CN109872034A - The project process method and system of project supervision - Google Patents

The project process method and system of project supervision Download PDF

Info

Publication number
CN109872034A
CN109872034A CN201811647207.2A CN201811647207A CN109872034A CN 109872034 A CN109872034 A CN 109872034A CN 201811647207 A CN201811647207 A CN 201811647207A CN 109872034 A CN109872034 A CN 109872034A
Authority
CN
China
Prior art keywords
project
supervision
block chain
content
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811647207.2A
Other languages
Chinese (zh)
Inventor
胡纯
席凯祥
聂望鑫
陈志辉
李山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Junsheng Construction Management Co Ltd
Original Assignee
Guangzhou Junsheng Construction Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Junsheng Construction Management Co Ltd filed Critical Guangzhou Junsheng Construction Management Co Ltd
Priority to CN201811647207.2A priority Critical patent/CN109872034A/en
Publication of CN109872034A publication Critical patent/CN109872034A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to the technical fields of project supervision, and more particularly, to a kind of project process method and system of project supervision, the project process method of project supervision includes: to establish project supervision project according to engineering project content and project supervision standard;Management program is obtained according to the project supervision project;Each flow nodes in the management program are obtained, this constructs management block chain according to the flow nodes;If getting project process content, the management block chain is written into the project process content, and be monitored to the project process content.The present invention has the effect of improving the efficiency of the project process of project supervision.

Description

The project process method and system of project supervision
Technical field
The present invention relates to the technical fields of project supervision, a kind of project process method more particularly, to project supervision and are System.
Background technique
Currently, project supervision refers to work of the supervisor with related qualification by the commission of Party A, according to state approval Journey project construction file, the law in relation to engineering construction, regulation and engineering supervision contract and other construction contracts, generation A kind of proficient service activity of the table Party A to the engineering construction implementing monitoring of Party B.
It is cumbersome due to project work during existing project supervision, it needs to the staff's of responsible project Work exercises supervision, and can only be exercised supervision at present by related personnel to the work of load terms purpose staff, does not meet Now to the requirement of office automatic, while extra work personnel are needed, causes the waste of human resources.
Summary of the invention
The object of the present invention is to provide it is a kind of improve project supervision project process efficiency project supervision project into Spend method and system.
Foregoing invention purpose one of the invention has the technical scheme that
A kind of project process method of project supervision, the project process method of the project supervision include:
According to engineering project content and project supervision standard, project supervision project is established;
Management program is obtained according to the project supervision project;
Each flow nodes in the management program are obtained, this constructs management block chain according to the flow nodes;
If getting project process content, the management block chain is written into the project process content, and to the project Progress content is monitored.
By using above-mentioned technical proposal, according to engineering project content and project supervision standard, the project supervision item of management Mesh enables to the project supervision project under the premise of complying with standard, is more in line with the content of concrete engineering project;Meanwhile Management block chain is established to each management step by block chain technology, since each process is all one straight sequentially in time Exhibition, the time being utilized in block chain well is irreversible, the characteristic that can not be distorted, and ensure that the safety of each process, meanwhile, The decentralization of block chain technology also improves the efficiency in monitoring.
The present invention is further arranged to: described to obtain management program according to the project supervision project, comprising:
According to the engineering project curriculum offering project supervision project process;
Obtain each process step of project supervision project process, and to each process step setting it is corresponding at the beginning of Between and the deadline after, obtain the management program.
By using above-mentioned technical proposal, by being planned for project supervision project, the process of project supervision is carried out Refinement and arrange, obtain corresponding process step and it is corresponding at the beginning of and the deadline so that the progress of project supervision It is more reasonable, while time started and deadline are set, it is also beneficial to be compared when being monitored.
The present invention is further arranged to: each flow nodes of the acquisition in the management program, this is according to institute State flow nodes building management block chain, comprising:
Using each process step as the corresponding flow nodes, and it is corresponding described to obtain each process step Deadline;
Each flow nodes are handled by block chain technology, obtain corresponding progress block, and according to described complete The progress block is constructed into the management block chain at the time.
By using above-mentioned technical proposal, each flow nodes are constructed by the management block chain by block chain technology, are mentioned More structurally sound data framework is supplied, while when building block chain, it will be between each management block by the time of each block The flow nodes of each progress can be obtained from the management block chain to obtain the management block chain by forming chain structure Specific beginning and deadline, it is convenient for subsequent monitoring.
The present invention is further arranged to: if described get project process content, the project process content being written The management block chain, comprising:
If getting the project process content, corresponding actual finish time is obtained;
Corresponding position in the management block chain is written into the project process content and the actual finish time.
Further, the project process content is monitored, comprising:
According to the project process content, when obtaining the corresponding processing time and the completion from the management program Between;
The project process content further includes the actual treatment time, obtains the actual treatment time of the project process content With the actual finish time, and respectively by the actual treatment time and the actual finish time and the corresponding processing Time and the deadline are compared;
If the result compared be that the actual treatment time is more late than the processing time and/or the actual finish time ratio described in Evening deadline then generates and sends progress unexpected message.
By using above-mentioned technical proposal, by by management program processing time and deadline and time project The processing time of progress is compared with actual finish time, can obtain unexpected message in time, convenient for management.
Foregoing invention purpose two of the invention has the technical scheme that
A kind of project process system of project supervision, the project process system of the project supervision include:
Project establishes module, for establishing project supervision project according to engineering project content and project supervision standard;
Program obtains module, for obtaining management program according to the project supervision project;
Block chain building module, for obtaining each flow nodes in the management program, this is according to the process section Point building management block chain;
Monitoring module, if the management block chain is written in the project process content for getting project process content, And the project process content is monitored.
By using above-mentioned technical proposal, according to engineering project content and project supervision standard, the project supervision item of management Mesh enables to the project supervision project under the premise of complying with standard, is more in line with the content of concrete engineering project;Meanwhile Management block chain is established to each management step by block chain technology, since each process is all one straight sequentially in time Exhibition, the time being utilized in block chain well is irreversible, the characteristic that can not be distorted, and ensure that the safety of each process, meanwhile, The decentralization of block chain technology also improves the efficiency in monitoring.
In conclusion advantageous effects of the invention are as follows:
1. according to engineering project content and project supervision standard, the project supervision project of management enables to the project supervision item Mesh is more in line with the content of concrete engineering project under the premise of complying with standard;
2. management block chain is established to each management step by block chain technology, since each process is all sequentially in time It is in progress always, the time being utilized in block chain well is irreversible, and the characteristic that can not be distorted ensure that the peace of each process Entirely, meanwhile, the decentralization of block chain technology also improves the efficiency in monitoring.
Detailed description of the invention
Fig. 1 is a flow chart of the project process method of project supervision in one embodiment of the invention.
Fig. 2 is in the project process method of project supervision in one embodiment of the invention to the implementation flow chart of step S20.
Fig. 3 is in the project process method of project supervision in one embodiment of the invention to the implementation flow chart of step S30.
Fig. 4 is in the project process method of project supervision in one embodiment of the invention to the implementation flow chart of step S40.
Fig. 5 is another implementation process in the project process method of project supervision in one embodiment of the invention to step S40 Figure.
Fig. 6 is a functional block diagram of the project process system of project supervision in one embodiment of the invention.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment one:
In one embodiment, it as shown in Figure 1, being a kind of project process method of project supervision disclosed by the invention, specifically includes Following steps:
S10: according to engineering project content and project supervision standard, project supervision project is established.
In the present embodiment, engineering project content refers to by examining on the spot and being planned to obtain according to surveys Specific engineering construction in content.Project supervision standard refers to basis when carrying out project supervision according to the work of state approval Journey project construction file, the law in relation to engineering construction, regulation and engineering supervision contract and other construction contracts from And the standard formulated.Project supervision project, which refers to, is monitored and manages corresponding item in actually construction to the engineering project Mesh.
Specifically, when establishing the project supervision project, according to project supervision standard and referring to actual engineering project The case where content and demand are adaptively adjusted, and the project supervision project is established, so that the project supervision project established More meet actual engineering project.
S20: management program is obtained according to project supervision project.
In the present embodiment, management program refers to the tables of data that project supervision project is planned and arranged Lattice.
Specifically, according to the actual content in project supervision project, preparatory planning is carried out, it will be to engineering project reality The step of management setting estimated time carried out and complete, to obtain the management program.
S30: obtaining each flow nodes in management program, this constructs management block chain according to flow nodes.
In one embodiment, flow nodes refer to each step in management program.Block chain is distributed data The new application mode of the computer technologies such as storage, point-to-point transmission, common recognition mechanism, Encryption Algorithm.So-called common recognition mechanism is exactly How to reach common understanding between all accounting nodes, goes the validity for assert a record, this is both the means of identification, and prevents The means distorted.Management block chain refers to the block chain for being stored with project supervision process step particular content.
Specifically, by the technology of block chain, chain structure will be formed between each flow nodes in management program, To obtain the management block chain.
S40: if getting project process content, management block chain is written into project process content, and to project process Content is monitored.
In the present embodiment, project process content, which refers to, obtains the specific progresses in real time of the engineering project by project supervision Corresponding data.
Specifically, after getting the project process content, by the project process content and working as the content is got Corresponding position in the management block chain is written in the preceding time.And according to the time planned in the current time and step S20 It is compared, realization is monitored project process content.
In the present embodiment, according to engineering project content and project supervision standard, the project supervision project of management can make The project supervision project is obtained under the premise of complying with standard, is more in line with the content of concrete engineering project;Meanwhile passing through block chain Technology establishes management block chain to each management step, since each process is all to be in progress always sequentially in time, well The time being utilized in block chain is irreversible, the characteristic that can not be distorted, and ensure that the safety of each process, meanwhile, block chain skill The decentralization of art also improves the efficiency in monitoring.
In one embodiment, as shown in Fig. 2, in step S20, i.e., management program is obtained according to project supervision project, Specifically comprise the following steps:
S21: according to engineering project curriculum offering project supervision project process.
In the present embodiment, project supervision project process, which refers to, carries out the specific process step of management to the engineering project content Suddenly.
Specifically, according to engineering project content, the i.e. actual demand of the engineering project, each process of the engineering project is formulated The time that step is carried out and completed, so that the project supervision project process is arranged, so that the progress to the engineering project carries out Management.
S22: obtaining each process step of project supervision project process, and to the setting of each process step it is corresponding at the beginning of Between and the deadline after, obtain management program.
Specifically, each process step of the project supervision project process respectively with the process step in engineering project content It is corresponding, according to the process step, be arranged it is corresponding it is estimated at the beginning of and the deadline, obtain this and establish program.
In one embodiment, as shown in figure 3, in step s 30, that is, obtaining each process section in management program Point, this constructs management block chain according to flow nodes, specifically comprises the following steps:
S31: using each process step as corresponding flow nodes, and each process step corresponding deadline is obtained.
Specifically, each process step corresponding deadline in obtaining step S22.
S32: each flow nodes are handled by block chain technology, obtain corresponding progress block, and according to complete Progress block is constructed into management block chain at the time.
Specifically, the sequence according to the time from front to back, by the deadline most previous flow nodes, i.e. the process walks After the progress block of the rapid first step is as the wound generation block of the management block chain, by each flow nodes and corresponding completion Time is handled by block chain technology, obtains corresponding progress block.
Further, when obtaining the progress block, from the sequence according to the time from front to back, from second process section The corresponding progress block of point starts, and the deadline of upper progress block is added, so that all progress blocks be constructed to obtain The management block chain.
In one embodiment, as shown in figure 4, in step s 40, even getting project process content, then by project into It spends content and management block chain is written, specifically comprise the following steps:
S41: if getting project process content, corresponding actual finish time is obtained.
Specifically, it during the engineering project carries out, according to management program one process step of every completion, obtains The corresponding engineering project progress content of the process step and current time, as actually accomplishing for the project process content Time.
S42: by corresponding position in project process content and actual finish time write-in management block chain.
Specifically, in step S41, the project process content is corresponding with the process step in management program, obtains The process step establishes the specific location of block chain at this, and the position of the management block chain is written as the project process content.
Further, by corresponding position in project process content and actual finish time write-in management block chain.
In one embodiment, specific to wrap as shown in figure 5, in step s 40, i.e., and to project process content being monitored Include following steps:
S43: according to project process content, corresponding processing time and deadline are obtained from management program.
Specifically, according to project process content, from the processing time obtained in management program in corresponding process step and Deadline.
S44: project process content further includes the actual treatment time, obtains actual treatment time and the reality of project process content The border deadline, and respectively compare actual treatment time and actual finish time with corresponding processing time and deadline It is right.
When specifically, by the processing that will be acquired in the actual treatment time of the project process content and step S43 Between be compared, and by the deadline acquired in the actual finish time of the project process content and step S43 into Row compares.
S45: if the result compared is that the actual treatment time is more late than the processing time and/or actual finish time compares the deadline Evening then generates and sends progress unexpected message.
Specifically, when the actual treatment time is more late than the processing time and actual finish time any one more late than the deadline Or when all occurring, illustrate the project process content without it is anticipated that carry out, then generate and send progress unexpected message, lead to Know that related personnel handles and analyzes.
It should be understood that the size of the serial number of each step is not meant that the order of the execution order in above-described embodiment, each process Execution sequence should be determined by its function and internal logic, the implementation process without coping with the embodiment of the present invention constitutes any limit It is fixed.
Embodiment two:
In one embodiment, a kind of project process system of project supervision is provided, the project process system of the project supervision with it is upper The project process method for stating project supervision in embodiment corresponds.As shown in fig. 6, the project process system packet of the project supervision The project of including establishes module 10, program obtains module 20, block chain building module 30 and monitoring module 40.Each functional module is detailed It is described as follows:
Project establishes module 10, for establishing project supervision project according to engineering project content and project supervision standard;
Program obtains module 20, for obtaining management program according to project supervision project;
Block chain building module 30, for obtaining each flow nodes in management program, this is constructed according to flow nodes Management block chain;
Monitoring module 40, if management block chain is written in project process content, and to item for getting project process content Mesh progress content is monitored.
Preferably, program obtains module 20, comprising:
Flow setting module 21, for according to engineering project curriculum offering project supervision project process;
Program acquisition submodule 22, for obtaining each process step of project supervision project process, and to each process step At the beginning of setting is corresponding and after the deadline, management program is obtained.
Preferably, block chain building module 30, comprising:
Deadline acquisition submodule 31 is used for using each process step as corresponding flow nodes, and obtains each process The step corresponding deadline;
Block chain building submodule 32, for each flow nodes to be handled by block chain technology, obtain it is corresponding into Block is spent, and progress block is constructed by management block chain according to the deadline.
Preferably, monitoring module 40, comprising:
Actual finish time acquisition submodule 41, if for getting project process content, when obtaining corresponding actually accomplish Between;
Reading and writing data submodule 42, for corresponding position in management block chain to be written in project process content and actual finish time It sets.
Preferably, monitoring module 40, further includes:
Time acquisition submodule 43, for according to project process content, obtained from management program the corresponding processing time with Deadline;
Submodule 44 is compared, further includes the actual treatment time for project process content, obtains the practical place of project process content Time and actual finish time are managed, and respectively by actual treatment time and actual finish time and corresponding processing time and completion Time is compared;
Message sending submodule 45, if the result for comparison is that the actual treatment time is more late and/or actually accomplish than the processing time Time is more late than the deadline, then generates and sends progress unexpected message.
The specific of project process system about project supervision limits the project that may refer to above for project supervision The restriction of progress method, details are not described herein.Modules in the project process system of above-mentioned project supervision can whole or portion Divide and is realized by software, hardware and combinations thereof.Above-mentioned each module can be embedded in the form of hardware or independently of computer equipment In processor in, can also be stored in a software form in the memory in computer equipment, in order to processor calling hold The corresponding operation of the above modules of row.

Claims (10)

1. a kind of project process method of project supervision, which is characterized in that the project process method of the project supervision includes:
According to engineering project content and project supervision standard, project supervision project is established;
Management program is obtained according to the project supervision project;
Each flow nodes in the management program are obtained, this constructs management block chain according to the flow nodes;
If getting project process content, the management block chain is written into the project process content, and to the project Progress content is monitored.
2. the project process method of project supervision as described in claim 1, which is characterized in that described according to the project supervision Project obtains management program, comprising:
According to the engineering project curriculum offering project supervision project process;
Obtain each process step of project supervision project process, and to each process step setting it is corresponding at the beginning of Between and the deadline after, obtain the management program.
3. the project process method of project supervision as described in claim 1, which is characterized in that it is described obtain the management into Each flow nodes in table are spent, this constructs management block chain according to the flow nodes, comprising:
Using each process step as the corresponding flow nodes, and it is corresponding described to obtain each process step Deadline;
Each flow nodes are handled by block chain technology, obtain corresponding progress block, and according to described complete The progress block is constructed into the management block chain at the time.
4. the project process method of project supervision as described in claim 1, which is characterized in that if described get project process Then the management block chain is written in the project process content by content, comprising:
If getting the project process content, corresponding actual finish time is obtained;
Corresponding position in the management block chain is written into the project process content and the actual finish time.
5. the project process method of project supervision as described in claim 1 or 4, which is characterized in that in the project process Appearance is monitored, comprising:
According to the project process content, when obtaining the corresponding processing time and the completion from the management program Between;
The project process content further includes the actual treatment time, obtains the actual treatment time of the project process content With the actual finish time, and respectively by the actual treatment time and the actual finish time and the corresponding processing Time and the deadline are compared;
If the result compared be that the actual treatment time is more late than the processing time and/or the actual finish time ratio described in Evening deadline then generates and sends progress unexpected message.
6. a kind of project process system of project supervision, which is characterized in that the project process system of the project supervision includes:
Project establishes module, for establishing project supervision project according to engineering project content and project supervision standard;
Program obtains module, for obtaining management program according to the project supervision project;
Block chain building module, for obtaining each flow nodes in the management program, this is according to the process section Point building management block chain;
Monitoring module, if the management block chain is written in the project process content for getting project process content, And the project process content is monitored.
7. the project process system of project supervision as claimed in claim 6, which is characterized in that the program obtains module, Include:
Flow setting module, for according to the engineering project curriculum offering project supervision project process;
Program acquisition submodule, for obtaining each process step of project supervision project process, and to each stream At the beginning of the setting of journey step is corresponding and after the deadline, the management program is obtained.
8. the project process system of project supervision as claimed in claim 6, which is characterized in that the block chain building module, Include:
Deadline acquisition submodule is used for using each process step as the corresponding flow nodes, and is obtained every The one process step corresponding deadline;
Block chain building submodule obtains corresponding for being handled each flow nodes by block chain technology Progress block, and the progress block is constructed by the management block chain according to the deadline.
9. the project process system of project supervision as claimed in claim 6, which is characterized in that the monitoring module, comprising:
Actual finish time acquisition submodule, if obtaining corresponding actually accomplish for getting the project process content Time;
Reading and writing data submodule, for the management block chain to be written in the project process content and the actual finish time In corresponding position.
10. the project process system of the project supervision as described in claim 6 or 9, which is characterized in that the monitoring module, also Include:
Time acquisition submodule, for being obtained from the management program corresponding described according to the project process content Handle time and the deadline;
Submodule is compared, further includes the actual treatment time for the project process content, obtains the project process content The actual treatment time and the actual finish time, and respectively by the actual treatment time and the actual finish time It is compared with the corresponding processing time and the deadline;
Message sending submodule, if the result for comparison is the actual treatment time is more late than the processing time and/or institute It is more late than the deadline to state actual finish time, then generates and sends progress unexpected message.
CN201811647207.2A 2018-12-30 2018-12-30 The project process method and system of project supervision Pending CN109872034A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811647207.2A CN109872034A (en) 2018-12-30 2018-12-30 The project process method and system of project supervision

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811647207.2A CN109872034A (en) 2018-12-30 2018-12-30 The project process method and system of project supervision

Publications (1)

Publication Number Publication Date
CN109872034A true CN109872034A (en) 2019-06-11

Family

ID=66917367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811647207.2A Pending CN109872034A (en) 2018-12-30 2018-12-30 The project process method and system of project supervision

Country Status (1)

Country Link
CN (1) CN109872034A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116644943A (en) * 2023-07-26 2023-08-25 湖南湘江城市运营管理有限公司 Engineering supervision data management system based on Internet of things
CN117933919A (en) * 2023-12-29 2024-04-26 上海翎熠工程监理有限公司 Engineering supervision system based on information terminal

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105913341A (en) * 2016-04-11 2016-08-31 广州市城市建设工程监理公司 Construction project supervision information management method and system
CN108197909A (en) * 2018-03-24 2018-06-22 浙江鼎力工程项目管理有限公司 A kind of project process supervision control system
CN108898289A (en) * 2018-06-13 2018-11-27 鹰投(上海)海洋科技发展有限公司 Project completion management system and its implementation based on block chain

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105913341A (en) * 2016-04-11 2016-08-31 广州市城市建设工程监理公司 Construction project supervision information management method and system
CN108197909A (en) * 2018-03-24 2018-06-22 浙江鼎力工程项目管理有限公司 A kind of project process supervision control system
CN108898289A (en) * 2018-06-13 2018-11-27 鹰投(上海)海洋科技发展有限公司 Project completion management system and its implementation based on block chain

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
何宗耀: "《新型智慧城市建设现状、技术与研究》", 北京邮电大学出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116644943A (en) * 2023-07-26 2023-08-25 湖南湘江城市运营管理有限公司 Engineering supervision data management system based on Internet of things
CN116644943B (en) * 2023-07-26 2023-09-29 湖南湘江城市运营管理有限公司 Engineering supervision data management system based on Internet of things
CN117933919A (en) * 2023-12-29 2024-04-26 上海翎熠工程监理有限公司 Engineering supervision system based on information terminal

Similar Documents

Publication Publication Date Title
Ozcan et al. Examination timetabling using late acceptance hyper-heuristics
CN104794057B (en) A kind of crossing event automated testing method and device
US20150012902A1 (en) Automatic mapping method for a distribution network based on logical layout
CN109872034A (en) The project process method and system of project supervision
CN108234127A (en) A kind of Internet of Things method and device based on block chain
CN106448779B (en) Master-control room of nuclear power plant screen inter-linked controlling method and device
CN203118041U (en) Project cost progress management system
CN109242732A (en) Campus activities organization system and method for organizing
CN109857565A (en) Data processing method, device, computer equipment and storage medium
CN110705808A (en) Power transmission network planning scheme generation system and method considering maintenance under new energy access
CN104199820A (en) Cloud platform MapReduce workflow scheduling optimizing method
CN110310090A (en) Dynamic electron approval process generation method, device, equipment and medium based on modularization
Jaengchuea et al. A hybrid genetic algorithm with local search and tabu search approaches for solving the post enrolment based course timetabling problem: Outperforming guided search genetic algorithm
CN110046638A (en) Fusion method, device and the equipment of multi-platform data
CN107229628A (en) The method and device of distributed data base pretreatment
CN109150981A (en) Block chain network network-building method, device, equipment and computer readable storage medium
Pita et al. ARMOR Security for Los Angeles International Airport.
CN115688495B (en) Distributed LVC simulation system collaborative planning method, server and storage medium
Wang P-value based task allocation in a scrum team: a multi-agent simulation
CN108804307A (en) process automation test method and device
CN105468455A (en) Dynamic task distribution method and apparatus for multiple devices
CN109272292A (en) The processing method and system of meeting summary based on block chain
CN108510188A (en) Data processing method, device based on alliance's operation and equipment
CN104020938B (en) A kind of information processing method and electronic equipment
Walker et al. Effects Of An Early Prototyping Experience: Can Design Fixation Be Avoided?

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190611