CN109898860B - 一种减小裂缝宽度的预制装配整体式剪力墙模板支架 - Google Patents
一种减小裂缝宽度的预制装配整体式剪力墙模板支架 Download PDFInfo
- Publication number
- CN109898860B CN109898860B CN201711283477.5A CN201711283477A CN109898860B CN 109898860 B CN109898860 B CN 109898860B CN 201711283477 A CN201711283477 A CN 201711283477A CN 109898860 B CN109898860 B CN 109898860B
- Authority
- CN
- China
- Prior art keywords
- outer frame
- fixed
- shear wall
- fixing
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000001681 protective effect Effects 0.000 claims description 23
- 238000009415 formwork Methods 0.000 claims description 19
- 239000011324 bead Substances 0.000 claims description 14
- 230000000149 penetrating effect Effects 0.000 claims description 5
- 238000009417 prefabrication Methods 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 3
- 238000010276 construction Methods 0.000 description 13
- 230000008901 benefit Effects 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 238000004064 recycling Methods 0.000 description 4
- 239000011150 reinforced concrete Substances 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 230000007246 mechanism Effects 0.000 description 3
- 230000009471 action Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000006835 compression Effects 0.000 description 2
- 238000007906 compression Methods 0.000 description 2
- 239000004567 concrete Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000007123 defense Effects 0.000 description 1
- 238000002474 experimental method Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711283477.5A CN109898860B (zh) | 2017-12-07 | 2017-12-07 | 一种减小裂缝宽度的预制装配整体式剪力墙模板支架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711283477.5A CN109898860B (zh) | 2017-12-07 | 2017-12-07 | 一种减小裂缝宽度的预制装配整体式剪力墙模板支架 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109898860A CN109898860A (zh) | 2019-06-18 |
CN109898860B true CN109898860B (zh) | 2021-05-11 |
Family
ID=66938901
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711283477.5A Active CN109898860B (zh) | 2017-12-07 | 2017-12-07 | 一种减小裂缝宽度的预制装配整体式剪力墙模板支架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109898860B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110835967B (zh) * | 2019-11-20 | 2021-06-15 | 北京建工四建工程建设有限公司 | 一种采用预应力控制组合剪力墙裂缝的方法 |
CN112681737B (zh) * | 2020-12-18 | 2022-04-22 | 中远融通工程咨询有限公司 | 一种基于bim的剪力墙施工缝处模板支托加固装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2583821B2 (ja) * | 1993-06-15 | 1997-02-19 | 政治 飯塚 | コンクリート型枠の固定装置 |
CN101603338A (zh) * | 2008-06-12 | 2009-12-16 | 黑龙江宇辉新型建筑材料有限公司 | 装配整体式预制混凝土剪力墙及施工方法 |
CN204001701U (zh) * | 2014-07-17 | 2014-12-10 | 同济大学 | 适用于多层夯土墙的建筑模板系统 |
CN106245913A (zh) * | 2016-08-22 | 2016-12-21 | 晟通科技集团有限公司 | 模板调节系统 |
CN206521942U (zh) * | 2017-03-09 | 2017-09-26 | 王萍 | 混凝土墙体浇注用构件 |
CN107268842A (zh) * | 2017-07-28 | 2017-10-20 | 上海市建筑装饰工程集团有限公司 | 一种轻钢龙骨内导墙浇筑模板装置 |
-
2017
- 2017-12-07 CN CN201711283477.5A patent/CN109898860B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2583821B2 (ja) * | 1993-06-15 | 1997-02-19 | 政治 飯塚 | コンクリート型枠の固定装置 |
CN101603338A (zh) * | 2008-06-12 | 2009-12-16 | 黑龙江宇辉新型建筑材料有限公司 | 装配整体式预制混凝土剪力墙及施工方法 |
CN204001701U (zh) * | 2014-07-17 | 2014-12-10 | 同济大学 | 适用于多层夯土墙的建筑模板系统 |
CN106245913A (zh) * | 2016-08-22 | 2016-12-21 | 晟通科技集团有限公司 | 模板调节系统 |
CN206521942U (zh) * | 2017-03-09 | 2017-09-26 | 王萍 | 混凝土墙体浇注用构件 |
CN107268842A (zh) * | 2017-07-28 | 2017-10-20 | 上海市建筑装饰工程集团有限公司 | 一种轻钢龙骨内导墙浇筑模板装置 |
Also Published As
Publication number | Publication date |
---|---|
CN109898860A (zh) | 2019-06-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106522382B (zh) | 一种装配式钢管混凝土柱-h型钢梁自复位耗能连接节点 | |
Wang et al. | Cyclic behaviour of novel blind bolted joints with different stiffening elements | |
KR100820299B1 (ko) | 가설브래킷 설치구조 및 가설브래킷을 이용한 사장교 주탑pc가로보 설치공법 | |
US10094132B2 (en) | Techniques for protection of structures from wind and earthquake type stresses | |
CN109898860B (zh) | 一种减小裂缝宽度的预制装配整体式剪力墙模板支架 | |
KR20200008685A (ko) | 콘크리트 기둥 내진 보강 방법 | |
CN104314013B (zh) | 一种极不对称组合梁的双悬臂施工方法 | |
CN207739130U (zh) | 一种中空夹层钢管混凝土桥墩 | |
CN110185179B (zh) | 装配式悬挂楼盖自复位建筑结构及施工方法 | |
CN210767249U (zh) | 一种适用于外包钢板混凝土组合剪力墙核心筒内部的墙板连接节点 | |
Vaghani et al. | Advanced retrofitting techniques for RC building: a state of an art review | |
JP2003213623A6 (ja) | 橋梁の上部構造 | |
JP5017887B2 (ja) | タワークレーンの支持構造、タワークレーンの支持方法 | |
KR20140105152A (ko) | 내진 보강용 벽체와 벽체의 시공방법 | |
CN212670316U (zh) | 一种用于钢混结合梁混凝土浇筑的边梁翼板支架装置 | |
CN210086610U (zh) | 一种用于混凝土剪力墙的叠合板 | |
CN107988896A (zh) | 一种中空夹层钢管混凝土桥墩 | |
CN211007136U (zh) | 消能减振撑杆及由其支撑的弦支组合楼盖 | |
JP2019027195A5 (zh) | ||
WO2017187452A1 (en) | System for connecting a precast column to a precast beam and method therefor | |
JP2812178B2 (ja) | 自昇式型枠工法による橋脚施工方法 | |
CA2987148A1 (en) | Compact anchor for post-tensioned concrete segment | |
CN215254638U (zh) | 一种剪力墙模板安装定位装置 | |
CN220928828U (zh) | 一种既有横梁原位现浇补强结构 | |
JP2019078056A (ja) | 袖壁を用いるラーメン構造及びその接合方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A Prefabricated Integral Shear Wall Formwork Support with Reduced Crack Width Effective date of registration: 20221214 Granted publication date: 20210511 Pledgee: Industrial and Commercial Bank of China Limited Hangzhou Banshan sub branch Pledgor: ZHEJIANG XINSHENG CONSTRUCTION GROUP Co.,Ltd. Registration number: Y2022330003664 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20231204 Granted publication date: 20210511 Pledgee: Industrial and Commercial Bank of China Limited Hangzhou Banshan sub branch Pledgor: ZHEJIANG XINSHENG CONSTRUCTION GROUP Co.,Ltd. Registration number: Y2022330003664 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A prefabricated assembled integral shear wall formwork bracket for reducing crack width Effective date of registration: 20231222 Granted publication date: 20210511 Pledgee: Industrial and Commercial Bank of China Limited Hangzhou Banshan sub branch Pledgor: ZHEJIANG XINSHENG CONSTRUCTION GROUP Co.,Ltd. Registration number: Y2023330003083 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |