CN109889357A - A kind of device and method of communication system of power grids alarm worksheet processing - Google Patents
A kind of device and method of communication system of power grids alarm worksheet processing Download PDFInfo
- Publication number
- CN109889357A CN109889357A CN201810619650.2A CN201810619650A CN109889357A CN 109889357 A CN109889357 A CN 109889357A CN 201810619650 A CN201810619650 A CN 201810619650A CN 109889357 A CN109889357 A CN 109889357A
- Authority
- CN
- China
- Prior art keywords
- alarm
- worksheet processing
- module
- network element
- post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The present invention relates to a kind of device and method of communication system of power grids alarm worksheet processing, by being configured to worksheet processing rule, alarm is judged simultaneously, the data information in corresponding worksheet processing post is issued for different alarms, auto form delivering is instead of artificial worksheet processing, the worksheet processing time is reduced, troubleshooting efficiency is improved.
Description
Technical field
The present invention relates to the technical fields of alarm worksheet processing, device and side more particularly to a kind of communication system of power grids alarm worksheet processing
Method.
Background technique
Currently, the mode of communication alarm worksheet processing is to be assigned to each area monitoring by hand by always monitoring central value class post
Center, each area monitoring center is being assigned to teams and groups post progress alarming processing, since different alarms is in alarming processing
It needs different maintenance personals to solve, therefore, than relatively time-consuming during this assignment, increases the handling duration of failure,
Manual allocation, which will appear mistake, sends phenomenon, reduces the treatment effeciency of failure.
Summary of the invention
The present invention is to overcome the shortcomings of described above, provides a kind of device and method of communication system of power grids alarm worksheet processing.
In order to solve the above technical problems, the technical solution adopted by the present invention is that:
A kind of device of communication system of power grids alarm worksheet processing, including monitoring module, maintenance teams and groups' module, rule configuration module, net
First library module, data processing module, worksheet processing module;
The monitoring module is used for real-time monitoring system, report and alarm;
The maintenance teams and groups module is for configuring network element number;
The rule configuration module is used to configure the rule of alarm worksheet processing;
The network element library module takes worksheet processing post data for storing;
The data processing module is for being analyzed and being handled to alarm;
The worksheet processing module is used for worksheet processing;
The number of maintenance teams and groups' module configuration network element, the rule of rule configuration module configuration alarm worksheet processing;Monitoring
Warning information is reported to data processing module to handle into analysis by module, meanwhile, alarm association and unified network element library module, if full
Sufficient worksheet processing rule, then obtain the data in worksheet processing post by network element library, and worksheet processing module is carried out automatic by the data information in post
Worksheet processing.
Preferably, network element number is maintenance post list.
Preferably, the post data are post list.
A kind of method of communication system of power grids alarm worksheet processing, comprising the following steps:
S1. alarm report;
S2. alarm association and unified network element library;
S3. judge whether alarm meets worksheet processing rule, if then carrying out step S4, otherwise end operation;
S4. worksheet processing post is obtained;
S5. auto form delivering is carried out.
Preferably, the step S1 is specific as follows: maintenance post list is configured, meanwhile, configure alarm worksheet processing rule
Then, it is reported after the alarm of acquisition.
Preferably, the step S4 is specific as follows: obtaining worksheet processing post data information by preset network element library.
In the above scheme, the number of maintenance teams and groups' module configuration network element, the rule of rule configuration module configuration alarm worksheet processing
Then;Warning information is reported to data processing module to handle into analysis by monitoring module, meanwhile, alarm association and unified network element library mould
Block obtains the data in worksheet processing post by network element library if meeting worksheet processing rule, worksheet processing module by the data information in post into
Row auto form delivering.
Compared with prior art, the beneficial effects of the present invention are: in the technical program, by matching to worksheet processing rule
It sets, while alarm is judged, the data information in corresponding worksheet processing post is issued for different alarms, auto form delivering replaces
Artificial worksheet processing reduces the worksheet processing time, improves troubleshooting efficiency.
Detailed description of the invention
Fig. 1 is a kind of flow diagram for the device and method that communication system of power grids alerts worksheet processing.
Specific embodiment s
The attached figures are only used for illustrative purposes and cannot be understood as limitating the patent;In order to better illustrate this embodiment, attached
Scheme certain components to have omission, zoom in or out, does not represent the size of actual product;To those skilled in the art,
The omitting of some known structures and their instructions in the attached drawings are understandable.With reference to the accompanying drawings and examples to of the invention
Technical solution is described further.
A kind of device of communication system of power grids alarm worksheet processing, including monitoring module, maintenance teams and groups' module, rule configuration module, net
First library module, data processing module, worksheet processing module;
The monitoring module is used for real-time monitoring system, report and alarm;
The maintenance teams and groups module is for configuring network element number;
The rule configuration module is used to configure the rule of alarm worksheet processing;
The network element library module takes worksheet processing post data for storing;
The data processing module is for being analyzed and being handled to alarm;
The worksheet processing module is used for worksheet processing;
The number of maintenance teams and groups' module configuration network element, the rule of rule configuration module configuration alarm worksheet processing;Monitoring
Warning information is reported to data processing module to handle into analysis by module, meanwhile, alarm association and unified network element library module, if full
Sufficient worksheet processing rule, then obtain the data in worksheet processing post by network element library, and worksheet processing module is carried out automatic by the data information in post
Worksheet processing.
In the present embodiment, network element number is maintenance post list.
In the present embodiment, post data are post list.
A kind of method of communication system of power grids alarm worksheet processing, flow diagram as shown in Figure 1: the following steps are included:
S1. alarm report;
S2. alarm association and unified network element library;
S3. judge whether alarm meets worksheet processing rule, if then carrying out step S4, otherwise end operation;
S4. worksheet processing post is obtained;
S5. auto form delivering is carried out.
In the present embodiment, step S1 is specific as follows: maintenance post list is configured, meanwhile, configure alarm worksheet processing rule
Then, it is reported after the alarm of acquisition.
In the present embodiment, step S4 is specific as follows: obtaining worksheet processing post data information by preset network element library.
In the present embodiment, the number of maintenance teams and groups' module configuration network element, the rule of rule configuration module configuration alarm worksheet processing
Then;Warning information is reported to data processing module to handle into analysis by monitoring module, meanwhile, alarm association and unified network element library mould
Block obtains the data in worksheet processing post by network element library if meeting worksheet processing rule, worksheet processing module by the data information in post into
Row auto form delivering.
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair
The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description
To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this
Made any modifications, equivalent replacements, and improvements etc., should be included in the claims in the present invention within the spirit and principle of invention
Protection scope within.
Claims (6)
1. a kind of device of communication system of power grids alarm worksheet processing, it is characterised in that: including monitoring module, maintenance teams and groups' module, rule is matched
Set module, network element library module, data processing module, worksheet processing module;
The monitoring module is used for real-time monitoring system, report and alarm;
The maintenance teams and groups module is for configuring network element number;
The rule configuration module is used to configure the rule of alarm worksheet processing;
The network element library module takes worksheet processing post data for storing;
The data processing module is for being analyzed and being handled to alarm;
The worksheet processing module is used for worksheet processing;
The number of maintenance teams and groups' module configuration network element, the rule of rule configuration module configuration alarm worksheet processing;Monitoring module
Data processing module is reported to handle into analysis warning information, meanwhile, alarm association and unified network element library module, if meeting group
Single gauge then, then obtains the data in worksheet processing post by network element library, and worksheet processing module carries out auto form delivering by the data information in post.
2. the device of communication system of power grids alarm worksheet processing according to claim 1, it is characterised in that: the network element number is dimension
Repair post list.
3. the device of communication system of power grids alarm worksheet processing according to claim 1, it is characterised in that: the post data are hilllock
Position list.
4. a kind of method of communication system of power grids alarm worksheet processing, it is characterised in that: the following steps are included:
S1. alarm report;
S2. alarm association and unified network element library;
S3. judge whether alarm meets worksheet processing rule, if then carrying out step S4, otherwise end operation;
S4. worksheet processing post is obtained;
S5. auto form delivering is carried out.
5. the method for the communication system of power grids according to claim 1 alarm worksheet processing, it is characterised in that: the step S1 is specifically such as
Under: maintenance post list is configured, meanwhile, alarm worksheet processing rule is configured, is reported after the alarm of acquisition.
6. the method for the communication system of power grids according to claim 1 alarm worksheet processing, it is characterised in that: the step S4 is specifically such as
Under: worksheet processing post data information is obtained by preset network element library.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810619650.2A CN109889357A (en) | 2018-06-13 | 2018-06-13 | A kind of device and method of communication system of power grids alarm worksheet processing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810619650.2A CN109889357A (en) | 2018-06-13 | 2018-06-13 | A kind of device and method of communication system of power grids alarm worksheet processing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109889357A true CN109889357A (en) | 2019-06-14 |
Family
ID=66924755
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810619650.2A Pending CN109889357A (en) | 2018-06-13 | 2018-06-13 | A kind of device and method of communication system of power grids alarm worksheet processing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109889357A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101830240A (en) * | 2009-03-12 | 2010-09-15 | 上海科泰信息技术有限公司 | Track traffic centralized alarming management system and method thereof |
CN202652238U (en) * | 2011-03-02 | 2013-01-02 | 广东省电力调度中心 | Fault list automatic distribution system |
KR20130123007A (en) * | 2012-05-02 | 2013-11-12 | (주)네오위즈게임즈 | Method for controlling trouble and server thereof |
CN107196804A (en) * | 2017-06-01 | 2017-09-22 | 国网山东省电力公司信息通信公司 | Power system terminal communication access network Centralized Alarm Monitoring system and method |
WO2017171677A1 (en) * | 2016-03-28 | 2017-10-05 | Ace Telekomünikasyon Ve İletişim Hizmetleri Anonim Şirketi | The method and system of monitoring the lv (low voltage) electricity infrastructure using gsm communication technology and taking precautionary measures |
-
2018
- 2018-06-13 CN CN201810619650.2A patent/CN109889357A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101830240A (en) * | 2009-03-12 | 2010-09-15 | 上海科泰信息技术有限公司 | Track traffic centralized alarming management system and method thereof |
CN202652238U (en) * | 2011-03-02 | 2013-01-02 | 广东省电力调度中心 | Fault list automatic distribution system |
KR20130123007A (en) * | 2012-05-02 | 2013-11-12 | (주)네오위즈게임즈 | Method for controlling trouble and server thereof |
WO2017171677A1 (en) * | 2016-03-28 | 2017-10-05 | Ace Telekomünikasyon Ve İletişim Hizmetleri Anonim Şirketi | The method and system of monitoring the lv (low voltage) electricity infrastructure using gsm communication technology and taking precautionary measures |
CN107196804A (en) * | 2017-06-01 | 2017-09-22 | 国网山东省电力公司信息通信公司 | Power system terminal communication access network Centralized Alarm Monitoring system and method |
Non-Patent Citations (1)
Title |
---|
易鸣: ""江西电信传输网告警自动派单功能研究与实施"", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103856339B (en) | A kind of method and apparatus being compressed to warning information | |
CN104699759B (en) | A kind of data base automatic operation and maintenance method | |
CN105183609A (en) | Real-time monitoring system and method applied to software system | |
CN106130786A (en) | The detection method of a kind of network failure and device | |
CN110169016A (en) | Handle method, control node, network element and the system of network event in telecommunication network | |
CN105634804B (en) | A kind of service dial testing method, device and system | |
CN107656156B (en) | A kind of equipment fault diagnosis and operating status appraisal procedure and system based on cloud platform | |
CN105260823A (en) | Method and system for evaluating health status of major equipment | |
CN104574557A (en) | Alarm-based site polling method, alarm-based site polling manipulation device and alarm-based site polling system | |
CN109005528A (en) | A kind of bluetooth mesh gateway data polymerization report method | |
CN107450501A (en) | A kind of manufacturing execution system for being applied to automate filling workshop | |
US20040083246A1 (en) | Method and system for performance management in a computer system | |
CN112462724A (en) | Data monitoring system based on industrial internet | |
EP3154238B1 (en) | Method and device for policy-based m2m terminal device monitoring and control | |
CN101197714B (en) | Method for centrally capturing mobile data service condition | |
CN202652238U (en) | Fault list automatic distribution system | |
CN102201927A (en) | Alarm information processing method and device | |
CN109818808A (en) | Method for diagnosing faults, device and electronic equipment | |
CN104914328B (en) | A kind of transformer station's on-Line Monitor Device automatic fault diagnosis method | |
CN107389124B (en) | Sensor-based road and bridge state monitoring method and system | |
CN109889357A (en) | A kind of device and method of communication system of power grids alarm worksheet processing | |
CN110837242A (en) | Hot water supply equipment running state monitoring system based on Internet of things | |
CN105007278A (en) | Automatic real-time acquisition system and acquisition method for network safety log | |
CN105892387B (en) | The automatic reporting device of computer room hidden danger and method based on cross-platform multi-point data acquisition MPCA model | |
CN109670551A (en) | The failure prediction method and device of engineering mechanical device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190614 |
|
RJ01 | Rejection of invention patent application after publication |