CN109523239A - A kind of OA office system for project management management - Google Patents

A kind of OA office system for project management management Download PDF

Info

Publication number
CN109523239A
CN109523239A CN201811369502.6A CN201811369502A CN109523239A CN 109523239 A CN109523239 A CN 109523239A CN 201811369502 A CN201811369502 A CN 201811369502A CN 109523239 A CN109523239 A CN 109523239A
Authority
CN
China
Prior art keywords
module
construction
time
consigner
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811369502.6A
Other languages
Chinese (zh)
Inventor
周海仪
谢杰
王良杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Nansheng Construction Supervision Co Ltd
Original Assignee
Foshan Nansheng Construction Supervision Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Nansheng Construction Supervision Co Ltd filed Critical Foshan Nansheng Construction Supervision Co Ltd
Priority to CN201811369502.6A priority Critical patent/CN109523239A/en
Publication of CN109523239A publication Critical patent/CN109523239A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/101Collaborative creation, e.g. joint development of products or services
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Telephonic Communication Services (AREA)

Abstract

The invention discloses a kind of OA office systems for project management management, it is related to the technical field of construction supervision system, it include data Layer, middle layer and expression layer, data Layer is preset with the step information section of each step division during project construction, and Step Information section is that each construction procedure is expected to the period completed;Middle layer include connect with Step Information section and be used to detect the time spent in each construction procedure is practical whether the comparison module between the scheduled time in end, comparison result feeds back to expression layer;Expression layer includes the uploading module for reminding consigner's construction time whether reasonable cue module and for uploading actual finish time;When actual finish time is more than the preset time in Step Information section, cue module prompts consigner's construction procedure to delay, the present invention has the schedule for reminding consigner's construction procedure in time, reinforces the connection of construction party and consigner, improves the Cooperation Satisfaction of both sides.

Description

A kind of OA office system for project management management
Technical field
The present invention relates to the technical fields of construction supervision system, more specifically, it relates to which a kind of supervise for project management The OA office system of reason.
Background technique
There are many drawbacks for traditional operating mode, such as: personnel dispersion, go on business frequently be easy to cause report provide delay and Information is transmitted not in time;Report, problem, file, picture are unable to the integrated quantization storage of high standard, and the links of workflow cannot It is handled in time and easily;Also it makes troubles to information sharing and data query, affects working efficiency and the work of employee Make enthusiasm, in addition with the rapid development of smart phone and 4G network, is just becoming by mobile terminal office and processing business Trend.
In the prior art, application publication number is that a Chinese patent document of CN106503927A discloses a kind of petrochemical industry work Journey equipment Monitoring information management system, including the outer net system and interior net system connected by hardware firewall;Outer net System includes outer network termination, and outer network termination accesses system by Internet;Set up respectively in interior net system WEB server and DATA server;DATA server storing data layer data, WEB server are connect with hardware firewall and switch communication, are handed over It changes planes and is communicated to connect with interior network termination, carry out internal communication;System use six layer architectures, from bottom to top layer successively based on prop up Support layer, data Layer, Business Logic, application layer, presentation layer and client layer;Application layer provides application service, interior collection for presentation layer At each functional module, including line module, management module, basis instrument module, archives and information management module and internal communication mould Block.Enterprise OA System and supervising business are integrated under a platform by system of the invention, support multiple terminals to log in, Optimization Work Process reduces management cost, improves working efficiency.
Since the concept in this supervision process in time is even more important, this system and most supervision system Some files are only all equally announced in OA system to understand or examine for consigner and senior management staff, but are gone out When existing some construction delays, consigner and senior management staff need the moment to pay close attention to OA system, and system can not be mentioned timely and effectively Wake up personnel, and after causing some construction periods to be spun out, aftersensation is known in commission afterwards just now, is unfavorable for the cooperation of consigner and construction party, has It is to be modified.
Summary of the invention
In view of the deficienciess of the prior art, the invention reside in provide a kind of OA office system for project management management System has the schedule for reminding consigner's construction procedure in time, reinforces the connection of construction party and consigner, improve the conjunction of both sides Make satisfaction.
To achieve the above object, the present invention provides the following technical scheme that a kind of OA for project management management handles official business System, includes data Layer, middle layer and expression layer, and the data Layer is preset with each step stroke during project construction The step information section divided, the Step Information section are that each construction procedure is expected to the period completed;The middle layer Include connect with Step Information section and be used to detect the time spent in each construction procedure is practical whether the scheduled time it Between comparison module in end, the comparison module connect with expression layer and comparison result fed back to the expression layer;The table Show that layer includes to connect and be used for comparison module to remind consigner's construction time whether reasonable cue module and be used for Pass the uploading module of each construction procedure actual finish time;When actual finish time is more than preset in Step Information section Between when, cue module prompt consigner's construction procedure delay.
By using above-mentioned technical proposal, need to input the required time of each construction procedure, each construction step in advance Suddenly the time that practice of construction is completed all is uploaded by uploading module by construction party, time that comparison module completes practice of construction and The time that default construction needs compares, and when actual finish time is more than the preset time in Step Information section, prompts mould Block prompts consigner's construction procedure to delay, and consigner can directly receive notice, reduce consigner and not know construction speed Probability promotes exchanging for construction party and consigner, reinforces the connection of construction party and consigner, and the cooperation for improving both sides is satisfied Degree.
The present invention is further arranged to: the Step Information section is provided with multiple, and each described Step Information area Between only correspond to a construction procedure;The uploading module includes construction sart point in time and construction stop time point;Institute Stating middle layer includes the starting module connecting with multiple Step Information sections, and the starting module is according to the construction of uploading module Start timing after sart point in time, timing, the starting module and the comparison module are ended after stop time point of constructing It connects and the signal of practice of construction time is sent to comparison module.
By using above-mentioned technical proposal, construction procedure corresponding to each Step Information section is not interfere with each other, construction party There is provided construction the time actually required by uploading module, the information that starting module is uploaded according to uploading module will be applied actually again Comparison module is sent between working hour, it is more reasonable that whole flow process arranges, if first a construction procedure is fulfiled ahead of schedule, that the latter Construction procedure is also to construct according to original defined duration, avoids a construction procedure and fulfils ahead of schedule, constructor Member maintains the interests of consigner the case where next construction procedure is relaxed.
The present invention is further arranged to: the expression layer includes to show correspondingly with multiple Step Information sections Show module, multiple display modules are connect with the starting module;It different step information sections can simultaneously by comparing Module compares.
By using above-mentioned technical proposal, different construction procedures, which can be to start simultaneously at, to go into operation, and applies so as to shorten all The work time total required for completing.
The present invention is further arranged to: the expression layer further includes having the confirmation module connecting with cue module, described true Recognizing module includes to pass through key;When cue module prompt consigner's construction procedure is delayed, whether touched by detection by key Hair, indicate consigner whether it is known that, if being triggered by key, indicate consigner it is known that, and the knot that whether will be known Structure feeds back the operation interface to expression layer.
It, can be anti-by triggering acknowledgement key after consigner receives the prompt of cue module by using above-mentioned technical proposal It is fed to operation interface, it is known that consigner has understood actual situations of construction, the interaction both increased has such construction party Conducive to the exchange of information.
The present invention is further arranged to: the expression layer includes account login module, and at least there are two types of different rights for tool Account, respectively construction party, consigner, the consigner has the confirmation module, and the construction party is without the confirmation mould Block.
Account by using above-mentioned technical proposal, only consigner just has confirmation module, avoids the direct point of construction party Acknowledgement key is hit, questioning closely for leader is escaped, lies about actual conditions.
The present invention is further arranged to: each Step Information section includes the personal information of construction responsible person, When corresponding construction procedure actually takes time the time more than expected, the cue module shows the individual of corresponding responsible person Information.
By using above-mentioned technical proposal, consigner can directly acquire corresponding construction procedure by prompt modes and be responsible for The connection type of people, is searched without going in address list, can directly relate to the responsible person that construction is delayed.
The present invention is further arranged to: the expression layer further includes having delay reason document, and construction responsible person is former in delay Because filling in the cause of delay in document, when actual finish time is more than the preset time in Step Information section, the expression The interface display of layer is delayed reason document, and cue module carries out consigner to remind the delay reason document.
By using above-mentioned technical proposal, delay reason document can be directly sent at consigner by cue module, in table Show directly to announce on the interface of layer and come out, on the one hand can understand convenient for consigner with explanation reasons, on the other hand play formula Effect.
The present invention is further arranged to: the confirmation module is connect with the comparison module, and the comparison module is preset with First fiducial time, when cue module prompt consigner's construction procedure is delayed, confirmation module starts timing, if confirmation module meter When duration be more than the first fiducial time and acknowledgement key is not triggered, cue module reminds construction party.
By using above-mentioned technical proposal, when consigner does not trigger acknowledgement key at the appointed time, it is defaulted as consigner There are no condition of construction is discovered, cue module can remind construction party, and construction party has reason to contact consigner again, avoid Construction party has understood condition of construction with consigner and has served as reasons, and shirks responsibility, and increases exchanging for construction party and consigner.
In conclusion the present invention compares the scheduled time of each construction procedure and real time, when actually accomplishing When time is more than the preset time in Step Information section, cue module reminds consigner, if consigner is not advising Fixed time trigger acknowledgement key, cue module remind construction party again, increase the exchange of both sides, improve Cooperation Satisfaction.
Detailed description of the invention
Fig. 1 is the principle of the present invention figure.
Appended drawing reference: 1, data Layer;2, middle layer;3, expression layer;4, Step Information section;5, comparison module;6, it prompts Module;7, uploading module;8, starting module;9, display module;10, confirmation module;11, account login module;12, it is delayed reason Document.
Specific embodiment
Referring to attached drawing, the present invention will be further described.
As shown in Figure 1, a kind of OA office system for project management management, include data Layer 1, middle layer 2 and Expression layer 3, data Layer 1 are preset with the step information section 4 of each step division during project construction, Step Information section 4 include that each construction procedure is expected to the period completed;Middle layer 2 includes to connect and be used for Step Information section 4 Detect the time spent in each construction procedure is practical whether the comparison module 5 between the scheduled time in end, comparison module 5 and table Show that layer 3 connects and comparison result is fed back to the expression layer 3;Expression layer 3 includes to connect with comparison module 5 and for reminding Consigner's construction time whether reasonable cue module 6 and the upload for uploading each construction procedure actual finish time Module 7;When actual finish time is more than the preset time in Step Information section 4, cue module 6 prompts consigner's construction step It is rapid to delay.Need to input the required time of each construction procedure in advance, each construction procedure is all by construction party by uploading mould Block 7 uploads the time that practice of construction is completed, the time phase that the time that comparison module 5 completes practice of construction needs with default construction Comparison, when actual finish time is more than the preset time in Step Information section 4, cue module 6 prompts consigner's construction Step is delayed, and consigner can directly receive notice, reduce the probability that consigner does not know construction speed, promote construction party with The exchange of consigner reinforces the connection of construction party and consigner, improves the Cooperation Satisfaction of both sides.
Step Information section 4 be provided with it is multiple, and each Step Information section 4 only correspond to a construction procedure.On Transmission module 7 includes construction sart point in time and construction stop time point.Middle layer 2 includes and multiple Step Information sections The starting module 8 of 4 connections, starting module 8 is according to timing is started after the construction sart point in time of uploading module 7, until construction is cut Only end timing, the mould compared with comparison module 5 connects and is sent to the signal of practice of construction time of starting module 8 after time point Block 5.Construction procedure corresponding to each Step Information section 4 is not interfere with each other, and it is real that construction party provides construction by uploading module 7 The practice of construction time is sent to comparison module 5 again by the time that border needs, the information that starting module 8 is uploaded according to uploading module 7, It is more reasonable that whole flow process arranges, if previous construction procedure is fulfiled ahead of schedule, that the latter construction procedure is also according to original Defined duration is constructed, and is avoided a construction procedure and is fulfiled ahead of schedule, and construction personnel is in next construction procedure pine Slack situation maintains the interests of consigner.It should be noted that expression layer 3 include with multiple Step Information sections 4 one by one Corresponding display module 9, multiple display modules 9 are connect with starting module 8.Different step information sections 4 can pass through simultaneously Comparison module 5 compares.Different construction procedures, which can be to start simultaneously at, to go into operation, required for completing so as to shorten all constructions Total time.
Expression layer 3 further includes having the confirmation module 10 connecting with cue module 6, and confirmation module 10 includes to pass through key;When When cue module 6 prompts consigner's construction procedure to delay, whether it is triggered by detection by key, whether indicates consigner Know, if being triggered by key, indicate consigner it is known that, and by the operation of the structural feedback whether known to expression layer 3 Interface.After consigner receives the prompt of cue module 6, operation interface, such construction party can be fed back by triggering acknowledgement key It is known that consigner has understood actual situations of construction, increases the interaction of the two, be conducive to the exchange of information.Confirmation module 10 connect with comparison module 5, and comparison module 5 was preset with for the first fiducial time, when cue module 6 prompts consigner's construction procedure to prolong When the phase, confirmation module 10 starts timing, if the duration of 10 timing of confirmation module be more than the first fiducial time and acknowledgement key not by Triggering, cue module 6 remind construction party.When consigner does not trigger acknowledgement key at the appointed time, it is defaulted as entrusting Condition of construction is discovered not yet by side, and cue module 6 can remind construction party, and construction party has reason to contact consigner again, It avoids construction party from understanding condition of construction with consigner to serve as reasons, shirk responsibility, increase exchanging for construction party and consigner.
Expression layer 3 includes account login module 11, the account of different rights at least there are two types of tool, respectively construction party, Consigner, consigner have the confirmation module 10, and construction party is without the confirmation module 10.The account of only consigner just has Confirmation module 10, avoids construction party from clicking directly on acknowledgement key, escapes questioning closely for leader, lies about actual conditions.
Each Step Information section 4 includes the personal information of construction responsible person, when the practical institute of corresponding construction procedure Take time the time more than expected when, cue module 6 shows the personal information of corresponding responsible person.Consigner can be by prompting mould Formula directly acquires the connection type of corresponding construction procedure responsible person, searches without going in address list, can directly relate to Construct the responsible person to delay.
Expression layer 3 further includes having delay reason document 12, and construction responsible person fills in delay in delay reason document 12 Cause, when actual finish time is more than the preset time in Step Information section 4, the interface display of expression layer 3 is delayed reason Document 12, and cue module 6 carries out consigner to remind the delay reason document 12.Cue module 6 can will directly be delayed reason Document 12 is sent at consigner, is directly announced and is come out on the interface of expression layer 3, on the one hand can be with explanation reasons, convenient for committee Support side understands, on the other hand plays the effect of formula.
The modes such as the prompt modes in the present embodiment may include having short message prompting, and mailbox is reminded.
Expression layer in this system is the graphical interfaces for being presented to staff and associated user, it includes HTML table List, JavaApplet, JSP etc. can show any system of data.The interface is by defined workflow and interface come complete At daily issued transaction and operation flow.This system middle layer utilizes Java language, with the technologies such as Servlet and Beans reality Existing, the form of expression is component packet, i.e. class libraries form.By user management, low level data access, data transmission and data analysis Deng having the function of that abstract adaptability etc. is packaged, the different aspects such as use to define several components according to function, logic sum Its unified standard is Core API (CoreAPI) by packet.It can be any conventional processor, controller or microcontroller to come in fact Various illustrative logical blocks, module, circuit, element and/or the component of existing embodiments disclosed herein description can be by general Processor, digital signal processor (DSP), specific integrated circuit (ASIC), field programmable gate array (FPGA) or it is other can Programmed logic component, discrete gate or transistor logic, discrete hardware components are designed to execute appointing for function described herein What combination is to be practiced or carried out.Data Layer, that is, data center in this system.It is used to complete unified data management and data The realization of Fabric Interface.Main managing and maintaining including Working information and data, data exchange, data pick-up and data mistake The functions such as filter.
The foregoing is merely presently preferred embodiments of the present invention, is not intended to restrict the invention, all in design structure of the invention Within think of, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (8)

1. a kind of OA office system for project management management includes data Layer (1), middle layer (2) and expression layer (3), it is characterized in that: the data Layer (1) is preset with the step information section of each step division during project construction (4), the Step Information section (4) is that each construction procedure is expected to the period completed;The middle layer (2) include with Step Information section (4) connect and for detect the time spent in each construction procedure is practical whether between the scheduled time end in Comparison module (5), the comparison module (5) connect with expression layer (3) and comparison result fed back to the expression layer (3); The expression layer (3) includes to connect with comparison module (5) and for reminding whether consigner's construction time reasonably prompts mould Block (6) and uploading module (7) for uploading each construction procedure actual finish time;When actual finish time is more than step In rapid information section (4) when the preset time, cue module (6) prompts consigner's construction procedure to delay.
2. a kind of OA office system for project management management according to claim 1, it is characterized in that: the step is believed Breath section (4) be provided with it is multiple, and each described Step Information section (4) only correspond to a construction procedure;The upload Module (7) includes construction sart point in time and construction stop time point;The middle layer (2) includes to believe with multiple steps The starting module (8) of section (4) connection is ceased, the starting module (8) is opened after the construction sart point in time according to uploading module (7) Beginning timing, ends timing after stop time point of constructing, and the starting module (8) connect with the comparison module (5) and will The signal of practice of construction time is sent to comparison module (5).
3. a kind of OA office system for project management management according to claim 2, it is characterized in that: the expression layer It (3) include that display module (9), multiple display modules (9) are equal correspondingly with multiple Step Information sections (4) It is connect with the starting module (8);Different step information sections (4) can be compared by comparing module (5) simultaneously.
4. a kind of OA office system for project management management according to claim 1, it is characterized in that: the expression layer It (3) further include having the confirmation module (10) connecting with cue module (6), the confirmation module (10) includes to pass through key;When mentioning When showing that module (6) prompt consigner's construction procedure is delayed, whether it is triggered by detection by key, whether indicates consigner Know, if being triggered by key, indicate consigner it is known that, and by the behaviour of the structural feedback whether known to expression layer (3) Make interface.
5. a kind of OA office system for project management management according to claim 4, it is characterized in that: the expression layer (3) include account login module (11), at least have the account there are two types of different rights, respectively construction party, consigner, it is described Consigner has the confirmation module (10), and the construction party is without the confirmation module (10).
6. a kind of OA office system for project management management according to claim 1, it is characterized in that: each step Rapid information section (4) includes the personal information of construction responsible person, when corresponding construction procedure is actually taken time beyond pre- When the time of meter, the cue module (6) shows the personal information of corresponding responsible person.
7. a kind of OA office system for project management management according to claim 1, it is characterized in that: the expression layer It (3) further include having delay reason document (12), construction responsible person fills in the cause of delay in delay reason document (12), works as reality When the border deadline is more than the preset time in Step Information section (4), expression layer (3) cue module (6) the display delay Reason document (12).
8. a kind of OA office system for project management management according to claim 4, it is characterized in that: the confirmation mould Block (10) is connect with the comparison module (5), and the comparison module (5) was preset with for the first fiducial time, when cue module (6) mentions When showing that consigner's construction procedure is delayed, confirmation module (10) starts timing, if the duration of confirmation module (10) timing is more than first Fiducial time and acknowledgement key is not triggered, cue module (6) reminds construction party.
CN201811369502.6A 2018-11-16 2018-11-16 A kind of OA office system for project management management Pending CN109523239A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811369502.6A CN109523239A (en) 2018-11-16 2018-11-16 A kind of OA office system for project management management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811369502.6A CN109523239A (en) 2018-11-16 2018-11-16 A kind of OA office system for project management management

Publications (1)

Publication Number Publication Date
CN109523239A true CN109523239A (en) 2019-03-26

Family

ID=65778516

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811369502.6A Pending CN109523239A (en) 2018-11-16 2018-11-16 A kind of OA office system for project management management

Country Status (1)

Country Link
CN (1) CN109523239A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110363502A (en) * 2019-07-16 2019-10-22 安徽求是工程建设咨询有限公司 A kind of OA office system for project management management
CN111785153A (en) * 2020-05-23 2020-10-16 中兵勘察设计研究院有限公司 Engineering project display method, device and system based on electronic map
CN112070465A (en) * 2020-08-26 2020-12-11 中铁济南工程建设监理有限公司 OA cooperative office system for supervision

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107622355A (en) * 2017-09-30 2018-01-23 长江勘测规划设计研究有限责任公司 Project cluster work progress digital management system and method
CN108197909A (en) * 2018-03-24 2018-06-22 浙江鼎力工程项目管理有限公司 A kind of project process supervision control system
CN108470315A (en) * 2018-02-11 2018-08-31 浙江联建工程设计有限公司 Project progress monitor system based on BIM

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107622355A (en) * 2017-09-30 2018-01-23 长江勘测规划设计研究有限责任公司 Project cluster work progress digital management system and method
CN108470315A (en) * 2018-02-11 2018-08-31 浙江联建工程设计有限公司 Project progress monitor system based on BIM
CN108197909A (en) * 2018-03-24 2018-06-22 浙江鼎力工程项目管理有限公司 A kind of project process supervision control system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110363502A (en) * 2019-07-16 2019-10-22 安徽求是工程建设咨询有限公司 A kind of OA office system for project management management
CN111785153A (en) * 2020-05-23 2020-10-16 中兵勘察设计研究院有限公司 Engineering project display method, device and system based on electronic map
CN112070465A (en) * 2020-08-26 2020-12-11 中铁济南工程建设监理有限公司 OA cooperative office system for supervision

Similar Documents

Publication Publication Date Title
CN109523239A (en) A kind of OA office system for project management management
CN106502902B (en) Web page operational efficiency monitoring method and device
CN108471366A (en) A kind of stereoscopic monitoring system of facing cloud native applications
CN102438039B (en) Perceptive health community information service system based on mobile internet and working method thereof
CN107678907A (en) Database business logic monitoring method, system and storage medium
CN104834582B (en) A kind of monitor event methods of exhibiting
MXPA03006823A (en) Digital multimedia contact center.
CN104009883A (en) Computer resource centralized remote real-time monitoring system and method
CN101820635A (en) Method and device for acquiring mobile communication data
US20090164289A1 (en) Call center schedule compliance management
CN108965048B (en) Data acquisition method and device for voice gateway, storage medium and server
WO2012088905A1 (en) Polling sub-system and polling method for communication network system and communication apparatus
CN109873853A (en) Equipment key parameter early warning system and its implementation, electronic device
CN109120684A (en) Informatization management method, device, ESB bus platform and storage medium
CN109460307A (en) Micro services a little, which are buried, based on log calls tracking and its system
CN109739816A (en) The date storage method and device of comprehensive monitoring system based on rail traffic
CN110457229A (en) Game performance monitoring method, device, electronic equipment and storage medium
CN106649856A (en) Database access device, system and method
CN105812432B (en) Cloud document processing method and device
CN102291616A (en) IPTV (Internet protocol television) terminal managing system
CN108520052A (en) Slow Query Information search method, device, server and readable storage medium storing program for executing
CN106341489A (en) Control system for remote interaction with intelligent Internet of things equipment through webpage
CN101056212B (en) Method for Web page ADSL test via push technology
CN110929130B (en) Public security level audit data query method based on distributed scheduling
CN102123056A (en) System and method for monitoring quality of Web services (QoWS) in end-to-end manner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190326