CN108316290A - One pile for one column structure without cushion cap and its construction method - Google Patents
One pile for one column structure without cushion cap and its construction method Download PDFInfo
- Publication number
- CN108316290A CN108316290A CN201810298414.5A CN201810298414A CN108316290A CN 108316290 A CN108316290 A CN 108316290A CN 201810298414 A CN201810298414 A CN 201810298414A CN 108316290 A CN108316290 A CN 108316290A
- Authority
- CN
- China
- Prior art keywords
- steel
- pile casting
- column
- pile
- casting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 24
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 274
- 239000010959 steel Substances 0.000 claims abstract description 274
- 238000005266 casting Methods 0.000 claims abstract description 138
- 239000002689 soil Substances 0.000 claims abstract description 27
- 238000003466 welding Methods 0.000 claims abstract description 14
- 230000000284 resting effect Effects 0.000 claims abstract description 4
- 238000003780 insertion Methods 0.000 claims abstract description 3
- 230000037431 insertion Effects 0.000 claims abstract description 3
- 230000036961 partial effect Effects 0.000 claims abstract description 3
- 230000002787 reinforcement Effects 0.000 claims description 6
- 238000010008 shearing Methods 0.000 claims description 5
- 238000005553 drilling Methods 0.000 claims description 3
- 230000010412 perfusion Effects 0.000 claims description 3
- 239000002002 slurry Substances 0.000 claims description 3
- 239000013049 sediment Substances 0.000 claims description 2
- 239000000725 suspension Substances 0.000 abstract description 6
- 230000007547 defect Effects 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 8
- 230000000694 effects Effects 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 5
- 239000003351 stiffener Substances 0.000 description 4
- 238000001514 detection method Methods 0.000 description 3
- 239000000686 essence Substances 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000005260 corrosion Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000003755 preservative agent Substances 0.000 description 2
- 230000002335 preservative effect Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 238000009411 base construction Methods 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 239000003365 glass fiber Substances 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 230000008521 reorganization Effects 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
Abstract
The present invention relates to a kind of one pile for one column structures of no cushion cap, including pile foundation, column and steel pile casting, steel pile casting partial insertion to below ground and the part side of resting on the ground, pile foundation, which pours, to be formed in steel pile casting, there is column outer steel pipe, outer steel pipe to be welded in steel pile casting top.Additionally relate to the construction method of the structure, including step:S1 squeezes into steel pile casting in the soil body to predetermined depth;S2 pours pile foundation in steel pile casting;S3 makes outer steel pipe and steel pile casting align, and carries out being welded to connect for outer steel pipe and steel pile casting.By the way of directly pouring pile foundation in steel pile casting, steel pile casting is shared with suspension column, need not extract steel pile casting, smaller to periphery soil disturbance;Steel pile casting and the welding of column steel outer tube do not have to excavate cushion cap on the basis of ensureing structural strength, smaller to surrounding soil disturbance, and defect that is larger to soil disturbance and needing expansion stake diameter is excavated efficiently against cushion cap existing in the prior art.
Description
Technical field
The invention belongs to construction engineering technical fields, are related to a kind of the one pile for one column structure and its construction method of no cushion cap,
The newly-built reorganization and expansion of construction of structures to be protected is needed suitable for closing on Important building, historical relic's protection building, railway line, subway line etc.
Engineering is also applied for other and needs to reduce engineering when constructing to soil disturbance.
Background technology
The suspension column way of steel column one pile for one column and to the longer pile making method of soil disturbance, at present there are mainly two types of mode,
One is by the way of single pile cap, another kind is by the way of being inserted into pile crown in steel column, and pile is required for first transferring steel
Casing.
1, by the way of single pile cap
Using the way of single pile cap, it is that steel pile casting is first descended to drill, steel pile casting is extracted after pile, then excavate around cushion cap
The soil body, formwork pour cushion cap.2.5D must be reached since specification regulation steel column is inserted into cushion cap depth, D is steel column diameter or long side
The length of side, cushion cap height are generally higher.Method of the verticality of steel column adjustment mode mainly by embedded column bolt below cushion cap at this time
It is adjusted, cushion cap will pour at twice.The shortcomings that way, has:
1) cushion cap is higher, and cutting depth is deeper, and generally 2 to 3m.Excavation is deeper, larger to periphery soil disturbance;
2) be to meet the requirement of stake back gauge, cushion cap sectional dimension is larger, by taking 1m diameter stakes as an example, sectional dimension be 2m ×
2m.It is larger to excavate range, it is larger to periphery soil disturbance;
3) it needs to cut larger pile crown, speed of application is slower;
4) it needs to extract steel pile casting, withdrawal process is big to soil disturbance.
2, the mode of pile crown is inserted into steel column
It is equally that steel pile casting, stake top is first descended to be poured using retarded concrete that the way of pile crown is inserted into steel column, then will weldering
The shortcomings that steel column for connecing peg is inserted into stake top and adjusts verticality, this method has:
1) it needs stake diameter at least bigger 400mm than steel column long side, when steel column sectional dimension is larger, is not suitable for;
2) the larger requirement for causing to be not easy to meet 3 times of stake diameters as defined in specification with existing pile centre-to-centre spacing of stake diameter;
3) verticality of steel column Adjustment precision is poor, needs the measure of additional fixation steel column, such as ground fixed frame;
4) foundation pile concrete is not up to prescribed strength, and steel column must be just installed when being unsatisfactory for testing conditions, if pile detection
Unqualified, steel column and foundation pile cancel together.
In conclusion needing construction to be protected for closing on Important building, historical relic's protection building, railway line, subway line etc.
For building the newly-built reconstruction and extension project of object, there is disadvantage in currently used two kinds of pile base construction methods, use cushion cap when cushion cap
It is unacceptable when protecting more demanding to excavate the disturbance to the soil body, needs stake enlarged-diameter when being inserted into pile crown in steel column,
It is also unacceptable when distance is unsatisfactory for 3 times of stake diameters.
So needing construction of structures to be protected for closing on Important building, historical relic's protection building, railway line, subway line etc.
Newly-built reconstruction and extension project for, find a kind of to periphery soil disturbance very little, of less demanding to stake diameter, column verticality being capable of essence
The pile foundation construction and steel kind design way really adjusted is engineering problem to be solved in practice.
Invention content
The present embodiments relate to a kind of one pile for one column structure of no cushion cap and its construction methods, can at least solve existing skill
The segmental defect of art.
The present embodiments relate to a kind of one pile for one column structures of no cushion cap, including pile foundation and column, further include steel pile casting,
For the steel pile casting partial insertion to below ground and the part side of resting on the ground, the pile foundation, which pours, is formed in the steel pile casting
Interior, there is the column outer steel pipe, the outer steel pipe to be welded in the steel pile casting top.
As one of embodiment, the outer steel pipe has the cross section of same shape and dimensions with the steel pile casting,
The outer steel pipe is connect with the steel pile casting butt welding;
Alternatively, the outer steel pipe has the cross section of different shape and/or dimensions, the outer steel with the steel pile casting
Pipe is welded to connect with the steel pile casting by switching node.
As one of embodiment, the steel pile casting top inner wall is equipped with inner cylinder, and the inner cylinder top stretches to the outer steel
It offsets in pipe and with the outer steel pipe inner wall.
As one of embodiment, inner ring plate is welded in the outer steel pipe, the inner ring plate, which is held, to be taken in the inner cylinder top.
It is extremely less than in its top inner wall as one of embodiment, in the steel pile casting and multiple first shear studs is set.
As one of embodiment, the column is steel column, and multiple second shearing resistance bolts are provided in the steel column bottom interior wall
It follows closely and in casting concrete in the steel column to cover each second shear stud.
The embodiment of the present invention further relates to the construction method of the one pile for one column structure without cushion cap as described above, including walks as follows
Suddenly:
S1 squeezes into steel pile casting in the soil body to predetermined depth;
S2 pours pile foundation in the steel pile casting;
S3 makes the outer steel pipe and the steel pile casting align, and carries out being welded to connect for the outer steel pipe and the steel pile casting.
As one of embodiment, in S2, after the completion of pile foundation pours, picks scalpriform in stake top and pick raggle at concrete;
In S3, after the outer steel pipe is welded with the steel pile casting, the casting concrete in the outer steel pipe;Wherein, when
When the column is steel core concrete column, overall length casting concrete in the outer steel pipe;When the column is steel column, described
Multiple second shear studs are set in outer steel pipe bottom interior wall and the concrete in the outer steel pipe is made to cover each described second and are resisted
Cut peg.
As one of embodiment, in S2, specifically include:
In the steel pile casting, stake holes is formed by mud off drilling machine, and clear up pile bottom sediment;
It transfers in steel reinforcement cage to stake holes and fixes, weld multiple first shearing resistance bolts in the steel pile casting using peg machine
Nail;
Casting concrete stops the condition of perfusion to ensure in stake holes that all mud are overflowed out of described steel pile casting and from institute
It states the concrete slurry overflowed in steel pile casting and is no less than 1 cubic metre.
As one of embodiment, in S3, it is respectively set on the steel pile casting outer wall and the outer steel pipe outer wall in advance more
A otic placode adjusts the verticality of the outer steel pipe using otic placode.
The embodiment of the present invention at least has the advantages that:
(1) by the way of directly pouring pile foundation in steel pile casting, steel pile casting is shared with suspension column, need not extract steel shield
Cylinder is smaller to periphery soil disturbance;
(2) connection that column and pile foundation are realized by the way of steel pile casting and the welding of column steel outer tube, is ensureing that structure is strong
On the basis of degree, do not have to excavate cushion cap, it is smaller to surrounding soil disturbance, the degree ignored is can reach, efficiently against existing
There is cushion cap present in technology to excavate defect that is larger to soil disturbance and needing to expand stake diameter.
Construction method provided by the invention, construction overall process are all made of ripe construction technology, and general applicability is preferable, entirely
Each step quality is controllable in work progress.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the constructing structure schematic diagram of the one pile for one column structure of no cushion cap provided in an embodiment of the present invention;
Fig. 2 be Fig. 1 along the sectional view of A-A;
Fig. 3 is the enlarged structure schematic diagram of the parts I in Fig. 1.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other
Embodiment shall fall within the protection scope of the present invention.
Such as Fig. 1-Fig. 3, the embodiment of the present invention provides a kind of one pile for one column structure of no cushion cap, including pile foundation 13,1 and of column
Steel pile casting 2, pile foundation 13, which pours, to be formed in steel pile casting 2 namely 13 jacket hoop of pile foundation has a steel pile casting 2, and 2 part of the steel pile casting is inserted
Enter to below ground and the part side of resting on the ground, there is the column 1 outer steel pipe 1, the outer steel pipe 1 to be welded in the steel shield
2 tops of cylinder.Wherein, the structural relation between above-mentioned pile foundation 13 and steel pile casting 2 is to squeeze into soil and excavate by steel pile casting 2 to be formed
After stake holes, directly pile foundation 13 is poured in the steel pile casting 2;In this way, the confined effect between steel pile casting 2 and pile foundation 13 can be protected
Demonstrate,prove pile foundation 13 and 2 common stress of steel pile casting when pile foundation 13 is pressurized.Above-mentioned column 1 can be steel column or steel core concrete column, be
When steel column, above-mentioned outer steel pipe 1 is steel column itself, and when being steel core concrete column, above-mentioned outer steel pipe 1 is steel pipe.
One pile for one column structure provided in this embodiment, at least has the advantages that:
(1) by the way of directly pouring pile foundation 13 in steel pile casting 2, steel pile casting 2 is shared with suspension column, need not extract steel
Casing 2 is smaller to periphery soil disturbance;
(2) connection that column 1 and pile foundation 13 are realized by the way of steel pile casting 2 and the welding of 1 steel outer tube of column, is ensureing to tie
On the basis of structure intensity, do not have to excavate cushion cap, surrounding soil is disturbed smaller, can reach the degree ignored, effectively gram
It takes cushion cap existing in the prior art and excavates defect that is larger to soil disturbance and needing to expand stake diameter.
Preferably due to which steel pile casting 2 is inserted directly into as permanent structure in the soil body, therefore the soil body at least is inserted into it
In part carry out preservative treatment, namely include asepticised outer layer 17, to improve its service life;Further preferably to the steel
2 overall length of casing carries out preservative treatment.Wherein preferred anti-corrosion way is:Perform basic anti-corrosion bottom successively on 2 outer wall of steel pile casting
Paint, intermediate coat and glass fibre erosion resistant coating;It is certainly not limited to the anticorrosion structure, those skilled in the art can be according to actual field
The factors such as ground situation are adjusted.
In above-mentioned one pile for one column structure, with outer steel pipe 1 and steel pile casting 2 with the cross with same shape and dimensions
Section is preferred, the outer steel pipe 1 and the steel pile casting 2 can directly butt welding connect.Steel pile casting 2 is generally pylindrical (certainly not
Exclude other shapes), then for above-mentioned preferred embodiment, outer steel pipe 1 is also cylinder, and diameter and 2 diameter phase of steel pile casting
Together.Certainly, 1 cross section of column may be rectangular or other shapes, for outer steel pipe 1 and steel pile casting 2 have different shape and/
Or dimensions cross section the case where, if outer steel pipe 1 is also cylindrical but diameter is different from steel pile casting 2 or outer steel pipe 1 is just
Shape etc., the outer steel pipe 1 are welded to connect with the steel pile casting 2 by switching node;The switching node can be that square-section turns
The node or minor diameter of circular cross-section are converted to the node etc. of major diameter, determines according to actual conditions, can be processed under line
It is good, it is such as pre-welded to 1 bottom of outer steel pipe and is either integrally formed with outer steel pipe 1, then welded with steel pile casting 2;In other words, right
In such case, column 1 includes the switching node being adapted to steel pile casting 2 positioned at 1 bottom of outer steel pipe.As it can be seen that the present embodiment carries
The one pile for one column structure of confession is preferable for the adaptability in column section, and the larger-size operating mode of column cross-section can also be fitted
With.
2 length of above-mentioned steel pile casting is protected the difference of the range of building, soil property situation etc. and is determined as needed, generally not
Less than 3m.Preferably, the height that steel pile casting 2 bassets is 0.8~1.5m, further preferably exposes 1m, ensures that structure is strong
Degree and convenient working.In addition, such as Fig. 1,2 bottom end groove processing 11 of steel pile casting, to facilitate steel pile casting 2 to squeeze into soil layer.
In above-described embodiment, steel pile casting 2 is welded and fixed with outer steel pipe 1, also serves as 1 suspension column of column, it should be apparent that, steel shield
Since section does not weaken between cylinder 2 and column 1, the two is to wait strong ties, thus meet requirement of the related specifications to suspension column.
It is further preferred that such as Fig. 1,2 top inner wall of the steel pile casting is equipped with inner cylinder 3, and 3 top of the inner cylinder stretches to institute
It states in outer steel pipe 1 and offsets with 1 inner wall of the outer steel pipe.The inner cylinder 3 is preferably welded on steel pile casting 2, in work progress
In, outer steel pipe 1 is inserted in the inner cylinder 3, which can offset with steel column/switching node inner wall, can be used in installation outer steel pipe 1
Shi Jinhang is radially limited temporarily, and convenient for the contraposition and construction between outer steel pipe 1 and steel pile casting 2, on the other hand, the inner cylinder 3 is also
It can be used as weld seam baffle when outer steel pipe 1 and steel pile casting 2 are welded.
It is further preferred that such as Fig. 1, it is welded with inner ring plate 8 in the outer steel pipe 1, the inner ring plate 8, which is held, to be taken in described interior
3 tops of cylinder.It is easy-to-understand to, which is annular plate, and in-between Kong Kerong concrete passes through, when column 1 is mixed for steel pipe
When solidifying earth pillar, the interstitial hole of the inner ring plate 8 answer it is larger, convenient for pouring for concrete;Its plate face be horizontal direction, preferably with it is outer
Steel pipe 1 is coaxially disposed, and is preferably welded in inside outer steel pipe 1 using fillet weld or groove weld.The effect packet of the inner ring plate 8
It includes:It can coordinate with above-mentioned inner cylinder 3, and when installing outer steel pipe 1, which can hold temporarily rides over 3 top of inner cylinder, can be external
Steel pipe 1 carries out interim axial limiting, convenient for the contraposition and construction between outer steel pipe 1 and steel pile casting 2;On the other hand, in outer steel
When pipe 1 is welded with steel pile casting 2, the structural strain's of outer steel pipe 1 can be limited, to improve connection essence of the outer steel pipe 1 with steel pile casting 2
Degree.
The preferred structure of one pile for one column structure as no cushion cap provided in this embodiment, such as Fig. 1 and Fig. 2, the steel shield
It is extremely less than in its top inner wall in cylinder 2 and multiple first shear studs 10 is set.Steel pile casting 2 and 13 concrete of pile foundation poured in it
Between confined effect both can ensure that cooperative bearing can by the way that the first shear stud 10 is further arranged in steel pile casting 2
To further increase the effect of common stress therebetween.Obviously, the quantity of the first shear stud 10 is more, and effect is better;From
Each first shear stud 10 can be arranged within the scope of the downward 1m in 2 top of steel pile casting in angle easy for construction;Preferably, such as Fig. 2,
Designed in a manner of multi-turn shearing resistance layer from top to bottom, often enclose shearing resistance layer include circumferentially be circular layout along 2 inner wall of steel pile casting it is multiple
First shear stud 10, the cooperative bearing between steel pile casting 2 and concrete are better.
Similarly, multiple second shear studs 9 are preferably set on 1 inner wall of outer steel pipe, can similarly be obtained above-mentioned
Technique effect;The set-up mode of second shear stud 9 uses for reference the set-up mode of above-mentioned first shear stud 10.For column 1
For steel core concrete column the case where, can on 1 inner wall of outer steel pipe overall length be arranged the second shear stud 9, also can be only at 1 bottom of outer steel pipe
Second shear stud 9 is set within the scope of the above 1m in portion;The case where being steel column for column 1, it can be not provided with the second shear stud 9,
Second shear stud 9, and casting concrete in the range of the second shear stud 9 are arranged preferably are set, can be improved column 1 with
The intensity and reliability of 13 connection structure of pile foundation.
The embodiment of the present invention further relates to the construction method of the one pile for one column structure without cushion cap as described above, including walks as follows
Suddenly:
S1 squeezes into steel pile casting 2 in the soil body to predetermined depth;
S2 pours pile foundation 13 in the steel pile casting 2;
S3 makes the outer steel pipe 1 be aligned with the steel pile casting 2, carries out the welding of the outer steel pipe 1 and the steel pile casting 2
Connection.
Wherein:
In S1, if Fig. 1 is equipped with impact platform for ease of construction on 2 outer wall of steel pile casting, impact is installed on impact platform
Cylinder 7, for completing to squeeze into the operation of steel pile casting 2 and ensureing that steel pile casting 2 is indeformable.The impact platform includes impact deck plate 4 and hits
Platform ribbed stiffener 5 is beaten, impact deck plate 4 is horizontally mounted and welds (preferably twin fillet wolt welding), impact with 2 outer wall of steel pile casting
Platform ribbed stiffener 5 welds (preferably twin fillet wolt welding) with 2 outer wall of steel pile casting and impact deck plate 4 respectively;Such as Fig. 2, this hits
It is annular panel to play deck plate 4 to be preferably, around steel pile casting 2 outer wall installation;It is to be welded to impact deck plate to strike cylinder 7 to be preferably
It on 4, is coaxially disposed with steel pile casting 2, and diameter is more than 2 diameter of steel pile casting.Above-mentioned impact platform can uniformly pass the power for striking cylinder 7
Steel pile casting 2 is passed, prevents steel pile casting 2 from deforming and influencing the subsequently welding precision with outer steel pipe 1.Specifically, above-mentioned impact table top
Plate 4, impact platform ribbed stiffener 5 and inner cylinder 3 are preferably to be pre-installed on steel pile casting 2 under line;Pacify behind live accurate setting-out stake position
Steel pile casting 2 is squeezed into the soil body to predetermined depth by dress impact cylinder 7, and when construction should control 2 horizontal position of steel pile casting and gradient.
Above-mentioned pile foundation 13 includes steel reinforcement cage and concrete, and steel reinforcement cage is preferably scene processing;In S2, following step is specifically included
Suddenly:
(1) after squeezing into steel pile casting 2, in steel pile casting 2, stake holes is formed by mud off drilling machine, and it is heavy to clear up a bottom
Slag, work progress are controlled according to related specifications;
(2) it transfers in steel reinforcement cage to stake holes and fixes, steel reinforcement cage stake top absolute altitude is preferably concordant with ground line 18;Use bolt
Nailing machine should make in interior multiple first shear studs 10 of welding of the steel pile casting 2, welding and reliably trample platform temporarily;
(3) casting concrete, the condition for stopping perfusion be ensure in stake holes all mud overflowed out of the steel pile casting 2 and
The concrete slurry overflowed in from the steel pile casting 2 is no less than 1 cubic metre, to ensure pile crown concrete pouring quality.
It is further preferred that concrete carries out sound detection integrity detection, inspection after reaching intensity 80% to pile concrete
After surveying qualification, picks scalpriform in stake top (showing the stake top 14 before not picking chisel in Fig. 1) and pick raggle 15 at concrete, dabbing simultaneously applies
Brush concrete interface agent can be improved column 1 and the connection structure of pile foundation 13 be strong convenient for the concreting in subsequent column 1
Degree.Such as Fig. 1, it is inversed taper platform shape that above-mentioned concrete, which picks raggle 15 to be preferably, better.
In S3, above-mentioned inner ring plate 8, second shear stud 9 etc. are installed in outer steel pipe 1 under preferably advance line;Online
In lower factory, preassembling preferably is carried out to outer steel pipe 1 and steel pile casting 2, to ensure in-site installation no problem.Outer steel pipe 1 and steel
It is preferably full penetration groove weld 12 between casing 2, weld seam grade is not less than two level, can be detected by ultrasonic examination, ensures
12 mass of weld seam can carry out weld seam repairing when detecting a flaw unqualified.Preferably, in advance in 2 outer wall of the steel pile casting and described outer
Multiple otic placodes 6 are respectively set on 1 outer wall of steel pipe, the verticality of the outer steel pipe 1 is adjusted using otic placode 6;Pass through above-mentioned inner cylinder
3, inner ring plate 8 and otic placode 6, accurately adjust position, the verticality etc. of outer steel pipe 1, and realization steel pile casting 2 is accurate with outer steel pipe 1
Contraposition ensures quality of connection, after the completion of adjustment, tightens the bolt of otic placode 6 to fix outer steel pipe 1, can be carried out after retest-ok outer
(when welding the first shear stud 10 in S2, the otic placode 6 on the steel pile casting 2 also can be used for welding between steel pipe 1 and steel pile casting 2
In fastening the safety belt).After the completion of outer steel pipe 1 and steel pile casting 2 are welded, each otic placode 6 and above-mentioned impact deck plate 4 and impact are cut off
Platform ribbed stiffener 5.It is common method in structural steelwork to adjust verticality by otic placode 6, is not repeated herein.
Further, after the outer steel pipe 1 is welded with the steel pile casting 2, the casting concrete in the outer steel pipe 1;
Wherein, when the column 1 is steel core concrete column, overall length casting concrete in the outer steel pipe 1;When the column 1 is steel
When column, multiple second shear studs 9 are set in 1 bottom interior wall of the outer steel pipe and the concrete in the outer steel pipe 1 is made to cover
Cover each second shear stud 9.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention
With within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention god.
Claims (10)
1. a kind of one pile for one column structure of no cushion cap, including pile foundation and column, it is characterised in that:Further include steel pile casting, the steel
To below ground and the part side of resting on the ground, the pile foundation pours to be formed in the steel pile casting casing partial insertion, described
There is column outer steel pipe, the outer steel pipe to be welded in the steel pile casting top.
2. the one pile for one column structure without cushion cap as described in claim 1, it is characterised in that:The outer steel pipe and the steel pile casting
Cross section with same shape and dimensions, the outer steel pipe are connect with the steel pile casting butt welding;
Alternatively, the outer steel pipe and the steel pile casting have a cross section of different shape and/or dimensions, the outer steel pipe with
The steel pile casting is welded to connect by switching node.
3. the one pile for one column structure without cushion cap as described in claim 1, it is characterised in that:The steel pile casting top inner wall is equipped with
Inner cylinder, the inner cylinder top stretch in the outer steel pipe and offset with the outer steel pipe inner wall.
4. the one pile for one column structure without cushion cap as claimed in claim 3, it is characterised in that:It is welded with inner ring in the outer steel pipe
Plate, the inner ring plate, which is held, to be taken in the inner cylinder top.
5. the one pile for one column structure without cushion cap as described in claim 1, it is characterised in that:To less than its top in the steel pile casting
Multiple first shear studs are set on portion's inner wall.
6. the one pile for one column structure without cushion cap as described in claim 1, it is characterised in that:The column is steel column, the steel
It is provided with multiple second shear studs on the inner wall of column bottom and is resisted with covering each described second in casting concrete in the steel column
Cut peg.
7. the construction method of the one pile for one column structure such as no cushion cap according to any one of claims 1 to 6, which is characterized in that
Include the following steps:
S1 squeezes into steel pile casting in the soil body to predetermined depth;
S2 pours pile foundation in the steel pile casting;
S3 makes the outer steel pipe and the steel pile casting align, and carries out being welded to connect for the outer steel pipe and the steel pile casting.
8. construction method as claimed in claim 7, it is characterised in that:In S2, after the completion of pile foundation pours, stake top pick scalpriform at
Concrete picks raggle;
In S3, after the outer steel pipe is welded with the steel pile casting, the casting concrete in the outer steel pipe;Wherein, when described
When column is steel core concrete column, overall length casting concrete in the outer steel pipe;When the column is steel column, in the outer steel
Multiple second shear studs are set on bottom of the tube inner wall and the concrete in the outer steel pipe is made to cover each second shearing resistance bolt
Nail.
9. construction method as claimed in claim 7 or 8, which is characterized in that in S2, specifically include:
In the steel pile casting, stake holes is formed by mud off drilling machine, and clear up pile bottom sediment;
It transfers in steel reinforcement cage to stake holes and fixes, weld multiple first shear studs in the steel pile casting using peg machine;
Casting concrete, the condition for stopping perfusion are to ensure in stake holes that all mud are overflowed out of described steel pile casting and from the steel
The concrete slurry overflowed in casing is no less than 1 cubic metre.
10. construction method as claimed in claim 7, it is characterised in that:In S3, in advance in the steel pile casting outer wall and described outer
Multiple otic placodes are respectively set on outer wall of steel pipe, the verticality of the outer steel pipe is adjusted using otic placode.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810298414.5A CN108316290B (en) | 2018-03-30 | 2018-03-30 | One-column one-pile structure without bearing platform and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810298414.5A CN108316290B (en) | 2018-03-30 | 2018-03-30 | One-column one-pile structure without bearing platform and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108316290A true CN108316290A (en) | 2018-07-24 |
CN108316290B CN108316290B (en) | 2024-01-23 |
Family
ID=62896607
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810298414.5A Active CN108316290B (en) | 2018-03-30 | 2018-03-30 | One-column one-pile structure without bearing platform and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108316290B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110005135A (en) * | 2019-04-30 | 2019-07-12 | 广东铝遊家科技有限公司 | Multi-layered modular house support column connection structure and connection method |
CN111677285A (en) * | 2020-06-20 | 2020-09-18 | 中铁十九局集团第一工程有限公司 | Bridge pier column concrete conduit method pouring construction process |
CN113373964A (en) * | 2021-07-02 | 2021-09-10 | 中冀建勘集团有限公司 | Pile column continuous construction method in strong corrosion environment |
CN113605376A (en) * | 2021-07-02 | 2021-11-05 | 青建集团股份公司 | Novel steel pipe pile |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101294384A (en) * | 2008-07-01 | 2008-10-29 | 北京住总集团有限责任公司 | Pile, pole interface positioning device and construction method |
CN202416309U (en) * | 2011-12-28 | 2012-09-05 | 防城港中一重工有限公司 | Concrete pile steel casing for shallow sea and rivers |
CN203403402U (en) * | 2013-06-27 | 2014-01-22 | 上海三益建筑设计有限公司 | Upright pile |
CN205000328U (en) * | 2015-07-23 | 2016-01-27 | 中铁港航局集团有限公司 | Cast -in -place support aquatic steel reinforced concrete composite pile of cable -stay bridge concrete ballast tank roof beam |
CN106245627A (en) * | 2016-08-30 | 2016-12-21 | 中铁三局集团有限公司 | A kind of quick positioning construction method of steel pipe stanchion |
CN206829149U (en) * | 2017-04-20 | 2018-01-02 | 中南勘察设计院(湖北)有限责任公司 | A kind of stand column pile combining structure |
CN208072391U (en) * | 2018-03-30 | 2018-11-09 | 中铁第四勘察设计院集团有限公司 | One pile for one column structure without cushion cap |
-
2018
- 2018-03-30 CN CN201810298414.5A patent/CN108316290B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101294384A (en) * | 2008-07-01 | 2008-10-29 | 北京住总集团有限责任公司 | Pile, pole interface positioning device and construction method |
CN202416309U (en) * | 2011-12-28 | 2012-09-05 | 防城港中一重工有限公司 | Concrete pile steel casing for shallow sea and rivers |
CN203403402U (en) * | 2013-06-27 | 2014-01-22 | 上海三益建筑设计有限公司 | Upright pile |
CN205000328U (en) * | 2015-07-23 | 2016-01-27 | 中铁港航局集团有限公司 | Cast -in -place support aquatic steel reinforced concrete composite pile of cable -stay bridge concrete ballast tank roof beam |
CN106245627A (en) * | 2016-08-30 | 2016-12-21 | 中铁三局集团有限公司 | A kind of quick positioning construction method of steel pipe stanchion |
CN206829149U (en) * | 2017-04-20 | 2018-01-02 | 中南勘察设计院(湖北)有限责任公司 | A kind of stand column pile combining structure |
CN208072391U (en) * | 2018-03-30 | 2018-11-09 | 中铁第四勘察设计院集团有限公司 | One pile for one column structure without cushion cap |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110005135A (en) * | 2019-04-30 | 2019-07-12 | 广东铝遊家科技有限公司 | Multi-layered modular house support column connection structure and connection method |
CN111677285A (en) * | 2020-06-20 | 2020-09-18 | 中铁十九局集团第一工程有限公司 | Bridge pier column concrete conduit method pouring construction process |
CN113373964A (en) * | 2021-07-02 | 2021-09-10 | 中冀建勘集团有限公司 | Pile column continuous construction method in strong corrosion environment |
CN113605376A (en) * | 2021-07-02 | 2021-11-05 | 青建集团股份公司 | Novel steel pipe pile |
Also Published As
Publication number | Publication date |
---|---|
CN108316290B (en) | 2024-01-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108316290A (en) | One pile for one column structure without cushion cap and its construction method | |
CN101614125B (en) | Construction method of V-level surrounding rock tunnel | |
CN106837352A (en) | Fault belt surrounding rock tunnel construction method | |
CN107288357A (en) | In reverse construction steel pipe column plumbing device and utilize the device carry out pile integrated construction technique | |
CN104818991A (en) | Construction method of residual slope wash tunnel with shallow cover and unsymmetrical pressure | |
CN101280563B (en) | Pretensioned prestressing pipe pile construction method under weak expansion soil condition | |
CN106968139B (en) | The construction method of railway bed supporting in undercrossing tunnel jacking framed bridge jack-in process | |
CN109611102A (en) | Construction of the flyover method is worn under a kind of cold excavation | |
CN108547644A (en) | A kind of Tunnel Passing crushed zone canopy protection structure and method for protecting support | |
CN108442370A (en) | The broken pile connector processing method of prestressed concrete pipe pile | |
CN107503344A (en) | The construction method of turnover type merogenesis steel pile casting retaining wall manually digging hole filling pile | |
CN110258571A (en) | A kind of bored concrete pile pipe sinking pressure grouting construction method | |
CN113431039A (en) | Construction method of bridge implanted pile | |
CN206721870U (en) | A kind of long auger guncreting pile steel reinforcement cage | |
KR20090007826A (en) | Process of blocking water penetration and blocking earth collapsing by using impermeable wall without strut | |
CN106758759B (en) | A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed | |
CN114215090A (en) | Construction method of raft and compression pile in closed space | |
CN208072391U (en) | One pile for one column structure without cushion cap | |
CN107100164A (en) | A kind of long auger guncreting pile construction method | |
CN108086307A (en) | Compound mini pile is perfused in concrete filled steel tube borehole | |
CN205662920U (en) | Take secret assembled precast pile in anchor rope hole | |
CN110410082B (en) | Tunnel excavation advance support method | |
CN208330410U (en) | A kind of Tunnel Passing crushed zone canopy protection structure | |
CN111980017A (en) | Broken pile reinforcing structure and method for large-diameter cast-in-place pile | |
CN207017255U (en) | Mechanical pile system in hole |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |