CN109882158B - Drilling water pumping level testing method and drilling water level testing device - Google Patents
Drilling water pumping level testing method and drilling water level testing device Download PDFInfo
- Publication number
- CN109882158B CN109882158B CN201910214225.XA CN201910214225A CN109882158B CN 109882158 B CN109882158 B CN 109882158B CN 201910214225 A CN201910214225 A CN 201910214225A CN 109882158 B CN109882158 B CN 109882158B
- Authority
- CN
- China
- Prior art keywords
- water level
- water
- data
- hole
- water pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 570
- 238000005086 pumping Methods 0.000 title claims abstract description 52
- 238000012360 testing method Methods 0.000 title claims abstract description 41
- 238000005553 drilling Methods 0.000 title description 6
- 238000011084 recovery Methods 0.000 claims abstract description 87
- 238000000034 method Methods 0.000 claims abstract description 21
- 238000010998 test method Methods 0.000 claims abstract description 3
- 238000012544 monitoring process Methods 0.000 claims description 20
- 239000002184 metal Substances 0.000 claims description 13
- 238000005070 sampling Methods 0.000 claims description 9
- 230000009189 diving Effects 0.000 claims description 5
- 238000006243 chemical reaction Methods 0.000 claims description 4
- 238000011156 evaluation Methods 0.000 abstract description 6
- 238000004891 communication Methods 0.000 description 2
- 239000003673 groundwater Substances 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 229910052500 inorganic mineral Inorganic materials 0.000 description 1
- 239000011707 mineral Substances 0.000 description 1
- 238000001556 precipitation Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 238000011179 visual inspection Methods 0.000 description 1
Images
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明提供一种钻孔抽水水位测试方法及钻孔水位测试装置,该方法包括获取钻孔孔内的初始水位;开启水泵进行单孔抽水试验,获取水位恢复观测数据;根据水位恢复观测数据,拟合水位恢复观测曲线;根据水位恢复观测曲线,获取孔壁水位;计算初始水位和孔壁水位之间的高程差,得到钻孔水位降深值。实现拟合水位恢复观测曲线,将该水位恢复观测曲线曲率最大的坐标点对应的水位确定为孔壁水位,减小了水位的误差,从而获取准确的水位降深,为勘探过程中的水量计算和评价提供了准确的参数,避免因水文地质参数错误而造成的损害。
The invention provides a borehole pumping water level test method and a borehole water level test device. The method includes obtaining the initial water level in the borehole; turning on the water pump to perform a single-hole pumping test to obtain observation data of water level restoration; and according to the observation data of water level restoration, Fit the observation curve of water level restoration; obtain the water level of the hole wall according to the observation curve of water level restoration; calculate the elevation difference between the initial water level and the water level of the hole wall to obtain the drawdown value of the borehole water level. Realize the fitting of the water level recovery observation curve, and determine the water level corresponding to the coordinate point with the largest curvature of the water level recovery observation curve as the hole wall water level, which reduces the error of the water level, thereby obtaining accurate water level drawdown, which is used for the calculation of water volume during the exploration process. And evaluation provides accurate parameters to avoid damage caused by wrong hydrogeological parameters.
Description
技术领域technical field
本发明涉及钻孔技术领域,具体而言,涉及钻孔抽水水位测试方法及钻孔水位测试装置。The invention relates to the technical field of drilling, in particular to a method for testing the pumping water level of a borehole and a device for testing the borehole water level.
背景技术Background technique
目前,在矿产资源的勘探过程中,钻孔抽水降水测试是不可或缺的工作,矿坑涌水量计算和地下水资源量的计算将是地质勘探的日常工作,其中,钻孔水位降深值,已是计算矿坑涌水量和地下水资源量中必不可少的参数。At present, during the exploration of mineral resources, drilling and pumping precipitation tests are indispensable tasks. The calculation of mine water inflow and groundwater resources will be the daily work of geological exploration. Among them, the drilling water level drawdown value has been It is an essential parameter in the calculation of mine water inflow and groundwater resources.
当前,钻孔水位降深值,主要是通过测量钻孔孔内的初始水位和孔内水位的最低点,并将测量的孔内水位的最低点作为漏斗中心水位,然后通过计算初始水位与漏斗中心水位的高程之差,得到钻孔水位降深值。At present, the water level drawdown of the borehole is mainly measured by measuring the initial water level in the borehole and the lowest point of the water level in the hole, and taking the lowest point of the measured water level in the hole as the center water level of the funnel, and then calculating the initial water level and the funnel The elevation difference of the central water level is used to obtain the borehole water level drawdown value.
由于水位降深值的定义为抽水构筑物处的初始水位与漏斗中心水位之差,其中,漏斗中心水位是孔壁水位的最低点,而测量的孔内水位的最低点与定义上的漏斗中心水位之间存在很大差别,将孔内水位的最低点直接作为漏斗中心水位,导致计算的钻孔水位降深值误差很大,通过该钻孔水位降深值获取的水文地质参数的误差很大,且根据该钻孔水位降深值及其反求的其他水文地质参数计算的涌水量远远小于井筒或矿坑实际涌水量,从而容易造成井筒或矿坑被淹和死亡灾害。Since the water level drawdown value is defined as the difference between the initial water level at the pumping structure and the water level at the center of the funnel, where the water level at the center of the funnel is the lowest point of the water level on the wall of the hole, and the lowest point of the measured water level in the hole is the same as the water level at the center of the funnel as defined There is a big difference between them. The lowest point of the water level in the hole is directly used as the center water level of the funnel, resulting in a large error in the calculated borehole water level drawdown value, and a large error in the hydrogeological parameters obtained through the borehole water level drawdown value. , and the water inflow calculated based on the borehole water level drawdown value and other hydrogeological parameters calculated inversely is far less than the actual water inflow of the shaft or pit, which may easily cause the well shaft or pit to be flooded and die.
发明内容Contents of the invention
有鉴于此,本发明实施例的目的在于提供一种钻孔抽水水位测试方法及钻孔水位测试装置,实现拟合水位恢复观测曲线,将该水位恢复观测曲线曲率最大的坐标点对应的水位确定为漏斗中心水位,减小了定义的漏斗中心水位的误差,从而可以获取准确的水位降深,为矿坑的涌水量计算和评价提供了准确的参数,避免了因水文地质参数错误而造成的损害。In view of this, the purpose of the embodiments of the present invention is to provide a borehole pumping water level testing method and a borehole water level testing device, to achieve fitting the water level recovery observation curve, and determine the water level corresponding to the coordinate point with the largest curvature of the water level recovery observation curve It is the funnel center water level, which reduces the error of the defined funnel center water level, so that accurate water level drawdown can be obtained, and accurate parameters are provided for the calculation and evaluation of water inflow in mine pits, and damage caused by errors in hydrogeological parameters is avoided .
第一方面,本发明实施例提供了一种钻孔抽水水位测试方法,所述方法包括:In a first aspect, an embodiment of the present invention provides a method for testing a borehole pumping water level, the method comprising:
获取钻孔孔内的初始水位;Obtain the initial water level in the borehole;
开启水泵进行单孔抽水试验,获取水位恢复观测数据;Turn on the water pump to conduct a single-hole pumping test to obtain observation data of water level recovery;
根据所述水位恢复观测数据,拟合水位恢复观测曲线;Fitting the water level recovery observation curve according to the water level recovery observation data;
根据所述水位恢复观测曲线,获取孔壁水位;Obtaining the water level of the hole wall according to the water level restoration observation curve;
计算所述初始水位和所述孔壁水位之间的高程差,得到钻孔水位降深值。Calculate the elevation difference between the initial water level and the water level of the hole wall to obtain the water level drawdown value of the borehole.
结合第一方面,本发明实施例提供了上述第一方面的第一种可能的实现方式,其中,所述开启水泵进行单孔抽水试验,获取水位恢复观测数据,包括:In combination with the first aspect, the embodiment of the present invention provides a first possible implementation of the first aspect above, wherein the turning on the water pump to conduct a single-hole pumping test to obtain observation data of water level restoration includes:
开启水泵进行抽水测试;Turn on the water pump for pumping test;
在进行预设时间段的抽水操作后,关闭水泵,通过水压传感器获取停止抽水后的孔内恢复水压数据;After the pumping operation is performed for a preset period of time, the water pump is turned off, and the water pressure data in the hole after stopping the pumping is obtained through the water pressure sensor;
将所述孔内恢复水压数据转换成水位恢复观测数据。Converting the restoration water pressure data in the hole into observation data of water level restoration.
结合第一方面,本发明实施例提供了上述第一方面的第二种可能的实现方式,其中,所述根据所述水位恢复观测数据,拟合水位恢复观测曲线,包括:In combination with the first aspect, the embodiment of the present invention provides a second possible implementation of the above first aspect, wherein the fitting of the water level restoration observation curve according to the water level restoration observation data includes:
根据所述水位恢复观测数据绘制水位恢复曲线;Draw a water level recovery curve according to the water level recovery observation data;
根据所述水位恢复曲线拟合水位恢复观测曲线。Fitting the water level recovery observation curve according to the water level recovery curve.
结合第一方面,本发明实施例提供了上述第一方面的第三种可能的实现方式,其中,所述根据所述水恢复位观测曲线,获取孔壁水位,包括:In combination with the first aspect, the embodiment of the present invention provides a third possible implementation of the above-mentioned first aspect, wherein the obtaining the water level of the hole wall according to the observation curve of the water restoration position includes:
根据所述水位观测曲线建立水位恢复曲线观测方程;Establishing a water level recovery curve observation equation according to the water level observation curve;
根据所述水位恢复曲线观测方程,计算所述水位恢复观测曲线上各坐标点对应的曲率;According to the observation equation of the water level recovery curve, calculate the curvature corresponding to each coordinate point on the water level recovery observation curve;
从所述各坐标点对应的曲率中确定曲率最大的坐标点;determining the coordinate point with the largest curvature from the curvatures corresponding to each coordinate point;
将所述确定的坐标点对应的水位确定为孔壁水位。The water level corresponding to the determined coordinate point is determined as the hole wall water level.
结合第一方面的第一种可能的实施方式,本发明实施例提供了上述第一方面的第四种可能的实现方式,其中,所述在进行预设时间段的抽水操作后,关闭水泵,通过所述水压传感器获取停止抽水后的孔内恢复水压数据,包括:With reference to the first possible implementation manner of the first aspect, the embodiment of the present invention provides a fourth possible implementation manner of the first aspect above, wherein, after performing the pumping operation for a preset period of time, turning off the water pump, The recovery water pressure data in the hole after stopping pumping is obtained through the water pressure sensor, including:
在进行预设时间段的抽水操作后,关闭水泵,通过所述水压传感器持续获取孔内水压数据;After performing the pumping operation for a preset period of time, the water pump is turned off, and the water pressure data in the hole is continuously obtained through the water pressure sensor;
对持续获取的孔内水压数据进行实时监测,当监测到连续获取的孔内水压数据满足预设稳定条件时,停止获取孔内水压数据;Carry out real-time monitoring of the continuously acquired water pressure data in the hole, and stop obtaining the water pressure data in the hole when the continuously obtained water pressure data in the hole is monitored to meet the preset stability conditions;
将从关闭水泵至停止获取孔内水压数据的过程中获取的孔内水压数据确定为停止抽水后的孔内恢复水压数据。The in-hole water pressure data acquired during the process from turning off the water pump to stopping the acquisition of in-hole water pressure data is determined as the in-hole recovery water pressure data after stopping pumping.
第二方面,本发明实施例提供了一种钻孔水位测试装置,所述装置包括水压传感器、二次仪表、数据处理器和数据线缆;In a second aspect, an embodiment of the present invention provides a borehole water level test device, the device includes a water pressure sensor, a secondary instrument, a data processor, and a data cable;
所述数据线缆的潜水端连接所述水压传感器,所述数据线缆的地面端连接所述二次仪表;The submersible end of the data cable is connected to the water pressure sensor, and the ground end of the data cable is connected to the secondary instrument;
所述水压传感器,用于采集初始水位及孔内水压数据,并将所述初始水位及孔内水压数据通过所述数据线缆传输给所述二次仪表;The water pressure sensor is used to collect initial water level and water pressure data in the hole, and transmit the initial water level and water pressure data in the hole to the secondary instrument through the data cable;
所述二次仪表,通过所述数据线缆发送监测命令给所述水压传感器;接收、存储和显示所述水压传感器传输的所述初始水位及孔内水压数据;The secondary instrument sends a monitoring command to the water pressure sensor through the data cable; receives, stores and displays the initial water level and the water pressure data in the hole transmitted by the water pressure sensor;
所述数据处理器,将所述孔内水压数据转换成水位恢复观测数据;根据所述水位恢复观测数据绘制水位恢复曲线;根据所述水位恢复曲线拟合水位恢复观测曲线;根据所述水位恢复观测曲线获取孔壁水位;计算初始水位和所述孔壁水位之间的高程差,得到钻孔水位降深值。The data processor converts the water pressure data in the hole into water level restoration observation data; draws a water level restoration curve according to the water level restoration observation data; fits a water level restoration observation curve according to the water level restoration curve; The observation curve is restored to obtain the water level of the hole wall; the elevation difference between the initial water level and the water level of the hole wall is calculated to obtain the drawdown value of the borehole water level.
结合第二方面,本发明实施例提供了上述第二方面的第一种可能的实现方式,其中,所述装置还包括水泵和金属杆;With reference to the second aspect, the embodiment of the present invention provides the first possible implementation of the second aspect above, wherein the device further includes a water pump and a metal rod;
所述水泵的吸水管与所述金属杆捆绑在一起;The water suction pipe of the water pump is bound together with the metal rod;
所述数据线缆固定在所述金属杆上,所述水压传感器固定安装在所述金属杆的潜水端。The data cable is fixed on the metal pole, and the water pressure sensor is fixedly installed on the diving end of the metal pole.
结合第二方面,本发明实施例提供了上述第二方面的第二种可能的实现方式,其中,所述二次仪表包括接收元件、存储元件、控制元件、信号键和显示屏;In combination with the second aspect, the embodiment of the present invention provides a second possible implementation of the second aspect above, wherein the secondary instrument includes a receiving element, a storage element, a control element, a signal key, and a display screen;
所述接收元件分别与所述存储元件、所述显示屏和所述水压传感器连接,接收所述水压传感器传输的所述孔内水压数据,并传输所述孔内水压数据给所述存储元件和所述显示屏;所述存储元件,用于存储所述孔内水压数据;所述显示屏,用于显示所述孔内水压数据;The receiving element is respectively connected with the storage element, the display screen and the water pressure sensor, receives the water pressure data in the hole transmitted by the water pressure sensor, and transmits the water pressure data in the hole to the The storage element and the display screen; the storage element is used to store the water pressure data in the hole; the display screen is used to display the water pressure data in the hole;
所述控制元件分别与所述存储元件、所述显示屏、所述信号键和所述水压传感器连接,接收所述信号键传输的触发信号,并根据所述触发信号发送监测命令给所述水压传感器,或者根据所述触发信号,从所述存储元件中调取所述孔内水压数据,并将所述孔内水压数据传输给所述显示屏。The control element is respectively connected with the storage element, the display screen, the signal key and the water pressure sensor, receives the trigger signal transmitted by the signal key, and sends a monitoring command to the The water pressure sensor, or according to the trigger signal, retrieves the water pressure data in the hole from the storage element, and transmits the water pressure data in the hole to the display screen.
结合第二方面的第二种可能的实施方式,本发明实施例提供了上述第二方面的第三种可能的实现方式,其中,所述信号键包括钟表校对键、存储键、显示键、采样频率设置键、水位换算键和数据导出键。With reference to the second possible implementation of the second aspect, the embodiment of the present invention provides a third possible implementation of the second aspect above, wherein the signal keys include a watch calibration key, a storage key, a display key, a sample Frequency setting key, water level conversion key and data export key.
结合第二方面的第二种可能的实施方式,本发明实施例提供了上述第二方面的第四种可能的实现方式,其中,所述二次仪表还包括USB接口和网络接口;With reference to the second possible implementation of the second aspect, the embodiment of the present invention provides a fourth possible implementation of the second aspect above, wherein the secondary instrument further includes a USB interface and a network interface;
所述USB接口,用于导出采集的钻孔孔内初始水位和钻孔孔内水位恢复数据;The USB interface is used to export the collected initial water level in the borehole and recovery data of the water level in the borehole;
所述网络接口,用于通过有线线缆连接所述二次仪表和所述数据处理器。The network interface is used to connect the secondary instrument and the data processor through a wired cable.
在本发明实施例提供的方法及装置中,该钻孔抽水水位测试方法包括获取钻孔孔内的初始水位;开启水泵进行单孔抽水试验,获取水位恢复观测数据;根据水位恢复观测数据,拟合水位恢复观测曲线;根据水位恢复观测曲线,获取孔壁水位;计算初始水位和孔壁水位之间的高程差,得到钻孔水位降深值;该钻孔水位测试装置包括水压传感器、二次仪表、数据处理器和数据线缆;数据线缆的潜水端连接水压传感器,数据线缆的地面端连接二次仪表;水压传感器,用于采集初始水位及孔内水压数据,并将初始水位及孔内水压数据通过数据线缆传输给二次仪表;二次仪表,通过数据线缆发送监测命令给水压传感器;接收、存储和显示水压传感器传输的初始水位及孔内水压数据;数据处理器,将孔内水压数据转换成水位恢复观测数据;根据水位恢复观测数据绘制水位恢复曲线;根据水位恢复曲线拟合水位恢复观测曲线;根据水位恢复观测曲线获取孔壁水位;计算初始水位和孔壁水位之间的高程差,得到钻孔水位降深值。实现了拟合水位恢复观测曲线,将该水位恢复观测曲线曲率最大的坐标点对应的水位确定为孔壁水位,减小了与定义的漏斗中心水位的误差,从而可以获取准确的水位降深,为矿坑的涌水量计算和评价提供了准确的参数,避免了因水文地质参数错误而造成的损害。In the method and device provided in the embodiments of the present invention, the borehole pumping water level test method includes obtaining the initial water level in the borehole; turning on the water pump to perform a single-hole pumping test, and obtaining the observation data of water level restoration; According to the water level restoration observation curve, the water level of the hole wall is obtained; the elevation difference between the initial water level and the water level of the hole wall is calculated to obtain the water level drawdown value of the borehole; the water level test device of the borehole includes a water pressure sensor, two secondary instrument, data processor and data cable; the submersible end of the data cable is connected to the water pressure sensor, and the ground end of the data cable is connected to the secondary instrument; the water pressure sensor is used to collect the initial water level and water pressure data in the hole, and Transmit the initial water level and water pressure data in the hole to the secondary instrument through the data cable; the secondary instrument sends monitoring commands to the water pressure sensor through the data cable; receives, stores and displays the initial water level and the water pressure in the hole transmitted by the water pressure sensor Water pressure data; data processor, convert the water pressure data in the hole into water level restoration observation data; draw the water level restoration curve according to the water level restoration observation data; fit the water level restoration observation curve according to the water level restoration curve; obtain the hole wall according to the water level restoration observation curve Water level: Calculate the elevation difference between the initial water level and the water level of the hole wall to obtain the drawdown value of the borehole water level. The fitting of the water level recovery observation curve is realized, and the water level corresponding to the coordinate point with the largest curvature of the water level recovery observation curve is determined as the water level of the hole wall, which reduces the error with the defined funnel center water level, so that accurate water level drawdown can be obtained. Accurate parameters are provided for the calculation and evaluation of water inflow in mine pits, and damages caused by errors in hydrogeological parameters are avoided.
为使本发明的上述目的、特征和优点能更明显易懂,下文特举较佳实施例,并配合所附附图,作详细说明如下。In order to make the above-mentioned objects, features and advantages of the present invention more comprehensible, preferred embodiments will be described in detail below together with the accompanying drawings.
附图说明Description of drawings
为了更清楚地说明本发明实施例的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本发明的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。In order to illustrate the technical solutions of the embodiments of the present invention more clearly, the accompanying drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of the present invention, and thus It should be regarded as a limitation on the scope, and those skilled in the art can also obtain other related drawings based on these drawings without creative work.
图1A示出了本发明实施例1所提供的钻孔抽水水位测试方法的流程图;Fig. 1A shows the flow chart of the borehole pumping water level testing method provided by Embodiment 1 of the present invention;
图1B示出了本发明实施例1所提供的获取水位恢复观测数据的流程图;FIG. 1B shows a flow chart of obtaining observation data for water level restoration provided by Embodiment 1 of the present invention;
图1C示出了本发明实施例1所提供的获取孔壁水位的流程图;Fig. 1C shows the flow chart of obtaining the water level of the hole wall provided by Embodiment 1 of the present invention;
图1D示出了本发明实施例1所提供的水位恢复曲线,以及水位恢复观测曲线;Figure 1D shows the water level recovery curve provided by
图2A示出了本发明实施例2所提供的一种钻孔水位测试装置的结构示意图;FIG. 2A shows a schematic structural view of a borehole water level testing device provided in
图2B示出了本发明实施例2所提供的钻孔水位测试装置的结构图。Fig. 2B shows a structural view of the borehole water level testing device provided by
具体实施方式Detailed ways
下面将结合本发明实施例中附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。通常在此处附图中描述和示出的本发明实施例的组件可以以各种不同的配置来布置和设计。因此,以下对在附图中提供的本发明的实施例的详细描述并非旨在限制要求保护的本发明的范围,而是仅仅表示本发明的选定实施例。基于本发明的实施例,本领域技术人员在没有做出创造性劳动的前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. The components of the embodiments of the invention generally described and illustrated in the figures herein may be arranged and designed in a variety of different configurations. Accordingly, the following detailed description of the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the invention. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without making creative efforts belong to the protection scope of the present invention.
考虑到现有技术中,由于测量的孔内水位的最低点与定义上的漏斗中心水位之间存在很大差别,将孔内水位的最低点直接作为漏斗中心水位,导致计算的钻孔水位降深值误差很大,通过该钻孔水位降深值获取的水文地质参数的误差很大,且根据该钻孔水位降深值计算的涌水量远远小于井筒和矿坑实际涌水量,从而在勘探过程中容易造成井筒或矿坑被淹和死亡灾害。基于此,本发明提供了一种钻孔抽水水位测试方法及钻孔水位测试装置,实现拟合水位恢复观测曲线,将该水位恢复观测曲线曲率最大的坐标点对应的水位确定为漏斗中心水位,减小了与定义的漏斗中心水位的误差,从而可以获取准确的水位降深,为勘探过程中对矿坑涌水量水量计算和评价提供了准确的参数,避免了因水文地质参数错误而造成的损害。下面通过实施例进行描述。Considering that in the prior art, due to the large difference between the lowest point of the measured water level in the hole and the defined funnel center water level, the lowest point of the water level in the hole is directly used as the center water level of the funnel, resulting in a drop in the calculated water level of the borehole. The error of the depth value is very large, the error of the hydrogeological parameters obtained through the water level drawdown value of the borehole is very large, and the water inflow calculated according to the water level drawdown value of the borehole is far smaller than the actual water inflow in the wellbore and mine pit, so in the exploration In the process, it is easy to cause the shaft or mine to be flooded and the disaster of death. Based on this, the present invention provides a borehole pumping water level testing method and a borehole water level testing device to realize fitting of the water level recovery observation curve, and determine the water level corresponding to the coordinate point with the largest curvature of the water level recovery observation curve as the funnel center water level, The error with the defined funnel center water level is reduced, so that accurate water level drawdown can be obtained, which provides accurate parameters for the calculation and evaluation of mine water inflow during the exploration process, and avoids damage caused by wrong hydrogeological parameters . The following is described by way of examples.
实施例1Example 1
参见图1A,本发明实施例提供了一种钻孔抽水水位测试方法。该方法包括以下S101-S105步骤。Referring to FIG. 1A , an embodiment of the present invention provides a method for testing a borehole pumping water level. The method includes the following steps S101-S105.
步骤S101:获取钻孔孔内的初始水位。Step S101: Obtain the initial water level in the borehole.
步骤S102:开启水泵进行单孔抽水试验,获取水位恢复观测数据。Step S102: Turn on the water pump to conduct a single-hole pumping test to obtain observation data of water level restoration.
步骤S103:根据水位观测数据,拟合水位恢复观测曲线。Step S103: According to the water level observation data, the water level restoration observation curve is fitted.
步骤S104:根据水位恢复观测曲线,获取孔壁水位。Step S104: Obtain the water level of the hole wall according to the water level restoration observation curve.
步骤S105:计算初始水位和孔壁水位之间的高程差,得到钻孔水位降深值。Step S105: Calculate the elevation difference between the initial water level and the water level of the hole wall to obtain the drawdown value of the borehole water level.
在本发明实施例中,在对钻孔进行单孔抽水试验之前, 需要先获取钻孔孔内的初始水位。其中,获取钻孔孔内的初始水位,是通过水压传感器先采集钻孔内水位的水压数据,水压传感器将采集的水压数据传输给二次仪表,然后通过二次仪表或其它水位换算器将水压数据换算成对应的水位值,将该水位值作为钻孔孔内的初始水位。In the embodiment of the present invention, before performing a single-hole pumping test on the borehole, it is necessary to obtain the initial water level in the borehole. Among them, to obtain the initial water level in the borehole, first collect the water pressure data of the water level in the borehole through the water pressure sensor, and the water pressure sensor transmits the collected water pressure data to the secondary instrument, and then through the secondary instrument or other water level The converter converts the water pressure data into a corresponding water level value, and the water level value is used as the initial water level in the borehole.
在上述S102步骤中,在按照勘探规范和单孔抽水试验标准等行业标准进行单孔抽水试验过程中, 获取水位观测数据, 具体可通过以下S1021-S1023步骤获取,如图1B所示。In the above S102 step, during the single-hole pumping test in accordance with industry standards such as exploration specifications and single-hole pumping test standards, the water level observation data can be obtained specifically through the following steps S1021-S1023, as shown in Figure 1B.
步骤S1021:开启水泵进行抽水测试。Step S1021: Turn on the water pump for water pumping test.
在水泵进行抽水时,上述水压传感器实时采集孔内抽水水压数据,并通过数据线缆将孔内抽水水压数据传输给地面上的二次仪表,二次仪表显示并存储孔内抽水水压数据。When the water pump is pumping water, the above-mentioned water pressure sensor collects the water pressure data in the hole in real time, and transmits the water pressure data in the hole to the secondary instrument on the ground through the data cable, and the secondary instrument displays and stores the water pumped in the hole. Compress data.
步骤S1022:在进行预设时间段的抽水操作后,关闭水泵,通过水压传感器获取停止抽水后的孔内恢复水压数据。Step S1022: after the pumping operation for a preset period of time, the water pump is turned off, and the water pressure data in the hole after the water pumping is stopped is acquired through the water pressure sensor.
在上述步骤S1022中,通过水压传感器获取停止抽水后的孔内恢复水压数据,具体可通过以下S10221-S10223步骤来获取。In the above step S1022, the recovery water pressure data in the hole after stopping the water pumping is obtained through the water pressure sensor, which can be obtained specifically through the following steps S10221-S10223.
步骤S10221:在进行预设时间段的抽水操作后,关闭水泵,通过水压传感器持续获取孔内水压数据。Step S10221: After the pumping operation is performed for a preset period of time, the water pump is turned off, and the water pressure data in the hole is continuously acquired through the water pressure sensor.
上述预设时间段,对钻孔水位的高频观测比单孔抽水试验标准中要求的最短时间要长,可以是1小时,在进行预设时间的抽水操作后,然后可以降低采样频率。For the preset time period mentioned above, the high-frequency observation of the borehole water level is longer than the minimum time required in the single-hole pumping test standard, which can be 1 hour. After the pumping operation for the preset time, the sampling frequency can then be reduced.
当关闭水泵后,二次仪表向水压传感器发送监测命令,水压传感器接收到监测命令后,按照监测命令包括的采样频率开始采集孔内水压数据。其中,该采样频率不低于5次/秒。When the water pump is turned off, the secondary instrument sends a monitoring command to the water pressure sensor. After receiving the monitoring command, the water pressure sensor starts to collect water pressure data in the hole according to the sampling frequency included in the monitoring command. Wherein, the sampling frequency is not lower than 5 times/second.
步骤S10222:对持续获取的孔内水压数据进行实时监测,当监测到连续获取的孔内水压数据满足预设稳定条件时,停止获取孔内水压数据。Step S10222: Perform real-time monitoring of the continuously acquired in-hole water pressure data, and stop acquiring in-hole water pressure data when the continuously acquired in-hole water pressure data is monitored to meet the preset stability conditions.
在水压传感器根据监测命令采集孔内水压数据时,二次仪表便可以接收到水压传感器传输的孔内水压数据,并对接收到的孔内水压数据进行统计,当统计的孔内水压数据中最后两个水压数据之差小于或等于预设值时,则说明孔内水压数据满足预设稳定条件,此时,二次仪表发送停止监测命令给水压传感器,水压传感器停止采集孔内水压数据;当统计的孔内水压数据中最后连续两个水压数据之差大于预设值,则说明孔内水压数据不满足预设稳定条件,此时,水压传感器继续采集孔内水压数据,二次仪表实时计算最后两个孔内水压数据之差,直至该最后两个孔内水压数据之差小于预设值,二次仪表发送停止监测命令给水压传感器,水压传感器停止采集孔内水压数据。When the water pressure sensor collects the water pressure data in the hole according to the monitoring command, the secondary instrument can receive the water pressure data in the hole transmitted by the water pressure sensor, and make statistics on the received water pressure data in the hole. When the difference between the last two water pressure data in the internal water pressure data is less than or equal to the preset value, it means that the water pressure data in the hole meets the preset stable conditions. At this time, the secondary instrument sends a stop monitoring command to the water pressure sensor, and the water pressure The pressure sensor stops collecting water pressure data in the hole; when the difference between the last two consecutive water pressure data in the statistical water pressure data in the hole is greater than the preset value, it means that the water pressure data in the hole does not meet the preset stability conditions. At this time, The water pressure sensor continues to collect water pressure data in the hole, and the secondary meter calculates the difference between the last two water pressure data in real time until the difference between the last two water pressure data is less than the preset value, and the secondary meter sends to stop monitoring The command is given to the water pressure sensor, and the water pressure sensor stops collecting water pressure data in the hole.
步骤S10223:将从关闭水泵至停止获取孔内水压数据的过程中获取的孔内水压数据确定为停止抽水后的孔内恢复水压数据。Step S10223: Determine the in-hole water pressure data acquired during the process from turning off the water pump to stopping the acquisition of in-hole water pressure data as the in-hole recovery water pressure data after stopping water pumping.
当通过S1022步骤获取到孔内恢复水压数据后,可通过以下S1023步骤获取水位恢复观测数据。After the recovery water pressure data in the hole is obtained through the step S1022, the water level recovery observation data can be obtained through the following step S1023.
步骤S1023:将孔内恢复水压数据转换成水位恢复观测数据。Step S1023: Convert the restoration water pressure data in the hole into observation data of water level restoration.
当通过S102步骤获取到水位恢复观测数据后,可通过以上S103步骤获取水位恢复观测曲线。After the water level recovery observation data is obtained through the step S102, the water level recovery observation curve can be obtained through the above step S103.
在上述步骤S103中,根据水位恢复观测数据,拟合水位恢复观测曲线,可通过以下过程来完成。In the above step S103, according to the water level recovery observation data, fitting the water level recovery observation curve can be completed through the following process.
首先根据水位恢复观测数据绘制水位恢复曲线;然后根据水位恢复曲线拟合水位恢复观测曲线。First, the water level recovery curve is drawn according to the water level recovery observation data; then, the water level recovery observation curve is fitted according to the water level recovery curve.
由于获取到的水位恢复观测数据中存在一些误差很大的数据,导致上述绘制的水位恢复曲线不平滑,此时还需要根据该水位恢复曲线建立对应的水位恢复曲线方程,通过对该建立的水位恢复曲线方程进行优化,以使根据优化后的水位恢复曲线方程绘制出平滑的水位恢复曲线,并将该平滑的水位恢复曲线确定为水位恢复观测曲线。Due to some data with large errors in the obtained water level recovery observation data, the water level recovery curve drawn above is not smooth. At this time, it is necessary to establish a corresponding water level recovery curve equation based on the water level recovery curve. The recovery curve equation is optimized so that a smooth water level recovery curve is drawn according to the optimized water level recovery curve equation, and the smooth water level recovery curve is determined as the water level recovery observation curve.
在本发明实施例中,绘制的水位恢复曲线,以及拟合得到的水位恢复观测曲线,示意性如图如1D所示。图1D中,水位恢复曲线对应的方程为h1=V(t),水位恢复观测曲线对应的方程为h2=V(t),其中,V为水压,t为恢复时间。In the embodiment of the present invention, the drawn water level recovery curve and the fitted observed water level recovery curve are schematically shown in Figure 1D. In Fig. 1D, the equation corresponding to the water level recovery curve is h1=V(t), and the equation corresponding to the water level recovery observation curve is h2=V(t), where V is the water pressure and t is the recovery time.
在上述步骤S104中,根据水位恢复观测曲线,获取孔壁水位,可通过以下S1041-S1044步骤来获取,如图1C所示。In the above step S104, the water level of the hole wall is obtained according to the water level recovery observation curve, which can be obtained through the following steps S1041-S1044, as shown in FIG. 1C.
步骤S1041:根据水位恢复观测曲线建立水位恢复曲线观测方程。Step S1041: Establish the observation equation of the water level recovery curve according to the water level recovery observation curve.
步骤S1042:根据水位恢复曲线观测方程,计算水位恢复观测曲线上各坐标点对应的曲率。Step S1042: According to the observation equation of the water level restoration curve, calculate the curvature corresponding to each coordinate point on the water level restoration observation curve.
步骤S1043:从各坐标点对应的曲率中确定曲率最大的坐标点。Step S1043: Determine the coordinate point with the largest curvature from the curvatures corresponding to each coordinate point.
步骤S1044:将确定的坐标点对应的水位确定为孔壁水位。Step S1044: Determine the water level corresponding to the determined coordinate point as the hole wall water level.
在本发明实施例中,根据水位观测曲线,获取孔壁水位,还可以通过目测法,观察水位恢复观测曲线上曲率最大的坐标点,将确定的坐标点对应的水位确定为孔壁水位。In the embodiment of the present invention, the hole wall water level is obtained according to the water level observation curve, and the coordinate point with the largest curvature on the water level recovery observation curve can also be observed by visual inspection, and the water level corresponding to the determined coordinate point is determined as the hole wall water level.
当通过以上S104获取孔壁水位后,可通过以上S105步骤钻孔水位降深值。After the hole wall water level is obtained through the above S104, the drilling water level drawdown value can be obtained through the above step S105.
在本发明实施例中,通过建立水位恢复观测曲线,将水位恢复观测曲线上曲率最大的坐标点对应的水位,确定为孔壁水位,如此,确定出的孔壁水位与定义的漏斗中心的误差很小,从而根据该漏斗中心水位计算的钻孔水位降深值精确度很高,通过该钻孔水位降深值计算水文地质参数的误差很小,在勘探过程中,根据该钻孔水位降深值计算的矿坑涌水量或井筒涌水量更为合理,可以减少出现井筒或矿坑被淹和死亡灾害的机率。In the embodiment of the present invention, by establishing the water level recovery observation curve, the water level corresponding to the coordinate point with the largest curvature on the water level recovery observation curve is determined as the water level of the hole wall. In this way, the error between the determined water level of the hole wall and the defined funnel center Therefore, the accuracy of the borehole drawdown value calculated according to the water level in the center of the funnel is very high, and the error in calculating the hydrogeological parameters through the borehole water level drawdown value is very small. The water inflow of the mine pit or the water inflow of the shaft calculated by the depth value is more reasonable, which can reduce the probability of flooding and death disasters in the shaft or mine.
在本发明实施例提供的钻孔抽水水位测试方法,该方法包括获取钻孔孔内的初始水位;开启水泵进行单孔抽水试验,获取水位恢复观测数据;根据水位恢复观测数据,拟合水位恢复观测曲线;根据水位恢复观测曲线,获取孔壁水位;计算初始水位和孔壁水位之间的高程差,得到钻孔水位降深值。实现了拟合水位观测曲线,将该水位观测曲线曲率最大的坐标点对应的水位确定为孔壁水位,减小了与定义的漏斗中心水位的误差,从而可以获取准确的水位降深,为勘探过程中的水量计算和评价提供了准确的参数,避免了因水文地质参数错误而造成的损害。In the borehole pumping water level testing method provided in the embodiment of the present invention, the method includes obtaining the initial water level in the borehole; turning on the water pump to perform a single-hole pumping test, and obtaining the observation data of water level restoration; according to the observation data of water level restoration, fitting the water level restoration Observation curve; According to the observation curve of water level recovery, the water level of the hole wall is obtained; the elevation difference between the initial water level and the water level of the hole wall is calculated to obtain the water level drawdown value of the borehole. The fitting of the water level observation curve is realized, and the water level corresponding to the coordinate point with the largest curvature of the water level observation curve is determined as the water level of the hole wall, which reduces the error with the defined funnel center water level, so that accurate water level drawdown can be obtained. The calculation and evaluation of water volume in the process provides accurate parameters and avoids damage caused by wrong hydrogeological parameters.
实施例2Example 2
参见图2A或2B,本发明实施例提供了一种钻孔水位测试装置,该装置包括水压传感器1、二次仪表2、数据处理器3和数据线缆4;Referring to Fig. 2A or 2B, an embodiment of the present invention provides a borehole water level testing device, which includes a
数据线缆4的潜水端连接水压传感器1,数据线缆4的地面端连接二次仪表2;The diving end of the
水压传感器1,用于采集初始水位及孔内水压数据,并将初始水位及孔内水压数据通过数据线缆4传输给二次仪表2;The
二次仪表2,通过数据线缆4发送监测命令给水压传感器1;接收、存储和显示水压传感器1传输的初始水位及孔内水压数据;The
数据处理器3,将孔内水压数据转换成水位恢复观测数据;根据水位恢复观测数据绘制水位恢复曲线;根据水位恢复曲线拟合水位恢复观测曲线;根据水位恢复观测曲线获取孔壁水位;计算初始水位和孔壁水位之间的高程差,得到钻孔水位降深值。The
在本发明实施例中,上述数据线缆4为防水、防腐蚀、抗干扰的低压线缆。该数据线缆4的地面端露置在地面上方的末端,该数据线缆4的潜水端为露置在钻孔内的末端。In the embodiment of the present invention, the above-mentioned
在采集初始水位对应的水压数据及孔内水压数据时,上述水压传感器1需要放置在钻孔孔内水位以下预设距离处。水压传感器1根据上述二次仪表2发送的监测命令开始采集孔内水压数据,其中,该监测命令包括采集时间和采集频率等。When collecting the water pressure data corresponding to the initial water level and the water pressure data in the hole, the above
上述二次仪表2为存储显示设备,根据用户的控制命令或用户事先设置的测试程序向水压传感器1发送监测命令或停止监测命令。The above-mentioned
上述数据处理器3可以是计算机、手机或进行水压数据处理的设备。该数据处理器3可以设置在远离勘探现场的远程控制中心,用户可以从上述二次仪表2中导出存储的初始水位对应的水压数据及孔内水压数据,并将该初始水位对应的水压数据及孔内水压数据通过网络传输给上述数据处理器3;该数据处理器3还可以设置在勘探现场,通过通信线缆与二次仪表2连接,二次仪表2通过该通信线缆,将存储的或实时采集的初始水位对应的水压数据及孔内水压数据传输给该数据处理器3。The above-mentioned
参见图2B,该装置还包括水泵5和金属杆6;Referring to Fig. 2B, the device also includes a
水泵5的吸水管与金属杆6捆绑在一起。The water suction pipe of
数据线缆4固定在金属杆6上,水压传感器1固定安装在金属杆6的潜水端。The
在本发明实施例中,上述水泵5可以是离心式水泵5。水压传感器1与上述水泵5的吸水管的进水口的距离不小于10m。上述数据线缆4固定在金属杆6上,可以避免单孔抽水试验过程中,数据线缆4被吸入水泵5的吸水管内。In the embodiment of the present invention, the above-mentioned
在本发明实施例中,上述二次仪表2包括接收元件、存储元件、控制元件、信号键和显示屏;In the embodiment of the present invention, the above-mentioned
接收元件分别与存储元件、显示屏和水压传感器1连接,接收水压传感器1传输的孔内水压数据,并传输孔内水压数据给存储元件和显示屏;存储元件,用于存储孔内水压数据;显示屏,用于显示孔内水压数据;The receiving element is respectively connected with the storage element, the display screen and the
控制元件分别与存储元件、显示屏、信号键和水压传感器1连接,接收信号键传输的触发信号,并根据触发信号发送监测命令给水压传感器1,或者根据触发信号,从存储元件中调取孔内水压数据,并将孔内水压数据传输给显示屏。The control element is respectively connected with the storage element, the display screen, the signal key and the
上述信号键包括钟表校对键、存储键、显示键、采样频率设置键、水位换算键和数据导出键。The above-mentioned signal keys include a watch calibration key, a storage key, a display key, a sampling frequency setting key, a water level conversion key and a data export key.
上述钟表校对键,用来校对上述水压传感器1的时间,用户按下此键,二次仪表2可以发送钟表校对的指令给水压传感器1,以使水压传感器1将自身的钟表时间调整至与二次仪表2当前时间一致的时间。通过钟表校对,可以确保二次仪表2存储的数据与水压传感器1采集的数据同步,提高数据的准确性。The clock calibration key is used to calibrate the time of the
上述存储键,用来存储水压传感器1传输的数据,用户按下此键,二次仪表2开始保存水压传感器1传输的数据,再次按下此键,水压传感器1将从按下此键开始至再次按下此键之间的数据进行分段保存,并重新开始另一段数据的保存。在本发明实施例中,二次仪表2还可以通过预先设置的程序,按照程序中的时间节点进行保存数据。The above-mentioned storage key is used to store the data transmitted by the
上述显示键,可以将水压传感器1采集的水压数据以水位形式实时显示,还可以显示二次仪表2存储的某一段的水压数据对应的水位。The above-mentioned display key can display the water pressure data collected by the
上述采样频率设置键,可以根据抽水试验的需求,用户自定义设置采样频率,当用户设置好采样频率后并按下此键,二次仪表2将该采样频率发送给水压传感器1,水压传感器1按照该采样频率进行水压数据采集。在本发明实施例中,二次仪表2还可以通过预先设置的程序,按照程序中设定的频率进行水压数据采集。The above-mentioned sampling frequency setting key can be customized by the user according to the needs of the pumping test. When the user sets the sampling frequency and presses this key, the
上述水位换算键,用于将水压值换算为对应的水位值。在本发明实施例中,当用户按下此键后,二次仪表2可以将水压传感器1传输的水压数据换算成水位数据进行显示,用户可以根据需要设置或保存水压形式的数据或者水位形式的数据。The above-mentioned water level conversion key is used to convert the water pressure value into the corresponding water level value. In the embodiment of the present invention, when the user presses this key, the
上述数据导出键,用于导出二次仪表2存储的水压数据或水位数据。The above-mentioned data export key is used to export the water pressure data or water level data stored in the
在本发明实施例中,上述二次仪表2还包括电源开关键、测试启动/停止键等测试设备常用按键。In the embodiment of the present invention, the above-mentioned
上述二次仪表2还包括USB接口和网络接口;The above-mentioned
USB接口,用于导出采集的钻孔孔内初始水位和钻孔孔内水位恢复数据;USB interface, used to export the collected initial water level in the borehole and recovery data of the water level in the borehole;
网络接口,用于通过有线线缆连接二次仪表2和数据处理器3。The network interface is used to connect the
在本发明实施例中,上述网络接口可以分为有线网络接口和无线网络接口,上述二次仪表2通过该网络接口可以连接上附近的局域网或互联网,通过局域网或互联网将存储的水压数据或水位数据传输给上述数据处理器3。In the embodiment of the present invention, the above-mentioned network interface can be divided into a wired network interface and a wireless network interface. The above-mentioned
在本发明实施例提供的钻孔水位测试装置中,该装置包括水压传感器、二次仪表、数据处理器和数据线缆;数据线缆的潜水端连接水压传感器,数据线缆的地面端连接二次仪表;水压传感器,用于采集初始水位及孔内水压数据,并将初始水位及孔内水压数据通过数据线缆传输给二次仪表;二次仪表,通过数据线缆发送监测命令给水压传感器;接收、存储和显示水压传感器传输的初始水位及孔内水压数据;数据处理器,将孔内水压数据转换成水位恢复观测数据;根据水位恢复观测数据绘制水位恢复曲线;根据水位恢复曲线拟合水位恢复观测曲线;根据水位恢复观测曲线获取孔壁水位;计算初始水位和孔壁水位之间的高程差,得到钻孔水位降深值。实现了拟合水位恢复观测曲线,将该水位恢复观测曲线曲率最大的坐标点对应的水位确定为孔壁水位,减小了与定义的漏斗中心水位的误差,从而可以获取准确的水位降深,为勘探过程中的水量计算和评价提供了准确的参数,避免了因水文地质参数错误而造成的损害。In the borehole water level testing device provided in the embodiment of the present invention, the device includes a water pressure sensor, a secondary instrument, a data processor and a data cable; the diving end of the data cable is connected to the water pressure sensor, and the ground end of the data cable Connect the secondary instrument; the water pressure sensor is used to collect the initial water level and the water pressure data in the hole, and transmit the initial water level and the water pressure data in the hole to the secondary instrument through the data cable; the secondary instrument is sent through the data cable Monitor commands to the water pressure sensor; receive, store and display the initial water level transmitted by the water pressure sensor and the water pressure data in the hole; the data processor converts the water pressure data in the hole into the water level recovery observation data; draw the water level according to the water level recovery observation data Restoration curve; fitting the observation curve of water level restoration according to the restoration curve of water level; obtaining the water level of the hole wall according to the restoration observation curve of water level; calculating the elevation difference between the initial water level and the water level of the hole wall to obtain the drawdown value of the borehole water level. The fitting of the water level recovery observation curve is realized, and the water level corresponding to the coordinate point with the largest curvature of the water level recovery observation curve is determined as the water level of the hole wall, which reduces the error with the defined funnel center water level, so that accurate water level drawdown can be obtained. Accurate parameters are provided for the calculation and evaluation of water volume in the exploration process, and damages caused by errors in hydrogeological parameters are avoided.
以上所述,仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应所述以权利要求的保护范围为准。The above is only a specific embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Anyone skilled in the art can easily think of changes or substitutions within the technical scope disclosed in the present invention. Should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910214225.XA CN109882158B (en) | 2019-03-20 | 2019-03-20 | Drilling water pumping level testing method and drilling water level testing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910214225.XA CN109882158B (en) | 2019-03-20 | 2019-03-20 | Drilling water pumping level testing method and drilling water level testing device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109882158A CN109882158A (en) | 2019-06-14 |
CN109882158B true CN109882158B (en) | 2023-03-14 |
Family
ID=66933321
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910214225.XA Active CN109882158B (en) | 2019-03-20 | 2019-03-20 | Drilling water pumping level testing method and drilling water level testing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109882158B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110284876B (en) * | 2019-06-25 | 2023-04-18 | 徐清清 | Method and device for carrying out multiple aquifer water pumping tests in single deep borehole |
CN111946333B (en) * | 2020-07-02 | 2021-05-18 | 临沂矿业集团菏泽煤电有限公司 | Simple test and solution method for hydrogeological parameters of aquifer under curtain grouting condition |
CN113532579B (en) * | 2021-05-25 | 2024-02-20 | 天地科技股份有限公司 | Water level monitoring method and device for aquifer, electronic equipment and storage medium |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103162762A (en) * | 2011-12-19 | 2013-06-19 | 西安广融电气有限公司 | Control loop for water level monitor |
CN104297129A (en) * | 2014-10-29 | 2015-01-21 | 中国电建集团成都勘测设计研究院有限公司 | Hydrogeologic testing method based on water injection free vibration method |
CN104597224A (en) * | 2015-01-27 | 2015-05-06 | 河南理工大学 | Three-drop distance non-steady flow dewatering test method for probing mine hydrogeology |
CN104612663A (en) * | 2013-11-05 | 2015-05-13 | 核工业二一六大队 | Vehicle-mounted borehole water level meter |
CN105386430A (en) * | 2015-10-16 | 2016-03-09 | 上海交通大学 | Method for confirming water head of two sides of waterproof curtain under waterproof curtain effect |
CN106485018A (en) * | 2016-10-21 | 2017-03-08 | 安徽理工大学 | One kind asks for infiltration coefficient method for coal mine roof plate outflow test |
CN107941675A (en) * | 2017-12-01 | 2018-04-20 | 黄河勘测规划设计有限公司 | Drill slug test test method |
CN109184663A (en) * | 2018-10-11 | 2019-01-11 | 中煤科工集团西安研究院有限公司 | A method of drilling specific capacity is obtained using outflow test |
-
2019
- 2019-03-20 CN CN201910214225.XA patent/CN109882158B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103162762A (en) * | 2011-12-19 | 2013-06-19 | 西安广融电气有限公司 | Control loop for water level monitor |
CN104612663A (en) * | 2013-11-05 | 2015-05-13 | 核工业二一六大队 | Vehicle-mounted borehole water level meter |
CN104297129A (en) * | 2014-10-29 | 2015-01-21 | 中国电建集团成都勘测设计研究院有限公司 | Hydrogeologic testing method based on water injection free vibration method |
CN104597224A (en) * | 2015-01-27 | 2015-05-06 | 河南理工大学 | Three-drop distance non-steady flow dewatering test method for probing mine hydrogeology |
CN105386430A (en) * | 2015-10-16 | 2016-03-09 | 上海交通大学 | Method for confirming water head of two sides of waterproof curtain under waterproof curtain effect |
CN106485018A (en) * | 2016-10-21 | 2017-03-08 | 安徽理工大学 | One kind asks for infiltration coefficient method for coal mine roof plate outflow test |
CN107941675A (en) * | 2017-12-01 | 2018-04-20 | 黄河勘测规划设计有限公司 | Drill slug test test method |
CN109184663A (en) * | 2018-10-11 | 2019-01-11 | 中煤科工集团西安研究院有限公司 | A method of drilling specific capacity is obtained using outflow test |
Non-Patent Citations (3)
Title |
---|
单孔抽水试验中水文地质的参数计算;张海;《住宅与房地产》;20180115;第205页 * |
张海.单孔抽水试验中水文地质的参数计算.《住宅与房地产》.2018, * |
水文地质参数自动监测处理系统的研制与应用;原国红等;《岩石力学与工程学报》;20090430;第28卷(第4期);第834-839页 * |
Also Published As
Publication number | Publication date |
---|---|
CN109882158A (en) | 2019-06-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109882158B (en) | Drilling water pumping level testing method and drilling water level testing device | |
CN202688979U (en) | Integrated monitoring system for foundation pit under construction | |
CN201460877U (en) | Comprehensive test system of drill hole packer test | |
CN111665093B (en) | Groundwater sampling method | |
CN104515791A (en) | Concrete pumping capability monitoring method and device | |
CN206054001U (en) | The portable safety for tunnel engineering early warning system of wireless location | |
CN110924457A (en) | Foundation pit deformation monitoring method and system based on measuring robot | |
CN114294570A (en) | Oil-gas pipeline stress monitoring and early warning method and system, storage medium and electronic device | |
US9205293B2 (en) | Fluid flow testing system | |
CN213148168U (en) | A long-term stress monitoring system based on perforated ground connection wall | |
CN103498660B (en) | The moisture long-distance metering device of individual well and individual well moisture content data transmission method | |
CN109060005B (en) | Intelligent acquisition system for large building structure safety | |
CN206638377U (en) | A kind of cable pulling force detection system | |
CN110056394A (en) | Tunnel construction safety monitoring device and control system thereof | |
CN111441769A (en) | Multi-drop pumping test parameter automatic detection system and detection method | |
CN111006742B (en) | Underground mine main draw shaft material level real-time monitoring system and method | |
CN107355214B (en) | Oil-submersible linear motor reciprocating pump closed-loop control system | |
CN112096370B (en) | Self-learning method of intermittent system | |
CN106768571A (en) | A kind of cable pulling force detection system | |
CN219715173U (en) | An online monitoring device for the siltation and blockage status of in-service pressure relief wells in embankments | |
KR101333075B1 (en) | Automatic conrol apparatus and method for managing water treatment of water supply and sewer system | |
CN111101928A (en) | Well depth measuring system and method | |
CN216517957U (en) | Automatic measuring device for gas flow attenuation coefficient of drilling hole | |
CN116839664A (en) | Intelligent hydrological parameter analysis control method for pumping experiment | |
CN112240198B (en) | Method and device for measuring drilling depth by water level |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |