CN108197909A - A kind of project process supervision control system - Google Patents
A kind of project process supervision control system Download PDFInfo
- Publication number
- CN108197909A CN108197909A CN201810248706.8A CN201810248706A CN108197909A CN 108197909 A CN108197909 A CN 108197909A CN 201810248706 A CN201810248706 A CN 201810248706A CN 108197909 A CN108197909 A CN 108197909A
- Authority
- CN
- China
- Prior art keywords
- node
- project
- module
- completion
- probability
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Engineering & Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Economics (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of project process supervision control systems,It is related to supervision control system regions,It solves supervisor and rational adjustment is difficult to the management and control of project,Easily cause the drawbacks of imbalance is supervised between project delay and multiple projects,Its key points of the technical solution are that include according to unique identifying information to obtain the login module of corresponding administration authority,It by the corresponding node schedule data input of the node schedule of practice of construction and is stored according to administration authority to the recording module of project process database,According to node schedule information to carry out the analysis module of project pressing degree analysis,The distribution module being allocated in response to analysis module and according to project pressing degree to the reception time of item nodes,A kind of project process supervision control system of the present invention,It is capable of the distribution of the intelligentized analysis and reception time for carrying out multiple projects automatically,The careless omission occurred during supervisor's management and control is avoided to cause the extension of project,Management and control is orderly convenient.
Description
Technical field
The present invention relates to supervision control system, more particularly to a kind of project process supervision control system.
Background technology
At present when being supervised to project under construction, usually a supervisor needs to manage multiple projects simultaneously, and
The most of flow of current project management still needs each verbal communication or meeting between management side and construction party
Form exchanged so that management side can be monitored the overall progress of construction party, and supervised and carried out every
Can the examination of a node, supervisor directly affect project for the examination of item destination node and normally continue.Current
Management system, for supervisor, project is more and can cause the cumbersome of various data to arrange, and supervisor be often difficult to and
When the urgency level for judging be responsible for project, rational management and control usually need supervisor have abundant working experience, but
It is according to supply and demand ratio, it is not especially sufficient supervisor that many projects, which still need to distribute to some experiences, at present, carries out management and control
When it is very cumbersome and inconvenient, rational adjustment is difficult in the management and control of project, gently then causes prolonging for project
It is phase, heavy then cause the imbalance supervised between multiple projects, the examination progress of multiple projects is influenced, brings immeasurable damage
It loses, the space that could be improved.
Invention content
The object of the present invention is to provide a kind of project process supervision control systems, intelligentized can carry out multiple items automatically
Purpose is analyzed and the distribution of reception time, and the careless omission occurred during supervisor's management and control is avoided to cause the extension of project, and management and control is orderly just
It is prompt.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of project process supervision control system includes according to unique identifying information to obtain the login of corresponding administration authority
Module by the corresponding node schedule data input of the node schedule of practice of construction and is stored to item according to administration authority
The recording module in mesh progress data library, according to node schedule information with carry out the analysis module of project pressing degree analysis,
The distribution module being allocated in response to analysis module and according to project pressing degree to the reception time of item nodes.
Using the above scheme, the administration authority obtained by login module is by the item destination node schedule of practice of construction
Information is obtained, and the typing of node schedule information is realized by recording module, and analysis module can be complete according to node
The whole pressing degree of project is analyzed into progress msg, can realize and multiple projects that supervisor is responsible for are carried out at the same time
The analysis of pressing degree, and the node that the setting of distribution module can then carry out an acceptance inspection to needs according to the pressing degree of multiple projects
Reception time, which automatically optimizes, sorts and distributes to supervisor so that supervisor can clearly know responsible project
Progress situation and corresponding pressing degree, and distribution module can directly be allocated, and then facilitate management reception time
The management of people reduces analysis selection of the supervisor between multiple projects, can be reduced to urgent while improving working efficiency
The extension of project avoids the occurrence of the out of control of receipt control.
Preferably, the project process database is also stored with expected completion progress msg, the expection completion progress
Information corresponds the expection completion progress setting of each node set in project process;The project pressing degree is residual term
The Completion Probability that mesh overall progress is completed on schedule, the analysis module transferred out of project process database and to it is expected complete into
Degree information and node schedule information compare and analyze to analyze Completion Probability:
It defines Completion Probability and is equal to 1, then node schedule is faster than or equal to expected completion progress;Completion Probability is less than 1, then saves
Point schedule is slower than expected completion progress;
The analysis module obtains corresponding Completion Probability according to the following formula:
P=Pi *Pi+1… PN;
Pi=1-X/Y;
P, the Completion Probability that remaining item is integrally completed on schedule;
Y, the duration surplus summation of remaining node reserves after node to be checked and accepted;
X, node extension amount to be checked and accepted, takes X=0 if no delay;
Pi, rdu remaining duration correspond to i-th of node single node in setting duration duration and complete probability;
Wherein, X is more than or equal to 0, if X>Y then takes Pi=0;
N, the quantity of project process remaining node after node to be checked and accepted, N is the integer more than 0.
Using the above scheme, analysis module carries out certain calculating analysis according to the Completion Probability to project entirety, according to
Analysis calculates the numerical value of gained, and then intuitively understand that the probability that corresponding project completes on schedule so that distribution when
Wait more convenient and science.
Preferably, the distribution module arranges the reception time of the node to be checked and accepted of projects according to Completion Probability
Sequence, and project of the Completion Probability less than 1 according to Completion Probability is corresponding in turn to from small to large and is successively sorted, the distribution module
By reception time according to sequence distribution output to corresponding supervisor.
Using the above scheme, distribution module is ranked up according to Completion Probability, and to project of the Completion Probability less than 1 successively
Sort and be allocated output so that supervisor can orderly carry out an acceptance inspection processing so that carry out management and control processing when
The extension that waiting can be reduced on project influences, the management and control of orderly carry out project.
Preferably, the sequence of the distribution module is set with priority, the priority is equal to 1 item for Completion Probability
Mesh is less than 1 project prior to Completion Probability;The distribution module is equal to the examination most later stage of 1 projects according to Completion Probability
Limit carries out just sorting successively, then entry sorting of the Completion Probability less than 1 is distributed to not being sorted in the examination period of setting and is accounted for
Period.
Using the above scheme, the priority of distribution module by by Completion Probability be 1 project according to check and accept the deadline date
It is ranked up, then project of the Completion Probability less than 1 is ranked up within the examination period, so that Completion Probability is equal to 1
Project can carry out an acceptance inspection on time, avoid because the examination of sundry item influence originally can finished item on schedule progress,
So that the project that supervisor is responsible for is in controllable state in examination.
Preferably, the distribution module includes is ranked up analysis and adjusting to project of the Completion Probability equal to 1
Adjust unit;If there is Completion Probability checking and accepting cycle memory and just sorting after the period of occupancy and the period is not sorted
The reception time of project just to sort after the period is adjusted sequence to being somebody's turn to do by the project equal to 1, the unit that adjusts successively
Period.
Using the above scheme, the setting of the adjusting unit of distribution module can realize the conjunction to checking and accepting reception time in the period
Reason is adjusted, and project of the Completion Probability equal to 1 is adjusted according to practical distribution condition checking and accepting period inner casing, so that project
It can timely carry out an acceptance inspection.
Preferably, further include the update module that with good grounds unique different identification information obtains renewal authority, it is described more
New module will complete the corresponding node schedule information checked and accepted and be deleted out of project process database and complete to the expection of setting
Work progress msg is adjusted update;
If corresponding node examination passes through, the node schedule information of the next node to be logged such as described recording module;It is if right
Node examination is answered not pass through, then the recording module again waits for the node schedule information of the typing node and again passes by
The secondary examination of node of corresponding node is carried out after the processing of analysis module and distribution module.
Using the above scheme, the setting of update module can realize that the update to node schedule information is handled so that
Analysis module and distribution module can be handled smoothly with the practice of construction progress of project so that analysis module and distribution mould
Block can be handled according to the progress of node in real time;And for checking and accepting, recording module to the item destination node that passes through of examination then etc.
It treats the typing of node progress msg next time, and secondary examination, and recording module is then carried out for checking and accepting unsanctioned node
The typing of the new node schedule of the node is waited for, to facilitate the subsequent processing of analysis module and distribution module.
Preferably, the distribution module is set with Completion Probability minimum value Pmin;The distribution module is to P<Pmin and
Need carry out the secondary examination of node project carry out an acceptance inspection the time distribute and send warning notice simultaneously to corresponding supervisor.
Using the above scheme, distribution module is general by the Completion Probability minimum value Pmin of setting and the completion of analysis calculating gained
Rate is compared, and the Completion Probability that can be obtained to analysis is less than Pmin and needs to carry out the item of the secondary examination of node
Mesh can send warning notice while being allocated so that supervisor understand that the actual conditions of project, and to going out
Existing Completion Probability it is too small and occurred the project of examination problem can timely alarm, convenient for management and control.
Preferably, item destination node of the Completion Probability less than 1 obtains corresponding new node after entering next node
Schedule information, the analysis module obtain corresponding new single node according to new node schedule information analysis and complete generally
Rate Pi ', and Pi ' and the preceding Pi once obtained are compared to analyze construction speed, the distribution module in response to
Analysis module and according to construction speed in Pi>Quadratic extension is sent during Pi ' to notify to corresponding supervisor.
Using the above scheme, node of the Completion Probability less than 1 then passes through when checking and accepting the examination by entering next node
The comparison of probability is completed to the single node in the case of two progresses, intuitively and can easily realize and delay in a upper node
In the case of, next node whether and delay again, convenient for integral construction progress management and control of the supervisor to project,
The communication of supervisor and construction party to be facilitated to handle.
Preferably, the login module is configured as construction party permission, the update module according to unique identifying information
Management side's permission is configured as according to unique different identification information.
Using the above scheme, login module is configured as construction party permission so that construction party can complete node construction
Complete timely of progress and easily realize processing to progress, convenient for knowing for management side, update module is then configured as supervising
Reason side's permission, so that management side can in real time be handled according to the progress of examination, according to corresponding to corresponding permission
People so that personnel can complete the work of oneself, improve working efficiency.
In conclusion the invention has the advantages that:
It is handled by the cooperation of recording module and analysis module so that every destination node, which completes probability, to be statistically analyzed
Go out so that supervisor can clearly know the progress situation of responsible project and corresponding pressing degree, distribution module
The distribution for the time that then can automatically be carried out an acceptance inspection according to the result intelligent of analysis according to the situation of project is set, and then facilitates prison
The management of people is managed, analysis selection of the supervisor between multiple projects is reduced, can be reduced to tight while improving working efficiency
Compel the extension of project, avoid the occurrence of the out of control of receipt control.
Description of the drawings
Fig. 1 is the system block diagram of project process supervision control system;
The flow diagram one of Fig. 2 systems in order to control;
The flow diagram two of Fig. 3 systems in order to control.
In figure:1st, login module;2nd, recording module;3rd, analysis module;4th, distribution module;41st, unit is adjusted;42nd, it alerts
Unit;5th, update module;6th, project process database.
Specific embodiment
The present invention is described in further detail below in conjunction with attached drawing.
A kind of project process supervision control system disclosed in the present embodiment can be presented by the form of webpage, can also
It is presented by the form of APP or software, is presented preferably in the form of APP in the present embodiment, be by the set system
Normal handling and the arrangement of time that management side carries out item nodes examination are served in urban construction.As shown in Figure 1, include login
Module 1, recording module 2, analysis module 3, distribution module 4 and update module 5 and to the project that each data are stored into
Degrees of data library 6.
Login module 1 obtains administration authority according to unique different identification information, and unique different identification information can lead to
The mode of account number cipher is crossed, it can also be by the way of recognition of face, the mode of the mode of fingerprint recognition and iris recognition etc.
Deng, as long as the mode verified for unique identification information can realize the acquisition of corresponding authority;The present embodiment
In, it is preferred to use it is realized by way of account number and password, i.e., the user name of user has determined that its user type in registration,
User need to only input username and password during login, and system can be entered by clicking " login " frame;When logging off, user only needs a little
Hit the interface upper right corner " exiting ", you can Safe withdrawing;Login module 1 is configured as construction party power according to unique identification information
Limit.
Construction party user Successful login obtains corresponding administration authority, and the automatic display management permission in interface corresponds to the item of management
Purpose construction speed node, construction speed node include all nodes that projects were checked and accepted and do not checked and accepted, and to checking and accepting
The node crossed is shown as processing and completes, and is not available for the state of editor, for the node in the stage constructed, then shows
" node completion " frame is triggered according to node schedule by corresponding administration authority and confirms the number for realizing node completion progress msg
According to transmission, to carry out the analysis of analysis module 3 and distribution module 4 and distribution outlet.
As shown in Fig. 2, recording module 2 receives and stores node completion progress msg typing to corresponding project process
In database 6.Analysis module 3 is by transferring in project process database 6 every destination node schedule information with to correspondence
Item destination node schedule and the project pressing degree of entirety are analyzed, and the result after analysis is exported,
Distribution module 4 is allocated in response to analysis module 3 and according to project pressing degree to the reception time of item nodes.
Analysis module 3 carries out the analysis of pressing degree, projects by the Completion Probability that the entirety to project is completed on schedule
The corresponding expection completion progress for presetting each node, and the construction period of each node is reserved with corresponding duration surplus.
The expection that the expection completion progress setting for corresponding each node set in project process is also stored in project database is complete
Work progress msg, analysis module 3 by transfer node schedule information and expected completion progress msg be compared with
Complete the analysis of Completion Probability.And the node schedule for defining practice of construction is faster than or the node equal to expected completion progress
Corresponding project, the Completion Probability that remaining item is integrally completed on schedule are equal to 1;The node schedule of practice of construction is slower than pre-
The corresponding project of node of phase completion progress, the Completion Probability that remaining item is integrally completed on schedule are less than 1.
Analysis module 3 obtains the Completion Probability of the project of corresponding node according to the following formula:
P=Pi *Pi+1… PN;
Pi=1-X/Y;
P, the Completion Probability that remaining item is integrally completed on schedule;
Y, the duration surplus summation of remaining node reserves after node to be checked and accepted;
X, node extension amount to be checked and accepted, takes X=0 if no delay;
Pi, rdu remaining duration correspond to i-th of node single node in setting duration duration and complete probability;
Wherein, X is more than or equal to 0, if X>Y then takes Pi=0;
N, the quantity of project process remaining node after node to be checked and accepted, N is the integer more than 0.
It is further finely divided, analysis further includes the following parameter being related to when calculating:
Pi=Yi’/Yi;
Yi’= Yi - Xi;
Xi= X*( Yi /Y);
In formula:
Xi, rdu remaining duration corresponds to the occupancy that i-th of node is deferred quantities, by proportionally distributing node extension amount
To the remaining node of project, and distribution is adjusted from the duration surplus of remaining each node;
Yi, rdu remaining duration correspond to i-th of node duration surplus, and duration surplus is that each node corresponds to reserved work in project process
Time phase;
Yi ', rdu remaining duration, which corresponds to i-th of node real surplus, can use duration surplus, if there is negative value, take Pi=0;
Pi, rdu remaining duration correspond to i-th of node single node and complete probability in setting duration duration.
Analysis module 3 is calculated the corresponding Completion Probability of each project by analysis and exports to distribution module 4, by dividing
The reception time of multiple item nodes is allocated with module 4.
Distribution module 4 is ranked up, and for complete the reception time of the node to be checked and accepted of projects according to Completion Probability
Project of the work probability less than 1 is corresponding in turn to from small to large according to Completion Probability successively to sort, in the distribution of time that carries out an acceptance inspection.Point
Sequence with module 4 is set with priority, and the project that priority level initializing is equal to 1 for Completion Probability is less than 1 prior to Completion Probability
Project;When being allocated, the projects of Completion Probability equal to 1 are first carried out walk-through by distribution module 4 by priority
Sequence, and carry out just sorting successively, then project of the Completion Probability less than 1 is general according to completion according to the examination deadline date of projects
Rate is not sorted the period of occupancy in the examination period that successively sequence distribution is extremely set successively from small to large.
Distribution module 4 further includes the adjusting unit 41 for being ranked up analysis and adjusting, adjusts unit 41 to completion
Project of the probability equal to 1 is analyzed again, and be not sorted the period of occupancy and the period checking and accepting cycle memory
Just sequence has the project that Completion Probability is equal to 1 later, adjusts the testing the project just to sort after the period successively of unit 41
Time adjustment is received to sort to the period, i.e., before the examination deadline date of the projects of the Completion Probability to sort originally equal to 1,
It is checking and accepting also there are during the period for not being sorted occupancy in the period, then according to the priority of sequence successively by these Completion Probabilities etc.
It is adjusted forward in the reception time of 1 project.Final distribution module 4 is by reception time according to sequence distribution output to corresponding prison
Manage people.
As shown in Figures 2 and 3, update module 5 obtains renewal authority, update module 5 according to unique different identification information
Management side's permission is configured as according to unique identification information.To the node for completing to check and accept, update module 5 is by its node schedule
It is deleted in from project process database 6, and the expected completion progress msg of setting is adjusted and updated.When node completes
When probability is equal to 1, then the expected completion progress msg of all nodes after the node remains unchanged, if the Completion Probability of node
During less than 1, then the expection completion progress of node is adjusted according to rdu remaining duration corresponding node duration surplus.
If node examination passes through, the typing of the node schedule information of the corresponding waiting next node of recording module 2,
It is analyzed and is distributed again, update processing;If corresponding node examination does not pass through, need to carry out secondary examination, it is similary to record
Enter module 2 and wait for the node schedule information of the typing node again, and analyzed again, distribute and update processing.
While distribution module 4 is allocated output to node reception time, it is additionally provided with warning unit 42, distribution module
4 are set with Completion Probability minimum value Pmin;Distribution module 4 is to P<Pmin and need carry out the secondary examination of node project tested
Warning notice is also sent to corresponding supervisor by warning unit 42 while distribution between time receiving, to play the work of reminder alerting
With to checking and accepting, there may be the more eye-catching promptings of the project of problem progress.
Item destination node of the Completion Probability less than 1 obtains corresponding new node schedule information after entering next node,
Analysis module 3 obtains corresponding new single node according to new node schedule information analysis and completes probability P i ', and by Pi ' with
The preceding Pi once obtained is compared to analyze construction speed, according to construction speed, if in Pi>During Pi ', mould is distributed
Block 4 is in response to analysis module 3 and sends quadratic extension and notifies to corresponding supervisor, equally to respective items purpose pressing degree into
Row notice, convenient for supervision and prompting of the supervisor to construction party.
It can be by logical with reference to various exemplary modules, unit, element and/or the component that embodiments disclosed herein describes
With processor, digital signal processor (DSP), application-specific integrated circuit (ASIC), field programmable gate array (FPGA) or other
Programmable logic components, discrete gate or transistor logic, discrete hardware components are designed to perform function described herein
Any combinations are practiced or carried out.General processor can be microprocessor, but another selected as, the processor can be appointed
What conventional processor, controller, microcontroller or state machine.Processor can also be embodied as the combination of computation module, such as DSP
The combination of combination, multi-microprocessor with microprocessor, one or more microprocessors are combined or are appointed with DSP core
What its this configuration.
Each function module in each embodiment of the present invention can be integrated in a processing unit or each
Module is individually physically present, can also two or more modules be integrated in a module.Above-mentioned integrated module both may be used
It realizes, can also be realized in the form of SFU software functional unit in the form of using hardware.
If the integrated module is realized in the form of SFU software functional unit and is independent product sale or uses
When, it can be stored in a computer read/write memory medium.Based on such understanding, technical scheme of the present invention is substantially
The part to contribute in other words to the prior art or all or part of the technical solution can be in the form of software products
It embodies, which is stored in a storage medium, is used including some instructions so that a computer
Equipment (can be personal computer, server or the network equipment etc.) performs the complete of each embodiment the method for the present invention
Portion or part steps.And aforementioned storage medium includes USB flash disk, mobile hard disk, read-only memory (ROM, Read-Only
Memory), random access memory (RAM, Random Access Memory), magnetic disc or CD etc. are various can store journey
The medium of sequence code.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art
Member can as needed make the present embodiment the modification of no creative contribution after this specification is read, but as long as at this
It is all protected in the right of invention by Patent Law.
Claims (9)
1. a kind of project process supervision control system, it is characterized in that:Include according to unique identifying information to obtain corresponding pipe
Manage the login module of permission(1), according to administration authority the corresponding node schedule of the node schedule of practice of construction is believed
Breath typing is simultaneously stored to project process database(6)Recording module(2), it is tight to carry out project according to node schedule information
Compel the analysis module of degree analyzing(3), in response to analysis module(3)And during according to project pressing degree to the examinations of item nodes
Between the distribution module that is allocated(4).
2. project process supervision control system according to claim 1, it is characterized in that:The project process database(6)
Also it is stored with expected completion progress msg, the expected completion progress msg corresponds each node for being set in project process
It is expected that completion progress is set;The Completion Probability that the project pressing degree is completed on schedule for remaining item overall progress, described point
Analyse module(3)From project process database(6)It inside transfers and expected completion progress msg and node schedule information is carried out
Comparative analysis is to analyze Completion Probability:
It defines Completion Probability and is equal to 1, then node schedule is faster than or equal to expected completion progress;Completion Probability is less than 1, then saves
Point schedule is slower than expected completion progress;
The analysis module(3)Corresponding Completion Probability is obtained according to the following formula:
P=Pi *Pi+1… PN;
Pi=1-X/Y;
P, the Completion Probability that remaining item is integrally completed on schedule;
Y, the duration surplus summation of remaining node reserves after node to be checked and accepted;
X, node extension amount to be checked and accepted, takes X=0 if no delay;
Pi, rdu remaining duration correspond to i-th of node single node in setting duration duration and complete probability;
Wherein, X is more than or equal to 0, if X>Y then takes Pi=0;
N, the quantity of project process remaining node after node to be checked and accepted, N is the integer more than 0.
3. project process supervision control system according to claim 2, it is characterized in that:The distribution module(4)According to complete
Work probability is ranked up the reception time of the node to be checked and accepted of projects, and for project of the Completion Probability less than 1 according to complete
Work probability is corresponding in turn to from small to large successively to sort, the distribution module(4)By reception time according to sequence distribution output to pair
The supervisor answered.
4. project process supervision control system according to claim 3, it is characterized in that:The distribution module(4)Sequence
Priority is set with, the priority is the project that project of the Completion Probability equal to 1 is less than 1 prior to Completion Probability;Described point
With module(4)It carries out just sorting, then Completion Probability is small successively according to the examination deadline date of the projects of Completion Probability equal to 1
Entry sorting in 1 was distributed to the period for not being sorted occupancy in the examination period of setting.
5. project process supervision control system according to claim 4, it is characterized in that:The distribution module(4)Include
The adjusting unit of analysis and adjusting is ranked up to project of the Completion Probability equal to 1(41);If check and accept cycle memory not by
Sort the period occupied and the period project for having Completion Probability to be equal to 1 that sorts first later, the adjusting unit(41)According to
The secondary reception time by the project just to sort after the period adjusts sequence to the period.
6. according to claim 2 to 5 any one of them project process supervision control system, it is characterized in that:It further includes with good grounds
Unique different identification information obtains the update module of renewal authority(5), the update module(5)It will complete the corresponding section checked and accepted
Schedule information is put from project process database(6)It is interior to delete and the expected completion progress msg of setting is adjusted more
Newly;
If corresponding node examination passes through, the recording module(2)Etc. the node schedule information of next node to be logged;If
Corresponding node examination does not pass through, then the recording module(2)Again wait for the node schedule information of the typing node and again
Secondary module by analysis(3)And distribution module(4)Processing after carry out corresponding node the secondary examination of node.
7. project process supervision control system according to claim 6, it is characterized in that:The distribution module(4)It is set with
Completion Probability minimum value Pmin;The distribution module(4)To P<Pmin and need carry out the secondary examination of node project tested
Distribution simultaneously sends warning notice to corresponding supervisor simultaneously between time receiving.
8. project process supervision control system according to claim 6, it is characterized in that:The Completion Probability is less than 1 item
Destination node obtains corresponding new node schedule information, the analysis module after entering next node(3)According to new section
The information analysis of point schedule obtains corresponding new single node and completes probability P i ', and Pi ' and the preceding Pi once obtained are compared
Compared with to analyze construction speed, the distribution module(4)In response to analysis module(3)And according to construction speed in Pi>
Quadratic extension is sent during Pi ' to notify to corresponding supervisor.
9. project process supervision control system according to claim 6, it is characterized in that:The login module(1)According to only
One identification information is configured as construction party permission, the update module(5)It is configured as supervising according to unique different identification information
Reason side's permission.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810248706.8A CN108197909B (en) | 2018-03-24 | 2018-03-24 | Project progress supervision control system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810248706.8A CN108197909B (en) | 2018-03-24 | 2018-03-24 | Project progress supervision control system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108197909A true CN108197909A (en) | 2018-06-22 |
CN108197909B CN108197909B (en) | 2020-11-03 |
Family
ID=62595859
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810248706.8A Active CN108197909B (en) | 2018-03-24 | 2018-03-24 | Project progress supervision control system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108197909B (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109146724A (en) * | 2018-08-31 | 2019-01-04 | 万翼科技有限公司 | Output value accounting method, device and computer readable storage medium |
CN109190962A (en) * | 2018-08-24 | 2019-01-11 | 北京中联环建设工程管理有限公司 | Project process supervision control system |
CN109409833A (en) * | 2018-10-22 | 2019-03-01 | 广州力挚网络科技有限公司 | A kind of defect handling method and device |
CN109523239A (en) * | 2018-11-16 | 2019-03-26 | 佛山市南盛建设监理有限公司 | A kind of OA office system for project management management |
CN109872034A (en) * | 2018-12-30 | 2019-06-11 | 广州骏升建设管理有限公司 | The project process method and system of project supervision |
CN110415110A (en) * | 2019-07-31 | 2019-11-05 | 中国工商银行股份有限公司 | Progress monitoring method, progress monitoring device and electronic equipment |
CN111126939A (en) * | 2019-11-22 | 2020-05-08 | 河北瑞池工程项目管理有限公司 | Project progress supervision control system |
CN111626626A (en) * | 2020-05-30 | 2020-09-04 | 阶梯项目咨询有限公司 | System, method and device for project consultation report progress monitoring and evaluation |
CN113313426A (en) * | 2021-06-29 | 2021-08-27 | 国能大渡河流域水电开发有限公司 | Intelligent early warning analysis decision-making method applied to hydropower engineering quality control |
CN116595057A (en) * | 2023-07-14 | 2023-08-15 | 腾讯科技(深圳)有限公司 | Data query method, device, computer equipment and computer program product |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102938110A (en) * | 2012-11-22 | 2013-02-20 | 张劲松 | Intelligent hotel workflow management system, process management method and check-in registering method |
KR20140025967A (en) * | 2012-08-24 | 2014-03-05 | 한창희 | Method for offering project management solution based mobile |
US20150369878A1 (en) * | 2014-06-18 | 2015-12-24 | International Business Machines Corporation | System and method to reduce human activity damage-induced power outage |
CN106096919A (en) * | 2016-08-09 | 2016-11-09 | 湖南宝信云建筑综合服务平台股份有限公司 | engineering project process online management system |
CN106651678A (en) * | 2016-12-16 | 2017-05-10 | 北京家装云网络科技有限公司 | Novel home decoration supervision process management method and system |
CN106709646A (en) * | 2016-12-23 | 2017-05-24 | 国网山东省电力公司 | Project progress dynamic regulating method considering resource constraint |
-
2018
- 2018-03-24 CN CN201810248706.8A patent/CN108197909B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20140025967A (en) * | 2012-08-24 | 2014-03-05 | 한창희 | Method for offering project management solution based mobile |
CN102938110A (en) * | 2012-11-22 | 2013-02-20 | 张劲松 | Intelligent hotel workflow management system, process management method and check-in registering method |
US20150369878A1 (en) * | 2014-06-18 | 2015-12-24 | International Business Machines Corporation | System and method to reduce human activity damage-induced power outage |
CN106096919A (en) * | 2016-08-09 | 2016-11-09 | 湖南宝信云建筑综合服务平台股份有限公司 | engineering project process online management system |
CN106651678A (en) * | 2016-12-16 | 2017-05-10 | 北京家装云网络科技有限公司 | Novel home decoration supervision process management method and system |
CN106709646A (en) * | 2016-12-23 | 2017-05-24 | 国网山东省电力公司 | Project progress dynamic regulating method considering resource constraint |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109190962A (en) * | 2018-08-24 | 2019-01-11 | 北京中联环建设工程管理有限公司 | Project process supervision control system |
CN109146724A (en) * | 2018-08-31 | 2019-01-04 | 万翼科技有限公司 | Output value accounting method, device and computer readable storage medium |
CN109409833A (en) * | 2018-10-22 | 2019-03-01 | 广州力挚网络科技有限公司 | A kind of defect handling method and device |
CN109409833B (en) * | 2018-10-22 | 2021-12-28 | 广州力挚网络科技有限公司 | Defect processing method and device |
CN109523239A (en) * | 2018-11-16 | 2019-03-26 | 佛山市南盛建设监理有限公司 | A kind of OA office system for project management management |
CN109872034A (en) * | 2018-12-30 | 2019-06-11 | 广州骏升建设管理有限公司 | The project process method and system of project supervision |
CN110415110B (en) * | 2019-07-31 | 2021-10-29 | 中国工商银行股份有限公司 | Progress monitoring method, progress monitoring device and electronic equipment |
CN110415110A (en) * | 2019-07-31 | 2019-11-05 | 中国工商银行股份有限公司 | Progress monitoring method, progress monitoring device and electronic equipment |
CN111126939A (en) * | 2019-11-22 | 2020-05-08 | 河北瑞池工程项目管理有限公司 | Project progress supervision control system |
CN111126939B (en) * | 2019-11-22 | 2023-10-03 | 河北瑞池工程项目管理有限公司 | Project progress supervision control system |
CN111626626A (en) * | 2020-05-30 | 2020-09-04 | 阶梯项目咨询有限公司 | System, method and device for project consultation report progress monitoring and evaluation |
CN113313426A (en) * | 2021-06-29 | 2021-08-27 | 国能大渡河流域水电开发有限公司 | Intelligent early warning analysis decision-making method applied to hydropower engineering quality control |
CN113313426B (en) * | 2021-06-29 | 2023-12-19 | 国能大渡河流域水电开发有限公司 | Intelligent early warning analysis decision method applied to hydropower engineering quality control |
CN116595057A (en) * | 2023-07-14 | 2023-08-15 | 腾讯科技(深圳)有限公司 | Data query method, device, computer equipment and computer program product |
CN116595057B (en) * | 2023-07-14 | 2024-02-27 | 腾讯科技(深圳)有限公司 | Data query method, device, computer equipment and computer program product |
Also Published As
Publication number | Publication date |
---|---|
CN108197909B (en) | 2020-11-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108197909A (en) | A kind of project process supervision control system | |
US10878324B2 (en) | Problem analysis and priority determination based on fuzzy expert systems | |
CN107809322A (en) | The distribution method and device of work order | |
Alptekinoğlu et al. | Inventory pooling to deliver differentiated service | |
CN107547606A (en) | Data processing method, cluster manager dual system, explorer, data handling system | |
CN104657212A (en) | Task scheduling method and system | |
CN103439886A (en) | Semiconductor production line self-adaptation dynamic dispatching device | |
CN112700131B (en) | AB test method and device based on artificial intelligence, computer equipment and medium | |
CN111652280A (en) | Behavior-based target object data analysis method and device and storage medium | |
CN115529232B (en) | Convergence shunting equipment management and control method, device and storage medium | |
CN107943697A (en) | Problem distribution method, device, system, server and computer-readable storage medium | |
CN108304293A (en) | A kind of software systems monitoring method based on big data technology | |
Arzi et al. | Operating an FMC by a decision-tree-based adaptive production control system | |
Moss et al. | Toward the estimation of bottleneck shiftiness in a manufacturing operation | |
CN117557415B (en) | Community resource management method and system based on intelligent property | |
CN114172921A (en) | Log auditing method and device for scheduling recording system | |
CN117495315A (en) | Business management method and device based on pipeline flow | |
CN116826961A (en) | Intelligent power grid dispatching and operation and maintenance system, method and storage medium | |
CN113011819B (en) | Management method and device of bare metal server and management server | |
CN106530084A (en) | Information processing method and server | |
CN113850448B (en) | Management method and system for consumption and scheduling of spare parts | |
CN103475435B (en) | Broadcasting command collision processing method and the device of network digital broadcast | |
CN107688907B (en) | Material sampling inspection method based on queue layering processing mechanism | |
CN109687592A (en) | Substation information display control method, device and electronic equipment | |
CN106603263A (en) | Service cutover method, device and equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |