CN109869137A CN201711265595.3A CN201711265595A CN109869137A CN 109869137 A CN109869137 A CN 109869137A CN 201711265595 A CN201711265595 A CN 201711265595A CN 109869137 A CN109869137 A CN 109869137A
Authority
CN
China
Prior art keywords
well
indicator card
oil
flowmeter
pumpingh
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711265595.3A
Other languages
Chinese (zh)
Other versions
CN109869137B (en
Inventor
曾鹏
郑东梁
李世超
石硕
张立婷
于海斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Institute of Automation of CAS
Original Assignee
Shenyang Institute of Automation of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Institute of Automation of CAS filed Critical Shenyang Institute of Automation of CAS
Priority to CN201711265595.3A priority Critical patent/CN109869137B/en
Publication of CN109869137A publication Critical patent/CN109869137A/en
Application granted granted Critical
Publication of CN109869137B publication Critical patent/CN109869137B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of pumpingh well fixed output quota mode control method based on flowmeter and indicator card, by analyzing oil well ground function figure, in conjunction with oil field actual production data and static parameter, oil well effective stroke, Liquid output are calculated, is calculated using the flow that distance weighting method calculates flowmeter.And compared according to the above two method for calculating yield, calculate wastage.By the difference between analysis oil well output and setting value, using forward feedback correction or the control strategy of feedback compensation, frequency control is carried out to oil well, is produced daily in combination with pumpingh well, pumpingh well fixed output quota range is modified.The present invention changes in the past under traditional mode, the case where oil well exhaustive exploitation, it can be according to oil field actual conditions rational field output, change previous oil field exhaustive exploitation, cannot be to the status that pumpingh well is adjusted in real time, realization frequency conversion optimizes on the basis of playing reservoir potentiality to greatest extent, realizes the management mode of pumpingh well fining.

Description

A kind of pumpingh well fixed output quota mode control method based on flowmeter and indicator card
Technical field
The present invention relates to oil field pumping well production model field, specifically a kind of pumping based on flowmeter and indicator card Oil well fixed output quota mode control method.
Background technique
With deepening continuously for oil field development, remaining reserves are constantly reduced, and becoming of gradually successively decreasing also is presented in light quiet yield Gesture, in the petroleum resources in China, crude oil yield is mainly using oil field or mining area as independent unit, crude oil initial stage library Although depositing the four part crude outputs such as difference and oil loss amount as a kind of measurement index, China's national situation is both adapted to, also to stone Oily industrial expansion, which has served, to be greatly facilitated.But these yield indexs used when calculating, there is certain office It is sex-limited, can only have to the achievement in kind of acquisition it is shown, but by crude oil from explore to during the entire process of exploitation fund, Technology, operating cost investment reflect, and the maximization of enterprise is difficult to the embodiment quantified.Moreover, condition of market economy Under, during enterprise production and management, crude output maximization is no longer final goal, should be with the maximum of final economic benefit Change the achievement for measuring enterprise operation production.Because, will be final if enterprise continues using simple pursuit crude output as target Lead to each oil field to reach yield target, and it is unscrupulous using extensive management mode, only focus on quantity and increases Long and scale enlargement, this will be such that oil field falls into constantly to seek in the maximized vicious circle of crude output index, lead to oil Field appearance investment is high, but low output and consequence of poor benefits.
Pumpingh well fixed output quota mode basic principle be exactly by based on indicator card calculate oil well output, and with well group flowmeter into Row compares, and realizes the adjustment of oil well output using the method for forward feedback correction or feedback compensation to its difference, guarantees the daily output For definite value.
Summary of the invention
In view of the deficiencies of the prior art, the present invention proposes a kind of pumpingh well fixed output quota mode control based on flowmeter and indicator card Method processed, in conjunction with oil field actual production data and static parameter, it is effective to calculate oil well by analyzing oil well ground function figure Stroke, Liquid output are calculated using the flow that distance weighting method calculates flowmeter.And according to above two calculating yield Method compares, and calculates wastage.By the difference between analysis oil well output and setting value, using forward feedback correction or feedback The control strategy of compensation carries out frequency control to oil well, produces daily in combination with pumpingh well, repair to pumpingh well fixed output quota range Just.
Present invention technical solution used for the above purpose is: a kind of pumpingh well based on flowmeter and indicator card Fixed output quota mode control method, comprising the following steps:
Oil well effective stroke, yield are obtained according to oil well ground function figure, the stream calculated using distance weighting method flowmeter Amount is calculated;
And compared according to the above two method for calculating yield, calculate wastage;
In conjunction with indicator card, by analyzing oil well output, frequency control is carried out to oil well using forward feedback correction or feedback compensation.
It is described that oil well effective stroke, Liquid output are obtained specifically by indicator card data analysis meter according to oil well ground function figure Calculation obtains the oil pumping well production of half an hour, calculates pumpingh well effective stroke using 5 curvature methods, the specific steps are as follows:
(1) mean filter is carried out to initial indicator card data:
Wherein, PiFor indicator card displacement point;FjFor the indicator card point of load;M is filter order;
(2) data normalization:
Pi=(Pi-Pmin)/(Pmax-Pmin)
Fj=(Fj-Fmin)/(Fmax-Fmin)
PmaxMaximum value, P are displaced for pump dynagraophminMinimum value, F are displaced for pump dynagraophmaxFor pump dynagraoph Maximal loading, Fmin For pump dynagraoph load minimum value;
(3) curvature is calculated:
The curvature at any point can be according to five adjacent point P on indicator card curvei-2(si-2,fi-2),Pi-1(si-1, fi-1),Pi(si,fi),Pi+1(si+1,fi+1),Pi+2(si+2,fi+2) between geometrical relationship calculate:
Ki=Δ θi/Δli
Wherein,
(4) Curvature varying amount is calculated
δKi=| Ki+1-Ki|
Curvature varying amount is corrected
δKi'=(δ Ki-1+δKi+δKi+1)/3
(5) actual production is calculated:
By seeking each area's point of maximum curvature to indicator card subregion, and then four inflection points of indicator card are acquired, obtained effectively Stroke;Known effective stroke, then the oil pumping well production calculated based on indicator card are as follows:
Qs=cc·πD2/4·Sy·30
In formula, QsFor half an hour oil pumping well production;ccFor pumpingh well jig frequency;D is pump diameter;SyFor pumpingh well effective stroke.
The flow calculated using distance weighting method flowmeter is calculated specifically:
Enable data point A1(a1,b1) to data point A1+n(a1+n,b1+n) distance be d, then have:
D=((a1+n-a1)2+(b1+n-b1)2)0.5
It finds out in data point A1And A1+nBetween n-1 data point value, i.e., the daily estimation of individual well during this week Value are as follows:
Ai=(ai,b1+(b1+n-b1)(i-1)/d)
Wherein, n is total well number of the well group;aiIt is i-th day of individual well;biFor i-th day yield.
The calculating pumpingh well wastage the following steps are included:
Ql=Qs-Qj
In formula, QjThe half an hour flow obtained for flow measurement;QsFor half an hour oil pumping well production, QlFor half an hour wastage.
The combination indicator card carries out frequency conversion to oil well using forward feedback correction or feedback compensation by analyzing oil well output Control, specifically:
The real-time yield that oil well is acquired by function figure, according to the demand at scene, using the side of forward feedback correction or feedback compensation Formula realizes frequency control to pumpingh well.
The forward feedback correction method are as follows:
Expression formula is established according to the relationship between flow and jig frequency, is carried out curve fitting using least square method, keeps it full Foot:
In formula, Φ is function class,For any form of letter in function class Number;M is the number of actual observation point;(xi,yi) indicate the flow of observation point, jig frequency;
The Selection of Function in function class solves above-mentioned equation, obtains the flow of individual well and the relationship of jig frequency:
In formula, αiFor the unknown parameter of arbitrary function in function class, i=0,1 ... n, n indicate curve matching order of a polynomial Number;
For oil well output, the jig frequency of subsequent time is arrived according to the relationship of the flow of individual well and jig frequency.
The feedback compensation are as follows:
Difference e by the current time yield q'(k of indicator card calculating) with the yield setting value q (k) of per half an hour (k), as departure compensation into the yield setting value at next moment, and according to new yield preset value calculation subsequent time The jig frequency n (k+1)=2 (q (k)+q'(k) of pumpingh well)/(15 π D2Sy);
In formula, n (k+1) is the beam-pumping unit jig frequency setting value of subsequent time;SyFor the effective stroke of current function figure, D is pump Diameter.
The invention has the following beneficial effects and advantage:
1, under current technical status, the acquisition of oil well ground function figure has been carried out real time implementation, thus using forward feedback correction and The control strategy of feedback compensation realizes the optimization of oil well Real-time frequency conversion, guarantees the accurate fixed output quota of oil well;
2, fixed output quota mode by comparison flowmeter and indicator card calculate yield as a result, realizing the real-time update of wastage And adjustment;
3, it is sought using the indicator card effective stroke based on mean filter, realizes the essence for calculating yield based on indicator card Exactness;
4, it by determining fixed output quota mode yield setting value section, prevents from leading to pumpingh well equipment damage because setting value is excessive, Reduce the failure rate of pumpingh well equipment;
5, the case where present invention changes in the past under traditional mode, oil well exhaustive exploitation, can be according to the practical feelings in oil field Condition rational field output, changes previous oil field exhaustive exploitation, cannot be to the status that pumpingh well is adjusted in real time, to greatest extent Performance reservoir potentiality on the basis of realize frequency conversion optimization, realize pumpingh well fining management mode.
Detailed description of the invention
Fig. 1 is fixed output quota mode whole process figure of the invention;
Fig. 2 is feedback compensation flow chart of the invention;
Specific embodiment
The present invention is described in further detail with reference to the accompanying drawings and embodiments.
The present invention is directed to the technical need of rod-pumped well frequency control production, devises a kind of new rod-pumped well fixed output quota mould Formula control method.The present invention is by analyzing oil well ground function figure, in conjunction with oil field actual production data and static parameter, meter Oil well effective stroke, Liquid output are calculated, is calculated using the flow that distance weighting method calculates flowmeter.And according to above two The method for calculating yield compares, and calculates wastage.By the difference between analysis oil well output and setting value, using feedforward The control strategy of correction or feedback compensation carries out frequency control to oil well, produces daily in combination with pumpingh well, to pumpingh well fixed output quota model It encloses and is modified.The present invention is changed by using the pumpingh well fixed output quota mode control method combined based on flowmeter and indicator card Become under previous traditional mode, the raising of oil well pump efficiency cannot be real dependent on means such as maintenance activity, well stimulation, tune ginseng optimizations The limitation of existing Filled function and yield control excessively rely on artificial participation, can not achieve the shortcomings that yield is accurately adjusted.This Invention reduces oil mining energy consumption, improves oil pumping to play realization frequency conversion optimization on the basis of reservoir potentiality to greatest extent Motor-pumped well system effectiveness realizes that Field Force can according to need quantitative production.
By analyzing oil well ground function figure, in conjunction with oil field actual production data and static parameter, calculating oil well has Stroke, Liquid output are imitated, is calculated using the flow that distance weighting method calculates flowmeter.And according to above two calculating yield Method compare, calculate wastage.
By the difference between analysis oil well output and setting value, using forward feedback correction or the control strategy of feedback compensation, Frequency control is carried out to oil well, is produced daily in combination with pumpingh well, pumpingh well fixed output quota range is modified.As shown in Figure 1.
1, the oil pumping well production of half an hour is obtained by indicator card data analytical calculation, is calculated and is taken out using 5 curvature methods Oil well effective stroke, the specific steps are as follows:
(1) mean filter is carried out to initial indicator card data:
Wherein, PiFor indicator card displacement point;FjFor the indicator card point of load;M is filter order.
(2) data normalization:
Pi=(Pi-Pmin)/(Pmax-Pmin)
Fj=(Fj-Fmin)/(Fmax-Fmin)
(3) curvature is calculated:
Calculating curvature is to look for the inflection point on indicator card, the i.e. unlatching of fixed valve and travelling valve, closing point.Indicator card is bent The curvature at any point can be calculated according to the geometrical relationship between five adjacent points on line:
Ki=Δ θi/li
Wherein,
(4) Curvature varying amount is calculated:
δKi=| Ki+1-Ki|
δKi'=(δ Ki-1+δKi+δKi+1)/3
(5) actual production is calculated:
By seeking each area's point of maximum curvature to indicator card subregion, and then four inflection points of indicator card are acquired, obtained effectively Stroke.Known effective stroke, then the oil pumping well production calculated based on indicator card are as follows:
Qs=cc·πD2/4·Sy·30
In formula, QsFor half an hour oil pumping well production;ccFor pumpingh well jig frequency;D is pump diameter;SyFor pumpingh well effective stroke.
2, oil pumping well production is calculated by flowmeter
For extending oil field, six mouthfuls of pumpingh wells constitute a well group, and each well group installs a flowmeter, passes through flow The timing for cutting of meter brings the actual production of measurement each well.
The switchover policy that current flux meter uses is measured for the mode of switching in each well one day one, and flowmeter can be every At 8 points in its morning switches over.And export the well data of the previous day of record, the content of data is per half an hour pumpingh well Production information, totally 48 information.Every information includes: initial time and the termination time, per half an hour of per half an hour Yield data, oil pumping well information of per half an hour etc..
In practical applications, due to flowmeter obtain be individual well discrete message, i.e., each well in one cycle only One day flow information can be obtained, it is therefore desirable to carry out at rule to several day datas unknown in its period using some way Reason, therefore by the historical text of analysis flowmeter measurement individual well, the prediction model of individual well is established, and by model It solves, the daily yield of prediction individual well.
This patent is using by distance weighting method, it is assumed that influence of the data point closer to the distance of certain point to the point is more Greatly, if only considering the several data points nearest from certain point, these are influenced on the value of the point and distance dependent, the remoter shadow of distance Sound is smaller.
Enable data point A1(a1,b1) to data point A1+n(a1+n,b1+n) distance be d, then have:
D=((a1+n-a1)2+(b1+n-b1)2)0.5
It finds out in data point A1And A1+nBetween n-1 data point value, i.e., the daily estimation of individual well during this week Value are as follows:
Ai=(ai,b1+(b1+n-b1)(i-1)/d)
Wherein, n is total well number of the well group;aiIt is i-th day of individual well;biFor i-th day yield.
3, the wastage of half an hour is calculated
The yield of yield and the flowmeter measurement calculated according to indicator card calculates wastage.
Ql=Qs-Qj
In formula, QjThe half an hour flow obtained for flow measurement;QlFor half an hour wastage.
Because wastage can change at any time with the variation of the geologic feature in oil field, the wastage of calculating also can with when Between constantly change.Therefore, the strategy that a wastage is calculated using each period, guarantees that the calculating error of wastage is continuously available Amendment.
4, the accurate fixed output quota of pumpingh well is realized using the control strategy of forward feedback correction and feedback compensation.
Because pumpingh well frequency control is a time lag inertial element, this need to be eliminated using certain control means Kind error, it is forward feedback correction and feedback compensation control method respectively that there is employed herein two methods to solve this problem.
(1) forward feedback correction
In practical applications, feedforward is formulated by the yield jig frequency relationship corresponding with pumpingh well of analysis flowmeter metering The principle of Corrective control strategy, forward feedback correction is also known as disturbance compensation, is adjusted according to the interference size for causing controlled variable to change Section, the variation of load disturbance amount is directly measured in this regulating system, when interference has just occurred and can be measured, adjusted Section device, which can issue signal, makes regulated quantity make corresponding variation, and both formulas are offset before regulated variable deviates.
As shown in the table, the relationship between certain mouthful of well half an hour flow and corresponding jig frequency:
Expression formula is established to the relationship between above-mentioned flow and jig frequency, is carried out curve fitting using least square method, makes it Meet:
In formula, Φ is function class,For any form of letter in function class Number;M is the number of actual observation point;(xi,yi) it is observation point coordinate.
Suitable function is chosen in function class, and above-mentioned equation is solved, is obtained:
In formula, αiFor the unknown parameter of arbitrary function in function class.
In this way, can be indicated with a certain expression formula between the flow and jig frequency of individual well, therefore, to the pumping at current time When oil well carries out instruction issuing, it can be compared according to the Production rate value of current time pumpingh well with theory setting value, then According to the changing value of the relation curve advance correction yield of fitting, and then adjust the jig frequency value of subsequent time.
(2) feedback compensation
Feedback compensation is i.e. in feedback system, and the control action that control device applies controlled device is controlled by obtaining The feedback information of amount constantly corrects the deviation between controlled volume and input quantity, thus what realization controlled controlled device Task.
As shown in Fig. 2, the step of feedback compensation, is as follows: the current time yield q'(k that indicator card is calculated) and every half The difference e (k) of the yield setting value q (k) of hour, as departure compensation into the yield setting value at next moment, and root According to the jig frequency n (k+1) of new yield preset value calculation subsequent time pumpingh well.
Then according to feedback compensation principle, pumpingh well jig frequency Adjustment principle, i.e. the jig frequency setting of pumpingh well subsequent time are set Value are as follows:
N (k+1)=2 (q (k)+q'(k))/(15 π D2Sy)
In formula, n (k+1) is the beam-pumping unit jig frequency setting value of subsequent time;Q (k) is the theory setting value of per half an hour; It q'(k) is last moment Production rate value, e (k) is the difference produced based on function figure folding with setting value, SyFor the effective of current function figure Stroke, D are pump diameter.
5, fixed output quota mode yield setting value section is determined
When pumpingh well feed flow is in good condition, jig frequency can be increased at this moment to improve yield, but when jig frequency increases to centainly When degree, quick pumping will lead to underground and be deteriorated for liquid status, and yield can decline instead, therefore well yield of pumping has one A maximum value needs to find out this maximum value and limits to the yield setting value of fixed output quota mode, prevents because setting value is excessive Cause the damage of pumpingh well equipment.The method of yield maximum value sought using statistics, passes through the system to the individual well daily output Count the maximum production to determine the well.

Claims (7)

1. a kind of pumpingh well fixed output quota mode control method based on flowmeter and indicator card, it is characterised in that the following steps are included:
Obtain oil well effective stroke, yield according to oil well ground function figure, the flow that flowmeter is calculated using distance weighting method into Row calculates;
And compared according to the above two method for calculating yield, calculate wastage;
In conjunction with indicator card, by analyzing oil well output, frequency control is carried out to oil well using forward feedback correction or feedback compensation.
2. the pumpingh well fixed output quota mode control method according to claim 1 based on flowmeter and indicator card, feature exist It oil well effective stroke, Liquid output is obtained according to oil well ground function figure is obtained specifically by indicator card data analytical calculation in described The oil pumping well production of half an hour calculates pumpingh well effective stroke using 5 curvature methods, the specific steps are as follows:
(1) mean filter is carried out to initial indicator card data:
Wherein, PiFor indicator card displacement point;FjFor the indicator card point of load;M is filter order;
(2) data normalization:
Pi=(Pi-Pmin)/(Pmax-Pmin)
Fj=(Fj-Fmin)/(Fmax-Fmin)
PmaxMaximum value, P are displaced for pump dynagraophminMinimum value, F are displaced for pump dynagraophmaxFor pump dynagraoph Maximal loading, FminFor pump Function figure load minimum value;
(3) curvature is calculated:
The curvature at any point can be according to five adjacent point P on indicator card curvei-2(si-2,fi-2),Pi-1(si-1,fi-1),Pi (si,fi),Pi+1(si+1,fi+1),Pi+2(si+2,fi+2) between geometrical relationship calculate:
Ki=Δ θi/Δli
Wherein,
(4) Curvature varying amount is calculated
δKi=| Ki+1-Ki|
Curvature varying amount is corrected
δKi'=(δ Ki-1+δKi+δKi+1)/3
(5) actual production is calculated:
By seeking each area's point of maximum curvature to indicator card subregion, and then four inflection points of indicator card are acquired, is effectively rushed Journey;Known effective stroke, then the oil pumping well production calculated based on indicator card are as follows:
Qs=cc·πD2/4·Sy·30
In formula, QsFor half an hour oil pumping well production;ccFor pumpingh well jig frequency;D is pump diameter;SyFor pumpingh well effective stroke.
3. the pumpingh well fixed output quota mode control method according to claim 1 based on flowmeter and indicator card, feature exist It is calculated in the flow calculated using distance weighting method flowmeter specifically:
Enable data point A1(a1,b1) to data point A1+n(a1+n,b1+n) distance be d, then have:
D=((a1+n-a1)2+(b1+n-b1)2)0.5
It finds out in data point A1And A1+nBetween n-1 data point value, i.e., the daily estimated value of individual well during this week are as follows:
Ai=(ai,b1+(b1+n-b1)(i-1)/d)
Wherein, n is total well number of the well group;aiIt is i-th day of individual well;biFor i-th day yield.
4. the pumpingh well fixed output quota mode control method according to claim 3 based on flowmeter and indicator card, feature exist In the calculating pumpingh well wastage the following steps are included:
Ql=Qs-Qj
In formula, QjThe half an hour flow obtained for flow measurement;QsFor half an hour oil pumping well production, QlFor half an hour wastage.
5. the pumpingh well fixed output quota mode control method according to claim 4 based on flowmeter and indicator card, feature exist In the combination indicator card, by analyzing oil well output, frequency control, tool are carried out to oil well using forward feedback correction or feedback compensation Body are as follows:
The real-time yield that oil well is acquired by function figure, according to the demand at scene, by the way of forward feedback correction or feedback compensation pair Pumpingh well realizes frequency control.
6. the pumpingh well fixed output quota mode control method according to claim 5 based on flowmeter and indicator card, feature exist In the forward feedback correction method are as follows:
Expression formula is established according to the relationship between flow and jig frequency, is carried out curve fitting using least square method, its satisfaction is made:
In formula, Φ is function class, For any form of function in function class;M is The number of actual observation point;(xi,yi) indicate the flow of observation point, jig frequency;
The Selection of Function in function class solves above-mentioned equation, obtains the flow of individual well and the relationship of jig frequency:
In formula, αiFor the unknown parameter of arbitrary function in function class, i=0,1 ... n, n indicate the polynomial order of curve matching;
For oil well output, the jig frequency of subsequent time is arrived according to the relationship of the flow of individual well and jig frequency.
7. the pumpingh well fixed output quota mode control method according to claim 5 based on flowmeter and indicator card, feature exist In the feedback compensation are as follows:
Difference e (k) by the current time yield q'(k of indicator card calculating) with the yield setting value q (k) of per half an hour, makees It is departure compensation into the yield setting value at next moment, and according to new yield preset value calculation subsequent time pumpingh well Jig frequency n (k+1)=2 (q (k)+q'(k))/(15 π D2Sy);
In formula, n (k+1) is the beam-pumping unit jig frequency setting value of subsequent time;SyFor the effective stroke of current function figure, D is pump diameter.
CN201711265595.3A 2017-12-05 2017-12-05 Method for controlling fixed production mode of pumping well based on flowmeter and indicator diagram Active CN109869137B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711265595.3A CN109869137B (en) 2017-12-05 2017-12-05 Method for controlling fixed production mode of pumping well based on flowmeter and indicator diagram

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711265595.3A CN109869137B (en) 2017-12-05 2017-12-05 Method for controlling fixed production mode of pumping well based on flowmeter and indicator diagram

Publications (2)

Publication Number Publication Date
CN109869137A true CN109869137A (en) 2019-06-11
CN109869137B CN109869137B (en) 2021-06-15

Family

ID=66916374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711265595.3A Active CN109869137B (en) 2017-12-05 2017-12-05 Method for controlling fixed production mode of pumping well based on flowmeter and indicator diagram

Country Status (1)

Country Link
CN (1) CN109869137B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112127869A (en) * 2019-06-24 2020-12-25 中石化石油工程技术服务有限公司 Zero-viewing flow correction method, oil gas water flow logging method and turbine flow instrument
CN112343549A (en) * 2020-09-22 2021-02-09 中国石油化工股份有限公司胜利油田分公司孤岛采油厂 Pneumatic screw pump mixed-flooding oil production process pipe column

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1596342A (en) * 2002-11-01 2005-03-16 多相工程控制公司 Control system for a pumping unit
US20050173114A1 (en) * 2004-02-03 2005-08-11 Cudmore Julian R. System and method for optimizing production in an artificially lifted well
RU2004135769A (en) * 2004-12-06 2006-05-20 Закрытое Акционерное Общество "Промышленна группа "Инженерные технологии", ЗАО ПГ "Инженерные технологии" (RU) METHOD AND DEVICE OF AUTOMATIC OIL PRODUCTION PROCESS MANAGEMENT
CN101245697A (en) * 2007-02-14 2008-08-20 项援 Oil pumping machine and its control system and control method
CN102865053A (en) * 2011-07-04 2013-01-09 中国石油天然气股份有限公司 Method and device for judging optimal times of stroke of pumping unit
CN103967449A (en) * 2013-01-31 2014-08-06 博世力士乐(常州)有限公司 Operational control system and corresponding control method of hydraulic pumping unit
CN104570991A (en) * 2013-10-29 2015-04-29 中国石油天然气股份有限公司 Indicator diagram-based oil pumping machine regulating and controlling method
CN104680257A (en) * 2015-03-12 2015-06-03 天津市万众科技发展有限公司 Intelligent optimization method for operation process of oil pumping unit
CN104702191A (en) * 2013-12-04 2015-06-10 浙江中科德润科技有限公司 Oil-submerged underground controller and control method
CN104948436A (en) * 2014-03-25 2015-09-30 布里斯托尔D/B/A远程自动化解决方案公司 Methods and apparatus to determine production of downhole pumps
CN204836022U (en) * 2015-06-03 2015-12-02 新疆敦华石油技术股份有限公司 Device is joined to automatic accent of beam -pumping unit
CN204906247U (en) * 2015-09-02 2015-12-23 安徽钟南电器有限责任公司 Frequency conversion compensation energy -saving control device of oil field beam -pumping unit
US20170002636A1 (en) * 2015-06-30 2017-01-05 KLD Energy Nano-Grid System, Inc. Detection and mitigation of detrimental operating conditions during pumpjack pumping
CN106917611A (en) * 2015-12-24 2017-07-04 中国石油天然气股份有限公司 Oil pumper constant-power control method and device

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1596342A (en) * 2002-11-01 2005-03-16 多相工程控制公司 Control system for a pumping unit
CN100422555C (en) * 2002-11-01 2008-10-01 杰克科技有限公司 Control system for a pumping unit
US20050173114A1 (en) * 2004-02-03 2005-08-11 Cudmore Julian R. System and method for optimizing production in an artificially lifted well
RU2004135769A (en) * 2004-12-06 2006-05-20 Закрытое Акционерное Общество "Промышленна группа "Инженерные технологии", ЗАО ПГ "Инженерные технологии" (RU) METHOD AND DEVICE OF AUTOMATIC OIL PRODUCTION PROCESS MANAGEMENT
CN101245697A (en) * 2007-02-14 2008-08-20 项援 Oil pumping machine and its control system and control method
CN102865053A (en) * 2011-07-04 2013-01-09 中国石油天然气股份有限公司 Method and device for judging optimal times of stroke of pumping unit
CN103967449A (en) * 2013-01-31 2014-08-06 博世力士乐(常州)有限公司 Operational control system and corresponding control method of hydraulic pumping unit
CN104570991A (en) * 2013-10-29 2015-04-29 中国石油天然气股份有限公司 Indicator diagram-based oil pumping machine regulating and controlling method
CN104702191A (en) * 2013-12-04 2015-06-10 浙江中科德润科技有限公司 Oil-submerged underground controller and control method
CN104948436A (en) * 2014-03-25 2015-09-30 布里斯托尔D/B/A远程自动化解决方案公司 Methods and apparatus to determine production of downhole pumps
CN104680257A (en) * 2015-03-12 2015-06-03 天津市万众科技发展有限公司 Intelligent optimization method for operation process of oil pumping unit
CN204836022U (en) * 2015-06-03 2015-12-02 新疆敦华石油技术股份有限公司 Device is joined to automatic accent of beam -pumping unit
US20170002636A1 (en) * 2015-06-30 2017-01-05 KLD Energy Nano-Grid System, Inc. Detection and mitigation of detrimental operating conditions during pumpjack pumping
CN204906247U (en) * 2015-09-02 2015-12-23 安徽钟南电器有限责任公司 Frequency conversion compensation energy -saving control device of oil field beam -pumping unit
CN106917611A (en) * 2015-12-24 2017-07-04 中国石油天然气股份有限公司 Oil pumper constant-power control method and device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王玉兰等: "浅析低渗透油田抽油机井工作制度的合理优化", 《电子世界》 *
郑东梁等: "油田监测与分析系统核心算法修正", 《计算机应用研究》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112127869A (en) * 2019-06-24 2020-12-25 中石化石油工程技术服务有限公司 Zero-viewing flow correction method, oil gas water flow logging method and turbine flow instrument
CN112343549A (en) * 2020-09-22 2021-02-09 中国石油化工股份有限公司胜利油田分公司孤岛采油厂 Pneumatic screw pump mixed-flooding oil production process pipe column
CN112343549B (en) * 2020-09-22 2024-03-15 中国石油化工股份有限公司胜利油田分公司孤岛采油厂 Pneumatic screw pump mixed flooding oil extraction process tubular column

Also Published As

Publication number Publication date
CN109869137B (en) 2021-06-15

Similar Documents

Publication Publication Date Title
CN108240208B (en) Oil field water-flooding classification well group development effect benchmarking method
CN108846517B (en) Integration method for predicating quantile probabilistic short-term power load
CN104715292A (en) City short-term water consumption prediction method based on least square support vector machine model
CN109858728B (en) Load prediction method based on industry-divided electricity utilization characteristic analysis
CN103336891B (en) A kind of pseudo-measurement generation method estimated for state of electric distribution network
CN109869137A (en) A kind of pumpingh well fixed output quota mode control method based on flowmeter and indicator card
CN109948272A (en) Tune based on inter well connectivity blocks up dynamic prediction method and system
CN105068567A (en) Water supply network regulation and storage method based on water tank
CN112016723B (en) Time granularity adjustable high-frequency power grid load prediction method
CN103258235A (en) Water supply network reorganization and expansion optimization method based on improved artificial fish school algorithm
CN106703904A (en) Method for optimizing steam distribution curves of steam turbines on basis of data mining technologies
CN104653170A (en) Method for calibrating recoverable reserve in ultra-high water containing stage
CN109445906A (en) A kind of virtual machine quantity required prediction technique
CN106354931A (en) Pump station optimal scheduling method based on pump characteristic curve update
CN105240058B (en) Steam turbine flow curve identifying and optimizing method based on spray nozzle flow calculation
CN106570786B (en) Reservoir adaptive scheduling method based on scheduling rule time-varying characteristics
CN104680400B (en) The short-term and long-range forecast method of enterprise's electricity sales amount variation based on grey correlation
CN111062576A (en) DMA partition based pressure management system with least disadvantages
CN104199296B (en) Linear regression performance evaluation method with forgetting factor
CN113807745A (en) Method for determining total annual planned water consumption of power plant
CN109871988B (en) Flood forecast early warning precision analysis method
Lu et al. Forecasting China’s per capita living energy consumption by employing a novel DGM (1, 1, tα) model with fractional order accumulation
CN109899057A (en) Heavy oil wells indicator card calculates the new method produced
CN105844343B (en) A kind of water light day combined scheduling method based on photovoltaic property analysis
CN103605381A (en) Dynamic matrix control optimization-based fractionating tower liquid-level controlling method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant