CN109882178A - A kind of opencut district drainage method - Google Patents

A kind of opencut district drainage method Download PDF

Info

Publication number
CN109882178A
CN109882178A CN201910275626.6A CN201910275626A CN109882178A CN 109882178 A CN109882178 A CN 109882178A CN 201910275626 A CN201910275626 A CN 201910275626A CN 109882178 A CN109882178 A CN 109882178A
Authority
CN
China
Prior art keywords
open
chamber
air pit
pump station
cavern
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910275626.6A
Other languages
Chinese (zh)
Other versions
CN109882178B (en
Inventor
王杰
常剑
李刚
陈继强
刘贞表
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Original Assignee
Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinosteel Maanshan General Institute of Mining Research Co Ltd filed Critical Sinosteel Maanshan General Institute of Mining Research Co Ltd
Priority to CN201910275626.6A priority Critical patent/CN109882178B/en
Publication of CN109882178A publication Critical patent/CN109882178A/en
Application granted granted Critical
Publication of CN109882178B publication Critical patent/CN109882178B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The invention discloses a kind of opencut district drainage methods, at open-air pit bottom, open-air pit standage (6) are set, the deployment of submersible pumps (1) on the sun deck on open-air pit standage (6), it is characterized by: laterally constructing cavern (8) in the open-air pit platform side slope (10) on conventional fixed pump station water pump (2) position, the chamber (8) position should avoid tomography;It builds chamber sump (5) downwards in chamber (8), cavern's fixed pump station water pump (3) is installed in chamber (8);The open-air pit charge for remittance that concentration converges into open-air pit standage (6) is evacuated to the chamber sump (5) in chamber (8) Nei, then is evacuated to other than open-air pit by cavern's fixed pump station water pump (3) by immersible pump (1).The present invention can produce part side slope pressure mine, reduce ore losses;Cavern's fixed pump station water pump (3) is not influenced by earth's surface meteorological condition, rockfall etc. simultaneously, is not required to build fixed pump station pump house.

Description

A kind of opencut district drainage method
Technical field
The present invention relates to a kind of opencut water discharge methods, and in particular to a kind of opencut is segmented comprehensive draining technology, can be It is widely applied in opencut draining, particularly suitable for the recessed open-air pit bottom draining of big moldeed depth.
Background technique
Carrying out guarded drainage work is to guarantee the prerequisite of opencut safety in production.Especially deep trough open pit, it is objective On have a condition for collecting Atmospheric precipitation, rainwash and underground water burst, therefore during the production of opencut overall process, even Effective waterproof and drain measure must be all taken during capital construction.
If open-air pit cannot be discharged in open-air pit water burst in time, it not only will lead to equipment and flooded, also resulting in other can not be pre- The consequence of survey influences normally to produce.To guarantee that dew adopts going on smoothly for work, it is necessary to which the ponding in open-air pit to be discharged in time.
Conventional opencut is segmented relay water discharge method, and the essence of the drainage system is: setting in the highwall of excavating plant Several fixed pump stations are set, segmentation intercepts and water burst is discharged, and water can be immediately discharged to earth's surface, can also take and connect by each fixed pump station Water is drained into earth's surface by the main pumping station of upper level by power mode.The water discharge method opencut big suitable for catchment area and water Mountain or the mine that mining depth is big, decrease speed is fast.But there are side slopes to press mine for the water discharge method;Fixed pump station is by earth's surface simultaneously The influence of meteorological condition, rockfall etc. needs to build fixed pump station pump house.
Summary of the invention
The purpose of the present invention is aiming at the pressure of side slope existing for existing opencut drainage system mine, need to build fixed pump Stand pump house the problem of, and provide one kind can produce part side slope pressure mine, reduce ore losses, be not required to build fixed pump station pump house Opencut district drainage method.
Above-mentioned purpose to realize the present invention, a kind of opencut district drainage method of the present invention use following technical scheme:
Open-air pit standage is arranged at open-air pit bottom, in open-air pit bottom water in a kind of opencut district drainage method of the present invention Deployment of submersible pumps on sun deck on storehouse, in the open-air pit platform side slope on conventional fixed pump station water pump location laterally Construct cavern, and the chamber position should avoid tomography, and selection is constructed in rock stability region;Build chamber downwards in chamber Sump installs cavern's fixed pump station water pump in chamber;Immersible pump will concentrate the open-air pit converged into open-air pit standage to converge Water is evacuated in the indoor chamber sump of cave, then is evacuated to other than open-air pit by cavern's fixed pump station water pump.
And traditional opencut district drainage method is then: open-air pit standage is arranged at open-air pit bottom, at open-air pit bottom Deployment of submersible pumps on sun deck on sump;The construction normal platform fixed pump station water on the sun deck on ore body Conventional fixed pump station water pump, normal platform fixed pump station are being arranged in storehouse on sun deck where normal platform fixed pump station sump Sump is in rectangle, horizontally disposed along side slope direction.In order to avoid rockfall smashes conventional fixed pump station water pump, it is also necessary to build Fixed pump station pump house, conventional fixed pump station water pump are mounted in fixed pump station pump house.Immersible pump converges into concentration outdoor Open-air pit charge for remittance in the standage of hole is evacuated in normal platform fixed pump station sump, then to have conventional fixed pump station water pump to be evacuated to outdoor Other than hole.
A kind of opencut district drainage method of the present invention after the above technical solution is adopted, has the positive effect that:
The present invention improves original method, and laterally construct cavern in open-air pit platform side slope, repairs downwards in chamber Chamber sump is built, fixed pump station water pump in cavern's is installed in chamber, it may be assumed that by traditional normal platform fixed pump station sump, routine Fixed pump station water pump is migrated to chamber.After water discharge method improves, fixed pump station can inwardly be bounced back with getting out of a predicament or an embarrassing situation, so as to produce Part side slope presses mine, reduces ore losses;Cavern's fixed pump station water pump is not by the shadow of earth's surface meteorological condition, rockfall etc. simultaneously It rings, is not required to build fixed pump station pump house.
Detailed description of the invention
Fig. 1 is that a kind of drainage system of opencut district drainage method of the present invention improves schematic diagram.
Appended drawing reference are as follows: 1- immersible pump;2- routine fixed pump station water pump;The cavern 3- fixed pump station water pump;4- normal platform Fixed pump station sump;5- chamber sump;6- open-air pit standage;7- drainpipe;8- chamber;9- ore body;10- open-air pit platform edges Slope.
Specific embodiment
To better describe the present invention, with reference to the accompanying drawings and examples to a kind of opencut district drainage method of the present invention It is described in further detail.
A kind of drainage system of opencut district drainage method of the present invention as shown in Figure 1 improves schematic diagram and finds out, tradition Opencut district drainage method be: open-air pit bottom be arranged open-air pit standage 6, it is outdoor on open-air pit standage 6 Deployment of submersible pumps 1 on platform.The construction normal platform fixed pump station sump 4 on the sun deck on ore body 9, in normal platform Arrange that conventional fixed pump station water pump 2, normal platform fixed pump station sump 4 are in rectangle on 4 place sun deck of fixed pump station sump, It is horizontally disposed along side slope direction.In order to avoid rockfall smashes conventional fixed pump station water pump 2, it is also necessary to build fixed pump station water Pump house, conventional fixed pump station water pump 2 are mounted in fixed pump station pump house.Concentration is converged into open-air pit standage 6 by immersible pump 1 Interior open-air pit charge for remittance is evacuated in normal platform fixed pump station sump 4, then have conventional fixed pump station water pump 2 be evacuated to open-air pit with Outside.This drainage system and water discharge method, the normal platform fixed pump station sump 4 built, conventional fixed pump station water pump 2 cover The ore body 9 of lower part causes side slope pressure mine in part that can not exploit, to result in waste of resources.
A kind of drainage system of opencut district drainage method of the present invention as shown in Figure 1, which improves schematic diagram, to be seen Out, open-air pit standage 6 is arranged at open-air pit bottom, on open-air pit standage 6 in opencut district drainage method of the present invention Deployment of submersible pumps 1 on sun deck is laterally constructed in the open-air pit platform side slope 10 on conventional 2 position of fixed pump station water pump Cavern 8,8 position of chamber should avoid tomography, and selection is constructed in rock stability region;Chamber is built downwards in chamber 8 Sump 5 installs cavern's fixed pump station water pump 3 in chamber 8;Immersible pump 1 will concentrate converge into it is outdoor in open-air pit standage 6 Hole charge for remittance is evacuated in the chamber sump 5 in chamber 8 by drainpipe 7, then passes through another draining by cavern's fixed pump station water pump 3 Pipe 7 is evacuated to other than open-air pit.
A kind of opencut district drainage method of the present invention migrates cavern's fixed pump station water pump 3, chamber sump 5 to chamber 8 Interior, chamber sump 5 is arranged along chamber 8, saves the project amount of chamber 8.
After a kind of opencut district drainage method of the present invention improves traditional opencut district drainage method, cavern is fixed Water pump in pump station 3 can inwardly be bounced back with getting out of a predicament or an embarrassing situation (see dotted line stepped line), so as to produce part side slope pressure mine, reduce ore damage It loses;Cavern's fixed pump station water pump 3 is not influenced by earth's surface meteorological condition, rockfall etc. simultaneously, is not required to build fixed pump station water pump Room.
A kind of opencut district drainage method of the present invention is answered in certain big recessed outdoors iron ore district drainage system of moldeed depth With, compared with traditional opencut district drainage method, more extraction more than 50,000 tons of high grade iron ore, economic value more than 500 ten thousand Member achieves unexpected economic effect.

Claims (2)

1. open-air pit standage (6) are arranged at open-air pit bottom, in open-air pit standage (6) in a kind of opencut district drainage method On sun deck on deployment of submersible pumps (1), it is characterised in that: it is outdoor on conventional fixed pump station water pump (2) position Cavern (8) are laterally constructed on hole platform side slope (10), the chamber (8) position should avoid tomography;It is repaired downwards in chamber (8) Chamber sump (5) are built, cavern's fixed pump station water pump (3) are installed in chamber (8);Concentration is converged into open-air pit by immersible pump (1) Open-air pit charge for remittance in standage (6) is evacuated to the chamber sump (5) in chamber (8) Nei, then is taken out by cavern's fixed pump station water pump (3) To other than open-air pit.
2. a kind of opencut district drainage method as described in claim 1, it is characterised in that: chamber (8) selection exists The construction of rock stability region.
CN201910275626.6A 2019-04-08 2019-04-08 Strip mine sectional drainage method Active CN109882178B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910275626.6A CN109882178B (en) 2019-04-08 2019-04-08 Strip mine sectional drainage method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910275626.6A CN109882178B (en) 2019-04-08 2019-04-08 Strip mine sectional drainage method

Publications (2)

Publication Number Publication Date
CN109882178A true CN109882178A (en) 2019-06-14
CN109882178B CN109882178B (en) 2021-06-29

Family

ID=66936298

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910275626.6A Active CN109882178B (en) 2019-04-08 2019-04-08 Strip mine sectional drainage method

Country Status (1)

Country Link
CN (1) CN109882178B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111472837A (en) * 2020-04-09 2020-07-31 华能伊敏煤电有限责任公司 Mixed drainage facility of strip mine
CN111852553A (en) * 2020-07-06 2020-10-30 紫金矿业集团股份有限公司 Method for rapidly sinking and trenching open-pit mine with large water inrush quantity
CN111852555A (en) * 2020-07-06 2020-10-30 紫金矿业集团股份有限公司 Trenching method for one-time blasting layered shovel loading of large water inrush sunken strip mine
RU2754754C1 (en) * 2021-02-18 2021-09-07 федеральное государственное бюджетное образовательное учреждение высшего образования "Иркутский национальный исследовательский технический университет" (ФГБОУ ВО "ИРНИТУ") Water disposal method in development of bedded deposits by uprising with internal dumping
CN114753465A (en) * 2022-04-21 2022-07-15 中铁十九局集团矿业投资有限公司 Drainage system and drainage method for pit side slope of strip mine

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1130712A (en) * 1995-12-26 1996-09-11 张朝喜 Drainage cut-off (deep ditch high-building method) drainage and supplying optimization combination for preventing and harnessing groud water
US20070169542A1 (en) * 2003-05-27 2007-07-26 The University Of Queensland Blast movement monitor
RU2453700C2 (en) * 2010-08-24 2012-06-20 Государственное образовательное учреждение высшего профессионального образования "Южно-Российский государственный технический университет (Новочеркасский политехнический институт)" Method for selective development of upland mineral estate reserves
CN103089266A (en) * 2012-12-18 2013-05-08 鞍钢集团矿业公司 Drift-pillar-free sublevel barnyard caving mining method of open pit transferred underground transitional period
CN106049511A (en) * 2016-06-20 2016-10-26 中钢集团马鞍山矿山研究院有限公司 Combined reinforcement method suitable for non-coal strip mine side slope landslide control
CN107268761A (en) * 2017-08-09 2017-10-20 中国瑞林工程技术有限公司 A kind of surface mine partition type bench energy dissipating relay drainage system and method
CN107313779A (en) * 2017-08-17 2017-11-03 山东华联矿业股份有限公司 Surface mine cheats batter drainage pipe fixing device
CN108867584A (en) * 2018-07-10 2018-11-23 中煤能源研究院有限责任公司 Combine the system and method for carrying out water-storage with underground roadway using discarded opencut

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1130712A (en) * 1995-12-26 1996-09-11 张朝喜 Drainage cut-off (deep ditch high-building method) drainage and supplying optimization combination for preventing and harnessing groud water
US20070169542A1 (en) * 2003-05-27 2007-07-26 The University Of Queensland Blast movement monitor
RU2453700C2 (en) * 2010-08-24 2012-06-20 Государственное образовательное учреждение высшего профессионального образования "Южно-Российский государственный технический университет (Новочеркасский политехнический институт)" Method for selective development of upland mineral estate reserves
CN103089266A (en) * 2012-12-18 2013-05-08 鞍钢集团矿业公司 Drift-pillar-free sublevel barnyard caving mining method of open pit transferred underground transitional period
CN106049511A (en) * 2016-06-20 2016-10-26 中钢集团马鞍山矿山研究院有限公司 Combined reinforcement method suitable for non-coal strip mine side slope landslide control
CN107268761A (en) * 2017-08-09 2017-10-20 中国瑞林工程技术有限公司 A kind of surface mine partition type bench energy dissipating relay drainage system and method
CN107313779A (en) * 2017-08-17 2017-11-03 山东华联矿业股份有限公司 Surface mine cheats batter drainage pipe fixing device
CN108867584A (en) * 2018-07-10 2018-11-23 中煤能源研究院有限责任公司 Combine the system and method for carrying out water-storage with underground roadway using discarded opencut

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王洪胜等: "矿山安全与防灾", 《冶金工业出版社》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111472837A (en) * 2020-04-09 2020-07-31 华能伊敏煤电有限责任公司 Mixed drainage facility of strip mine
CN111852553A (en) * 2020-07-06 2020-10-30 紫金矿业集团股份有限公司 Method for rapidly sinking and trenching open-pit mine with large water inrush quantity
CN111852555A (en) * 2020-07-06 2020-10-30 紫金矿业集团股份有限公司 Trenching method for one-time blasting layered shovel loading of large water inrush sunken strip mine
CN111852553B (en) * 2020-07-06 2021-08-03 紫金矿业集团股份有限公司 Method for rapidly sinking and trenching open-pit mine with large water inrush quantity
CN111852555B (en) * 2020-07-06 2021-08-03 紫金矿业集团股份有限公司 Trenching method for one-time blasting layered shovel loading of large water inrush sunken strip mine
RU2754754C1 (en) * 2021-02-18 2021-09-07 федеральное государственное бюджетное образовательное учреждение высшего образования "Иркутский национальный исследовательский технический университет" (ФГБОУ ВО "ИРНИТУ") Water disposal method in development of bedded deposits by uprising with internal dumping
CN114753465A (en) * 2022-04-21 2022-07-15 中铁十九局集团矿业投资有限公司 Drainage system and drainage method for pit side slope of strip mine

Also Published As

Publication number Publication date
CN109882178B (en) 2021-06-29

Similar Documents

Publication Publication Date Title
CN109882178A (en) A kind of opencut district drainage method
CN109209379B (en) Mine mining, selecting, filling and X mining method
CN206290281U (en) A kind of mine gas extraction pipe negative pressure automatic drainage device
CN207538059U (en) A kind of water drainage of deep foundation pit structure
CN106638891A (en) Comprehensive water managing method in underground mining stage of open pit into underground mining
CN103790590A (en) Technology for preventing and controlling underground floods in transitional period from surface mine to underground mine
CN106120701B (en) Prepressing structure and method for Perioperative cardiac events blowing-filling sludge epeirogenetic
CN206957764U (en) A kind of underground mine capital construction phase temporary drainage system
CN104652383B (en) Tailings warehouse dam body free-draining device
CN106968227A (en) The maintenance arrangement of the permanent plug of induced joint diversion tunnel
CN204370462U (en) Open-cut station water drainage of deep foundation pit system
CN203114340U (en) Drainage device for constructing inclined shaft
CN110578552B (en) Connecting structure of mine drainage shaft and drainage roadway
CN110593949A (en) Mine sluicing wind shielding structure
CN206928255U (en) The maintenance arrangement of the permanent plug of induced joint diversion tunnel
CN205839761U (en) A kind of drainage system for foundation ditch infiltration
CN205348204U (en) Light well point precipitation system
CN109869188A (en) A kind of opencut is removed contamination the district drainage method of separation
CN212896418U (en) Light well point pipe foundation pit dewatering system is united to pipe well
CN103382853A (en) Buffer system for draining local burst gushing water of tunnel and control method
CN103741703B (en) A kind of radial pumped well formula siphon drainage device
CN110552737A (en) Flow guiding device for mine drainage roadway
CN203284787U (en) Composite pipe well precipitation system
CN104088664A (en) Method and system for treating waste water of mine suitable for upward filling and mining
CN107130643B (en) A method of drainage system is added in built Tailings Dam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 243000 No. 666 Xitang Road, Ma'anshan Economic Development Zone, Anhui Province

Applicant after: MAANSHAN Mine Research Institute Co.,Ltd.

Address before: 243000 No. 666 Xitang Road, Ma'anshan Economic Development Zone, Anhui Province

Applicant before: SINOSTEEL MAANSHAN INSTITUTE OF MINING RESEARCH Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant