CN109853347A - A kind of pot hole method for repairing and mending - Google Patents

A kind of pot hole method for repairing and mending Download PDF

Info

Publication number
CN109853347A
CN109853347A CN201910070284.4A CN201910070284A CN109853347A CN 109853347 A CN109853347 A CN 109853347A CN 201910070284 A CN201910070284 A CN 201910070284A CN 109853347 A CN109853347 A CN 109853347A
Authority
CN
China
Prior art keywords
connector
supported hole
repairing
hole
support shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910070284.4A
Other languages
Chinese (zh)
Other versions
CN109853347B (en
Inventor
沈宇翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yinshan Construction Co ltd
Original Assignee
Hangzhou Yuanshan Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Yuanshan Construction Co Ltd filed Critical Hangzhou Yuanshan Construction Co Ltd
Priority to CN201910070284.4A priority Critical patent/CN109853347B/en
Publication of CN109853347A publication Critical patent/CN109853347A/en
Application granted granted Critical
Publication of CN109853347B publication Critical patent/CN109853347B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of pot hole method for repairing and mending, include the following steps: S1: supported hole are opened up at pot hole, the supported hole is circumferentially distributed;S2: support shaft is inserted at supported hole;S3: adjustment position allows the one end of support shaft outside supported hole to be located at the middle part of hollow;And all support shafts are located at one end outside supported hole using connector to connect;S4: mortar is poured into supported hole;S5: passing through connector using grouting part and be inserted into weak subgrade soil, then fixes grouting part with connector;S6: mortar is poured into weak subgrade soil by grouting part;S7: after the mortar initial set in subgrade soils and in supported hole, stopping is recycled to fill up hollow.The present invention have can repair pot hole, and make repair after road surface have the effect of higher intensity.

Description

A kind of pot hole method for repairing and mending
Technical field
The present invention relates to LB mending technique fields, more particularly, to a kind of pot hole method for repairing and mending.
Background technique
Roadbed provides support force for road surface, can not provide required for road surface if the subgrade soils below road surface are more weak Enough support forces, then road surface above weak subgrade is rolled by vehicle easy to break damaged then to generate hollow. When being repaired to these road surfaces, if only carrying out simple filler repairing only for these hollows, then when road surface again It is secondary then and hollow to be generated when being rolled by vehicle.
Summary of the invention
In view of the deficienciess of the prior art, the invention reside in a kind of pot hole method for repairing and mending is provided, it is advantageous that Pot hole can be repaired, and makes the road surface after repairing that there is higher intensity.
Technical purpose of the invention has the technical scheme that a kind of pot hole method for repairing and mending, packet Include following steps:
S1: opening up supported hole at pot hole, and the supported hole is circumferentially distributed;
S2: support shaft is inserted at supported hole;
S3: adjustment position allows the one end of support shaft outside supported hole to be located at the middle part of hollow;And using connector by all Axle position is supportted to connect in one end outside supported hole;
S4: mortar is poured into supported hole;
S5: passing through connector using grouting part and be inserted into weak subgrade soil, then fixes grouting part with connector;
S6: mortar is poured into weak subgrade soil by grouting part;
S7: after the mortar initial set in subgrade soils and in supported hole, stopping is recycled to fill up hollow.
By using above-mentioned technical proposal, mortar is injected into weak subgrade soils using grouting part, after mortar consolidation The bearing capacity of subgrade soils can be enhanced.After filling up stopping into hollow, support shaft, connector and grouting part are used as and fill up The inner frame of material enhances the intensity of mend, so that the road surface after repairing has higher intensity.
The present invention is further arranged to: the supported hole in step S1 opens up obliquely.
By using above-mentioned technical proposal, supported hole is oblique to be opened up so that drilling device is easier to operate to, and oblique is opened up Supported hole can make way for support shaft therein and be more not easy to tilt when being under pressure.
The present invention is further arranged to: the support shaft is strangled reinforcing bar by band and is made.
By using above-mentioned technical proposal, selects band to strangle reinforcing bar as support shaft, support shaft and mortar can be allowed to have more Big contact area, and then allow support shaft and the more firm connection in road surface.
The present invention is further arranged to: connector is annular shape, and the support shaft includes being located at one outside supported hole with it The link block of rotation connection is held, the link block has connection cambered surface far from one end of support shaft;In step S3, the connection arc After face is bonded with the outer surface of connector, link block and connector are fixed together in the way of welding.
By using above-mentioned technical proposal, link block and support shaft are rotatablely connected, and link block is enabled to be more easier to adjust It is whole to link together to proper angle and connector, and connect and welded again after cambered surface is bonded with connector, enable link block The more stable connection with connector.
The present invention is further arranged to: grouting part includes sleeve and flange open at one end, and the flange is located at sleeve Open at one end, offer out paddle hole on the sleeve;After sleeve is passed through connector in step S5, then by flange and connector It is welded and fixed together.
By using above-mentioned technical proposal, flange is fixed together by welding manner and connector so that grouting part with Connector can be connected firmly, and after the mortar to sleeve openings one end indentation high pressure, mortar enters soft from the output of paddle hole out In weak subgrade soils, the meeting after mortar consolidation is so that subgrade soils have stronger bearing capacity.
The present invention is further arranged to: the one end of the sleeve far from flange is in sharp setting.
By using above-mentioned technical proposal, the one end of sleeve far from flange is inserted into weakness in sharp setting convenient for grouting set Subgrade soils in.
The present invention is further arranged to: adjusting position using regulating part during being welded to connect connector and support shaft It sets, so that connector be allowed to be ultimately at a horizontal position.
By using above-mentioned technical proposal, connector is adjusted to horizontal position, can be oriented to grouting part, so that Grouting part vertical can be inserted into subgrade soils, so that road surface load preferably can be passed to road by grouting part Base soil.
The present invention is further arranged to: regulating part has magnetism, and regulating part includes that a diameter dimension is biggish slotting Enter cylinder and the lesser abutting cylinder of a diameter dimension, insertion cylinder is coaxially fixed with cylinder end face is abutted, the adjusting Part further include one with abut the co-axially fixed adjusting rod of cylinder;When using regulating part, insertion cylinder is inserted into connector, And abutting cylinder is abutted to be attached together with the connector of irony, then welds one of link block and connector It is connected together, it is whether horizontal by the way that the air level observation connector of upper end of adjusting rod is arranged in, determining connector level simultaneously And after being fixed together with all support shafts, regulating part is separated with connector, then will grouting part insertion connector in and It is fixed with connector
By using above-mentioned technical proposal, after regulating part is absorbed and fixed at together with connector, it can easily pass through adjusting rod Connector is controlled, and whether horizontal by air level observation connector.
In conclusion the invention has the following advantages:
1, mortar is injected into weak subgrade soils using grouting part, the bearing capacity of subgrade soils can be enhanced after mortar consolidation;
2, after filling up stopping into hollow, support shaft, connector and grouting part enhance as the inner frame of stopping The intensity of mend, so that the road surface after repairing has higher intensity;
3, connector is adjusted to horizontal position, can be oriented to grouting part, be enabled grouting part is vertical to be inserted into In subgrade soils, so that road surface load preferably can be passed to subgrade soils by grouting part.
Detailed description of the invention
Fig. 1 is regulating part and connector of the invention, the diagrammatic cross-section for supporting Axile connection structure;
Fig. 2 is regulating part and connector, support shaft attachment structure schematic diagram of the invention.
Appended drawing reference: 1, supported hole;2, support shaft;3, link block;4, cambered surface is connected;5, connector;6, regulating part;7, it inserts Enter cylinder;8, cylinder is abutted;9, adjusting rod;10, air level;11, be in the milk part;12, sleeve;13, flange;14, go out paddle hole;15, Road surface;16, hollow.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
As shown in Figure 1, 2, it is a kind of pot hole method for repairing and mending disclosed by the invention, includes the following steps:
S1:
Supported hole 1 obliquely is opened up at the hollow 16 on road surface 15, supported hole 1 is circumferentially equally spaced six;
S2:
Insertion strangles support shaft 2 made of reinforcing bar band at supported hole 1, and support shaft 2 further includes being located at the outer one end of supported hole 1 with it The link block 3 of rotation connection, wherein link block 3 has connection cambered surface 4 far from one end of support shaft 2;
S3:
Position is adjusted, allows the one end of support shaft 2 outside supported hole 1 to be located at the middle part of hollow 16, and utilize circular connection Part 5 links together all link blocks 3;
During connector 5 and link block 3 link together, also need to adjust connection using the magnetic regulating part 6 of tool The horizontality of part 5.Wherein regulating part 6 includes that the biggish insertion cylinder 7 of a diameter dimension and a diameter dimension are smaller Abutting cylinder 8, insertion cylinder 7 coaxially fixes with 8 end face of cylinder is abutted, regulating part 6 further include one with to abut cylinder 8 coaxial Fixed adjusting rod 9;
When using regulating part 6, insertion cylinder 7 is inserted into connector 5, and makes the connector 5 for abutting cylinder 8 and irony Abutting is attached together, and then the connection cambered surface 4 of one of link block 3 is bonded and is welded with the periphery of connector 5 Together, then by be coaxially fixed on round bar shape adjusting rod 9 upper end circular air level 10 observe connector 5 whether water Flat, when bubble is in the middle of air level 10, then connector 5 is level, by all companies after determining 5 level of connector Block 3 is connect to be welded and fixed with connector 5;
S4:
Mortar is poured into supported hole 1, and band is selected to strangle reinforcing bar as support shaft 2, support shaft 2 and mortar can be allowed to have bigger Contact area, and then can allow support shaft 2 and the more firm connection in road surface 15 after mortar consolidation;
S5:
Connector 5 is passed through using grouting part 11 and is inserted into weak subgrade soil, it is then that grouting part 11 and connector 5 is fixed;
Wherein, grouting part 11 includes open at one end, the sleeve 12 and flange 13 that the other end is sharply arranged, and flange 13 is located at set The open at one end of cylinder 12, is also provided with out paddle hole 14 on sleeve 12, and paddle hole 14 is along the axis of sleeve 12 and circumferentially-spaced out It is distributed in sharp one end of sleeve 12;
After sleeve 12 is passed through connector 5, the sharp one end of sleeve 12 is squeezed into subgrade soils using hammer mode, until turning over Side 13 is abutted with connector 5, is then again welded and fixed together flange 13 and connector 5;
Because regulating part 6 is utilized to adjust connector 5 to horizontal position, regulating part 6 can lead grouting part 11 To enabling grouting part 11 is vertical to be driven into subgrade soils;
S6:
Mortar is poured into weak subgrade soil by grouting part 11, the bearing capacity of subgrade soils can be enhanced after mortar consolidation;
S7:
After the mortar initial set in subgrade soils and in supported hole 1, stopping is recycled to fill up hollow 16, according to 15 material of road surface Difference selects different stoppings, and bituminous pavement 15 then selects pitch stopping, and concrete road surface 15 then selects concrete to fill up Material;After filling up stopping into hollow 16, support shaft 2, connector 5 and grouting part 11 increase as the inner frame of stopping The strong intensity of mend, so that the road surface 15 after repairing has higher intensity.
The embodiment of present embodiment is presently preferred embodiments of the present invention, not limits protection of the invention according to this Range, therefore: the equivalence changes that all structures under this invention, shape, principle are done, should all be covered by protection scope of the present invention it It is interior.

Claims (8)

1. a kind of pot hole method for repairing and mending, it is characterized in that: including the following steps:
S1: opening up supported hole (1) at the hollow (16) of road surface (15), and the supported hole (1) is circumferentially distributed;
S2: support shaft (2) are inserted at supported hole (1);
S3: adjustment position allows support shaft (2) to be located at the middle part of hollow (16) in the one end of supported hole (1) outside;And utilize connection All support shafts (2) are located at the one end of supported hole (1) outside and connected by part (5);
S4: mortar is poured into supported hole (1);
S5: passing through connector (5) using grouting part (11) and be inserted into weak subgrade soil, then will grouting part (11) and connector (5) fixed;
S6: mortar is poured into weak subgrade soil by grouting part (11);
S7: after the mortar initial set in subgrade soils and in supported hole (1), stopping is recycled to fill up hollow (16).
2. a kind of pot hole method for repairing and mending according to claim 1, it is characterized in that: the supported hole (1) in step S1 is oblique It opens up downwards.
3. a kind of pot hole method for repairing and mending according to claim 1, it is characterized in that: the support shaft (2) is that band strangles steel Muscle is made.
4. a kind of pot hole method for repairing and mending according to claim 1, it is characterized in that: connector (5) is annular shape, it is described Support shaft (2) includes the link block (3) for being located at one end rotation connection of supported hole (1) outside with it, and the link block (3) is far from branch The one end for supportting axis (2) has connection cambered surface (4);In step S3, connection cambered surface (4) is bonded with the outer surface of connector (5) Afterwards, link block (3) and connector (5) are fixed together in the way of welding.
5. a kind of pot hole method for repairing and mending according to claim 4, it is characterized in that: grouting part (11) includes open at one end Sleeve (12) and flange (13), the flange (13) is located at the open at one end of sleeve (12), opens up on the sleeve (12) There are paddle hole (14) out;After sleeve (12) are passed through connector (5) in step S5, then flange (13) and connector (5) welding is solid It is scheduled on together.
6. a kind of pot hole method for repairing and mending according to claim 5, it is characterized in that: the sleeve (12) is far from flange (13) one end is in sharp setting.
7. a kind of pot hole method for repairing and mending according to claim 4, it is characterized in that: by connector (5) and support shaft (2) position is adjusted using regulating part (6) during being welded to connect, so that connector (5) be allowed to be ultimately at a horizontal position.
8. a kind of pot hole method for repairing and mending according to claim 7, it is characterized in that: regulating part (6) has magnetism, and Regulating part (6) includes the biggish insertion cylinder (7) of a diameter dimension and the lesser abutting cylinder (8) of a diameter dimension, Insertion cylinder (7) is coaxially fixed with cylinder (8) end face is abutted, the regulating part (6) further include one with to abut cylinder (8) coaxial Fixed adjusting rod (9);When using regulating part (6), insertion cylinder (7) is inserted into connector (5), and to abut and justify Column (8) is abutted with the connector (5) of irony and is attached together, and then welds one of link block (3) and connector (5) Together, whether air level (10) observation connector (5) by setting in the upper end of adjusting rod (9) is horizontal, connects determining Part (5) is horizontal and after being fixed together with all support shafts (2), and regulating part (6) separate with connector (5), then by filling It starches in part (11) insertion connector (5) and fixed with connector (5).
CN201910070284.4A 2019-01-24 2019-01-24 Road surface pothole repairing method Expired - Fee Related CN109853347B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910070284.4A CN109853347B (en) 2019-01-24 2019-01-24 Road surface pothole repairing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910070284.4A CN109853347B (en) 2019-01-24 2019-01-24 Road surface pothole repairing method

Publications (2)

Publication Number Publication Date
CN109853347A true CN109853347A (en) 2019-06-07
CN109853347B CN109853347B (en) 2020-10-16

Family

ID=66896099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910070284.4A Expired - Fee Related CN109853347B (en) 2019-01-24 2019-01-24 Road surface pothole repairing method

Country Status (1)

Country Link
CN (1) CN109853347B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4507013A (en) * 1980-06-06 1985-03-26 Bonifac Martinak Device and method for repair of pot holes
CN105603855A (en) * 2016-01-05 2016-05-25 杭州修路人科技有限公司 Method for repairing concrete pavement cracks
CN205821963U (en) * 2016-07-21 2016-12-21 宋磊 Fixing device is repaired in road and bridge crack
CN106587782A (en) * 2016-12-21 2017-04-26 江苏卓典钻掘科技有限公司 Method for preparing geopolymer grouting material and method for applying geopolymer grouting material to static pressure grouting
CN108386005A (en) * 2018-04-08 2018-08-10 中国电建集团成都勘测设计研究院有限公司 Repairing concrete crack structure and method for repairing and mending
CN108755333A (en) * 2018-05-24 2018-11-06 郑州工业应用技术学院 A kind of road and bridge crack repairing device and method for repairing and mending
CN208104991U (en) * 2018-01-05 2018-11-16 西安铁路职业技术学院 A kind of fixed device of road and bridge crack reparation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4507013A (en) * 1980-06-06 1985-03-26 Bonifac Martinak Device and method for repair of pot holes
CN105603855A (en) * 2016-01-05 2016-05-25 杭州修路人科技有限公司 Method for repairing concrete pavement cracks
CN205821963U (en) * 2016-07-21 2016-12-21 宋磊 Fixing device is repaired in road and bridge crack
CN106587782A (en) * 2016-12-21 2017-04-26 江苏卓典钻掘科技有限公司 Method for preparing geopolymer grouting material and method for applying geopolymer grouting material to static pressure grouting
CN208104991U (en) * 2018-01-05 2018-11-16 西安铁路职业技术学院 A kind of fixed device of road and bridge crack reparation
CN108386005A (en) * 2018-04-08 2018-08-10 中国电建集团成都勘测设计研究院有限公司 Repairing concrete crack structure and method for repairing and mending
CN108755333A (en) * 2018-05-24 2018-11-06 郑州工业应用技术学院 A kind of road and bridge crack repairing device and method for repairing and mending

Also Published As

Publication number Publication date
CN109853347B (en) 2020-10-16

Similar Documents

Publication Publication Date Title
JP5693140B2 (en) Artificial ground such as road and its construction method
CN103726503B (en) Anchor rod pile reinforcing bearing platform structure used for reinforcing deformed bridge pile and construction method thereof
US20170002537A1 (en) Filling tube for producing a column of filling material in the ground as well as device and method related thereto
CN203654308U (en) Anchor jacked pile reinforced bearing platform structure for reinforcing deformed bridge pile
CN102121236A (en) Reinforcement method for single column type pier column for supporting main beam of circular arc curve ramp bridge
CN108316290A (en) One pile for one column structure without cushion cap and its construction method
CN213358663U (en) Sign basis among traffic engineering
CN109853347A (en) A kind of pot hole method for repairing and mending
JP5209278B2 (en) Construction method of steel column and pile connection structure of steel building
CN105672308B (en) A kind of pile pile Quick connection part
CN109440803A (en) Railroad bridge foundation structure, tubular pole and cushion cap moment connection structure and construction method
CN103938610B (en) The construction pile pipe of the variable cross-section Reinforced Gravel Pile of a kind of strengthening soft foundation and technique
CN107476319A (en) Mountain area steep slope region Road Bridge Pile Foundation construction method
CN104863152A (en) High-strength bare rock pipe pile inserting-driving method
US20190071835A1 (en) Tip for a foundation pile
CN110258556A (en) A kind of pile extension method of engineering tubular pile construction
CN109778894A (en) A kind of railroad bridge tubular pole and cushion cap connection structure, foundation structure and construction method
JP2001288753A (en) Press-in open caisson method making use of press jack
CN104452797A (en) Steel cylinder foundation structure and equipment and construction method of steel cylinder foundation structure
CN215669558U (en) Front-mounted inclined pile of foundation pit supporting system
CN214940085U (en) Reinforced structure at pile splicing part of prestressed concrete pipe pile
KR101601876B1 (en) Composite Pile Connecting Apparatus and Composite Pile Construction Method Using the Same
CN209798807U (en) Railway bridge tubular pile and bearing platform connecting structure and railway bridge foundation structure
US5593251A (en) Method of installing a composite timber and concrete pile
CN206752699U (en) A kind of concrete filled steel tube column connected node

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 310000 room 877-6, bonded building, West bonded Road, Hangzhou Airport Economic Zone, Xiaoshan District, Hangzhou, Zhejiang Province

Patentee after: Zhejiang Yinshan Construction Co.,Ltd.

Address before: 311225 2nd floor, No. 579 and 577, Yongfeng Road, Hezhuang street, Hangzhou dajiangdong industrial agglomeration area, Xiaoshan District, Hangzhou, Zhejiang Province

Patentee before: HANGZHOU YINSHAN CONSTRUCTION Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201016