CN109914455A - A kind of structure foundation cast-in-place pile construction method - Google Patents

A kind of structure foundation cast-in-place pile construction method Download PDF

Info

Publication number
CN109914455A
CN109914455A CN201910250427.XA CN201910250427A CN109914455A CN 109914455 A CN109914455 A CN 109914455A CN 201910250427 A CN201910250427 A CN 201910250427A CN 109914455 A CN109914455 A CN 109914455A
Authority
CN
China
Prior art keywords
casing
stake holes
drilling
pile construction
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910250427.XA
Other languages
Chinese (zh)
Inventor
莫桂洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Xinhao Construction Engineering Co Ltd
Original Assignee
Guangxi Xinhao Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Xinhao Construction Engineering Co Ltd filed Critical Guangxi Xinhao Construction Engineering Co Ltd
Priority to CN201910250427.XA priority Critical patent/CN109914455A/en
Publication of CN109914455A publication Critical patent/CN109914455A/en
Pending legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of structure foundation cast-in-place pile construction methods, specifically according to following operating procedure: S1: preparation of construction;S2: mud is prepared;S3: drilling;S4: casing follow-up;S5: fixed steel bars cage;S6: concrete perfusion.The present invention in hole by supplementing mud in drilling, be conducive to carry out pressure compensation to the inner wall of drilling, reduce hole wall collapse trend, cooperate casing simultaneously, improve the stability of stake holes, prevent hole wall collapse from impacting to stake holes, in concrete perfusion, the perfusion of concrete and the taking-up of casing carry out simultaneously, the interior part for being detached from casing supported of stake holes is substituted using concrete, stake holes inner wall can be supported using concrete after casing extraction, during constantly pulling out cylinder, realize the gradually perfusion of concrete, prevent in filling process that there is a phenomenon where hole wall collapses, it can effectively ensure that filling pile construction efficiency and construction quality in soft soil horizon.

Description

A kind of structure foundation cast-in-place pile construction method
Technical field
The invention belongs to technical field of building construction, and in particular to a kind of structure foundation cast-in-place pile construction method.
Background technique
Bored concrete pile is the directly aperture on designed stake position, and section is circle, and steel reinforcement cage is placed in hole after pore-forming, Made of concrete perfusion.In filling pile construction, advanced drilling is needed, is influenced by geological conditions, in high water level soil On layer and soft soil horizon when drilling, it is easy to happen stake holes inner wall and collapses and the phenomenon that stake holes deforms, not only increase drilling Difficulty, influence construction speed, and influence the construction quality of bored concrete pile.
Summary of the invention
The purpose of the present invention is to provide a kind of structure foundation cast-in-place pile construction methods, to solve in above-mentioned background technique The problem of proposition.
To achieve the above object, the invention provides the following technical scheme: a kind of structure foundation cast-in-place pile construction method, tool Body is according to following operating procedure:
S1: preparation of construction, centered on boring point, the triple-length of stake holes radius is radius, excavates surface layer 60-80cm thickness Soft soil horizon, and stake holes top casing is inserted at boring point, backfills 6% dirt outside casing later, compress compacting and with ground Face flushes;
S2: preparing mud, and clay, bentonite, heavy weight additive, tackifier and sealing agent and water are mixed, retaining wall is prepared Mud, it is spare;
S3: drilling machine is mounted on the pedestal in backfill by drilling, and drill bit and stake holes centre deviation is made to be less than 5cm, works as brill When hole depth is greater than 1m, slurry coat method is pumped into hole in time;
S4: single-unit casing with the increase of drilling depth, is cut into two identical semicolumn casings, and again by casing follow-up It is weldingly fixed on outside drill bit drilling rod, later sinks to casing in drilling, and expose 0.5m height, using casing bracket to exposing End is fixed, when casing lower end drilling depth be greater than single-unit casing length when, with expose top casing on weld one again Root casing, and sink in drilling and move in circles again, until drilling depth reaches projected depth;
S5: fixed steel bars cage is removed residue in stake holes, then the steel reinforcement cage being welded is fixed in stake holes, steel reinforcement cage and stake Deviation is less than 1% between the axle center of hole;
S6: concrete perfusion carries out rapping to casing using vibration excitor, casing is extracted and cut off paragraph by paragraph, while will be prefabricated mixed Solidifying soil injects the least significant end of stake holes by pipeline, and is vibrated using vibrator, until completing coagulation when extracting whole casings Soil perfusion.
Preferably, stake holes top casing diameter is greater than bore diameter 5-10cm in step S1.
Preferably, each substance is calculated by weight as in step S2: 16-24 parts of clay, 30-48 parts of bentonite, heavy weight additive 10-14 parts of 5-8 parts, 4-10 parts of mud tackifier and sealing agent, 100-128 parts of water.
Preferably, casing diameter is less than bore diameter 3-5cm in step S4, and single-unit casing length is 2m, works as bottom A casing length gauge is pressed when casing is apart from less than one single-unit casing length of bottom hole, and stake holes bottom is inserted into extra casing bottom end Hold 10-20cm.
Preferably, step S4 casing gradient is less than 2%.
Preferably, the every vibration 5-10s of vibration excitor in step S6 carries out a tube drawing and operates, single tube drawing length 0.5-1m, Pipe-pulling speed 0.6-1.0m/min.
Preferably, filling concrete speed is identical as pipe-pulling speed in step S6.
Technical effect and advantage of the invention:
The present invention is conducive to carry out pressure compensation to the inner wall of drilling, reduces hole wall by supplementing mud in hole in drilling Collapsing trend, while cooperating casing, the stability of stake holes is improved, prevents hole wall collapse from impacting to stake holes, in perfusion coagulation When native, the perfusion of concrete and the taking-up of casing carry out simultaneously, the interior part for being detached from casing supported of stake holes are utilized mixed Solidifying soil is substituted, and can be supported using concrete to stake holes inner wall after casing extraction, during constantly pulling out cylinder, The gradually perfusion for realizing concrete, prevents in filling process that there is a phenomenon where hole wall collapses, can effectively ensure that in mollisol Filling pile construction efficiency and construction quality in layer.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical scheme in the embodiment of the invention is clearly and completely described, Obviously, described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based in the present invention Embodiment, every other embodiment obtained by those of ordinary skill in the art without making creative efforts, all Belong to the scope of protection of the invention.
Embodiment 1
The invention provides the following technical scheme: a kind of structure foundation cast-in-place pile construction method, specifically according to following operating procedure:
S1: preparation of construction, centered on boring point, the triple-length of stake holes radius is radius, excavates the pine of surface layer 60cm thickness Soft Soil Layer, and stake holes top casing is inserted at boring point, 6% dirt is backfilled outside casing later, compresses compacting and and ground It flushes;
S2: preparing mud, and clay, bentonite, heavy weight additive, tackifier and sealing agent and water are mixed, retaining wall is prepared Mud, it is spare;
S3: drilling machine is mounted on the pedestal in backfill by drilling, and drill bit and stake holes centre deviation is made to be less than 5cm, works as brill When hole depth is greater than 1m, slurry coat method is pumped into hole in time;
S4: single-unit casing with the increase of drilling depth, is cut into two identical semicolumn casings, and again by casing follow-up It is weldingly fixed on outside drill bit drilling rod, later sinks to casing in drilling, and expose 0.5m height, using casing bracket to exposing End is fixed, when casing lower end drilling depth be greater than single-unit casing length when, with expose top casing on weld one again Root casing, and sink in drilling and move in circles again, until drilling depth reaches projected depth;
S5: fixed steel bars cage is removed residue in stake holes, then the steel reinforcement cage being welded is fixed in stake holes, steel reinforcement cage and stake Deviation is less than 1% between the axle center of hole;
S6: concrete perfusion carries out rapping to casing using vibration excitor, casing is extracted and cut off paragraph by paragraph, while will be prefabricated mixed Solidifying soil injects the least significant end of stake holes by pipeline, and is vibrated using vibrator, until completing coagulation when extracting whole casings Soil perfusion.
Stake holes top casing diameter is greater than bore diameter 5cm in step S1.
Each substance is calculated by weight as in step S2: 16 parts of clay, 30 parts of bentonite, 5 parts of heavy weight additive, mud tackifier 4 parts and 10 parts of sealing agent, 100 parts of water.
Casing diameter is less than bore diameter 3cm in step S4, and single-unit casing length is 2m, when bottom casing is apart from hole A casing length gauge is pressed when less than the one single-unit casing length in bottom, and stake holes bottom end 10cm is inserted into extra casing bottom end.
Step S4 casing gradient is less than 2%.
The every vibration 5s of vibration excitor in step S6 carries out a tube drawing operation, single tube drawing length 0.5m, pipe-pulling speed 0.6m/min。
Filling concrete speed is identical as pipe-pulling speed in step S6.
Embodiment 2
The invention provides the following technical scheme: a kind of structure foundation cast-in-place pile construction method, specifically according to following operating procedure:
S1: preparation of construction, centered on boring point, the triple-length of stake holes radius is radius, excavates the pine of surface layer 70cm thickness Soft Soil Layer, and stake holes top casing is inserted at boring point, 6% dirt is backfilled outside casing later, compresses compacting and and ground It flushes;
S2: preparing mud, and clay, bentonite, heavy weight additive, tackifier and sealing agent and water are mixed, retaining wall is prepared Mud, it is spare;
S3: drilling machine is mounted on the pedestal in backfill by drilling, and drill bit and stake holes centre deviation is made to be less than 5cm, works as brill When hole depth is greater than 1m, slurry coat method is pumped into hole in time;
S4: single-unit casing with the increase of drilling depth, is cut into two identical semicolumn casings, and again by casing follow-up It is weldingly fixed on outside drill bit drilling rod, later sinks to casing in drilling, and expose 0.5m height, using casing bracket to exposing End is fixed, when casing lower end drilling depth be greater than single-unit casing length when, with expose top casing on weld one again Root casing, and sink in drilling and move in circles again, until drilling depth reaches projected depth;
S5: fixed steel bars cage is removed residue in stake holes, then the steel reinforcement cage being welded is fixed in stake holes, steel reinforcement cage and stake Deviation is less than 1% between the axle center of hole;
S6: concrete perfusion carries out rapping to casing using vibration excitor, casing is extracted and cut off paragraph by paragraph, while will be prefabricated mixed Solidifying soil injects the least significant end of stake holes by pipeline, and is vibrated using vibrator, until completing coagulation when extracting whole casings Soil perfusion.
Stake holes top casing diameter is greater than bore diameter 8cm in step S1.
Each substance is calculated by weight as in step S2: 20 parts of clay, 40 parts of bentonite, 7 parts of heavy weight additive, mud tackifier 7 parts and 12 parts of sealing agent, 114 parts of water.
Casing diameter is less than bore diameter 4cm in step S4, and single-unit casing length is 2m, when bottom casing is apart from hole A casing length gauge is pressed when less than the one single-unit casing length in bottom, and stake holes bottom end 15cm is inserted into extra casing bottom end.
Step S4 casing gradient is less than 2%.
The every vibration 8s of vibration excitor in step S6 carries out a tube drawing operation, single tube drawing length 0.8m, pipe-pulling speed 0.8m/min。
Filling concrete speed is identical as pipe-pulling speed in step S6.
Embodiment 3
The invention provides the following technical scheme: a kind of structure foundation cast-in-place pile construction method, specifically according to following operating procedure:
S1: preparation of construction, centered on boring point, the triple-length of stake holes radius is radius, excavates surface layer 60-80cm thickness Soft soil horizon, and stake holes top casing is inserted at boring point, backfills 6% dirt outside casing later, compress compacting and with ground Face flushes;
S2: preparing mud, and clay, bentonite, heavy weight additive, tackifier and sealing agent and water are mixed, retaining wall is prepared Mud, it is spare;
S3: drilling machine is mounted on the pedestal in backfill by drilling, and drill bit and stake holes centre deviation is made to be less than 5cm, works as brill When hole depth is greater than 1m, slurry coat method is pumped into hole in time;
S4: single-unit casing with the increase of drilling depth, is cut into two identical semicolumn casings, and again by casing follow-up It is weldingly fixed on outside drill bit drilling rod, later sinks to casing in drilling, and expose 0.5m height, using casing bracket to exposing End is fixed, when casing lower end drilling depth be greater than single-unit casing length when, with expose top casing on weld one again Root casing, and sink in drilling and move in circles again, until drilling depth reaches projected depth;
S5: fixed steel bars cage is removed residue in stake holes, then the steel reinforcement cage being welded is fixed in stake holes, steel reinforcement cage and stake Deviation is less than 1% between the axle center of hole;
S6: concrete perfusion carries out rapping to casing using vibration excitor, casing is extracted and cut off paragraph by paragraph, while will be prefabricated mixed Solidifying soil injects the least significant end of stake holes by pipeline, and is vibrated using vibrator, until completing coagulation when extracting whole casings Soil perfusion.
Stake holes top casing diameter is greater than bore diameter 10cm in step S1.
Each substance is calculated by weight as in step S2: 24 parts of clay, 48 parts of bentonite, 8 parts of heavy weight additive, mud tackifier 10 parts and 14 parts of sealing agent, 128 parts of water.
Casing diameter is less than bore diameter 5cm in step S4, and single-unit casing length is 2m, when bottom casing is apart from hole A casing length gauge is pressed when less than the one single-unit casing length in bottom, and stake holes bottom end 20cm is inserted into extra casing bottom end.
Step S4 casing gradient is less than 2%.
The every vibration 10s of vibration excitor in step S6 carries out a tube drawing operation, single tube drawing length 1m, pipe-pulling speed 1.0m/ min。
Filling concrete speed is identical as pipe-pulling speed in step S6.
The present invention is conducive to carry out pressure compensation to the inner wall of drilling, reduce by supplementing mud in hole in drilling Hole wall collapse trend, while cooperating casing, the stability of stake holes is improved, prevents hole wall collapse from impacting to stake holes, is being perfused When concrete, the perfusion of concrete and the taking-up of casing carry out simultaneously, enable the interior part for being detached from casing supported of stake holes sharp Substituted with concrete, stake holes inner wall can be supported using concrete after casing extraction, constantly pull out a mistake Cheng Zhong realizes the gradually perfusion of concrete, prevents in filling process that there is a phenomenon where hole wall collapses, can effectively ensure that in pine Filling pile construction efficiency and construction quality in Soft Soil Layer.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features, All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention Within protection scope.

Claims (7)

1. a kind of structure foundation cast-in-place pile construction method, it is characterised in that: specifically according to following operating procedure:
S1: preparation of construction, centered on boring point, the triple-length of stake holes radius is radius, excavates surface layer 60-80cm thickness Soft soil horizon, and stake holes top casing is inserted at boring point, backfills 6% dirt outside casing later, compress compacting and with ground Face flushes;
S2: preparing mud, and clay, bentonite, heavy weight additive, tackifier and sealing agent and water are mixed, retaining wall is prepared Mud, it is spare;
S3: drilling machine is mounted on the pedestal in backfill by drilling, and drill bit and stake holes centre deviation is made to be less than 5cm, works as brill When hole depth is greater than 1m, slurry coat method is pumped into hole in time;
S4: single-unit casing with the increase of drilling depth, is cut into two identical semicolumn casings, and again by casing follow-up It is weldingly fixed on outside drill bit drilling rod, later sinks to casing in drilling, and expose 0.5m height, using casing bracket to exposing End is fixed, when casing lower end drilling depth be greater than single-unit casing length when, with expose top casing on weld one again Root casing, and sink in drilling and move in circles again, until drilling depth reaches projected depth;
S5: fixed steel bars cage is removed residue in stake holes, then the steel reinforcement cage being welded is fixed in stake holes, steel reinforcement cage and stake Deviation is less than 1% between the axle center of hole;
S6: concrete perfusion carries out rapping to casing using vibration excitor, casing is extracted and cut off paragraph by paragraph, while will be prefabricated mixed Solidifying soil injects the least significant end of stake holes by pipeline, and is vibrated using vibrator, until completing coagulation when extracting whole casings Soil perfusion.
2. a kind of structure foundation cast-in-place pile construction method according to claim 1, it is characterised in that: stake holes in step S1 Top casing diameter is greater than bore diameter 5-10cm.
3. a kind of structure foundation cast-in-place pile construction method according to claim 1, it is characterised in that: each object in step S2 Matter is calculated by weight as: 16-24 parts of clay, 30-48 parts of bentonite, 5-8 parts of heavy weight additive, 4-10 parts of mud tackifier and leak stopping 10-14 parts of agent, 100-128 parts of water.
4. a kind of structure foundation cast-in-place pile construction method according to claim 1, it is characterised in that: casing in step S4 Diameter is less than bore diameter 3-5cm, and single-unit casing length is 2m, when bottom casing is apart from less than one single-unit casing of bottom hole A casing length gauge is pressed when length, and stake holes bottom end 10-20cm is inserted into extra casing bottom end.
5. a kind of structure foundation cast-in-place pile construction method according to claim 1, it is characterised in that: step S4 casing inclines Gradient is less than 2%.
6. a kind of structure foundation cast-in-place pile construction method according to claim 1, it is characterised in that: exciting in step S6 The every vibration 5-10s of device carries out a tube drawing operation, single tube drawing length 0.5-1m, pipe-pulling speed 0.6-1.0m/min.
7. a kind of structure foundation cast-in-place pile construction method according to claim 1, it is characterised in that: coagulation in step S6 Native rate of flooding is identical as pipe-pulling speed.
CN201910250427.XA 2019-03-29 2019-03-29 A kind of structure foundation cast-in-place pile construction method Pending CN109914455A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910250427.XA CN109914455A (en) 2019-03-29 2019-03-29 A kind of structure foundation cast-in-place pile construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910250427.XA CN109914455A (en) 2019-03-29 2019-03-29 A kind of structure foundation cast-in-place pile construction method

Publications (1)

Publication Number Publication Date
CN109914455A true CN109914455A (en) 2019-06-21

Family

ID=66967722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910250427.XA Pending CN109914455A (en) 2019-03-29 2019-03-29 A kind of structure foundation cast-in-place pile construction method

Country Status (1)

Country Link
CN (1) CN109914455A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344764A (en) * 2019-07-26 2019-10-18 范茂丰 Base expanding and base expanding reperfusion pile mechanical piling device and its pile making method
CN110700241A (en) * 2019-10-08 2020-01-17 上海建工一建集团有限公司 Cast-in-situ bored pile and construction method thereof
CN113175011A (en) * 2021-05-11 2021-07-27 南京长江都市建筑设计股份有限公司 Pile testing method for cast-in-situ bored pile

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102146672A (en) * 2011-03-15 2011-08-10 中铁六局集团有限公司 Method for constructing pile foundation in karst area
CN103015408A (en) * 2012-12-20 2013-04-03 山东万鑫建设有限公司 Cast-in-place pile synchronous casing hole-forming constructing method
JP2013147933A (en) * 2013-05-08 2013-08-01 Ohbayashi Corp Earth retaining wall construction method, cast-in-place pile construction method, earth retaining wall, and cast-in-place pile
CN106759288A (en) * 2016-11-29 2017-05-31 昆山顶牛市政建设有限公司 One kind building bored pile construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102146672A (en) * 2011-03-15 2011-08-10 中铁六局集团有限公司 Method for constructing pile foundation in karst area
CN103015408A (en) * 2012-12-20 2013-04-03 山东万鑫建设有限公司 Cast-in-place pile synchronous casing hole-forming constructing method
JP2013147933A (en) * 2013-05-08 2013-08-01 Ohbayashi Corp Earth retaining wall construction method, cast-in-place pile construction method, earth retaining wall, and cast-in-place pile
CN106759288A (en) * 2016-11-29 2017-05-31 昆山顶牛市政建设有限公司 One kind building bored pile construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王瑞: "旋挖成孔灌注桩施工工艺要点控制", 《山西建筑》 *
邓志勇: "岩溶地区钻孔灌注桩施工要点分析", 《城市道桥与防洪》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110344764A (en) * 2019-07-26 2019-10-18 范茂丰 Base expanding and base expanding reperfusion pile mechanical piling device and its pile making method
CN110700241A (en) * 2019-10-08 2020-01-17 上海建工一建集团有限公司 Cast-in-situ bored pile and construction method thereof
CN113175011A (en) * 2021-05-11 2021-07-27 南京长江都市建筑设计股份有限公司 Pile testing method for cast-in-situ bored pile

Similar Documents

Publication Publication Date Title
CN109914455A (en) A kind of structure foundation cast-in-place pile construction method
CN104278667A (en) Underground karst cave filling treatment method
CN105821835B (en) The construction method of water injection type rotary digging drilling hole bored concrete pile
CN108316291A (en) Deep mud pit cast-in-situ bored pile and construction method
CN108978643A (en) Supporting pile construction method, reinforcement cage structure and supporting pile structure
CN112196494B (en) Construction process and construction equipment for geological pipeline jointed between rock and soil layer
CN102535440A (en) Method of using all-casing drilling rig with rotary drilling rig to construct rock-socketed secant pile wall
CN109024305A (en) A kind of loose geology bridge deep pile foundation construction method
CN109385992A (en) The construction method of pore-forming in artificial Backfilled Stone Layer
CN108643214A (en) It is a kind of to backfill miscellaneous native composite foundation structure and its construction method
CN108397128A (en) A kind of bridge construction perforating device and its drilling method
CN100523389C (en) Ballastless track steel reinforced concrete pile-net construction method
CN101338560A (en) Construction method for reinforced concrete pile
CN217352573U (en) Fixed quicksand layer combined pile foundation structure
CN208088287U (en) Half casing guncreting pile construction equipment
CN116291471A (en) Construction method and tunneling equipment for large-diameter vertical shaft of upper soft and lower hard stratum
CN108049804B (en) Non-excavation in-situ replacement spiral drilling method for unconsolidated formation
CN102817349A (en) Method for consolidating soft soil foundations through fine dynamic compaction replacement
CN202000360U (en) Equipment for side slope supporting construction
CN211646351U (en) Cast-in-situ bored pile
CN108316288A (en) Half casing guncreting pile construction equipment and construction method
CN208105249U (en) Deep mud pit cast-in-situ bored pile
CN211524698U (en) Numerical control spiral drilling machine
CN108729933B (en) Shear-resistant rotary spraying freezing blocking superposition structure for shield tunnel and construction method thereof
CN114703848B (en) Old pile pulling-out method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190621