914656 B CN 109914656B
Authority
CN
China
Prior art keywords
thin
steel plate
wall steel
wall
shear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910294269.8A
Other languages
Chinese (zh)
Other versions
CN109914656A (en
Inventor
于金光
侯同飞
冯啸天
郝际平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201910294269.8A priority Critical patent/CN109914656B/en
Publication of CN109914656A publication Critical patent/CN109914656A/en
Application granted granted Critical
Publication of CN109914656B publication Critical patent/CN109914656B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a thin-wall steel plate PEC combined shear wall structure with a PBL shear key, wherein third thin-wall steel plates are sequentially arranged between a first thin-wall steel plate and a second thin-wall steel plate in parallel, fourth thin-wall steel plates are welded between each first thin-wall steel plate and the adjacent third thin-wall steel plate, between the adjacent two third thin-wall steel plates and between the second thin-wall steel plate and the adjacent third thin-wall steel plate, local penetrating steel bars are fixed on the side surfaces of the third thin-wall steel plates, one end of each long tie bar is fixed on the side surface of the first thin-wall steel plate, and the other end of each long tie bar sequentially penetrates through each third thin-wall steel plate and is fixed on the side surface of the second thin-wall steel plate; concrete is filled between the first thin-wall steel plate and the second thin-wall steel plate, each fourth thin-wall steel plate, each third thin-wall steel plate, each long-through drawknot rib and each local penetrating steel bar are all wrapped in the concrete, and the shear wall structure is excellent in structural performance under the action of an earthquake and lighter in dead weight.

Description

Thin-wall steel plate PEC combined shear wall structure with PBL shear keys
Technical Field
The invention belongs to the technical field of steel structures, and relates to a thin-wall steel plate PEC combined shear wall structure with a PBL shear key.
Background
Steel-concrete composite shear walls have been used in very high-rise buildings in recent years for their excellent vertical load-carrying capacity and earthquake-resistant ductility. Compared with the traditional reinforced concrete shear wall, the steel plate-concrete combined shear wall has higher bearing capacity and ductility, smaller section size, and can effectively increase the practical area of the building, is a side force resistant member with wide application prospect, and can meet the design requirement of a high-rise building structure on the shear wall of high axial compression, high ductility and thin wall, so that the steel plate-concrete combined shear wall can be widely applied to super high-rise buildings.
At present, steel plate-concrete composite shear walls applied in engineering mainly comprise an embedded steel plate-concrete shear wall, a single-side steel plate-concrete shear wall and a double-steel plate-concrete shear wall. Traditional steel plate shear walls are generally embedded with steel plates and are welded with studs, so that the steel plates and concrete work cooperatively, and meanwhile, transverse and longitudinal tie bars are arranged at two ends close to flanges, so that the local integrity of the component is improved. The embedded steel plate-concrete shear wall is seriously damaged under the working condition of large deformation, and the structural performance is limited under the action of large earthquake; because the external arrangement of the double steel plates and the concrete combined shear wall steel plates limits the high-temperature fire resistance of the structure, the structure can only be used for special buildings and is rarely applied to civil buildings. Then, an assembled-concrete combined shear wall with concrete covered by embedded steel plates, external flat steel and plain concrete components is provided, and the dead weight of the structure with the flat steel on the structural web plate greatly increased is not suitable for future higher-rise buildings.
Disclosure of Invention
The invention aims to overcome the defects of the prior art, and provides a thin-wall steel plate PEC combined shear wall structure with a PBL shear key, which has excellent structural performance under the action of an earthquake and light dead weight.
In order to achieve the purpose, the thin-wall steel plate PEC combined shear wall structure with the PBL shear key comprises a first thin-wall steel plate, a second thin-wall steel plate, a plurality of third thin-wall steel plates and a plurality of through-length tie bars;
the third thin-wall steel plates are sequentially and parallelly arranged between the first thin-wall steel plates and the second thin-wall steel plates, fourth thin-wall steel plates are welded between each first thin-wall steel plate and the third thin-wall steel plate adjacent to the first thin-wall steel plate, between each second thin-wall steel plate and the third thin-wall steel plate adjacent to the second thin-wall steel plate, local penetrating steel bars are fixed on the side surfaces of each third thin-wall steel plate, through-length tie bars are arranged between the upper part and the lower part of the two local penetrating steel bars, one end of each through-length tie bar is fixed on the side surface of the first thin-wall steel plate, and the other end of each first through-length tie bar sequentially penetrates through each third thin-wall steel plate and is fixed on the side surface of the second thin-wall steel plate;
concrete is filled between the first thin-wall steel plate and the second thin-wall steel plate, and all the fourth thin-wall steel plates, all the third thin-wall steel plates, all the through long tie bars and all the local penetrating steel bars are wrapped in the concrete.
The width of the third thin-wall steel plate is smaller than the width of the first thin-wall steel plate and the width of the second thin-wall steel plate, and the width of the first thin-wall steel plate is equal to the width of the second thin-wall steel plate.
And local penetrating reinforcing steel bars are arranged on two side surfaces of each third thin-wall steel plate.
Each local penetrating reinforcing steel bar is positioned at two sides of each fourth thin-wall steel plate.
The long tie bars are positioned at two sides of the fourth thin-wall steel plate.
And a plurality of through holes for the long tie bars to pass through are formed in the side surfaces of the third thin-wall steel plates, wherein the size of the through holes is larger than the diameter of the long tie bars.
The invention has the following beneficial effects:
in the concrete operation of the thin-wall steel plate PEC combined shear wall structure with the PBL shear key, the thin-wall steel plates are taken as main bodies, the self weights of the thin-wall steel plates are lighter in sequence, in addition, the third thin-wall steel plates are sequentially arranged between the first thin-wall steel plates and the second thin-wall steel plates in parallel, fourth thin-wall steel plates are welded between each first thin-wall steel plate and the third thin-wall steel plate adjacent to the first thin-wall steel plates, and between each second thin-wall steel plate and the third thin-wall steel plate adjacent to the second thin-wall steel plate, one end of each through-length tie bar is fixed on the side surface of the first thin-wall steel plate, the other end of each first through-length tie bar sequentially penetrates through each third thin-wall steel plate and then is fixed on the side surface of the second thin-wall steel plate, and after concrete is poured, the third thin-wall steel plates and the fourth thin-wall steel plates connected with the first thin-wall steel plates form a hidden column, so that the bearing capacity of the shear wall is improved, and simultaneously, through the through-length tie bars and concrete are welded between the first thin-wall steel plates, the second thin-wall steel plates and the third thin-wall steel plates, the through-length tie bars and the shear steel plates can bear good stress, but the through-like stress of the shear steel structures can be well under the stress, and the stress is better, and the through-resistant to the through-tie structures.
Further, a plurality of through holes for the long tie bars to pass through are formed in the side face of each third thin-wall steel plate, wherein the size of the through holes is larger than the diameter of the long tie bars, concrete tenons are formed after concrete is poured, and the local stability of the component is improved.
Drawings
FIG. 1 is a schematic view of the structure of the present invention prior to casting concrete;
FIG. 2 is a top view of the present invention prior to casting concrete;
fig. 3 is a schematic structural view of the present invention.
Wherein 1 is a first thin-wall steel plate, 2 is a second thin-wall steel plate, 3 is a third thin-wall steel plate, 4 is a fourth thin-wall steel plate, 5 is a through-length drawknot bar, and 6 is a local penetrating steel bar.
Detailed Description
The invention is described in further detail below with reference to the attached drawing figures:
referring to fig. 1, 2 and 3, the thin-wall steel plate PEC combined shear wall structure with the PBL shear key comprises a first thin-wall steel plate 1, a second thin-wall steel plate 2, a plurality of third thin-wall steel plates 3 and a plurality of through-length tie bars 5; the third thin-wall steel plates 3 are sequentially and parallelly arranged between the first thin-wall steel plates 1 and the second thin-wall steel plates 2, fourth thin-wall steel plates 4 are welded between each first thin-wall steel plate 1 and the adjacent third thin-wall steel plate 3, between each second thin-wall steel plate 2 and the adjacent third thin-wall steel plate 3, and the side surfaces of each third thin-wall steel plate 3 are respectively fixed with a local penetrating steel bar 6, wherein a through-length tie bar 5 is arranged between the upper and lower adjacent local penetrating steel bars 6, one end of each through-length tie bar 5 is fixed on the side surface of the first thin-wall steel plate 1, and the other end of each first through-length tie bar 5 sequentially penetrates through each third thin-wall steel plate 3 and is then fixed on the side surface of the second thin-wall steel plate 2; concrete is filled between the first thin-wall steel plate 1 and the second thin-wall steel plate 2, and all the fourth thin-wall steel plates 4, the third thin-wall steel plates 3, the through long tie bars 5 and the local penetrating steel bars 6 are wrapped in the concrete.
The width of the third thin-wall steel plate 3 is smaller than the width of the first thin-wall steel plate 1 and the width of the second thin-wall steel plate 2, and the width of the first thin-wall steel plate 1 is equal to the width of the second thin-wall steel plate 2; the two side surfaces of each third thin-walled steel plate 3 are provided with local penetrating steel bars 6.
Each local penetrating steel bar 6 is positioned at two sides of each fourth thin-wall steel plate 4; the through long tie bars 5 are positioned at two sides of the fourth thin-wall steel plate 4; the side surface of each third thin-wall steel plate 3 is provided with a plurality of through holes for the long drawknot bars 5 to pass through, wherein the size of the through holes is larger than the diameter of the long drawknot bars 5.
During construction, the end part of the through-length tie bar 5 is welded with the flange, the local penetrating steel bar 6 penetrates through the hole of the flange, but is not welded with the flange, and then concrete is poured.

Claims (4)

1. The thin-wall steel plate PEC combined shear wall structure with the PBL shear keys is characterized by comprising a first thin-wall steel plate (1), a second thin-wall steel plate (2), a plurality of third thin-wall steel plates (3), a plurality of through-length tie bars (5) and a plurality of local penetrating steel bars (6);
the third thin-wall steel plates (3) are sequentially arranged between the first thin-wall steel plates (1) and the second thin-wall steel plates (2) in parallel, fourth thin-wall steel plates (4) are welded between each first thin-wall steel plate (1) and the adjacent third thin-wall steel plates (3), between each second thin-wall steel plate (2) and the adjacent third thin-wall steel plates (3), local penetrating steel bars (6) are fixed on the side surfaces of each third thin-wall steel plate (3), long tie bars (5) are arranged between the upper and lower adjacent local penetrating steel bars (6), one end of each long tie bar (5) is fixed on the side surface of the first thin-wall steel plate (1), and the other end of each first long tie bar (5) sequentially penetrates through each third thin-wall steel plate (3) and is then fixed on the side surface of the second thin-wall steel plate (2);
concrete is filled between the first thin-wall steel plate (1) and the second thin-wall steel plate (2), and each fourth thin-wall steel plate (4), each third thin-wall steel plate (3), each through-length tie bar (5) and each local penetrating steel bar (6) are wrapped in the concrete;
two side surfaces of each third thin-wall steel plate (3) are respectively provided with a local penetrating steel bar (6);
each local penetrating steel bar (6) is positioned at two sides of each fourth thin-wall steel plate (4).
2. The thin-walled steel plate PEC composite shear wall structure with the PBL shear key according to claim 1, wherein the width of the third thin-walled steel plate (3) is smaller than the width of the first thin-walled steel plate (1) and the width of the second thin-walled steel plate (2), and the width of the first thin-walled steel plate (1) is equal to the width of the second thin-walled steel plate (2).
3. The thin-walled steel plate PEC composite shear wall structure with the PBL shear key according to claim 1, characterized in that the through-length tie bars (5) are located at both sides of the fourth thin-walled steel plate (4).
4. The thin-walled steel plate PEC combined shear wall structure with the PBL shear key according to claim 1, wherein a plurality of through holes for the through-length tie bars (5) to pass through are formed in the side face of each third thin-walled steel plate (3), and the size of the through holes is larger than the diameter of the through-length tie bars (5).
CN201910294269.8A 2019-04-12 2019-04-12 Thin-wall steel plate PEC combined shear wall structure with PBL shear keys Active CN109914656B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910294269.8A CN109914656B (en) 2019-04-12 2019-04-12 Thin-wall steel plate PEC combined shear wall structure with PBL shear keys

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910294269.8A CN109914656B (en) 2019-04-12 2019-04-12 Thin-wall steel plate PEC combined shear wall structure with PBL shear keys

Publications (2)

Publication Number Publication Date
CN109914656A CN109914656A (en) 2019-06-21
CN109914656B true CN109914656B (en) 2024-02-27

Family

ID=66969739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910294269.8A Active CN109914656B (en) 2019-04-12 2019-04-12 Thin-wall steel plate PEC combined shear wall structure with PBL shear keys

Country Status (1)

Country Link
CN (1) CN109914656B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112695931B (en) * 2021-01-07 2024-04-26 中铁建设集团有限公司 Precast concrete shear wall connection structure based on PBL and energy consumption shock absorption connection

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060036595A (en) * 2004-10-26 2006-05-02 재단법인 포항산업과학연구원 A steel plate shear wall rigidly connected to the reinforced concrete frame and a working method
KR20060090405A (en) * 2005-02-05 2006-08-11 유성근 Steel beam with plate type shear connector and steel composite beam using the steel beam
CN203546946U (en) * 2013-11-11 2014-04-16 华侨大学 Novel double-steel-plate concrete composite shear wall
CN205688619U (en) * 2016-05-17 2016-11-16 长安大学 A kind of steel coupling beam-double-layer plate Combined concrete Coupled Shear Wall
CN207892080U (en) * 2016-05-17 2018-09-21 长安大学 A kind of steel plate concrete combined shear wall
CN208293597U (en) * 2018-06-05 2018-12-28 西南交通大学 A kind of super plane size well foundation structure
CN209837402U (en) * 2019-04-12 2019-12-24 西安建筑科技大学 Thin-wall steel plate PEC combined shear wall structure with PBL shear keys

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060036595A (en) * 2004-10-26 2006-05-02 재단법인 포항산업과학연구원 A steel plate shear wall rigidly connected to the reinforced concrete frame and a working method
KR20060090405A (en) * 2005-02-05 2006-08-11 유성근 Steel beam with plate type shear connector and steel composite beam using the steel beam
CN203546946U (en) * 2013-11-11 2014-04-16 华侨大学 Novel double-steel-plate concrete composite shear wall
CN205688619U (en) * 2016-05-17 2016-11-16 长安大学 A kind of steel coupling beam-double-layer plate Combined concrete Coupled Shear Wall
CN207892080U (en) * 2016-05-17 2018-09-21 长安大学 A kind of steel plate concrete combined shear wall
CN208293597U (en) * 2018-06-05 2018-12-28 西南交通大学 A kind of super plane size well foundation structure
CN209837402U (en) * 2019-04-12 2019-12-24 西安建筑科技大学 Thin-wall steel plate PEC combined shear wall structure with PBL shear keys

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
薄壁钢-混凝土组合结构研究现状;卢孝哲;;工程建设与设计(03);全文 *

Also Published As

Publication number Publication date
CN109914656A (en) 2019-06-21

Similar Documents

Publication Publication Date Title
CN104929281A (en) Steel bar truss stiffened steel concrete composite shear wall
CN109667354B (en) Vertical energy dissipation seam connecting device of assembled shear force wall
CN102444224A (en) Concrete composite shear wall
CN203546946U (en) Novel double-steel-plate concrete composite shear wall
CN108589969B (en) Combined assembly type shear wall with vertical ECC energy consumption belt and manufacturing method thereof
CN103031926B (en) With the double-T compound beam and preparation method thereof of pre-stressed steel pipe concrete plug
CN202298983U (en) Concrete composite shear wall
CN106638957B (en) Cold formed steel structure external wall of house structural system
CN215977847U (en) Steel pipe shear wall
CN109610654B (en) Prefabricated assembly type double-steel-plate concrete shear wall connecting assembly and using method thereof
CN109914656B (en) Thin-wall steel plate PEC combined shear wall structure with PBL shear keys
CN212336419U (en) Assembled composite wall based on steel pipe
CN101435237A (en) Novel hollow combined board
CN107965053A (en) The frame structure and its construction method of a kind of column and linking beam combined earthquake-resistant
CN210597743U (en) Assembled PEC recycled concrete beam column and steel plate combined shear wall
CN204715539U (en) A kind of round steel pipe binding type steel concrete column and reinforced concrete beam node structure
CN209837402U (en) Thin-wall steel plate PEC combined shear wall structure with PBL shear keys
CN204691011U (en) The steel concrete compound shear wall that steel bar girder is put more energy into
CN212772980U (en) Assembled composite wall based on C shaped steel
CN207553359U (en) Assembled ribbing steel plate shear force wall
CN208088587U (en) A kind of assembling steel plate compound shear wall
CN105350441A (en) Concrete combined box beam internally provided with tie bar steel and box column
CN214090308U (en) UHPC anti-progressive collapse structure
CN215858225U (en) Screw type connecting joint of corrugated plate-ECC (error correction code) assembled superposed column and steel beam
CN210685111U (en) Simple floor slab for prefabricated building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant