CN109881844A - Smear cream formula reinforcing bar connection component and the connection method applied to the assembly of PC component - Google Patents

Smear cream formula reinforcing bar connection component and the connection method applied to the assembly of PC component Download PDF

Info

Publication number
CN109881844A
CN109881844A CN201910311547.6A CN201910311547A CN109881844A CN 109881844 A CN109881844 A CN 109881844A CN 201910311547 A CN201910311547 A CN 201910311547A CN 109881844 A CN109881844 A CN 109881844A
Authority
CN
China
Prior art keywords
reinforcing bar
component
sleeve
docking
cuff
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910311547.6A
Other languages
Chinese (zh)
Inventor
王玉峰
崔士启
丁一旭
王世诚
张洪忠
王聪聪
张丁涛
马明
石雷
李桂强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910311547.6A priority Critical patent/CN109881844A/en
Publication of CN109881844A publication Critical patent/CN109881844A/en
Pending legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

Cream formula reinforcing bar connection component is smeared and applied to the connection method of PC component assembly, category assembled architecture engineering reinforcing bar connection area the invention discloses a kind of.Mainly the variable cross-section composite sleeve 1 of paste anchoring material 3 can be applied by inner cavity in the present invention, mating taper cuff 2 is constituted, and the variable cross-section composite sleeve 1 is that its internal diameter is equal everywhere after the two semicircular cylinders combination being radially divided into two from inner wall with several road ring ribs or annular groove 1.1, circumference, outer diameter is from middle section to the variable diameter Circular Pipe of both ends gradual change undergauge;The anchoring material 3 is the paste cement base high-strength mortar that can be uniformly applied to the recessed core of semicircular cylinder and wrap up two docking spiral ends;After the make-up of two semicircular cylinder is at combined sleeve 1, matched by a pair of identical and internal diameter sum outer diameter variable cross-section, long degree≤1/2 combined sleeve, 1 length taper cuff is inserted in molding from the both ends of combined sleeve 1 respectively;After 3 solidification of anchoring material, effective splice is obtained.The present invention goes back while giving specific connection method.

Description

Smear cream formula reinforcing bar connection component and the connection method applied to the assembly of PC component
Technical field
The present invention relates to the rebar connecting technology fields of assembled architecture field more particularly to one kind to smear the connection of cream formula reinforcing bar Component, and it is applied particularly to the connection method of PC component assembly.
Background technique
In engineering construction field, what China's assembled architecture generallyd use at present is sleeve grouting interconnection technique.Grouting set Cylinder is born in the invention sixties in last century in the U.S. by Zhan Shuxian more than Chinese American, continues to use by the application and improving of over half a century So far.Sleeve be in the milk interconnection technique, working principle exactly by metal sleeve cover two docking it is end reinforced, then pass through injected hole Fill cement based sizing in toward sleeve, reinforcing bar be fixed with anchor after slurry solidification, the cement based sizing after solidification as reinforcing bar and Shearing resistance material between barrel and form the effective connector of grout sleeve.Though repeatedly being improved afterwards, retain its primitive technology side always The grouting basic characteristics of case, the change of minor details could not eliminate its defect from the root.The deficiency and defect of the technology are specific Show following aspects: 1., grouting material waste it is serious, corresponding assembly cost increases.By taking PC shear wall as an example, either adopt It is still in the milk in a point storehouse with connection grouting, slurry needs first to flow into the gap under PC wall from inlet pipe, fills behind gap used in bottom again Upper fill backward expires the gap of sleeve lining and reinforcing bar, then flows out from grout outlet, at last the end of a grouting process.It is present in sleeve Effective slurry between reinforcing bar gap, the 10% of practical deficiency grouting amount, effective rate of utilization is low, and waste is serious.2., slurry phase It is lower to intensity, cause the anchorage length of sleeve and reinforcing bar relatively long.The grouting is as its name suggests liquid fluidity, And liquid source is water.By the common knowledge of the industry it is found that the size of amount of water is to determine in the case where composition material is given Determine the major parameter of the physical and mechanical properties such as cement base products intensity, durability.When watering quantity is more than the hydration institute of cement After the Optimum needed, the intensity of cement base products declines ratio linear with the increase of watering quantity.The prior art Grouting material used in grout sleeve, because the ratio of mud for needing to cause grouting material of high fluidity is excessively high, the far super cement of water content Needed for hydration, peak-peak is not achieved so as to cause the intensity for becoming anchoring material after solidification, it can only be to lengthen casing and steel The anchorage length of muscle is made up.By diameter 20mm screw-thread steel it is several be connected form for, binding reinforcement connection is related Technical standard is described further: a, flash butt welding connection: because being that interfacial molecular is mutually fitting to connection, " anchoring " length is almost Zero;B, extrusion socket joint: single-ended reinforced bar sleeve anchorage length 60mm;C, sleeve grouting connection: single-ended reinforced bar sleeve anchoring length Spend 160mm.The connection or anchorage length of reinforcing bar are determined premised on its constraint condition or connection type, different companies Mode is connect, anchorage length difference is obvious.3., grouting plumpness leave a question open, there are security risks.Due to grout sleeve be it is closed, By Grouting Pipe slip casting inwards, by grout outlet plasma discharge, but the true grouting situation in cylinder, floor and barrel can not be observed visually Corner be easy to choke with resentment to form cavity;Although into and out of slurry mouth after filling all blocking sealing, when sleeve vertically connects like The back-off cup for filling with water, under the gravity of liquid grouting material, it is also possible that other for flowing to PC member bottom section do not fill Solid horn is fallen, and causes the cavity hidden danger of sleeve inner.Sleeve is in the milk interconnection technique in addition to insufficient and defect described above, and there is also works Many problems such as the pre-buried trouble of factory, construction site installation centering difficulty.Therefore, it researches and develops economical and practical, safe and reliable, quick for installation Splice technical solution be the industry the task of top priority.
Summary of the invention
The technical problem to be solved in the present invention is to provide one kind to smear cream formula reinforcing bar connection component, and this connection component can be effective The grouting material waste for avoiding above-mentioned connector shortens anchorage length of steel bar or improves anchoring strength, and applies this connection group The specific method of part solution PC component assembly connection.
In order to solve the above technical problems, the technical scheme of the present invention is realized as follows: paste anchoring mainly can be applied by inner cavity The variable cross-section composite sleeve 1 of material, mating taper cuff 2 are constituted;The variable cross-section composite sleeve 1 is by two semicircular cylinder make-up groups The internal diameter of conjunction is equal everywhere, outer diameter is from centre to the variable diameter assembled tube of both ends gradual change undergauge;If 1 internal chamber wall of combined sleeve has Arterial highway ring rib or annular groove 1.1, inner cavity chamber can accommodate paste anchoring 3 and can sweep along two docking spiral ends 4;The taper Cuff 2 is that the outer diameter variable cross-section of a pair of of internal diameter and combined sleeve 1 matches and can be inserted in respectively from the both ends of combined sleeve 1 The variable cross-section round tube of fastening, the modular sleeve of Chang Du≤1/2 1.
Grouting material used in existing general technology grout sleeve is all with cement, high-strength compared with present invention anchoring material The dry blend for spending the compositions such as fine aggregate, concrete admixture and micro-expanding agent, adds water and stirs at the construction field (site).Difference exists In the size of amount of water.But it is as follows to distinguish effect: 1., saving material.Paste anchoring material watering quantity of the invention is small, close to Solid-state only need to uniformly daub into 1.1~1.2 times of anchoring material of actual amount, without grouting material in semicircular cylinder cavity groove High fluidity, without fill feed and exhaust tube, PC component with dock slip casting path clearance between supporting surface, sleeve gap and cause big Measure the waste of grouting material.2., avoid cavity dead angle.It is more when semicircular cylinder after uniformly smearing cream is fastened on steel bar end by the present invention Remaining creme is squeezed out from opposite joint, and the compactness that visually whole can be observed or perceive anchoring and expect is avoided because grouting is brought Harm of choking with resentment.3., improve anchoring material intensity, shorten the length of anchoring sleeve.Because the moisture content of present invention anchoring material is reasonable Section, hence it is evident that higher than the grouting material intensity of good fluidity, corresponding shearing strength, bond stress are also high.So combined sleeve with The anchorage length of docking reinforcing bar can accordingly shorten, alternatively, original anchorage length referring to grout sleeve is constant, strength of joint will Improve a credit rating, more conducively antidetonation.
Further, the combined sleeve inner cavity can also be that the thin ends and thick middle variable cross-section composite in waist drum shape is oval Pipe.
If not considering, the expansion of the compensatory micro-expanding agent added due to the cement base of anchoring material is easy to the characteristic of drying shrinkage is made With under reinforcing bar responsive to axial force, anchoring material and straight tube set tube wall interface, anchoring expect not produce between rebar surface interface Raw radial pressure.By friction formula it is found that frictional force=pressure × coefficient of friction.When pressure is null, frictional force is certainly It is so not present, existing is to anchor material to the screw thread and reinforcing bar rough surface and pipe of the bond stress of reinforcing bar and anchoring material and reinforcing bar The ring rib of wall and the mechanical snap power of tube wall rough surface.When the inner cavity tube wall of sleeve is contracted from centre to both ends diameter, in two osculums Respectively when outside thin ends and thick middle swelling-waist shape, anchoring material tightly bonds docking screw-thread steel end, docks steel two Muscle is in axial under tension state, and the circumferential inclined-plane of tube wall will expect anchoring to generate inclined-plane resistance, a part point of inclined-plane resistance Solution obtains a part of frictional force multiplied by coefficient of friction at the radial compression power for being directed toward rebar surface.Dock it is end reinforced On the basis of obtaining original bond stress and mechanical snap power, since the inclined-plane of sleeve wall changes, and rubbing for superposition is obtained Power is wiped, to keep steel reinforcement abutting joints connector stronger.
Further, the ends of the two docking spiral can also be cased with the interior of outer diameter and place sleeve portion respectively The consistent limiting gasket of diameter.The consistent limit of internal diameter of outer diameter and place sleeve portion is cased in the end of two docking spirals Washer, effect, one to be to maintain position of the steel bar end in casing placed in the middle, second is that during installing casing collar Keep positional stability of the steel bar end in casing constant.PC component stretches out external docking reinforcing bar in demoulding, transport, lifting In the process, can inevitably collide with deforming displacement, and after the installation of PC component is in place, splice one by one, two docking are end reinforced may not Concentric axis can be in.During fastening two halves round buss fastening hoop, the port of sleeve rectifies a deviation reinforcing bar poly- by force In, the end for docking reinforcing bar will have the small size amplitude of oscillation of reforming as free end, it is possible to the anchoring filling agent of plasticity be stirred, to lead It causes to generate between the filler lotion and reinforcing bar at the steel bar end amplitude of oscillation direction of displacement back side hollow, influences the close of filler lotion in casing cavity It solidity and wraps to reinforcing bar, limiting gasket plays the limit to reinforcing bar as bracket and avoids reinforcing bar agitation anchoring material cream Firm effect.
Further, the anchoring material is cement base high-strength mortar, and mortar aggregate ingredient can be steel cuttings or include Steel cuttings compares with existing grouting material, can greatly improve mortar strength.Because the flow behavior of grouting material should not add density The steel cuttings ingredient that height easily precipitates.
Further, the anchoring material can also be that epoxy group aggregate mortar, mortar aggregate ingredient can be steel cuttings or packet Contain steel cuttings.Another selection of the epoxy group mortar as anchoring material, it is identical with cement-based mortar in role of the present invention, But its mechanical property is more than cement-based mortar, and quick solidifying is suitable for and tries to meet the deadline for the project, Accelerating The Construction speed;Mortar aggregate ingredient is steel It considers to be worth doing or includes steel cuttings, mortar strength can be greatly improved.
Further, also buckle has the section that can fasten docking screw-thread steel on the edge of the end semi-ring rib of the semicircular cylinder Be in U-shape rubber closed-loop.The section being snapped on semi-ring rib edge is in U-shape rubber closed-loop, can fasten docking screw-thread steel, make With first is that combined sleeve two ends by rubber closed-loop banding reinforcing bar, make it not glide when being applied to vertical reinforcement, are applied to Position is not moved when horizontal reinforcement;Second is that being applied to further, the both ends or in which one end end of the taper cuff when vertical reinforcement The eaves side that portion has the side for stretching out outer circle circumference T-shaped.Annular eaves side plays the role of ribs, while increasing end Annulus area, in order to increase the focusing surface that specific purpose tool elapses it to modular sleeve middle section.It reveals all the details under anchoring fresh material not Pendant.
Further, the outside of the combined sleeve, be respectively arranged with uniformly anti-skidding coarse on the inside of taper cuff Face.The setting of anti-skidding rough surface is to increase coefficient of friction;Prevent the retroversion relaxation of taper cuff during the work time.
A method of when smearing cream formula reinforcing bar connection component applied to assembled vertical PC member stress reinforcing bar connection, including Following steps:
1., every docking steel bar end being reserved at the top of built engineering be inserted in the upper of the opposite outer layer sleeve of a pair of big mouth diameter Inferior pyramidal cuff.
2., lifting PC component, land slowly in the predeterminated position of built engineering, be allowed to several of PC member bottom section docking Steel bar end is corresponded with the steel bar end that docks reserved at the top of project under construction in respective vertical axis with the guiding of guiding device Line --- steel bar end docking of the invention, without requiring high-precision as grout sleeve is socketed lower end bar;Deviation is slightly larger , slightly being pulled with reinforcing bar special spanner can rectify a deviation;It is slightly devious, in the fastening stroke of subsequent cuff from fine to coarse Obtain two connectors voluntarily correction it is poly- in.
3., with interim hound support PC component side, and PC component is made to be in plumbness.
4., by upper cuff strip to docking splice upper end suitable position be fixed temporarily for use.
5., it is selectable, two docking steel bar ends be set with limiting gasket.When two docking steel bar ends be in it is same When axis, installation limiting gasket can be omitted.
6., paste anchoring material is smeared with specific purpose tool in the cavity groove of two semi-circular tubes of combined sleeve, be fastened on docking In splice.
7., upper and lower cuff is inserted in combined sleeve end up and down respectively, and it is with specific purpose tool that the spacing of upper and lower cuff is strong Row shortens, and is allowed to combined sleeve and is integrally formed.
A method of when smearing cream formula reinforcing bar connection component applied to assembled horizontal PC member stress reinforcing bar connection, including Following steps:
1., in the supported underneath face for being intended to set horizontal PC component, height adjustable bracket is set, bracket, which is equipped with, can make horizontal PC component The support roll shaft of back-and-forth motion and the front and back end two sides of bracket, which are equipped with, can make PC component move position along the fine tuning of support roll shaft axis direction Promotion or prizing device.
2., lean out on the vertical member installed side or level that horizontal PC component ends are overhanging it is reserved Docking steel bar end is inserted in the opposite inner wall taper cuff of a pair of big mouth diameter.
3., lifting PC component, dropped on the support roll shaft predeterminated position of adjustable bracket slowly, gently drive roller shaft, makes Horizontal PC component is moved forward and backward, and is allowed to several docking steel bar ends of horizontal PC component ends with the guiding of guiding device, with The reserved steel bar end that side is leant out on built engineering vertical member is corresponded in respective horizontal axis;Steel reinforcement abutting joints end is same Axis is devious, can facilitate solution by the method for correcting error of above-mentioned vertical PC component.
4., taper cuff divided right and left it is stand-by to suitable width.
5., it is selectable, two docking steel bar ends be set with limiting gasket.When two docking steel bar ends are in same When axis, it is convenient to omit installation limiting gasket.
6., paste anchoring material is smeared with specific purpose tool in the cavity groove of two semi-circular tubes of combined sleeve, be fastened on docking In splice.
7., left and right cuff is inserted in the left and right end of combined sleeve respectively, and with specific purpose tool by the spacing of left and right cuff Shorten by force, is allowed to combined sleeve and is integrally formed.
Advantageous effects
In conclusion the present invention smears cream formula reinforcing bar connection component and the connection method applied to the assembly of PC component, in addition to improving anchor Admittedly the intensity expected, substantially to save anchoring material outer, in the PC element precast stage, also omits pre-buried process, reduce the factory of component at This;In PC component erection stage, since the deviation-correcting function of this connection component is prominent, to the axis coaxle essence of docking splice Degree requires to relax, and serious forgiveness is high, and installation effectiveness greatly improved.
Detailed description of the invention
With reference to the accompanying drawing and embodiments of the present invention the present invention is further illustrated.
Fig. 1 is that the radial of combined sleeve 1 of the invention halves construction perspective view;
Fig. 2 is the construction perspective view of taper cuff 3 of the invention;
Fig. 3 is that combined sleeve 1 of the invention is wrapped the internal structure schematic diagram of anchor bar;
Fig. 4 is the schematic perspective view diagram of the invention tied up after the completion of a formula reinforcing bar connection component assembly;
Fig. 5 is the inside variable diameter organigram of combined sleeve 1 of the invention.
Description of symbols: 1- combined sleeve;2- taper cuff;3- anchoring material;4- docks reinforcing bar;5- limiting gasket; Side ring rib or groove in 1.1- combined sleeve;The inside acute angle cross rib of 2.1- middle casing;The end annular of 1.2- assembled casing 1 Head plate;1.3- is stuck in the U-shaped rubber ring on annular seal head plate;2.1- taper cuff eaves side.
Specific embodiment
One kind of the present invention smears cream formula reinforcing bar connection component: as shown in Figure 3, Figure 4, paste anchoring material mainly can be applied by inner cavity 3 variable cross-section composite sleeve 1, the hoop of mating coning sleeve 2 are constituted;If as shown in Figure 1,1 inner wall of variable cross-section composite sleeve has Arterial highway ring rib or annular groove 1.1 and can wrap up two docking spirals, 4 end and anchoring material 3, the variable cross-section composite sleeve 1 is round Its internal diameter is equal everywhere after two semicircular cylinders combination that week is radially divided into two, outer diameter is from centre to the variable diameter of both ends gradual change undergauge Circular Pipe;As shown in Fig. 2, the make-up of two semicircular cylinder combines, cut by a pair of identical internal diameter and with the change of the outer diameter of combined sleeve 1 Face matches, long degree≤1/2 modular sleeve 1 taper cuff 2 is inserted in molding from the both ends of combined sleeve 1 respectively;Such as Fig. 3 Shown, the anchoring material 3 is smearable paste cement base high-strength mortar.The semicircular cylinder and cuff can be cast, It can forge and press or punching press, according to precise manner, can further select to machine after casting, forging and stamping or punching press.Founding materials are excellent Select spheroidal graphite cast-iron, forging and stamping or stamping material preferred alloy steel.As shown in Figure 1, the ring rib or annular groove 1.1 of described sleeve pipe inner wall, make With being the mechanical snap power increased with anchoring material, as an alternative, being also possible to fin or pit.The outer diameter of the combined sleeve 1 The contracting of gradual change diameter, the gradual change of outer diameter with 1 longitudinal axis of combined sleeve in 2~5 ° of angles to be advisable.The smearable paste cement Base anchoring material 3, lotion is in plasticity, emplaster is first uniformly smeared to the semicircle cavity groove into semicircular cylinder with flat scraper plate, then use and semicircle Semicircle hollow is smoothed out with the fingers out in Ω's and less than the specific purpose tool of bar diameter in the corresponding section of shape cavity groove, will be with anchoring material 3 Two halves cylinder make-up is in the two end reinforced composition combined sleeves 1 of docking, as shown in Figure 2, Figure 4 shows, then in two end caps of combined sleeve 1 Enter taper cuff 2, shortens the fastening of two cuff spacing, smear cream formula steel bar connector for one and accuse completion.
As shown in figure 5, the inner cavity of the combined sleeve 1 can also be the thin ends and thick middle variable cross-section composite in waist drum shape Circular Pipe.The inner cavity of the combined sleeve 1 be in waist drum shape, in outside head fall with 1 longitudinal axis of combined sleeve It is advisable in 5~10 ° of angles.It also buckles to have on the edge of the end semi-ring rib 1.1 of the semicircular cylinder and can fasten docking spiral 3 section is in U-shape rubber closed-loop 1.2.For convenient for fastening reinforcing bar, internal diameter Yi≤bar diameter of rubber closed-loop 1.2 is advisable. The anchoring expects that 3 cement base high-strength mortars, mortar aggregate ingredient can be steel cuttings or include steel cuttings.The anchoring material 3 is also It can be epoxy group mortar, mortar aggregate ingredient can be steel cuttings or include steel cuttings.The both ends of the taper cuff 2 or in which There is the eaves side for the annular for stretching out outer circle circumference in one end end.The outside of the combined sleeve 1, the inside of taper cuff 2 are divided It is not provided with uniform anti-skidding rough surface.As shown in figure 3, the end of the two docking spiral 4 can also be cased with respectively The consistent limiting gasket 5 of the internal diameter of outer diameter and place sleeve portion.
Illustrate below with reference to above-mentioned technical proposal of the present invention, describes specific connection method of the invention.PC component is in factory When production, basic application conditions of the invention should be met.It is slightly changed with the existing existing mold of PC component factory, i.e. casting concrete When, end mold around docking reinforcing bar reserve operating space, it is proposed that reserved at connector reinforcing bar diameter about 100~ The semicylinder space of 120mm, high about 300~500mm.
A method of when smearing cream formula reinforcing bar connection component applied to assembled vertical PC member stress reinforcing bar connection, including Following steps:
1., every docking steel bar end being reserved at the top of built engineering be inserted in the opposite outer layer sleeve 2 of a pair of big mouth diameter Upper and lower taper cuff.
2., lifting PC component, land slowly in the predeterminated position of built engineering, be allowed to several of PC member bottom section docking Steel bar end is corresponded with the steel bar end that docks reserved at the top of project under construction in respective vertical axis with the guiding of guiding device Line;The coaxial sexual deviation of steel reinforcement abutting joints is biggish, is rectified a deviation with steel bar wrench.The steel bar wrench is in letter F shape, is with vertical reinforcement Example, blocks reinforcing bar, pulls spanner up and down, can arbitrarily adjust the verticality of reinforcing bar.
3., with interim hound support PC component side, and PC component is made to be in plumbness.
4., by upper cuff strip to docking threaded reinforcing bar joint upper end suitable position be fixed temporarily for use.
5., it is selectable, two docking steel bar ends be set with limiting gasket;The coaxial zero deflection in steel reinforcement abutting joints end , without suit.
6., paste anchoring material is smeared with specific purpose tool in the cavity groove of two semi-circular tubes of combined sleeve, be fastened on docking In splice.
7., upper and lower cuff is inserted in combined sleeve end up and down respectively, and it is with specific purpose tool that the spacing of upper and lower cuff is strong Row shortens, and is allowed to combined sleeve and is integrally formed.
A method of when smearing cream formula reinforcing bar connection component applied to assembled horizontal PC member stress reinforcing bar connection, including Following steps:
1., in the supported underneath face for being intended to set horizontal PC component, height adjustable bracket is set, bracket, which is equipped with, can make horizontal PC component The support roll shaft of back-and-forth motion and the front and back end two sides of bracket, which are equipped with, can make PC component move position along the fine tuning of support roll shaft axis direction Promotion or prizing device.
2., lean out on the vertical member installed side or level that horizontal PC component ends are overhanging it is reserved Docking steel bar end is inserted in the opposite inner wall taper cuff (2) of a pair of big mouth diameter.
3., lifting PC component, dropped on the support roll shaft predeterminated position of adjustable bracket slowly, gently drive roller shaft, makes Horizontal PC component is moved forward and backward, and is allowed to several docking steel bar ends of horizontal PC component ends with the guiding of guiding device, with The reserved steel bar end that side is leant out on built engineering vertical member is corresponded in respective horizontal axis;Steel reinforcement abutting joints end is same Axis is devious, can facilitate solution by the method for correcting error of above-mentioned vertical PC component.
4., taper cuff divided right and left it is stand-by to suitable width.
5., it is selectable, two docking steel bar ends be set with limiting gasket;The coaxial zero deflection in steel reinforcement abutting joints end , without suit.
6., paste anchoring material is smeared with specific purpose tool in the cavity groove of two semi-circular tubes of combined sleeve, be fastened on docking In splice.
7., left and right cuff is inserted in the left and right end of combined sleeve respectively, and with specific purpose tool by the spacing of left and right cuff Shorten by force, is allowed to combined sleeve and is integrally formed.
After the completion of above step, the reservation operations hole at splice position between PC member bottom section and built structure, Or at the joint leakage of horizontal PC component, filling or formwork pour high grade slightly expanded concrete and block the reserved handle hole of connector Hole or gap are the Normal practices of the industry, no longer excessively repeat herein.
The method and step of above embodiment, sequence arrangement can also be exchanged or be adjusted according to site specific, As can also 2., then implementation steps be 1. for implementation steps first.Above-mentioned specific embodiment is intended merely to illustrate the present invention, and not uses Make limitation of the invention, as long as will all fall in spirit of the invention to variation, modification of above-described embodiment etc. Within the scope of protection of the claims of the present invention.

Claims (10)

1. one kind smears cream formula reinforcing bar connection component: it is characterized by: the variable cross-section of paste anchoring material (3) mainly can be applied by inner cavity Combined sleeve (1), mating taper cuff (2) are constituted;The variable cross-section composite sleeve (1) is combined by two semicircular cylinder make-ups Internal diameter is equal everywhere, outer diameter is from centre to the variable diameter assembled tube of both ends gradual change undergauge;Combined sleeve (1) internal chamber wall is with several Road ring rib or annular groove (1.1), inner cavity chamber can accommodate paste anchoring material (3) and can sweep along two docking spiral ends (4);Institute Taper cuff (2) are stated, are that the outer diameter variable cross-section of a pair of of internal diameter and combined sleeve (1) matches and can be respectively from combined sleeve (1) Both ends be inserted in the variable cross-section casing of fastening, the modular sleeve of Chang Du≤1/2 (1).
2. one kind smears cream formula reinforcing bar connection component according to claim 1, which is characterized in that the combined sleeve (1) it is interior Chamber can also be the thin ends and thick middle variable cross-section composite Circular Pipe in waist drum shape.
3. one kind according to claim 1 or claim 2 smears cream formula reinforcing bar connection component, which is characterized in that the two docking screw-thread steel The end of muscle (4) can also be cased with the consistent space washer of internal diameter (5) of outer diameter and place sleeve portion respectively.
4. the described one kind of any one smears cream formula reinforcing bar connection component according to claim 1~3, which is characterized in that the taper sheath There is the annular eaves side (2.1) for stretching out outer circle circumference at the both ends or in which one end end of binding round (2).
5. the described one kind of any one smears cream formula reinforcing bar connection component according to claim 1~3, which is characterized in that the anchoring material It (3) is cement base high-strength mortar, mortar aggregate ingredient can be steel cuttings or include steel cuttings.
6. the described one kind of any one smears cream formula reinforcing bar connection component according to claim 1~5, which is characterized in that the anchoring material (3) it can also be that epoxy group mortar, mortar aggregate ingredient can be steel cuttings or include steel cuttings.
7. the described one kind of any one smears cream formula reinforcing bar connection component according to claim 1~6, which is characterized in that the semicircular cylinder End annular head plate (1.2) edge on also buckle have can fasten dock spiral (4) section be in U-shape rubber seal Closed loop (1.3).
8. the described one kind of any one smears cream formula reinforcing bar connection component according to claim 1~7, which is characterized in that described group of trap The lateral surface of cylinder (1), the medial surface of taper cuff (2) are respectively arranged with uniformly anti-skidding rough surface.
9. any one of piece claim 1~8 one kind smear cream formula reinforcing bar connection component applied to the vertical PC component of assembled by Method when power reinforcing bar connects, includes the following steps:
1., every docking steel bar end being reserved at the top of built engineering be inserted in the opposite outer layer sleeve (2) of a pair of big mouth diameter Taper cuff up and down;
2., lifting PC component, built engineering predeterminated position slowly land, be allowed to several docking reinforcing bars of PC member bottom section End is corresponded with the steel bar end that docks reserved at the top of project under construction in respective vertical axis with the guiding of guiding device;
3., with interim hound support PC component side, and PC component is made to be in plumbness;
4., by upper cuff strip to docking threaded reinforcing bar joint upper end suitable position be fixed temporarily for use;
5., it is selectable, two docking steel bar ends be set with limiting gasket;
6., paste anchoring material is smeared with specific purpose tool in the recessed core of two semi-circular tubes of combined sleeve, be fastened on docking reinforcing bar On connector;
7., upper and lower cuff is inserted in combined sleeve end up and down respectively, and the spacing of upper and lower cuff is contracted by force with specific purpose tool It is short, it is allowed to combined sleeve and is integrally formed.
10. the described one kind of any one smears cream formula reinforcing bar connection component applied to the horizontal PC component of assembled according to claim 1~8 Method when steel bar stress connects, includes the following steps:
1., in the supported underneath face for being intended to set horizontal PC component, height adjustable bracket is set, bracket, which is equipped with, can make horizontal PC component The support roll shaft of back-and-forth motion and the front and back end two sides of bracket, which are equipped with, can make PC component move position along the fine tuning of support roll shaft axis direction Promotion or prizing device;
2., lean out on the vertical member installed side or the reserved docking of level that horizontal PC component ends are overhanging Steel bar end is inserted in the opposite inner wall taper cuff (2) of a pair of big mouth diameter;
3., lifting PC component, dropped on the support roll shaft predeterminated position of adjustable bracket slowly, gently drive roller shaft, makes level PC component is moved forward and backward, and is allowed to several of horizontal PC component ends docking steel bar ends with the guiding of guiding device, and built The reserved steel bar end that side is leant out on engineering vertical member is corresponded in respective horizontal axis;
4., taper cuff divided right and left it is stand-by to suitable width;
5., it is selectable, two docking steel bar ends be set with limiting gasket;
6., paste anchoring material is smeared with specific purpose tool in the recessed core of two semi-circular tubes of combined sleeve, be fastened on docking reinforcing bar On connector;
7., left and right cuff is inserted in the left and right end of combined sleeve respectively, and with specific purpose tool by the spacing of left and right cuff by force Shorten, is allowed to combined sleeve and is integrally formed.
CN201910311547.6A 2019-04-18 2019-04-18 Smear cream formula reinforcing bar connection component and the connection method applied to the assembly of PC component Pending CN109881844A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910311547.6A CN109881844A (en) 2019-04-18 2019-04-18 Smear cream formula reinforcing bar connection component and the connection method applied to the assembly of PC component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910311547.6A CN109881844A (en) 2019-04-18 2019-04-18 Smear cream formula reinforcing bar connection component and the connection method applied to the assembly of PC component

Publications (1)

Publication Number Publication Date
CN109881844A true CN109881844A (en) 2019-06-14

Family

ID=66937580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910311547.6A Pending CN109881844A (en) 2019-04-18 2019-04-18 Smear cream formula reinforcing bar connection component and the connection method applied to the assembly of PC component

Country Status (1)

Country Link
CN (1) CN109881844A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112196188A (en) * 2019-11-29 2021-01-08 福建工程学院 Slip casting connecting device
CN115387541A (en) * 2021-12-20 2022-11-25 甘肃建研建设工程有限公司 Self-locking grouting sleeve with assembled structure and preparation method thereof
CN117905108A (en) * 2024-03-19 2024-04-19 福建一建集团有限公司 Construction method for building engineering reverse construction method of civil air defense in heavy-layer water-bearing sand layer

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB623942A (en) * 1947-06-02 1949-05-25 William Herbert Smith Reinforced concrete construction
GB999675A (en) * 1961-10-28 1965-07-28 Zueblin Ag Method for the connection of reinforcing bars in reinforced concrete construction
CN1088858A (en) * 1992-12-31 1994-07-06 华电建设工程接头技术公司 A kind of continued access method of reinforcing bar
JPH0776886A (en) * 1993-06-14 1995-03-20 Nippon Splice Sleeve Kk Horizontal joining method for precast concrete member and coupling mortar coupling group
CN2608592Y (en) * 2002-04-29 2004-03-31 吴雪 Shuttle slipknot rifled concrete bar connecting adapter
CN202391019U (en) * 2011-12-09 2012-08-22 中冶建筑研究总院有限公司 End part thickened grouting connector of steel bar
CN205276695U (en) * 2016-01-08 2016-06-01 金陵科技学院 Reinforcing bar quick -connect machanism
CN108277929A (en) * 2018-02-01 2018-07-13 青岛森林金属制品有限公司 Means for jointing rods
CN207761180U (en) * 2017-03-20 2018-08-24 建研科技股份有限公司 The special-shaped grout sleeve of bar connecting
CN108915156A (en) * 2018-08-20 2018-11-30 西北民族大学 Combined grouting sleeve connection structure and reinforcing bar connection construction method
CN109235780A (en) * 2018-10-22 2019-01-18 北京工业大学 A kind of half grouting connection sleeve suitable for highly seismic region and its apply method
CN109235781A (en) * 2018-10-22 2019-01-18 北京工业大学 A kind of self-centering construction of grout sleeve connection prefabricated components reinforcing bar and the practice
CN208618668U (en) * 2018-08-08 2019-03-19 西南科技大学 Composite connector for FRP tendons
CN210482757U (en) * 2019-04-18 2020-05-08 王玉峰 Plaster-applying type steel bar connecting assembly

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB623942A (en) * 1947-06-02 1949-05-25 William Herbert Smith Reinforced concrete construction
GB999675A (en) * 1961-10-28 1965-07-28 Zueblin Ag Method for the connection of reinforcing bars in reinforced concrete construction
CN1088858A (en) * 1992-12-31 1994-07-06 华电建设工程接头技术公司 A kind of continued access method of reinforcing bar
JPH0776886A (en) * 1993-06-14 1995-03-20 Nippon Splice Sleeve Kk Horizontal joining method for precast concrete member and coupling mortar coupling group
CN2608592Y (en) * 2002-04-29 2004-03-31 吴雪 Shuttle slipknot rifled concrete bar connecting adapter
CN202391019U (en) * 2011-12-09 2012-08-22 中冶建筑研究总院有限公司 End part thickened grouting connector of steel bar
CN205276695U (en) * 2016-01-08 2016-06-01 金陵科技学院 Reinforcing bar quick -connect machanism
CN207761180U (en) * 2017-03-20 2018-08-24 建研科技股份有限公司 The special-shaped grout sleeve of bar connecting
CN108277929A (en) * 2018-02-01 2018-07-13 青岛森林金属制品有限公司 Means for jointing rods
CN208618668U (en) * 2018-08-08 2019-03-19 西南科技大学 Composite connector for FRP tendons
CN108915156A (en) * 2018-08-20 2018-11-30 西北民族大学 Combined grouting sleeve connection structure and reinforcing bar connection construction method
CN109235780A (en) * 2018-10-22 2019-01-18 北京工业大学 A kind of half grouting connection sleeve suitable for highly seismic region and its apply method
CN109235781A (en) * 2018-10-22 2019-01-18 北京工业大学 A kind of self-centering construction of grout sleeve connection prefabricated components reinforcing bar and the practice
CN210482757U (en) * 2019-04-18 2020-05-08 王玉峰 Plaster-applying type steel bar connecting assembly

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112196188A (en) * 2019-11-29 2021-01-08 福建工程学院 Slip casting connecting device
CN115387541A (en) * 2021-12-20 2022-11-25 甘肃建研建设工程有限公司 Self-locking grouting sleeve with assembled structure and preparation method thereof
CN117905108A (en) * 2024-03-19 2024-04-19 福建一建集团有限公司 Construction method for building engineering reverse construction method of civil air defense in heavy-layer water-bearing sand layer
CN117905108B (en) * 2024-03-19 2024-05-28 福建一建集团有限公司 Construction method for building engineering reverse construction method of civil air defense in heavy-layer water-bearing sand layer

Similar Documents

Publication Publication Date Title
CN109881844A (en) Smear cream formula reinforcing bar connection component and the connection method applied to the assembly of PC component
CN103216044B (en) The cement grouting steel bar connecting structure of precast unit
CN202391019U (en) End part thickened grouting connector of steel bar
CN103899044B (en) Embedded pyramidal full grout sleeve
CN103758292B (en) The full grout sleeve of a kind of shearing enhancement mode
CN103758291B (en) A kind of shearing enhancement mode half grout sleeve
CN105625641B (en) A kind of FRP grout sleeves for bar connecting
CN103899043B (en) Embedded pyramidal half grout sleeve
CN100348804C (en) Multifunction pulp stopping plug for anchor rod and its pulp filling adaptor
CN105064619A (en) Rebar sleeve grouting connection member for prefabricated assembled type concrete component and connection method
CN210458914U (en) Connecting structure of prefabricated bridge pier stud and capping beam
CN205476091U (en) Cast in situ concrete is reinforcing bar connecting sleeve that is in milk entirely for structure
CN205935417U (en) Take half grout sleeve of threaded connection spare
CN101356318B (en) Precast concrete segment having connecting structure using steel duct, and connecting structure thereof
CN210482757U (en) Plaster-applying type steel bar connecting assembly
CN108222656B (en) The construction method of Prefabricated enclosure wall
CN104695430B (en) Foundation pile the most quickly rotates docking structure
CN111005502A (en) Inner cavity convex multi-point distributed grouting sleeve and manufacturing method thereof
CN211286302U (en) Inner cavity convex multi-point distributed grouting sleeve
CN205712772U (en) A kind of grout sleeve and prefabricated component
CN108978932A (en) A kind of vertical connector of precast wall body and its connection type
CN205399829U (en) A FRP grout sleeve for steel bar connection
CN207419713U (en) A kind of built-in connection
FR3097886A1 (en) Construction system in UHPC / Composite tubular element
CN203007800U (en) Sealing clamp for irrigating pointing joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190614