CN109853930A - Double mast formulas combine lifting platform - Google Patents
Double mast formulas combine lifting platform Download PDFInfo
- Publication number
- CN109853930A CN109853930A CN201910249955.3A CN201910249955A CN109853930A CN 109853930 A CN109853930 A CN 109853930A CN 201910249955 A CN201910249955 A CN 201910249955A CN 109853930 A CN109853930 A CN 109853930A
- Authority
- CN
- China
- Prior art keywords
- climbing frame
- guide rail
- bogie
- speed reducer
- lifting platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The present invention relates to high-building construction technical fields, lifting platform is combined more particularly to double mast formulas, including hoistable platform and climbing frame, climbing frame is mounted on hoistable platform, hoistable platform includes horizontally disposed bogie and two guide rail brackets being vertically arranged, both ends close to bogie have been symmetrically arranged speed reducer, rack gear is vertically arranged on guide rail bracket, rack gear is connect with speed reducer drive, climbing frame includes several upright bars, the top or bottom of bogie are provided with several connecting tubes, upright bar correspondence is mounted in connecting tube, stiffener assembly is slidably connected between guide rail bracket and climbing frame, climbing frame can follow bogie oscilaltion, improve the practical performance of climbing frame, using double mast formulas design of two guide rail brackets, stiffener assembly is also slidably connected between guide rail bracket and climbing frame, further improve whole stability and security performance.
Description
Technical field
The present invention relates to high-building construction technical fields, and in particular to double mast formulas combine lifting platform.
Background technique
Climbing frame is suitable for 45 meters or more of building body, can be applied to the building body of various structures, whole to use all steel
Structure, have the characteristics that it is integrated equipment, it is totally-enclosed protection, mechanical discipline safety, without fire hazard.Then, it is actually using
In the process, climbing frame is mostly single fixed structure, and effect is single, is only available for coating and mopping, practical performance is low, also there is use
The climbing frame of a vertical liftable guide rail is added, then the security performance of the program is lower, and stability is low, be easy to happen and climb
Frame such as falls apart or collapses at the contingencies.
Summary of the invention
For the deficiencies in the prior art, the present invention provides double mast formulas to combine lifting platform, skill to be solved
Art problem is how to improve the practical performance and security performance of climbing frame during high-building construction.
In order to solve the above technical problems, present invention provide the technical scheme that double mast formulas combine lifting platform, including lifting
Platform and climbing frame, climbing frame are mounted on hoistable platform;
Hoistable platform includes horizontally disposed bogie and two guide rail brackets being vertically arranged, close to the both ends of bogie point
It is not symmetrically arranged with speed reducer, rack gear is vertically arranged on guide rail bracket, rack gear is connect with speed reducer drive;
Climbing frame includes several upright bars, and the top or bottom of bogie are provided with several connecting tubes, and upright bar correspondence is mounted on
In connecting tube;
Stiffener assembly is slidably connected between guide rail bracket and climbing frame.
The upright bar of climbing frame be mounted in connecting tube realize climbing frame and hoistable platform combined type connection, enable climbing frame with
With bogie oscilaltion, improve the practical performance of climbing frame, designed using double mast formulas of two guide rail brackets, guide rail bracket with climb
Stiffener assembly is also slidably connected between frame, further improves whole stability and security performance.
Further, catching device is additionally provided on bogie, catching device is located at the lower section of speed reducer, and catching device and rack gear pass
Dynamic connection.
Further, when the bottom of bogie is provided with several connecting tubes, it is provided with protective frame below climbing frame, close to anti-
The both ends of retaining frame are symmetrically arranged with secondary speed reducer, and secondary catching device, secondary speed reducer and secondary catching device are provided with below secondary speed reducer
It is connect with rack-driving.
Further, stiffener assembly includes several idler wheels, and idler wheel, which rolls, to be arranged on guide rail bracket, and idler wheel is rotatably connected to
Fixed link, fixed link are fixedly connected by screw with upright bar.
Further, there are two idler wheels, guide rail bracket includes several square columns, and two idler wheels respectively symmetrically roll setting
In the two sides of square column.
Further, array is provided with horizontal line frame on climbing frame, and horizontal line frame is fixedly connected with upright bar.
Further, the bottom of guide rail bracket is provided with buffer spring.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and constitutes part of specification, with reality of the invention
It applies example to be used to explain the present invention together, not be construed as limiting the invention.In the accompanying drawings:
Fig. 1 is that the double mast formulas of the present invention combine the structural schematic diagram of lifting platform in embodiment 1;
Fig. 2 is the enlarged structure schematic diagram in Fig. 1 at I;
Fig. 3 is the enlarged structure schematic diagram in Fig. 1 at II;
Fig. 4 is the enlarged structure schematic diagram in Fig. 1 at III;
Fig. 5 is the enlarged structure schematic diagram in Fig. 1 at IV;
Fig. 6 is the structural schematic diagram of stiffener assembly;
Fig. 7 is the structural schematic diagram of the double mast formula combination lifting hair clips of the present invention in example 2;
Fig. 8 is the enlarged structure schematic diagram in Fig. 7 at V;
In figure: 1- hoistable platform, 11- bogie, 111- speed reducer, 112- connecting tube, 113- catching device, 12- guide rail bracket,
121- rack gear, 122- stiffener assembly, 123- idler wheel, 124- fixed link, 125- screw, 126- square column, 127- buffer spring,
2- climbing frame, 21- upright bar, 22- horizontal line frame, 3- protective frame, 31- pair speed reducer, 32- pair catching device.
Specific embodiment
Below in conjunction with attached drawing, preferable examples of the present invention will be described, it should be understood that preferred embodiment described herein
Only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
Embodiment 1: as shown in Figures 1 to 6, this double mast formula combination lifting platforms connect climbing frame 2 and 1 combined type of hoistable platform
It connects, while improving the practical performance and security performance of climbing frame 2.Double mast formula combination lifting platforms include hoistable platform 1 and climb
Frame 2, climbing frame 2 are mounted on hoistable platform 1, and hoistable platform 1 is led including what horizontally disposed bogie 11 and two were vertically arranged
Rail gantry 12, bogie 11 and guide rail bracket 12 are connected by several standard knots, and the both ends close to bogie 11 are respectively symmetrically set
It is equipped with speed reducer 111, symmetrically arranged speed reducer 111 can be such that bogie 11 is more uniformly stressed, improve firm performance.It leads
Rack gear 121 is vertically arranged in rail gantry 12, rack gear 121 and speed reducer 111 are sequentially connected, and bogie 11 is enabled to pass through in this way
The oscilaltion on guide rail bracket 12 is realized in the transmission connection of speed reducer 111 and rack gear 121, and the designs of two guide rail brackets 12 can be with
Whole stability is improved, meanwhile, there are four speed reducers 111, each two of both ends, is capable of providing sufficient power in this way, prevents
Only there is a situation where be short of power when driving overweight object to rise for bogie 11.
Climbing frame 2 includes several upright bars 21, and the arrangement of 21 array of upright bar provides support force to climbing frame 2 in the vertical direction.It drives
The top of moving frame 11 is provided with several connecting tubes 112, and the correspondence of upright bar 21 is mounted in connecting tube 112, by connecting tube 112 and stands
Bar 21 is fixedly connected, and climbing frame 2 can be fixed on bogie 11, to realize that bogie 11 drives 2 oscilaltion of climbing frame, is mentioned
The high practical performance of climbing frame 2, makes climbing frame 2 not only can be used to coating mopping at work, can also be used to carry out patch glass, dress
It repairs, do the multi-mode operations such as the wooden wall.
Stiffener assembly 122 is slidably connected between guide rail bracket 12 and climbing frame 2, and climbing frame 2 can be improved by stiffener assembly 122
Stability and security performance, prevent climbing frame 2 from the fortuitous events such as avalanche occurring during lifting.
In the present embodiment, it is additionally provided with catching device 113 on bogie 11, which is located under speed reducer 111
Side, and be sequentially connected with rack gear 121, the transmission speed of rack gear 121 can be prevented too fast in this way to make bogie 11 go up and down
Speed is relatively stable in the process, prevents the generation of fortuitous event to a certain extent, improves whole security performance.
In the present embodiment, stiffener assembly 122 includes several idler wheels 123, and idler wheel 123, which rolls, to be arranged in guide rail bracket 12
On, idler wheel 123 is rotatably connected to fixed link 124, and fixed link 124 is fixedly connected by screw 125 with upright bar 21.Make to climb in this way
Frame 2 will drive 124 oscilaltion of fixed link while following 11 oscilaltion of bogie, and fixed link 124 then drives idler wheel
123 scroll up and down on guide rail bracket 12, so that the reinforcement fixed effect between climbing frame 2 and guide rail bracket 12 is realized, meanwhile, screw
125 good fixing effect further improves whole stability and security performance.
In the present embodiment, there are two idler wheels 123, guide rail bracket 12 includes several square columns 126, and idler wheel 123 is distinguished
It is symmetrical to roll the two sides that square column 126 is set, so that two idler wheels 123 can clamp square column 126, further
It improves and reinforces fixed effect, to improve stability.
In the present embodiment, array is provided with horizontal line frame 22 on climbing frame 2, and horizontal line frame 22 is fixedly connected with upright bar 21,
The horizontal line frame 22 is located at below the working lining of climbing frame 2, can play the role of promoting climbing frame stability.
In the present embodiment, the bottom of guide rail bracket 12 is provided with buffer spring 127, which can prevent from driving
The excessive velocities when something unexpected happened glides of frame 11 damage bogie 11 in itself, play the role of a buffering, into
One step improves whole security performance.
Embodiment 2: as shown in Figure 7,8, connecting tube 112 may be alternatively located at the bottom of bogie 11, at this point, climbing frame 2 is still logical
It crosses connecting tube 112 and upright bar 21 is fixedly connected with bogie 11, and the lower section of bogie 11 can be located at.At this point, under climbing frame 2
Side is provided with protective frame 3, and the both ends close to protective frame 3 are symmetrically arranged with secondary speed reducer 31, and the lower section of secondary speed reducer 31 is provided with
Secondary catching device 32, secondary speed reducer 31 and secondary catching device 32 are sequentially connected with rack gear 121.By having added one layer of protective frame 3
Design can prevent climbing frame 2 from occurring to cause damages to the staff on lower section or climbing frame 2 when collapsing falls, meanwhile, protective frame 3
On be also equipped with corresponding secondary speed reducer 31 and secondary catching device 32,2 rise and fall of bogie 11 and climbing frame can be followed, into one
Step improves security performance.
In conclusion the double mast formulas of the present invention combine lifting platform, it is connect in fact by climbing frame 2 with the combined type of hoistable platform 1
Being freely lifted for climbing frame 2 is showed, so that the practical performance of climbing frame 2 is improved, specifically, using upright bar 21 is inserted into connecting tube
112 interior realization climbing frames 2 are fixedly connected with bogie 11, utilize the tooth on the speed reducer 111 and guide rail bracket 12 on bogie 11
Between item 121 transmission connection realize bogie 11 can the oscilaltion on guide rail bracket 12, to drive 2 oscilaltion of climbing frame.
Meanwhile climbing frame 2 and guide rail bracket 12 being slidably connected using stiffener assembly 122, whole firm performance is improved, is further prevented
Only climbing frame 2 falls apart situations such as collapsing, and improves security performance.
Finally, it should be noted that being not intended to restrict the invention the foregoing is merely preferred embodiment of the invention, to the greatest extent
Present invention has been described in detail with reference to the aforementioned embodiments for pipe, for those skilled in the art, still can be with
It modifies the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features.It is all
Within the spirit and principles in the present invention, any modification, equivalent substitution, improvement and etc. done should be included in guarantor of the invention
Within the scope of shield.
Claims (7)
1. pair mast formula combines lifting platform, it is characterised in that:
Including hoistable platform (1) and climbing frame (2), the climbing frame (2) is mounted on the hoistable platform (1);
The hoistable platform (1) includes horizontally disposed bogie (11) and two guide rail brackets (12) being vertically arranged, close to institute
The both ends for stating bogie (11) have been symmetrically arranged speed reducer (111), are vertically arranged with rack gear on the guide rail bracket (12)
(121), the rack gear (121) and the speed reducer (111) are sequentially connected;
The climbing frame (2) includes several upright bars (21), and the top or bottom of the bogie (11) are provided with several connecting tubes
(112), the upright bar (21) is corresponding is mounted in the connecting tube (112);
Stiffener assembly (122) are slidably connected between the guide rail bracket (12) and the climbing frame (2).
2. double mast formulas according to claim 1 combine lifting platform, it is characterised in that: also set up on the bogie (11)
Have catching device (113), the catching device (113) is located at the lower section of the speed reducer (111), the catching device (113) with it is described
Rack gear (121) transmission connection.
3. double mast formulas according to claim 1 combine lifting platform, it is characterised in that: the connecting tube (112) is located at institute
When stating the bottom of bogie (11), protective frame (3) are provided with below the climbing frame (2), close to the both ends of the protective frame (3)
It is symmetrically arranged with secondary speed reducer (31), is provided with secondary catching device (32) below the pair speed reducer (31), the pair speed reducer
(31) it is sequentially connected with the rack gear (121) with the secondary catching device (32).
4. double mast formulas according to claim 1 combine lifting platform, it is characterised in that: the stiffener assembly (122) includes
Several idler wheels (123), the idler wheel (123), which rolls, to be arranged on the guide rail bracket (12), idler wheel (123) rotation connection
Have fixed link (124), the fixed link (124) is fixedly connected by screw (125) with the upright bar (21).
5. double mast formulas according to claim 4 combine lifting platform, it is characterised in that: there are two the idler wheels (123), institute
Stating guide rail bracket (12) includes several square columns (126), and two idler wheels (123), which respectively symmetrically roll, to be arranged in the side
The two sides of shape column (126).
6. double mast formulas according to claim 1 combine lifting platform, it is characterised in that: array is arranged on the climbing frame (2)
Have horizontal line frame (22), the horizontal line frame (22) is fixedly connected with the upright bar (21).
7. double mast formulas according to claim 1 combine lifting platform, it is characterised in that: the bottom of the guide rail bracket (12) is set
It is equipped with buffer spring (127).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910249955.3A CN109853930A (en) | 2019-03-29 | 2019-03-29 | Double mast formulas combine lifting platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910249955.3A CN109853930A (en) | 2019-03-29 | 2019-03-29 | Double mast formulas combine lifting platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109853930A true CN109853930A (en) | 2019-06-07 |
Family
ID=66902538
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910249955.3A Pending CN109853930A (en) | 2019-03-29 | 2019-03-29 | Double mast formulas combine lifting platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109853930A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114319824A (en) * | 2021-05-07 | 2022-04-12 | 四川九鼎建筑工程集团有限公司 | Climbing type building construction operation platform outside building |
CN114704071A (en) * | 2022-05-13 | 2022-07-05 | 山东新活新材料科技有限公司 | Automatic butt-joint type aluminum alloy climbing frame lifting system and using method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101333863A (en) * | 2008-08-05 | 2008-12-31 | 无锡申欧工程设备有限公司 | Dual roller rail clamping type falling-proof scaffold |
CN102345375A (en) * | 2011-11-08 | 2012-02-08 | 江苏申锡建筑机械有限公司 | Dual-mast construction operation platform capable of being leveled automatically |
CN102364006A (en) * | 2011-11-08 | 2012-02-29 | 江苏申锡建筑机械有限公司 | Construction operation platform convenient to assemble and disassemble |
CN106869473A (en) * | 2017-04-06 | 2017-06-20 | 北京建筑机械化研究院 | The liftable operation platform and its construction method of assembled architecture |
CN109113319A (en) * | 2018-09-11 | 2019-01-01 | 广州达蒙安防科技有限公司 | Rack guide rail and elevating scaffold |
CN209855196U (en) * | 2019-03-29 | 2019-12-27 | 无锡市傲世机械制造有限公司 | Double-mast type combined lifting climbing frame |
-
2019
- 2019-03-29 CN CN201910249955.3A patent/CN109853930A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101333863A (en) * | 2008-08-05 | 2008-12-31 | 无锡申欧工程设备有限公司 | Dual roller rail clamping type falling-proof scaffold |
CN102345375A (en) * | 2011-11-08 | 2012-02-08 | 江苏申锡建筑机械有限公司 | Dual-mast construction operation platform capable of being leveled automatically |
CN102364006A (en) * | 2011-11-08 | 2012-02-29 | 江苏申锡建筑机械有限公司 | Construction operation platform convenient to assemble and disassemble |
CN106869473A (en) * | 2017-04-06 | 2017-06-20 | 北京建筑机械化研究院 | The liftable operation platform and its construction method of assembled architecture |
CN109113319A (en) * | 2018-09-11 | 2019-01-01 | 广州达蒙安防科技有限公司 | Rack guide rail and elevating scaffold |
CN209855196U (en) * | 2019-03-29 | 2019-12-27 | 无锡市傲世机械制造有限公司 | Double-mast type combined lifting climbing frame |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114319824A (en) * | 2021-05-07 | 2022-04-12 | 四川九鼎建筑工程集团有限公司 | Climbing type building construction operation platform outside building |
CN114704071A (en) * | 2022-05-13 | 2022-07-05 | 山东新活新材料科技有限公司 | Automatic butt-joint type aluminum alloy climbing frame lifting system and using method |
CN114704071B (en) * | 2022-05-13 | 2024-02-09 | 山东新活新材料科技有限公司 | Automatic butt-joint type aluminum alloy climbing frame lifting system and use method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107859315A (en) | Circular arc hanging basket and the annular hanging basket being spliced with circular arc hanging basket | |
CN109853930A (en) | Double mast formulas combine lifting platform | |
CN209855196U (en) | Double-mast type combined lifting climbing frame | |
CN105155828B (en) | A kind of hoistable platform and its four column guide rail gantries | |
CN207673028U (en) | A kind of anti-dropping apparatus for high-rise template | |
CN209509449U (en) | A kind of novel room, which is built, sets up the stage | |
CN206625135U (en) | A kind of gondola-hanging mechanism | |
CN207144427U (en) | A kind of construction Anti-dropping rack | |
CN108277972A (en) | A kind of safety-type hanging basket of construction | |
CN206859639U (en) | Attachment type raise scaffold wall-attached supporting seat | |
CN205399229U (en) | Bridge triangle hanging basket | |
CN108373126A (en) | A kind of road and bridge construction tool fast lifting equipment | |
CN206957179U (en) | A kind of cladding panel construction protector | |
CN106672743A (en) | Temporary supporting device for large-space structure construction elevator wall attaching frame | |
CN211622512U (en) | Modular aerial working safety protection platform | |
CN107126686A (en) | A kind of adjustable for height mobile basketball frame | |
CN207004172U (en) | A kind of provisional guard rail of construction engineering quality detection | |
CN108639995A (en) | A kind of housing construction safety cage | |
CN207348784U (en) | A kind of technique car is ascended a height bulwark ladder | |
CN207905333U (en) | Saddle combines Construction of Supporting hoistable platform | |
CN219570006U (en) | Road bridge construction safety ladder | |
CN220245227U (en) | Self-balancing device of underground cavern construction elevator | |
CN205875165U (en) | Connection structure of foundation ditch stand and two -way support of foundation ditch | |
CN206308993U (en) | A kind of fast formula single pole of spelling makes somebody a mere figurehead platform | |
CN219952637U (en) | Overlength hanging flower basket support reinforced structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |