CN109888914A - A kind of major-minor interlock method of substation and device - Google Patents
A kind of major-minor interlock method of substation and device Download PDFInfo
- Publication number
- CN109888914A CN109888914A CN201910015817.9A CN201910015817A CN109888914A CN 109888914 A CN109888914 A CN 109888914A CN 201910015817 A CN201910015817 A CN 201910015817A CN 109888914 A CN109888914 A CN 109888914A
- Authority
- CN
- China
- Prior art keywords
- control system
- linkage
- measuring point
- auxiliary control
- minor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
Landscapes
- Selective Calling Equipment (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The present invention provides a kind of major-minor interlock method of substation and devices, and when measuring point has remote signalling displacement or fault tripping signal, master control system sends the linkage message of the measuring point to auxiliary control system;Auxiliary control system finds call number of the measuring point in auxiliary control system according to the measuring point call number in message, obtains corresponding linkage strategy, sends linkage command to corresponding auxiliary control subsystem according to linkage strategy, executes linkage strategy by the auxiliary control subsystem received.Linked system structure is simple, does not need additionally to increase other equipment, reduce costs, and when handling data linkage, treatment process is also relatively easy.Operation maintenance personnel can monitor the displacement signal or fault tripping signal of master control system in standing from main control workstation in standing in monitoring work room, and the remote signalling displacement of master control system or fault tripping signal are confirmed, the information sharing between the major-minor system of substation and intelligent linkage are enhanced, it is significant to the safety, the reliability that improve substation operation.
Description
Technical field
The invention belongs to intelligent substation technical field, in particular to the major-minor interlock method of a kind of substation and device.
Background technique
In intelligent Substation System framework, master device monitors system (abbreviation master control system) is located at the safe area II, auxiliary
Equipment monitoring system (abbreviation auxiliary control system) is located at the safe area III, has positive isolating device to ensure the unidirectional of data between twoth area
Transmission.Substation's master device monitors and all kinds of ancillary equipment monitoring systems are independent, interface disperses, equipment covering is not complete, in information
Send imperfect, major-minor facility information can not effectively be shared, and power transformation operation maintenance personnel lacks effective monitoring means to administration equipment, pass through
The equipment operating data that various monitoring measures obtain can not efficiently use, and cannot achieve Accurate Diagnosis and the master of equipment health status
Dynamic early warning.Therefore, it is necessary to optimize integration to the various information system resource of existing isolated dispersion, unified substation is constructed
Major-minor linked system realizes the seamless connection of business between information resources share and system.
Publication No. " CN102497033A ", in entitled " a kind of visual realization method and system of power transformation operation "
State's application for a patent for invention, by being arranged between comprehensive automation system of transformer substation and video monitoring system for substation when the patent
Connected protocol converter and environment host, so that leading between substation's Milky Way automated system and video monitoring system for substation
Believe and carries out video interlink.Although this method provides the mode of linkage, additional increase environment host is needed, cost is caused to increase
Add, and data processing complex.
Summary of the invention
The purpose of the present invention is to provide a kind of major-minor interlock method of substation and devices, become in the prior art for solving
The problem of power station interlock method is at high cost, data processing complex.
To achieve the above object, the present invention provides a kind of major-minor interlock methods of substation, method includes the following steps:
1) when measuring point has remote signalling displacement or fault tripping signal, master control system sends the linkage message of the measuring point to auxiliary control
System, the content of the linkage message include: measuring point call number, attribute, value description and markers;
2) after auxiliary control system receives linkage message, which is found in auxiliary control system according to the measuring point call number in message
Call number, obtain corresponding linkage strategy, send linkage command to corresponding auxiliary control subsystem, by receiving according to linkage strategy
Auxiliary control subsystem execute the linkage strategy.
For interlock method of the invention when handling data linkage, treatment process is simple, stands interior operation maintenance personnel in station
The displacement signal or fault tripping signal of master control system can be monitored in monitoring work room from main control workstation, then again from auxiliary
Control work station monitor linkage as a result, with to master control system displacement signal or fault tripping signal confirm, enhance
Information sharing and intelligent linkage between the major-minor system of substation increase substation's operation maintenance personnel to the monitoring hand of administration equipment
Section, it is significant to the safety, the reliability that improve substation operation.
In order to establish effective configuration strategy between master control system and auxiliary control system, master control system is sent out to auxiliary control system
Before sending linkage message, linkage configuration need to be carried out, configuration process is as follows:
A. master control system sends the measuring point information for needing to carry out major-minor linkage to auxiliary control system, and the measuring point information includes sequence
Number, power transformation station number, measuring point call number, device name, device type and value description information;
B. auxiliary control system increases the measuring point according to the measuring point information update local linkage configuration file received in the database
Main equipment call number and the measuring point auxiliary control system in call number mapping table;
C. auxiliary control system is based on the corresponding linkage strategy of measuring point information configuration;The configuration information of the linkage strategy includes touching
Type of signaling, triggering measuring point title, triggering measuring point call number, trigger signal attribute, the description of trigger signal value, interlocking equipment name
Title, enables mark at linkage control mode.
In order to avoid transmitting the interference of signal between master control system and auxiliary control system, master control system is arranged in the safe area II,
Auxiliary control system is arranged in the safe area III, carries out one way signal biography by positive isolating device between master control system and auxiliary control system
It is defeated.
The measuring point information and linkage message that master control system is sent to auxiliary control system are sent with text mode.Using text
This mode keeps measuring point information and the form of expression for the message that links simple, is suitable for various types of operators.
The present invention also provides a kind of major-minor linkage of substation, including master control system and auxiliary control system, the master controls
System is used for when measuring point has remote signalling displacement or fault tripping signal, sends the linkage message of the measuring point to auxiliary control system, described
The content of linkage message includes: measuring point call number, attribute, value description and markers;The auxiliary control system is used to receive linkage report
Wen Hou finds call number of the measuring point in auxiliary control system according to the measuring point call number in message, obtains corresponding linkage strategy,
Linkage command is sent to corresponding auxiliary control subsystem according to linkage strategy, and the linkage plan is executed by the auxiliary control subsystem received
Slightly.
Linked system structure of the invention is simple, does not need additionally to increase other equipment, reduce costs, and right
When data linkage processing, treatment process is also relatively easy.Operation maintenance personnel can be from master control work in monitoring work room in standing in standing
Make displacement signal or fault tripping signal that station monitors master control system, then monitors linkage knot from auxiliary control work station again
Fruit, with to master control system displacement signal or fault tripping signal confirm, enhance between the major-minor system of substation
Information sharing and intelligent linkage increase substation's operation maintenance personnel to the monitoring means of administration equipment, to raising substation operation
Safety, reliability it is significant.
In order to establish effective configuration strategy between master control system and auxiliary control system, master control system is sent out to auxiliary control system
Before sending linkage message, linkage configuration need to be carried out, configuration process is as follows:
A. master control system sends the measuring point information for needing to carry out major-minor linkage to auxiliary control system, and the measuring point information includes sequence
Number, power transformation station number, measuring point call number, device name, device type and value description information;
B. auxiliary control system increases the measuring point according to the measuring point information update local linkage configuration file received in the database
Main equipment call number and the measuring point auxiliary control system in call number mapping table;
C. auxiliary control system is based on the corresponding linkage strategy of measuring point information configuration;The configuration information of the linkage strategy includes touching
Type of signaling, triggering measuring point title, triggering measuring point call number, trigger signal attribute, the description of trigger signal value, interlocking equipment name
Title, enables mark at linkage control mode.
In order to avoid transmitting the interference of signal between master control system and auxiliary control system, master control system is arranged in the safe area II,
Auxiliary control system is arranged in the safe area III, carries out one way signal biography by positive isolating device between master control system and auxiliary control system
It is defeated.
The measuring point information and linkage message that master control system is sent to auxiliary control system are sent with text mode.Using text
This mode keeps measuring point information and the form of expression for the message that links simple, is suitable for various types of operators.
Further, the auxiliary control subsystem includes video monitoring system, robot inspection system, lighting system, fire-fighting
System and on-line monitoring system.
Detailed description of the invention
Fig. 1 is the structure chart of the major-minor linkage of substation of the invention.
Specific embodiment
A specific embodiment of the invention is described further with reference to the accompanying drawing.
Installation practice:
The present invention provides a kind of major-minor linkage of substation, including master control system and auxiliary control system, master control system is used
In when measuring point has remote signalling displacement or fault tripping signal, sending the linkage message of the measuring point to auxiliary control system, the linkage report
The content of text includes: measuring point call number, attribute, value description and markers;Auxiliary control system is used for after receiving linkage message, according to report
Measuring point call number in text finds call number of the measuring point in auxiliary control system, obtains corresponding linkage strategy, according to linkage plan
Linkage command is slightly sent to corresponding auxiliary control subsystem, linkage strategy is executed by the auxiliary control subsystem received.
The major-minor linkage of substation not only includes substation's master control system and auxiliary control system, as shown in Figure 1, further including master
Positive isolating device between auxiliary control system.Wherein auxiliary control system includes: substation's auxiliary control server, work station and power transformation
Auxiliary control of standing subsystem;Wherein substation's auxiliary control subsystem includes but is not limited to video monitoring system, robot inspection system, illumination
The subsystems such as system, fire-fighting system, on-line monitoring.
Embodiment of the method:
For the master control system and auxiliary control system of the present embodiment, for the interlock method of master control system and auxiliary control system,
Process is as follows:
In linkage configuration phase, process are as follows: 1) master control system sends the measuring point information for needing to carry out major-minor linkage to auxiliary
Control system.Measuring point information includes: the information such as serial number, power transformation station number, measuring point call number, device name, device type, value description;
2) after auxiliary control system receives major-minor linkage measuring point arrangement information, need first to update local linkage configuration file, then in database
The mapping table of middle the main equipment call number for increasing the measuring point and call number of the measuring point in auxiliary control system;3) at auxiliary control end
The remote signalling displacement for configuring some point in the linkage strategy based on these measuring points, such as corresponding master control system, auxiliary control end need by
Some camera in subsystem of video is adjusted to some presetting bit, is then turned on real-time video, and be hit by a bullet in auxiliary control work station
The real-time video out.The configuration of linkage strategy is can be flexile.
In linkage implementation phase, process are as follows: 1) when there is the signals such as remote signalling displacement or fault trip generation, master control system
The whether configured linkage information of the measuring point is searched in linkage allocation list;2) master control system sends linkage message to auxiliary control system,
Message content includes: measuring point call number, attribute, value description and markers, and wherein attribute includes movement, displacement, tripping etc.;Value description
Including return, starting, splitting or integrating, successfully, unsuccessfully, interrupt, restore etc..3) after auxiliary control system receives linkage message, according to measuring point rope
Quotation marks find call number of the measuring point in auxiliary control system in the database, then read linkage strategy, send out according to linkage strategy
Send linkage command to corresponding auxiliary control subsystem, the configuration information of linkage strategy include trigger signal types, triggering measuring point title,
It triggers measuring point call number, trigger signal attribute, the description of trigger signal value, interlocking equipment title, linkage control mode, enable mark
Will.4) after auxiliary control subsystem executes linkage strategy, implementing result is returned into auxiliary control server.
Further, since master control system and auxiliary control system are in different subregions, the two can only pass through positive isolating device
Carry out unidirectional signal transfer.In linkage configuration phase and linkage implementation phase, information is all passed through with text mode by udp protocol
Positive isolating device is sent to auxiliary control system.
The following are the embodiment for the major-minor linkage that disconnecting link remote control operation causes, it is divided into linkage configuration and two ranks is implemented in linkage
Section.
In linkage configuration phase, master control system sends the measuring point information for carrying out major-minor linkage to auxiliary control system.The first step, because
Remote control operation, which is divided into, is remotely controlled preset and remote control two steps of execution, needs to configure two information are as follows:<1>serial number 1, power transformation station number 1, measuring point
Call number 1000, device name " Hangzhou three changes of text/astronomical 1096 lines of 110kV./501 switches ", device type is remote controls, attribute
It is described as control conjunction to be remotely controlled preset, value;<2>serial number 2, power transformation station number 1, measuring point call number 1000, device name " Hangzhou text three
Astronomical 1096 lines of change/110kV./501 switches ", device type are that remote control executes, value is described as control and closes into remote control, attribute.Second
Step, these information are sent to auxiliary control system server by positive isolating device with udp protocol in a text form.Third step,
After auxiliary control system receives major-minor linkage measuring point arrangement information, need first to update local linkage information configuration file, then in data
Increase the main equipment call number of the measuring point and the mapping table of call number of the measuring point in auxiliary control system in library.<1>article
Information MAP indexes point number 4001 to auxiliary control, and<2>article information MAP to auxiliary control indexes point number 4002.4th step, at auxiliary control end
Configure the linkage strategy based on these measuring points.Index the linkage strategy of point number 4001 are as follows: presetting bit will be adjusted to as head, and (501 open
The position of pass), and open real-time video and video recording;Index the linkage strategy of point number 4002 are as follows: 5 seconds rear cameras of delay are closed real
When video, stop video recording, and open intelligent video analysis system, auxiliary control server will be sent in video analysis result.
In linkage implementation phase, it is remotely controlled preset implementation process are as follows: the first step, master control system issue remote control predetermined order
When, it is first searched in the linkage allocation list of oneself and whether is configured with call number 1000, device type is remote control, attribute is that remote control is pre-
Set, value be described as control close information, search at this time;Second step, by linkage information in the form of text by udp protocol by just
Auxiliary control server, the information content are sent to isolating device are as follows: measuring point call number 1000, device type are remote control, attribute is distant
Control preset, value be described as control close, when be designated as 2018-10-01 08:18:55.356;Third step, auxiliary control system receive linkage message
Afterwards, its call number 4001 in auxiliary control system is searched for according to the description of measuring point call number, attribute and value in the database, is then read
Take linkage strategy.4th step, according to linkage strategy, auxiliary control system server sends to subsystem of video and orders, by camera tune
It is whole to arrive presetting bit, and open real-time video and video recording.
In linkage implementation phase, it is remotely controlled the implementation process of execution are as follows: the first step, master control system issue remote control and execute order
When, it is first searched in the linkage allocation list of oneself and whether is configured with call number 1000, device type is remote control, attribute is that remote control is held
Row, value are described as the information that control is closed, and search at this time;Second step, by linkage information in the form of text by udp protocol by just
Auxiliary control server, the information content are sent to isolating device are as follows: measuring point call number 1000, device type are remote control, attribute is distant
Control execute, value be described as control conjunction, when be designated as 2018-10-01 08:28:55.356;Third step, auxiliary control system receive linkage message
Afterwards, its call number 4002 in auxiliary control system is searched for according to the description of measuring point call number, attribute and value in the database, is then read
Take linkage strategy.4th step, according to linkage strategy, auxiliary control system server sends to subsystem of video and orders, and delay is closed after 5 seconds
Real-time video is closed, stops video recording, and open intelligent video analysis system.5th step, intelligent video analysis system combine linkage letter
Equipment in breath is switch, attribute be remote control execute, value be described as control conjunction, when be designated as 2018-10-01 08:28:55.356 this
A little information carry out video analysis, and result is to switch to switch to coincidence by quartile in 2018-10-01 08:28:56, are remotely controlled successfully.So
Intelligent video analysis system will send auxiliary control system server afterwards in a little results.
So far, substation's operation maintenance personnel has sent switch remote control command in master control system, sees on auxiliary control system
The real-time video of switch motion, and switch coincidence has been obtained by intelligent video analysis system and has successfully been confirmed as a result, entire major-minor
Linkage is completed.
The above are the linkages of master control system and subsystem of video.Other embodiments further include: certain Master device operations or
After master-failure, operating result is captured in linkage robot to inspection point, video recording, and inspection is completed in identification related data monitoring etc.
Robot review;After certain Master device operations or master-failure, link lighting system, opens lighting;Certain main equipments
After operation or master-failure, link on-line monitoring system, issues calling online monitoring data, updates related data etc..In standing
Operation maintenance personnel can monitor the displacement signal or fault trip of master control system in standing from main control workstation in monitoring work room
Signal then monitors linkage as a result, with the displacement signal or fault tripping signal to master control system from auxiliary control work station again
Confirmed, enhances the information sharing between the major-minor system of substation and intelligent linkage, increase substation's operation maintenance personnel pair
The monitoring means for administering equipment, it is significant to the safety, the reliability that improve substation operation.
Linked system structure of the invention is simple, does not need additionally to increase other equipment, reduce costs, and right
When data linkage processing, treatment process is also relatively easy.Realize master status change information (including emergency stop valve trip,
Abnormal, equipment displacement of device etc.) and on-line monitoring, security protection, fire-fighting, environmental monitoring, light intelligent control, video, intelligent patrol detection
The linkage of the auxiliary systems such as robot increases power transformation operation maintenance personnel to the monitoring means of administration equipment, it is auxiliary to improve substation
Auxiliary system intelligence O&M is horizontal, improves O&M efficiency and equipment operational reliability.
Specific embodiment is presented above, but the present invention is not limited to embodiment described above.The present invention
Basic ideas be above-mentioned basic scheme, for those of ordinary skill in the art, introduction according to the present invention is designed each
The model of kind deformation, formula, parameter do not need to spend creative work.The case where not departing from the principle and spirit of the invention
Under to embodiment carry out variation, modification, replacement and deformation still fall in protection scope of the present invention.
Claims (9)
1. a kind of major-minor interlock method of substation, which is characterized in that method includes the following steps:
1) when measuring point has remote signalling displacement or fault tripping signal, the linkage message that master control system sends the measuring point gives auxiliary control system
System, the content of the linkage message include: measuring point call number, attribute, value description and markers;
2) after auxiliary control system receives linkage message, rope of the measuring point in auxiliary control system is found according to the measuring point call number in message
Quotation marks obtain corresponding linkage strategy, auxiliary by what is received according to linkage strategy transmission linkage command to corresponding auxiliary control subsystem
It controls subsystem and executes the linkage strategy.
2. the major-minor interlock method of substation according to claim 1, which is characterized in that master control system is sent out to auxiliary control system
Before sending linkage message, linkage configuration need to be carried out, configuration process is as follows:
A. master control system, which is sent, needs to carry out the measuring point information of major-minor linkage to auxiliary control system, the measuring point information include serial number,
Power transformation station number, measuring point call number, device name, device type and value description information;
B. auxiliary control system increases the master of the measuring point according to the measuring point information update local linkage configuration file received in the database
The mapping table of call number in equipment call number and the measuring point auxiliary control system;
C. auxiliary control system is based on the corresponding linkage strategy of measuring point information configuration;The configuration information of the linkage strategy includes triggering letter
Number type, triggering measuring point title, triggering measuring point call number, trigger signal attribute, the description of trigger signal value, interlocking equipment title,
Linkage control mode enables mark.
3. the major-minor interlock method of substation according to claim 1 or 2, which is characterized in that master control system is arranged in safety
The area II, auxiliary control system are arranged in the safe area III, are unidirectionally believed between master control system and auxiliary control system by positive isolating device
Number transmission.
4. the major-minor interlock method of substation according to claim 3, which is characterized in that master control system is sent to auxiliary control system
Measuring point information and linkage message be to be sent with text mode.
5. a kind of major-minor linkage of substation, including master control system and auxiliary control system, which is characterized in that the master control system is used
In when measuring point has remote signalling displacement or fault tripping signal, sending the linkage message of the measuring point to auxiliary control system, the linkage report
The content of text includes: measuring point call number, attribute, value description and markers;The auxiliary control system is used for after receiving linkage message, root
Call number of the measuring point in auxiliary control system is found according to the measuring point call number in message, obtains corresponding linkage strategy, according to connection
Dynamic strategy sends linkage command to corresponding auxiliary control subsystem, executes the linkage strategy by the auxiliary control subsystem received.
6. the major-minor linkage of substation according to claim 5, which is characterized in that master control system is sent out to auxiliary control system
Before sending linkage message, linkage configuration need to be carried out, configuration process is as follows:
A. master control system, which is sent, needs to carry out the measuring point information of major-minor linkage to auxiliary control system, the measuring point information include serial number,
Power transformation station number, measuring point call number, device name, device type and value description information;
B. auxiliary control system increases the master of the measuring point according to the measuring point information update local linkage configuration file received in the database
The mapping table of call number in equipment call number and the measuring point auxiliary control system;
C. auxiliary control system is based on the corresponding linkage strategy of measuring point information configuration;The configuration information of the linkage strategy includes triggering letter
Number type, triggering measuring point title, triggering measuring point call number, trigger signal attribute, the description of trigger signal value, interlocking equipment title,
Linkage control mode enables mark.
7. the major-minor linkage of substation according to claim 5 or 6, which is characterized in that master control system is arranged in safety
The area II, auxiliary control system are arranged in the safe area III, are unidirectionally believed between master control system and auxiliary control system by positive isolating device
Number transmission.
8. the major-minor linkage of substation according to claim 7, which is characterized in that master control system is sent to auxiliary control system
Measuring point information and linkage message be to be sent with text mode.
9. the major-minor linkage of substation according to claim 5, which is characterized in that the auxiliary control subsystem includes video
Monitoring system, robot inspection system, lighting system, fire-fighting system and on-line monitoring system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910015817.9A CN109888914B (en) | 2019-01-08 | 2019-01-08 | Main and auxiliary linkage method and device for transformer substation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910015817.9A CN109888914B (en) | 2019-01-08 | 2019-01-08 | Main and auxiliary linkage method and device for transformer substation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109888914A true CN109888914A (en) | 2019-06-14 |
CN109888914B CN109888914B (en) | 2020-10-30 |
Family
ID=66925757
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910015817.9A Active CN109888914B (en) | 2019-01-08 | 2019-01-08 | Main and auxiliary linkage method and device for transformer substation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109888914B (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110730163A (en) * | 2019-09-17 | 2020-01-24 | 许昌许继软件技术有限公司 | Substation main and auxiliary control linkage method and substation auxiliary control equipment |
CN110855005A (en) * | 2019-12-02 | 2020-02-28 | 广东电网有限责任公司 | Video linkage double-confirmation interaction method applied to intelligent substation |
CN110957704A (en) * | 2019-12-13 | 2020-04-03 | 云南电网有限责任公司保山供电局 | Intelligent inspection method and system for protection action tripping of transformer substation |
CN111030847A (en) * | 2019-11-19 | 2020-04-17 | 国网智能科技股份有限公司 | Intelligent station linkage communication method and system |
CN111862568A (en) * | 2020-07-20 | 2020-10-30 | 百度在线网络技术(北京)有限公司 | Instruction transmission method, device, system, electronic equipment and storage medium |
CN112421778A (en) * | 2020-11-10 | 2021-02-26 | 许继集团有限公司 | Linkage method and linkage system based on power transformation information comprehensive processing system |
CN112511801A (en) * | 2020-11-19 | 2021-03-16 | 天津凯发电气股份有限公司 | Method for retrieving videos of auxiliary monitoring system by railway telecontrol monitoring system |
CN113743758A (en) * | 2021-08-25 | 2021-12-03 | 许昌许继软件技术有限公司 | Linkage system and linkage method of substation equipment |
WO2022095616A1 (en) * | 2020-11-03 | 2022-05-12 | 国网智能科技股份有限公司 | On-line intelligent inspection system and method for transformer substation |
CN115102145A (en) * | 2022-05-19 | 2022-09-23 | 国网湖南省电力有限公司 | Linkage strategy sharing method and device of equipment, terminal and readable storage medium |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100020724A1 (en) * | 2007-03-30 | 2010-01-28 | Abb Technology Ag | Method of configuring an intelligent electronic device |
CN101834468A (en) * | 2010-03-10 | 2010-09-15 | 江苏省电力设计院 | Coordination linkage method of intelligent transformer substation assisting production system |
CN102122844A (en) * | 2011-03-01 | 2011-07-13 | 江苏省电力设计院 | Intelligent substation based on sensor, communication network and expert system |
CN203164731U (en) * | 2013-03-29 | 2013-08-28 | 国家电网公司 | Auxiliary control system for underground substation |
CN104617665A (en) * | 2015-01-07 | 2015-05-13 | 山东鲁能智能技术有限公司 | Intelligent auxiliary monitoring system and method for substation |
CN104636986A (en) * | 2014-12-23 | 2015-05-20 | 江苏省电力公司 | Dispatching remote safety remote control checking method based on service |
CN105743223A (en) * | 2016-04-12 | 2016-07-06 | 国网江苏省电力公司电力科学研究院 | GOOSE linkage-based video inspection method for secondary equipment prefabricated cabin |
CN106844432A (en) * | 2016-12-13 | 2017-06-13 | 国网北京市电力公司 | Data processing method and device |
CN107515741A (en) * | 2017-07-11 | 2017-12-26 | 中国电力科学研究院 | The lightweight transmission method and device of data between a kind of transformer station and main website |
-
2019
- 2019-01-08 CN CN201910015817.9A patent/CN109888914B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100020724A1 (en) * | 2007-03-30 | 2010-01-28 | Abb Technology Ag | Method of configuring an intelligent electronic device |
CN101834468A (en) * | 2010-03-10 | 2010-09-15 | 江苏省电力设计院 | Coordination linkage method of intelligent transformer substation assisting production system |
CN102122844A (en) * | 2011-03-01 | 2011-07-13 | 江苏省电力设计院 | Intelligent substation based on sensor, communication network and expert system |
CN203164731U (en) * | 2013-03-29 | 2013-08-28 | 国家电网公司 | Auxiliary control system for underground substation |
CN104636986A (en) * | 2014-12-23 | 2015-05-20 | 江苏省电力公司 | Dispatching remote safety remote control checking method based on service |
CN104617665A (en) * | 2015-01-07 | 2015-05-13 | 山东鲁能智能技术有限公司 | Intelligent auxiliary monitoring system and method for substation |
CN105743223A (en) * | 2016-04-12 | 2016-07-06 | 国网江苏省电力公司电力科学研究院 | GOOSE linkage-based video inspection method for secondary equipment prefabricated cabin |
CN106844432A (en) * | 2016-12-13 | 2017-06-13 | 国网北京市电力公司 | Data processing method and device |
CN107515741A (en) * | 2017-07-11 | 2017-12-26 | 中国电力科学研究院 | The lightweight transmission method and device of data between a kind of transformer station and main website |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110730163A (en) * | 2019-09-17 | 2020-01-24 | 许昌许继软件技术有限公司 | Substation main and auxiliary control linkage method and substation auxiliary control equipment |
CN110730163B (en) * | 2019-09-17 | 2022-02-25 | 许昌许继软件技术有限公司 | Substation main and auxiliary control linkage method and substation auxiliary control equipment |
CN111030847A (en) * | 2019-11-19 | 2020-04-17 | 国网智能科技股份有限公司 | Intelligent station linkage communication method and system |
CN110855005A (en) * | 2019-12-02 | 2020-02-28 | 广东电网有限责任公司 | Video linkage double-confirmation interaction method applied to intelligent substation |
CN110957704A (en) * | 2019-12-13 | 2020-04-03 | 云南电网有限责任公司保山供电局 | Intelligent inspection method and system for protection action tripping of transformer substation |
CN110957704B (en) * | 2019-12-13 | 2021-11-02 | 云南电网有限责任公司保山供电局 | Intelligent inspection method and system for protection action tripping of transformer substation |
CN111862568A (en) * | 2020-07-20 | 2020-10-30 | 百度在线网络技术(北京)有限公司 | Instruction transmission method, device, system, electronic equipment and storage medium |
CN111862568B (en) * | 2020-07-20 | 2022-02-25 | 百度在线网络技术(北京)有限公司 | Instruction transmission method, device, system, electronic equipment and storage medium |
WO2022095616A1 (en) * | 2020-11-03 | 2022-05-12 | 国网智能科技股份有限公司 | On-line intelligent inspection system and method for transformer substation |
CN112421778A (en) * | 2020-11-10 | 2021-02-26 | 许继集团有限公司 | Linkage method and linkage system based on power transformation information comprehensive processing system |
CN112511801A (en) * | 2020-11-19 | 2021-03-16 | 天津凯发电气股份有限公司 | Method for retrieving videos of auxiliary monitoring system by railway telecontrol monitoring system |
CN113743758A (en) * | 2021-08-25 | 2021-12-03 | 许昌许继软件技术有限公司 | Linkage system and linkage method of substation equipment |
CN115102145A (en) * | 2022-05-19 | 2022-09-23 | 国网湖南省电力有限公司 | Linkage strategy sharing method and device of equipment, terminal and readable storage medium |
CN115102145B (en) * | 2022-05-19 | 2023-08-11 | 国网湖南省电力有限公司 | Linkage policy sharing method and device for equipment, terminal and readable storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN109888914B (en) | 2020-10-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109888914A (en) | A kind of major-minor interlock method of substation and device | |
CN107069954B (en) | Substation equipment cloud maintenance system and monitoring system | |
CN109459664A (en) | A kind of detection of distribution network failure and positioning analysis system | |
CN101813928B (en) | Automated one-machine multiple-station intelligent five-defense system of energy system transformer substation | |
CN110311468A (en) | Substation's three-dimensional live abnormality monitoring method, system, device and storage medium | |
CN103576650A (en) | Operation security monitoring and managing system for airport ground equipment | |
CN105245001B (en) | A kind of event driven substation accident intelligent alarm treating method and apparatus | |
CN108053041B (en) | Secondary system abnormity identification and anti-misoperation system and method under multi-association scene of transformer substation | |
CN102819249A (en) | Linkage control system and control method for power tunnel | |
CN109639477A (en) | A kind of secondary device in-service monitoring and analysis system and method | |
CN113988633A (en) | Anti-misoperation system of digital twin transformer substation | |
CN104360237A (en) | Intelligent on-line distinguishing method for main equipment failures of regional power grid | |
CN104516801A (en) | Substation computer monitoring system and method | |
CN110794872A (en) | Substation unmanned aerial vehicle group intelligent early warning monitoring system and method | |
CN205620503U (en) | Regional trouble fault -tolerance automatic location system of distribution network feeder | |
CN107944655A (en) | Event level method for diagnosing faults based on Expert Rules storehouse and multi-source fault message | |
CN109586414A (en) | A kind of scheduler program auxiliary operation system and method | |
CN107742925A (en) | The hard pressing plate method for inspecting of transformer station based on three-level network | |
CN111313552A (en) | Monitoring system for power electromechanical distribution station room | |
CN202110281U (en) | Automatic recombination structure of hollow pipe primary radar apparatus | |
CN108287519A (en) | Logical construction and implementation method for proton therapy equipment safety interlocking | |
CN110855005A (en) | Video linkage double-confirmation interaction method applied to intelligent substation | |
CN106899084B (en) | Distributor track website switch state analysis method and system based on video intelligent identification | |
CN105553113A (en) | Intelligent identification based anti-misoperation system and method for robot | |
CN104504537B (en) | A kind of transformer station's AC power monitoring system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |