CN108316290A - One pile for one column structure without cushion cap and its construction method - Google Patents

One pile for one column structure without cushion cap and its construction method Download PDF

Info

Publication number
CN108316290A
CN108316290A CN201810298414.5A CN201810298414A CN108316290A CN 108316290 A CN108316290 A CN 108316290A CN 201810298414 A CN201810298414 A CN 201810298414A CN 108316290 A CN108316290 A CN 108316290A
Authority
CN
China
Prior art keywords
steel
pile casting
column
pile
casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810298414.5A
Other languages
Chinese (zh)
Other versions
CN108316290B (en
Inventor
刘蒙
彭扬
倪文兵
陈紫妍
徐永浩
陈雨蒙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Southwest Survey and Design Co Ltd of China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Southwest Survey and Design Co Ltd of China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd, Southwest Survey and Design Co Ltd of China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201810298414.5A priority Critical patent/CN108316290B/en
Publication of CN108316290A publication Critical patent/CN108316290A/en
Application granted granted Critical
Publication of CN108316290B publication Critical patent/CN108316290B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds

Abstract

The present invention relates to a kind of one pile for one column structures of no cushion cap, including pile foundation, column and steel pile casting, steel pile casting partial insertion to below ground and the part side of resting on the ground, pile foundation, which pours, to be formed in steel pile casting, there is column outer steel pipe, outer steel pipe to be welded in steel pile casting top.Additionally relate to the construction method of the structure, including step:S1 squeezes into steel pile casting in the soil body to predetermined depth;S2 pours pile foundation in steel pile casting;S3 makes outer steel pipe and steel pile casting align, and carries out being welded to connect for outer steel pipe and steel pile casting.By the way of directly pouring pile foundation in steel pile casting, steel pile casting is shared with suspension column, need not extract steel pile casting, smaller to periphery soil disturbance;Steel pile casting and the welding of column steel outer tube do not have to excavate cushion cap on the basis of ensureing structural strength, smaller to surrounding soil disturbance, and defect that is larger to soil disturbance and needing expansion stake diameter is excavated efficiently against cushion cap existing in the prior art.

Description

One pile for one column structure without cushion cap and its construction method
Technical field
The invention belongs to construction engineering technical fields, are related to a kind of the one pile for one column structure and its construction method of no cushion cap, The newly-built reorganization and expansion of construction of structures to be protected is needed suitable for closing on Important building, historical relic's protection building, railway line, subway line etc. Engineering is also applied for other and needs to reduce engineering when constructing to soil disturbance.
Background technology
The suspension column way of steel column one pile for one column and to the longer pile making method of soil disturbance, at present there are mainly two types of mode, One is by the way of single pile cap, another kind is by the way of being inserted into pile crown in steel column, and pile is required for first transferring steel Casing.
1, by the way of single pile cap
Using the way of single pile cap, it is that steel pile casting is first descended to drill, steel pile casting is extracted after pile, then excavate around cushion cap The soil body, formwork pour cushion cap.2.5D must be reached since specification regulation steel column is inserted into cushion cap depth, D is steel column diameter or long side The length of side, cushion cap height are generally higher.Method of the verticality of steel column adjustment mode mainly by embedded column bolt below cushion cap at this time It is adjusted, cushion cap will pour at twice.The shortcomings that way, has:
1) cushion cap is higher, and cutting depth is deeper, and generally 2 to 3m.Excavation is deeper, larger to periphery soil disturbance;
2) be to meet the requirement of stake back gauge, cushion cap sectional dimension is larger, by taking 1m diameter stakes as an example, sectional dimension be 2m × 2m.It is larger to excavate range, it is larger to periphery soil disturbance;
3) it needs to cut larger pile crown, speed of application is slower;
4) it needs to extract steel pile casting, withdrawal process is big to soil disturbance.
2, the mode of pile crown is inserted into steel column
It is equally that steel pile casting, stake top is first descended to be poured using retarded concrete that the way of pile crown is inserted into steel column, then will weldering The shortcomings that steel column for connecing peg is inserted into stake top and adjusts verticality, this method has:
1) it needs stake diameter at least bigger 400mm than steel column long side, when steel column sectional dimension is larger, is not suitable for;
2) the larger requirement for causing to be not easy to meet 3 times of stake diameters as defined in specification with existing pile centre-to-centre spacing of stake diameter;
3) verticality of steel column Adjustment precision is poor, needs the measure of additional fixation steel column, such as ground fixed frame;
4) foundation pile concrete is not up to prescribed strength, and steel column must be just installed when being unsatisfactory for testing conditions, if pile detection Unqualified, steel column and foundation pile cancel together.
In conclusion needing construction to be protected for closing on Important building, historical relic's protection building, railway line, subway line etc. For building the newly-built reconstruction and extension project of object, there is disadvantage in currently used two kinds of pile base construction methods, use cushion cap when cushion cap It is unacceptable when protecting more demanding to excavate the disturbance to the soil body, needs stake enlarged-diameter when being inserted into pile crown in steel column, It is also unacceptable when distance is unsatisfactory for 3 times of stake diameters.
So needing construction of structures to be protected for closing on Important building, historical relic's protection building, railway line, subway line etc. Newly-built reconstruction and extension project for, find a kind of to periphery soil disturbance very little, of less demanding to stake diameter, column verticality being capable of essence The pile foundation construction and steel kind design way really adjusted is engineering problem to be solved in practice.
Invention content
The present embodiments relate to a kind of one pile for one column structure of no cushion cap and its construction methods, can at least solve existing skill The segmental defect of art.
The present embodiments relate to a kind of one pile for one column structures of no cushion cap, including pile foundation and column, further include steel pile casting, For the steel pile casting partial insertion to below ground and the part side of resting on the ground, the pile foundation, which pours, is formed in the steel pile casting Interior, there is the column outer steel pipe, the outer steel pipe to be welded in the steel pile casting top.
As one of embodiment, the outer steel pipe has the cross section of same shape and dimensions with the steel pile casting, The outer steel pipe is connect with the steel pile casting butt welding;
Alternatively, the outer steel pipe has the cross section of different shape and/or dimensions, the outer steel with the steel pile casting Pipe is welded to connect with the steel pile casting by switching node.
As one of embodiment, the steel pile casting top inner wall is equipped with inner cylinder, and the inner cylinder top stretches to the outer steel It offsets in pipe and with the outer steel pipe inner wall.
As one of embodiment, inner ring plate is welded in the outer steel pipe, the inner ring plate, which is held, to be taken in the inner cylinder top.
It is extremely less than in its top inner wall as one of embodiment, in the steel pile casting and multiple first shear studs is set.
As one of embodiment, the column is steel column, and multiple second shearing resistance bolts are provided in the steel column bottom interior wall It follows closely and in casting concrete in the steel column to cover each second shear stud.
The embodiment of the present invention further relates to the construction method of the one pile for one column structure without cushion cap as described above, including walks as follows Suddenly:
S1 squeezes into steel pile casting in the soil body to predetermined depth;
S2 pours pile foundation in the steel pile casting;
S3 makes the outer steel pipe and the steel pile casting align, and carries out being welded to connect for the outer steel pipe and the steel pile casting.
As one of embodiment, in S2, after the completion of pile foundation pours, picks scalpriform in stake top and pick raggle at concrete;
In S3, after the outer steel pipe is welded with the steel pile casting, the casting concrete in the outer steel pipe;Wherein, when When the column is steel core concrete column, overall length casting concrete in the outer steel pipe;When the column is steel column, described Multiple second shear studs are set in outer steel pipe bottom interior wall and the concrete in the outer steel pipe is made to cover each described second and are resisted Cut peg.
As one of embodiment, in S2, specifically include:
In the steel pile casting, stake holes is formed by mud off drilling machine, and clear up pile bottom sediment;
It transfers in steel reinforcement cage to stake holes and fixes, weld multiple first shearing resistance bolts in the steel pile casting using peg machine Nail;
Casting concrete stops the condition of perfusion to ensure in stake holes that all mud are overflowed out of described steel pile casting and from institute It states the concrete slurry overflowed in steel pile casting and is no less than 1 cubic metre.
As one of embodiment, in S3, it is respectively set on the steel pile casting outer wall and the outer steel pipe outer wall in advance more A otic placode adjusts the verticality of the outer steel pipe using otic placode.
The embodiment of the present invention at least has the advantages that:
(1) by the way of directly pouring pile foundation in steel pile casting, steel pile casting is shared with suspension column, need not extract steel shield Cylinder is smaller to periphery soil disturbance;
(2) connection that column and pile foundation are realized by the way of steel pile casting and the welding of column steel outer tube, is ensureing that structure is strong On the basis of degree, do not have to excavate cushion cap, it is smaller to surrounding soil disturbance, the degree ignored is can reach, efficiently against existing There is cushion cap present in technology to excavate defect that is larger to soil disturbance and needing to expand stake diameter.
Construction method provided by the invention, construction overall process are all made of ripe construction technology, and general applicability is preferable, entirely Each step quality is controllable in work progress.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the constructing structure schematic diagram of the one pile for one column structure of no cushion cap provided in an embodiment of the present invention;
Fig. 2 be Fig. 1 along the sectional view of A-A;
Fig. 3 is the enlarged structure schematic diagram of the parts I in Fig. 1.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other Embodiment shall fall within the protection scope of the present invention.
Such as Fig. 1-Fig. 3, the embodiment of the present invention provides a kind of one pile for one column structure of no cushion cap, including pile foundation 13,1 and of column Steel pile casting 2, pile foundation 13, which pours, to be formed in steel pile casting 2 namely 13 jacket hoop of pile foundation has a steel pile casting 2, and 2 part of the steel pile casting is inserted Enter to below ground and the part side of resting on the ground, there is the column 1 outer steel pipe 1, the outer steel pipe 1 to be welded in the steel shield 2 tops of cylinder.Wherein, the structural relation between above-mentioned pile foundation 13 and steel pile casting 2 is to squeeze into soil and excavate by steel pile casting 2 to be formed After stake holes, directly pile foundation 13 is poured in the steel pile casting 2;In this way, the confined effect between steel pile casting 2 and pile foundation 13 can be protected Demonstrate,prove pile foundation 13 and 2 common stress of steel pile casting when pile foundation 13 is pressurized.Above-mentioned column 1 can be steel column or steel core concrete column, be When steel column, above-mentioned outer steel pipe 1 is steel column itself, and when being steel core concrete column, above-mentioned outer steel pipe 1 is steel pipe.
One pile for one column structure provided in this embodiment, at least has the advantages that:
(1) by the way of directly pouring pile foundation 13 in steel pile casting 2, steel pile casting 2 is shared with suspension column, need not extract steel Casing 2 is smaller to periphery soil disturbance;
(2) connection that column 1 and pile foundation 13 are realized by the way of steel pile casting 2 and the welding of 1 steel outer tube of column, is ensureing to tie On the basis of structure intensity, do not have to excavate cushion cap, surrounding soil is disturbed smaller, can reach the degree ignored, effectively gram It takes cushion cap existing in the prior art and excavates defect that is larger to soil disturbance and needing to expand stake diameter.
Preferably due to which steel pile casting 2 is inserted directly into as permanent structure in the soil body, therefore the soil body at least is inserted into it In part carry out preservative treatment, namely include asepticised outer layer 17, to improve its service life;Further preferably to the steel 2 overall length of casing carries out preservative treatment.Wherein preferred anti-corrosion way is:Perform basic anti-corrosion bottom successively on 2 outer wall of steel pile casting Paint, intermediate coat and glass fibre erosion resistant coating;It is certainly not limited to the anticorrosion structure, those skilled in the art can be according to actual field The factors such as ground situation are adjusted.
In above-mentioned one pile for one column structure, with outer steel pipe 1 and steel pile casting 2 with the cross with same shape and dimensions Section is preferred, the outer steel pipe 1 and the steel pile casting 2 can directly butt welding connect.Steel pile casting 2 is generally pylindrical (certainly not Exclude other shapes), then for above-mentioned preferred embodiment, outer steel pipe 1 is also cylinder, and diameter and 2 diameter phase of steel pile casting Together.Certainly, 1 cross section of column may be rectangular or other shapes, for outer steel pipe 1 and steel pile casting 2 have different shape and/ Or dimensions cross section the case where, if outer steel pipe 1 is also cylindrical but diameter is different from steel pile casting 2 or outer steel pipe 1 is just Shape etc., the outer steel pipe 1 are welded to connect with the steel pile casting 2 by switching node;The switching node can be that square-section turns The node or minor diameter of circular cross-section are converted to the node etc. of major diameter, determines according to actual conditions, can be processed under line It is good, it is such as pre-welded to 1 bottom of outer steel pipe and is either integrally formed with outer steel pipe 1, then welded with steel pile casting 2;In other words, right In such case, column 1 includes the switching node being adapted to steel pile casting 2 positioned at 1 bottom of outer steel pipe.As it can be seen that the present embodiment carries The one pile for one column structure of confession is preferable for the adaptability in column section, and the larger-size operating mode of column cross-section can also be fitted With.
2 length of above-mentioned steel pile casting is protected the difference of the range of building, soil property situation etc. and is determined as needed, generally not Less than 3m.Preferably, the height that steel pile casting 2 bassets is 0.8~1.5m, further preferably exposes 1m, ensures that structure is strong Degree and convenient working.In addition, such as Fig. 1,2 bottom end groove processing 11 of steel pile casting, to facilitate steel pile casting 2 to squeeze into soil layer.
In above-described embodiment, steel pile casting 2 is welded and fixed with outer steel pipe 1, also serves as 1 suspension column of column, it should be apparent that, steel shield Since section does not weaken between cylinder 2 and column 1, the two is to wait strong ties, thus meet requirement of the related specifications to suspension column.
It is further preferred that such as Fig. 1,2 top inner wall of the steel pile casting is equipped with inner cylinder 3, and 3 top of the inner cylinder stretches to institute It states in outer steel pipe 1 and offsets with 1 inner wall of the outer steel pipe.The inner cylinder 3 is preferably welded on steel pile casting 2, in work progress In, outer steel pipe 1 is inserted in the inner cylinder 3, which can offset with steel column/switching node inner wall, can be used in installation outer steel pipe 1 Shi Jinhang is radially limited temporarily, and convenient for the contraposition and construction between outer steel pipe 1 and steel pile casting 2, on the other hand, the inner cylinder 3 is also It can be used as weld seam baffle when outer steel pipe 1 and steel pile casting 2 are welded.
It is further preferred that such as Fig. 1, it is welded with inner ring plate 8 in the outer steel pipe 1, the inner ring plate 8, which is held, to be taken in described interior 3 tops of cylinder.It is easy-to-understand to, which is annular plate, and in-between Kong Kerong concrete passes through, when column 1 is mixed for steel pipe When solidifying earth pillar, the interstitial hole of the inner ring plate 8 answer it is larger, convenient for pouring for concrete;Its plate face be horizontal direction, preferably with it is outer Steel pipe 1 is coaxially disposed, and is preferably welded in inside outer steel pipe 1 using fillet weld or groove weld.The effect packet of the inner ring plate 8 It includes:It can coordinate with above-mentioned inner cylinder 3, and when installing outer steel pipe 1, which can hold temporarily rides over 3 top of inner cylinder, can be external Steel pipe 1 carries out interim axial limiting, convenient for the contraposition and construction between outer steel pipe 1 and steel pile casting 2;On the other hand, in outer steel When pipe 1 is welded with steel pile casting 2, the structural strain's of outer steel pipe 1 can be limited, to improve connection essence of the outer steel pipe 1 with steel pile casting 2 Degree.
The preferred structure of one pile for one column structure as no cushion cap provided in this embodiment, such as Fig. 1 and Fig. 2, the steel shield It is extremely less than in its top inner wall in cylinder 2 and multiple first shear studs 10 is set.Steel pile casting 2 and 13 concrete of pile foundation poured in it Between confined effect both can ensure that cooperative bearing can by the way that the first shear stud 10 is further arranged in steel pile casting 2 To further increase the effect of common stress therebetween.Obviously, the quantity of the first shear stud 10 is more, and effect is better;From Each first shear stud 10 can be arranged within the scope of the downward 1m in 2 top of steel pile casting in angle easy for construction;Preferably, such as Fig. 2, Designed in a manner of multi-turn shearing resistance layer from top to bottom, often enclose shearing resistance layer include circumferentially be circular layout along 2 inner wall of steel pile casting it is multiple First shear stud 10, the cooperative bearing between steel pile casting 2 and concrete are better.
Similarly, multiple second shear studs 9 are preferably set on 1 inner wall of outer steel pipe, can similarly be obtained above-mentioned Technique effect;The set-up mode of second shear stud 9 uses for reference the set-up mode of above-mentioned first shear stud 10.For column 1 For steel core concrete column the case where, can on 1 inner wall of outer steel pipe overall length be arranged the second shear stud 9, also can be only at 1 bottom of outer steel pipe Second shear stud 9 is set within the scope of the above 1m in portion;The case where being steel column for column 1, it can be not provided with the second shear stud 9, Second shear stud 9, and casting concrete in the range of the second shear stud 9 are arranged preferably are set, can be improved column 1 with The intensity and reliability of 13 connection structure of pile foundation.
The embodiment of the present invention further relates to the construction method of the one pile for one column structure without cushion cap as described above, including walks as follows Suddenly:
S1 squeezes into steel pile casting 2 in the soil body to predetermined depth;
S2 pours pile foundation 13 in the steel pile casting 2;
S3 makes the outer steel pipe 1 be aligned with the steel pile casting 2, carries out the welding of the outer steel pipe 1 and the steel pile casting 2 Connection.
Wherein:
In S1, if Fig. 1 is equipped with impact platform for ease of construction on 2 outer wall of steel pile casting, impact is installed on impact platform Cylinder 7, for completing to squeeze into the operation of steel pile casting 2 and ensureing that steel pile casting 2 is indeformable.The impact platform includes impact deck plate 4 and hits Platform ribbed stiffener 5 is beaten, impact deck plate 4 is horizontally mounted and welds (preferably twin fillet wolt welding), impact with 2 outer wall of steel pile casting Platform ribbed stiffener 5 welds (preferably twin fillet wolt welding) with 2 outer wall of steel pile casting and impact deck plate 4 respectively;Such as Fig. 2, this hits It is annular panel to play deck plate 4 to be preferably, around steel pile casting 2 outer wall installation;It is to be welded to impact deck plate to strike cylinder 7 to be preferably It on 4, is coaxially disposed with steel pile casting 2, and diameter is more than 2 diameter of steel pile casting.Above-mentioned impact platform can uniformly pass the power for striking cylinder 7 Steel pile casting 2 is passed, prevents steel pile casting 2 from deforming and influencing the subsequently welding precision with outer steel pipe 1.Specifically, above-mentioned impact table top Plate 4, impact platform ribbed stiffener 5 and inner cylinder 3 are preferably to be pre-installed on steel pile casting 2 under line;Pacify behind live accurate setting-out stake position Steel pile casting 2 is squeezed into the soil body to predetermined depth by dress impact cylinder 7, and when construction should control 2 horizontal position of steel pile casting and gradient.
Above-mentioned pile foundation 13 includes steel reinforcement cage and concrete, and steel reinforcement cage is preferably scene processing;In S2, following step is specifically included Suddenly:
(1) after squeezing into steel pile casting 2, in steel pile casting 2, stake holes is formed by mud off drilling machine, and it is heavy to clear up a bottom Slag, work progress are controlled according to related specifications;
(2) it transfers in steel reinforcement cage to stake holes and fixes, steel reinforcement cage stake top absolute altitude is preferably concordant with ground line 18;Use bolt Nailing machine should make in interior multiple first shear studs 10 of welding of the steel pile casting 2, welding and reliably trample platform temporarily;
(3) casting concrete, the condition for stopping perfusion be ensure in stake holes all mud overflowed out of the steel pile casting 2 and The concrete slurry overflowed in from the steel pile casting 2 is no less than 1 cubic metre, to ensure pile crown concrete pouring quality.
It is further preferred that concrete carries out sound detection integrity detection, inspection after reaching intensity 80% to pile concrete After surveying qualification, picks scalpriform in stake top (showing the stake top 14 before not picking chisel in Fig. 1) and pick raggle 15 at concrete, dabbing simultaneously applies Brush concrete interface agent can be improved column 1 and the connection structure of pile foundation 13 be strong convenient for the concreting in subsequent column 1 Degree.Such as Fig. 1, it is inversed taper platform shape that above-mentioned concrete, which picks raggle 15 to be preferably, better.
In S3, above-mentioned inner ring plate 8, second shear stud 9 etc. are installed in outer steel pipe 1 under preferably advance line;Online In lower factory, preassembling preferably is carried out to outer steel pipe 1 and steel pile casting 2, to ensure in-site installation no problem.Outer steel pipe 1 and steel It is preferably full penetration groove weld 12 between casing 2, weld seam grade is not less than two level, can be detected by ultrasonic examination, ensures 12 mass of weld seam can carry out weld seam repairing when detecting a flaw unqualified.Preferably, in advance in 2 outer wall of the steel pile casting and described outer Multiple otic placodes 6 are respectively set on 1 outer wall of steel pipe, the verticality of the outer steel pipe 1 is adjusted using otic placode 6;Pass through above-mentioned inner cylinder 3, inner ring plate 8 and otic placode 6, accurately adjust position, the verticality etc. of outer steel pipe 1, and realization steel pile casting 2 is accurate with outer steel pipe 1 Contraposition ensures quality of connection, after the completion of adjustment, tightens the bolt of otic placode 6 to fix outer steel pipe 1, can be carried out after retest-ok outer (when welding the first shear stud 10 in S2, the otic placode 6 on the steel pile casting 2 also can be used for welding between steel pipe 1 and steel pile casting 2 In fastening the safety belt).After the completion of outer steel pipe 1 and steel pile casting 2 are welded, each otic placode 6 and above-mentioned impact deck plate 4 and impact are cut off Platform ribbed stiffener 5.It is common method in structural steelwork to adjust verticality by otic placode 6, is not repeated herein.
Further, after the outer steel pipe 1 is welded with the steel pile casting 2, the casting concrete in the outer steel pipe 1; Wherein, when the column 1 is steel core concrete column, overall length casting concrete in the outer steel pipe 1;When the column 1 is steel When column, multiple second shear studs 9 are set in 1 bottom interior wall of the outer steel pipe and the concrete in the outer steel pipe 1 is made to cover Cover each second shear stud 9.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention With within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention god.

Claims (10)

1. a kind of one pile for one column structure of no cushion cap, including pile foundation and column, it is characterised in that:Further include steel pile casting, the steel To below ground and the part side of resting on the ground, the pile foundation pours to be formed in the steel pile casting casing partial insertion, described There is column outer steel pipe, the outer steel pipe to be welded in the steel pile casting top.
2. the one pile for one column structure without cushion cap as described in claim 1, it is characterised in that:The outer steel pipe and the steel pile casting Cross section with same shape and dimensions, the outer steel pipe are connect with the steel pile casting butt welding;
Alternatively, the outer steel pipe and the steel pile casting have a cross section of different shape and/or dimensions, the outer steel pipe with The steel pile casting is welded to connect by switching node.
3. the one pile for one column structure without cushion cap as described in claim 1, it is characterised in that:The steel pile casting top inner wall is equipped with Inner cylinder, the inner cylinder top stretch in the outer steel pipe and offset with the outer steel pipe inner wall.
4. the one pile for one column structure without cushion cap as claimed in claim 3, it is characterised in that:It is welded with inner ring in the outer steel pipe Plate, the inner ring plate, which is held, to be taken in the inner cylinder top.
5. the one pile for one column structure without cushion cap as described in claim 1, it is characterised in that:To less than its top in the steel pile casting Multiple first shear studs are set on portion's inner wall.
6. the one pile for one column structure without cushion cap as described in claim 1, it is characterised in that:The column is steel column, the steel It is provided with multiple second shear studs on the inner wall of column bottom and is resisted with covering each described second in casting concrete in the steel column Cut peg.
7. the construction method of the one pile for one column structure such as no cushion cap according to any one of claims 1 to 6, which is characterized in that Include the following steps:
S1 squeezes into steel pile casting in the soil body to predetermined depth;
S2 pours pile foundation in the steel pile casting;
S3 makes the outer steel pipe and the steel pile casting align, and carries out being welded to connect for the outer steel pipe and the steel pile casting.
8. construction method as claimed in claim 7, it is characterised in that:In S2, after the completion of pile foundation pours, stake top pick scalpriform at Concrete picks raggle;
In S3, after the outer steel pipe is welded with the steel pile casting, the casting concrete in the outer steel pipe;Wherein, when described When column is steel core concrete column, overall length casting concrete in the outer steel pipe;When the column is steel column, in the outer steel Multiple second shear studs are set on bottom of the tube inner wall and the concrete in the outer steel pipe is made to cover each second shearing resistance bolt Nail.
9. construction method as claimed in claim 7 or 8, which is characterized in that in S2, specifically include:
In the steel pile casting, stake holes is formed by mud off drilling machine, and clear up pile bottom sediment;
It transfers in steel reinforcement cage to stake holes and fixes, weld multiple first shear studs in the steel pile casting using peg machine;
Casting concrete, the condition for stopping perfusion are to ensure in stake holes that all mud are overflowed out of described steel pile casting and from the steel The concrete slurry overflowed in casing is no less than 1 cubic metre.
10. construction method as claimed in claim 7, it is characterised in that:In S3, in advance in the steel pile casting outer wall and described outer Multiple otic placodes are respectively set on outer wall of steel pipe, the verticality of the outer steel pipe is adjusted using otic placode.
CN201810298414.5A 2018-03-30 2018-03-30 One-column one-pile structure without bearing platform and construction method thereof Active CN108316290B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810298414.5A CN108316290B (en) 2018-03-30 2018-03-30 One-column one-pile structure without bearing platform and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810298414.5A CN108316290B (en) 2018-03-30 2018-03-30 One-column one-pile structure without bearing platform and construction method thereof

Publications (2)

Publication Number Publication Date
CN108316290A true CN108316290A (en) 2018-07-24
CN108316290B CN108316290B (en) 2024-01-23

Family

ID=62896607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810298414.5A Active CN108316290B (en) 2018-03-30 2018-03-30 One-column one-pile structure without bearing platform and construction method thereof

Country Status (1)

Country Link
CN (1) CN108316290B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110005135A (en) * 2019-04-30 2019-07-12 广东铝遊家科技有限公司 Multi-layered modular house support column connection structure and connection method
CN111677285A (en) * 2020-06-20 2020-09-18 中铁十九局集团第一工程有限公司 Bridge pier column concrete conduit method pouring construction process
CN113373964A (en) * 2021-07-02 2021-09-10 中冀建勘集团有限公司 Pile column continuous construction method in strong corrosion environment
CN113605376A (en) * 2021-07-02 2021-11-05 青建集团股份公司 Novel steel pipe pile

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101294384A (en) * 2008-07-01 2008-10-29 北京住总集团有限责任公司 Pile, pole interface positioning device and construction method
CN202416309U (en) * 2011-12-28 2012-09-05 防城港中一重工有限公司 Concrete pile steel casing for shallow sea and rivers
CN203403402U (en) * 2013-06-27 2014-01-22 上海三益建筑设计有限公司 Upright pile
CN205000328U (en) * 2015-07-23 2016-01-27 中铁港航局集团有限公司 Cast -in -place support aquatic steel reinforced concrete composite pile of cable -stay bridge concrete ballast tank roof beam
CN106245627A (en) * 2016-08-30 2016-12-21 中铁三局集团有限公司 A kind of quick positioning construction method of steel pipe stanchion
CN206829149U (en) * 2017-04-20 2018-01-02 中南勘察设计院(湖北)有限责任公司 A kind of stand column pile combining structure
CN208072391U (en) * 2018-03-30 2018-11-09 中铁第四勘察设计院集团有限公司 One pile for one column structure without cushion cap

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101294384A (en) * 2008-07-01 2008-10-29 北京住总集团有限责任公司 Pile, pole interface positioning device and construction method
CN202416309U (en) * 2011-12-28 2012-09-05 防城港中一重工有限公司 Concrete pile steel casing for shallow sea and rivers
CN203403402U (en) * 2013-06-27 2014-01-22 上海三益建筑设计有限公司 Upright pile
CN205000328U (en) * 2015-07-23 2016-01-27 中铁港航局集团有限公司 Cast -in -place support aquatic steel reinforced concrete composite pile of cable -stay bridge concrete ballast tank roof beam
CN106245627A (en) * 2016-08-30 2016-12-21 中铁三局集团有限公司 A kind of quick positioning construction method of steel pipe stanchion
CN206829149U (en) * 2017-04-20 2018-01-02 中南勘察设计院(湖北)有限责任公司 A kind of stand column pile combining structure
CN208072391U (en) * 2018-03-30 2018-11-09 中铁第四勘察设计院集团有限公司 One pile for one column structure without cushion cap

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110005135A (en) * 2019-04-30 2019-07-12 广东铝遊家科技有限公司 Multi-layered modular house support column connection structure and connection method
CN111677285A (en) * 2020-06-20 2020-09-18 中铁十九局集团第一工程有限公司 Bridge pier column concrete conduit method pouring construction process
CN113373964A (en) * 2021-07-02 2021-09-10 中冀建勘集团有限公司 Pile column continuous construction method in strong corrosion environment
CN113605376A (en) * 2021-07-02 2021-11-05 青建集团股份公司 Novel steel pipe pile

Also Published As

Publication number Publication date
CN108316290B (en) 2024-01-23

Similar Documents

Publication Publication Date Title
CN108316290A (en) One pile for one column structure without cushion cap and its construction method
CN101614125B (en) Construction method of V-level surrounding rock tunnel
CN106837352A (en) Fault belt surrounding rock tunnel construction method
CN107288357A (en) In reverse construction steel pipe column plumbing device and utilize the device carry out pile integrated construction technique
CN104818991A (en) Construction method of residual slope wash tunnel with shallow cover and unsymmetrical pressure
CN101280563B (en) Pretensioned prestressing pipe pile construction method under weak expansion soil condition
CN106968139B (en) The construction method of railway bed supporting in undercrossing tunnel jacking framed bridge jack-in process
CN109611102A (en) Construction of the flyover method is worn under a kind of cold excavation
CN108547644A (en) A kind of Tunnel Passing crushed zone canopy protection structure and method for protecting support
CN108442370A (en) The broken pile connector processing method of prestressed concrete pipe pile
CN107503344A (en) The construction method of turnover type merogenesis steel pile casting retaining wall manually digging hole filling pile
CN110258571A (en) A kind of bored concrete pile pipe sinking pressure grouting construction method
CN113431039A (en) Construction method of bridge implanted pile
CN206721870U (en) A kind of long auger guncreting pile steel reinforcement cage
KR20090007826A (en) Process of blocking water penetration and blocking earth collapsing by using impermeable wall without strut
CN106758759B (en) A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN114215090A (en) Construction method of raft and compression pile in closed space
CN208072391U (en) One pile for one column structure without cushion cap
CN107100164A (en) A kind of long auger guncreting pile construction method
CN108086307A (en) Compound mini pile is perfused in concrete filled steel tube borehole
CN205662920U (en) Take secret assembled precast pile in anchor rope hole
CN110410082B (en) Tunnel excavation advance support method
CN208330410U (en) A kind of Tunnel Passing crushed zone canopy protection structure
CN111980017A (en) Broken pile reinforcing structure and method for large-diameter cast-in-place pile
CN207017255U (en) Mechanical pile system in hole

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant