CN109853093A - The quick feeding system of drawing frame and its method of feeding - Google Patents

The quick feeding system of drawing frame and its method of feeding Download PDF

Info

Publication number
CN109853093A
CN109853093A CN201910280492.7A CN201910280492A CN109853093A CN 109853093 A CN109853093 A CN 109853093A CN 201910280492 A CN201910280492 A CN 201910280492A CN 109853093 A CN109853093 A CN 109853093A
Authority
CN
China
Prior art keywords
pipeline
shuttle
bucket
drawing frame
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910280492.7A
Other languages
Chinese (zh)
Other versions
CN109853093B (en
Inventor
万由顺
桂长明
杨华明
王勇
杨立家
闫循斌
金宏健
饶金海
武名虎
万英和
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Yu Dahua Textile Clothing Group Co Ltd
Original Assignee
Wuhan Yu Dahua Textile Clothing Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Yu Dahua Textile Clothing Group Co Ltd filed Critical Wuhan Yu Dahua Textile Clothing Group Co Ltd
Publication of CN109853093A publication Critical patent/CN109853093A/en
Application granted granted Critical
Publication of CN109853093B publication Critical patent/CN109853093B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention provides a kind of quick feeding system of drawing frame, including shuttle, track, feed pipeline, shuttle can be mobile in track rear and front end, second pipeline equipment of the first pipeline equipment and rear end including front end, the feed pipeline parallel with shuttle is provided on the left of track, for completely filling item bucket to the conveying of the pipeline equipment of shuttle and being transported away the hollow bar bucket of pipeline equipment, drawing frame is provided on the right side of track, it is transported by the way that the sliver of the full dress item bucket in pipeline equipment is attached to small item bucket, two groups of pipeline equipment work alternatively.The present invention realizes cotton spinning production automation, reduces the dependence to labour, reduces labor intensity, increases production efficiency, to realize cotton spinning production automation, reduces product cost, increases economic benefit.

Description

The quick feeding system of drawing frame and its method of feeding
Technical field
The present invention relates to a kind of shop logistics systems of cotton spinning production, more particularly, to a kind of quick feeding system of drawing frame And its method of feeding.
Background technique
The sliver in item bucket to drawing frame when being fed at present, generally by manual operation.Mode of operation is mostly artificial Feed, is provided below wheel in item bucket, after sliver fills item bucket, pushes item bucket to be fed to drawing frame by people.So It does, large labor intensity, and low efficiency.
Summary of the invention
The present invention provides a kind of quick feeding system of drawing frame and its methods of feeding, solve item bucket and are fed to drawing frame Automation issues, it is described that its technical solution is as follows:
A kind of quick feeding system of drawing frame, including shuttle, track, feed pipeline, shuttle can be before track Both ends are mobile afterwards, and the first pipeline equipment and rear end the second pipeline equipment including front end are provided with and are worn on the left of track The parallel feed pipeline of shuttle car, for completely filling item bucket to the conveying of the pipeline equipment of shuttle and by the hollow bar of pipeline equipment Bucket is transported away, and drawing frame is provided on the right side of track, and drawing frame carries out drafting using the raw material in item bucket full in pipeline equipment, Small item bucket is packed into after drafting, two groups of pipeline equipment work alternatively.
Shuttle includes car body, wheel, anticollision device, collision-prevention device, is equipped with wheel in the lower end of car body, wheel on car body by pacifying The motor driven of dress;The rear and front end of car body is equipped with anticollision device, collision-prevention device, and the rear and front end of track is provided with limit pillar, anticollision dress It sets through limit pillar limit, issues signal to motor, and then stop the movement of car body.
Pipeline equipment is equipped with conveying device, and conveying device uses one or more pipeline.
When item bucket in pipeline equipment can be realized snakelike into and out, conveying device uses a snakelike conveying Line.
Feed pipeline is provided with three transfer pipelines, including two hollow bar bucket pipelines, and one completely fills item bucket pipeline, Two hollow bar bucket pipelines are located at the two sides for completely filling item bucket pipeline.
When being fed pipeline using a transfer pipeline, the hollow bar bucket of corresponding transfer pipeline unloads cylinder conveying line interface and full item Barreled bucket conveys the public interface of line interface, and mechanical assist device is equipped on transfer pipeline.
Mechanical assist device uses baffle, and conveying device is arranged with pipeline, every strip transmission line pair in every a line item bucket Answer a baffle.
Anticollision device, collision-prevention device is provided with pressure sensor, whether reaches limit pillar by pressure sensor induction.
A kind of method of feeding of the quick feeding system of drawing frame, comprising the following steps:
(1) shuttle is disposed with two groups of pipeline equipment, and the first pipeline equipment and rear end second including front end convey Line equipment, two groups of pipeline equipment work alternatively, and every group of pipeline equipment is provided with individual conveying device;
(2) when shuttle is moved to track front end, the second pipeline group is located at drawing frame for discharge position, can supply for drawing frame Material, at this time on shuttle the first pipeline group hollow bar bucket by hollow bar bucket unload cylinder conveying line interface unloaded automatically from shuttle Under, it transports, line interface is then conveyed shuttle on full barreled by full barreled bucket, is waited to be fed;
(3) after the sliver of the full item bucket of the second pipeline group is finished on shuttle, shuttle is moved to track rear end, shuttles The first pipeline group on vehicle is located at drawing frame for discharge position, can be fed for drawing frame, the sky of the second pipeline group on shuttle Item bucket unloads cylinder conveying line interface by hollow bar bucket and unloads automatically from shuttle, transports, then passes through full barreled bucket pipeline Interface waits shuttle on full barreled to be fed;
(4) circulation is completed, above step (2), (3) are repeated.
Every group of pipeline equipment is provided with counter, the loading and Quantity Landed for record strip bucket.
The present invention realizes cotton spinning production automation, reduces the dependence to labour, reduces labor intensity, increases production effect Rate reduces product cost to realize cotton spinning production automation, increases economic benefit.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the quick feeding system of the drawing frame;
Fig. 2 is the side view of Fig. 1;
Fig. 3 is the top view of Fig. 1;
Fig. 4 is the first operating position schematic diagram of the quick feeding system of the drawing frame;
Fig. 5 is the first loading working method schematic diagram of Fig. 4;
Fig. 6 is second of loading working method schematic diagram of Fig. 4;
Fig. 7 is the second operating position schematic diagram of the quick feeding system of the drawing frame;
Fig. 8 is the first loading working method schematic diagram of Fig. 7;
Fig. 9 is second of loading working method schematic diagram of Fig. 7;
Figure 10 is the schematic diagram of infrared alignment;
Figure 11 is snakelike transport diagram;
Figure 12 is linear type transport diagram.
Specific embodiment
The quick feeding system of drawing frame includes shuttle, track, and shuttle can be mobile in track rear and front end.? The feed pipeline parallel with shuttle is provided on the left of track, for completely filling item bucket to shuttle conveying and by the sky of shuttle Item bucket is transported away.Drawing frame is provided on the right side of track, drawing frame is carried out simultaneously using the raw material in item bucket full in pipeline equipment Item, small item bucket is packed into after drafting, and small item bucket is transported by the discharging transmission line that drawing frame goes out.
As shown in Figure 1, track 1 is erected on ground 100, shuttle includes car body 3, wheel 4, conveying device 6, anticollision dress Set 5.
Wheel 4 is installed in the lower end of car body 3, wheel 4 is mobile by the motor control being mounted on car body 3, so that wearing Shuttle car can be mobile in track rear and front end.
Limit pillar 2 is installed in the rear and front end of track, for limiting the moving range of shuttle.Before car body 3 Both ends are fitted with anticollision device, collision-prevention device 5 afterwards, when anticollision device, collision-prevention device 5 touches limit pillar 2, then stop shuttle.
The anticollision device, collision-prevention device 5 includes first pressure sensor and spring, and on the car body, the other end connects for one end installation of spring It is connected to first pressure sensor, first pressure sensor is connected to the motor by control device and is connect, and is connect in first pressure sensor When contacting limit pillar 2, by limiting the effect of pillar 2 and spring, control device is provided signals to, control device controls motor Stopping or deceleration.
When in order to the guarantee work and position of drawing frame can be equipped in the middle part of spring and be fixed on car body 3 to just Bumping post, the front end of bumping post is equipped with second pressure sensor, when bumping post and limit pillar 2 contact, is supplied to the Two signals of pressure sensor one, second pressure sensor are connected with control device, and control device controls the stopping of motor.
Control device uses PC machine, single-chip microcontroller or other data processing chips.
Or can be by the way of infrared alignment, such as shown in Figure 10, shuttle is in track front end to positive drawing frame When, it is mounted below infrared transmitter 30 in the front end of shuttle car body, in the position of the corresponding track front end of infrared transmitter 30 It sets and infrared remote receiver 31 is installed, when shuttle is run along track forward end, after first pressure sensor provides signal, shuttle Vehicle slowly runs advance, and when the infrared light that infrared transmitter 30 emits reaches infrared remote receiver 31, then infrared remote receiver 31 mentions One stop signal of apparatus for controlling of supply, control device control the stopping of motor, at this point, shuttle is just in track front end and simultaneously The operating position alignment of machine.Similarly, when shuttle is when track rear end is to positive drawing frame, below the rear end of shuttle car body Infrared transmitter is installed, infrared remote receiver is installed in the position of the corresponding track rear end of infrared transmitter, works as infrared emission When the infrared light of device transmitting reaches infrared remote receiver, then infrared remote receiver is supplied to one stop signal of control device, control dress Set the stopping of control motor.
Conveying device 6 is installed, conveying device 6 transports phase for receiving full dress item bucket and will completely fill item bucket on car body 3 Position is answered, or for transporting hollow bar bucket.
As shown in Figures 2 and 3, the conveying, discharge of the layout and conveying device 6 of the item bucket 7 on car body 3 are related.
As shown in figure 4, being disposed with two groups of pipeline equipment on shuttle, two groups of pipeline equipment are worked alternatively, in this reality It applies in example, two groups of pipeline device structures are identical, and every group of pipeline equipment is provided with individual conveying device 6.
Shuttle 200 is movable in the working region of track 15, when shuttle 200 is moved to track rear end, shuttle The the first pipeline equipment 9 and drawing frame 10 of 200 front ends are aligned, and drawing frame 10 works, by the full dress item of the first pipeline equipment 9 The sliver of bucket is attached to small item bucket, while the second pipeline equipment 8 of 200 rear end of shuttle unloads cylinder by hollow bar bucket and conveys line interface 14 transport hollow bar bucket, while conveying line interface 13 by full barreled bucket and being fully loaded with item bucket.
Similarly, as shown in fig. 7, when shuttle 200 is moved to track front end, the second pipeline of 200 rear end of shuttle Equipment 8 and drawing frame 10 are aligned, and drawing frame 10 works, and the sliver of the full dress item bucket of the second pipeline equipment 8 is attached to small item bucket, The first pipeline equipment 9 of 200 front end of shuttle unloads cylinder conveying line interface 11 by hollow bar bucket and transports hollow bar bucket simultaneously, simultaneously Line interface 12, which is conveyed, by full barreled bucket is fully loaded with item bucket.
Cylinder conveying line interface feed pipeline corresponding with full barreled bucket conveying line interface is unloaded in specific arrangement hollow bar bucket When 300, as shown in Figure 5 and Figure 8, first method is three transfer pipelines of design, including two hollow bar bucket pipelines, and one full Item bucket pipeline is filled, two hollow bar bucket pipelines are located at the two sides for completely filling item bucket pipeline, are divided into the first hollow bar bucket in the inner part Pipeline 22, the second hollow bar bucket pipeline 20 in the outer part, and intermediate full dress item bucket pipeline 21.
In Fig. 5, completely full dress item bucket 17 is transported to the second pipeline equipment 8 by dress item bucket pipeline 21, and defeated by second Hollow bar bucket 16 in line sending equipment 8 is transported.Drawing frame 10 works, and the empty small item bucket 19 shipped on pipeline is filled, is being filled Man Hou, pipeline transport the small item bucket 18 filled.
In fig. 8, it completely fills item bucket pipeline 21 and full dress item bucket 17 is transported to the first pipeline equipment 9, and is defeated by first Hollow bar bucket 16 in line sending equipment 9 is transported.Drawing frame 10 works, and the empty small item bucket 19 shipped on pipeline is filled, is being filled Man Hou, pipeline transport the small item bucket 18 filled.
By designing above, it is seen then that two groups of pipeline equipment being arranged on shuttle, when shuttle is moved to track front end When, the second pipeline equipment 8 is located at drawing frame and is fed 10 positions, can be fed for drawing frame 10, the first conveying on shuttle at this time The hollow bar bucket of line equipment 9 unloads cylinder conveying line interface by hollow bar bucket and unloads automatically from shuttle, transports, then passes through full item bucket Barrelling conveys line interface shuttle on full barreled, waits to be fed.The full item bucket of second pipeline equipment 8 on shuttle After sliver is finished, shuttle is moved to track rear end, and the first pipeline equipment 9 on shuttle is located at drawing frame for material position at this time Set, can be fed for drawing frame 10, on shuttle the hollow bar bucket of the second pipeline equipment 8 by hollow bar bucket unload cylinder conveying line interface from It unloads, transports automatically on shuttle, line interface is then conveyed shuttle on full barreled by full barreled bucket, waits and supplying Material.Complete a circulation.
It is fed pipeline 300 and needs three transfer pipelines, if be changed to a transfer pipeline, hollow bar bucket unloads a pipeline Interface and full barreled bucket conveying line interface can be with a public interfaces.As shown in Fig. 6 and Fig. 9, an only transfer pipeline 23, At this point, item bucket is moved by mechanical assist device, realize the simplification of transfer pipeline.
For conveying device 6, in conjunction with mechanical assist device, how to realize that the position of item bucket is mobile, as shown in figure 11, defeated Item bucket in line sending equipment can be snakelike entrance and when unloading, then correspond to snakelike arrow direction of advance setting conveying device 6, Conveying device 6 can according to circumstances realize positive conveying or reversed conveying using the pipeline for realizing direction of advance.The design energy Enough realize the traffic program of three transfer pipelines.
It, can be each by pipeline equipment when the item bucket in pipeline equipment can not realize snakelike entrance and unload Capable item bucket uses an individual pipeline, and as shown in figure 12, conveying device 6 includes three conveyings below three row item buckets Line, every strip transmission line work independently, and mechanical assist device is equipped at transfer pipeline 23, and mechanical assist device is provided with corresponding every The first baffle 40 of strip transmission line, second baffle 41, third baffle 42, when unloading hollow bar bucket, three strip transmission lines are all by hollow bar Bucket is discharged on transfer pipeline 23, and then completely dress item bucket transports at first baffle 40, and first baffle is opened, so that completely dress barreled Upper corresponding pipeline, pipeline work at the same time, and until the pipeline is filled, then first baffle 40 is closed;Second baffle 41 Work, until corresponding pipeline is filled;Then third baffle 42 is opened, until corresponding pipeline is filled.The design can Realize the design scheme of Fig. 6 and Fig. 9.
Motor, conveying device 6, the feed pipeline 300 of shuttle are all connected with control device, pass through pressure sensing Device, counter etc. realize function described above.Control device is connected with various sensors, counter, is realized and is controlled using PC machine System.
Usually it can determine that transportation scheme realizes conveying function according to reasons such as place situations.
The method of feeding of the quick feeding system of specific drawing frame, comprising the following steps:
1, shuttle is disposed with two groups of pipeline equipment, the second pipeline of the first pipeline equipment and rear end including front end Equipment, two groups of pipeline equipment work alternatively, and every group of pipeline equipment is provided with individual conveying device;
2, when shuttle is moved to track front end, it can be drafting that the second pipeline equipment 8, which is located at drawing frame and is fed 10 positions, Machine 10 is fed, and the hollow bar bucket of the first pipeline equipment 9 unloads cylinder by hollow bar bucket and conveys line interface from shuttle on shuttle at this time On unload automatically, transport, line interface then conveyed shuttle on full barreled by full barreled bucket, is waited to be fed;
3, after the sliver of the full item bucket of the second pipeline equipment 8 is finished on shuttle, shuttle is moved to track rear end, wears The first pipeline equipment 9 on shuttle car is located at drawing frame for discharge position, can be fed for drawing frame 10, the second pipeline on shuttle The hollow bar bucket of equipment 8 unloads cylinder conveying line interface by hollow bar bucket and unloads automatically from shuttle, transports, then passes through full barreled Bucket conveying line interface waits shuttle on full barreled to be fed;
4, a circulation is completed, step 2,3 are repeated.
When realizing the method for the invention, when every subsystem starts and stops, working condition is retained in control device.
The present invention is almost not necessarily to labour, and the labour for greatly reducing cotton spinning production relies on, and improves production efficiency, drops Low cost, increases product economy benefit.

Claims (10)

1. a kind of quick feeding system of drawing frame, it is characterised in that: including shuttle, track, feed pipeline, shuttle can Mobile in track rear and front end, the first pipeline equipment and rear end the second pipeline equipment including front end are set on the left of track It is equipped with the feed pipeline parallel with shuttle, for completely filling item bucket to the conveying of the pipeline equipment of shuttle and setting pipeline Standby hollow bar bucket is transported away, and drawing frame is provided on the right side of track, and drawing frame uses the raw material in item bucket full in pipeline equipment Drafting is carried out, small item bucket is packed into after drafting, two groups of pipeline equipment work alternatively.
2. the quick feeding system of drawing frame according to claim 1, it is characterised in that: shuttle includes car body, wheel, prevents Collision device is equipped with wheel in the lower end of car body, and wheel passes through the motor driven installed on car body;It installs the rear and front end of car body There is anticollision device, collision-prevention device, the rear and front end of track is provided with limit pillar, and anticollision device, collision-prevention device is issued to motor and believed by limit pillar limit Number, and then stop the movement of car body.
3. the quick feeding system of drawing frame according to claim 1, it is characterised in that: pipeline equipment is equipped with conveying dress It sets, conveying device uses one or more pipeline.
4. the quick feeding system of drawing frame according to claim 3, it is characterised in that: the item bucket in pipeline equipment can When realizing snakelike into and out, conveying device uses a snakelike pipeline.
5. the quick feeding system of drawing frame according to claim 4, it is characterised in that: feed pipeline be provided with three it is defeated Pipeline, including two hollow bar bucket pipelines are sent, one completely fills item bucket pipeline, and it is defeated that two hollow bar bucket pipelines are located at completely dress item bucket The two sides of line sending.
6. the quick feeding system of drawing frame according to claim 3, it is characterised in that: feed pipeline is using a conveying When pipeline, the hollow bar bucket of corresponding transfer pipeline unloads cylinder conveying line interface and the full barreled bucket conveying public interface of line interface, Mechanical assist device is installed on transfer pipeline.
7. the quick feeding system of drawing frame according to claim 6, it is characterised in that: mechanical assist device uses baffle, Conveying device is arranged with pipeline, the corresponding baffle of every strip transmission line in every a line item bucket.
8. the quick feeding system of drawing frame according to claim 2, it is characterised in that: anticollision device, collision-prevention device is provided with pressure sensing Whether device reaches limit pillar by pressure sensor induction.
9. a kind of method of feeding of the quick feeding system of drawing frame, comprising the following steps:
(1) shuttle is disposed with two groups of pipeline equipment, and the first pipeline equipment and the second pipeline of rear end including front end are set Standby, two groups of pipeline equipment work alternatively, and every group of pipeline equipment is provided with individual conveying device;
(2) when shuttle is moved to track front end, the second pipeline group is located at drawing frame for discharge position, can be fed for drawing frame, At this time on shuttle the first pipeline group hollow bar bucket by hollow bar bucket unload cylinder convey line interface unloaded automatically from shuttle, transport Out, line interface is then conveyed shuttle on full barreled by full barreled bucket, waited to be fed;
(3) after the sliver of the full item bucket of the second pipeline group is finished on shuttle, shuttle is moved to track rear end, on shuttle The first pipeline group be located at drawing frame for discharge position, can be fed for drawing frame, the hollow bar bucket of the second pipeline group on shuttle Cylinder conveying line interface is unloaded by hollow bar bucket to unload automatically from shuttle, is transported, and line interface is then conveyed by full barreled bucket Shuttle on full barreled, wait to be fed;
(4) circulation is completed, above step (2), (3) are repeated.
10. the method for feeding of the quick feeding system of drawing frame according to claim 9, it is characterised in that: every group of pipeline Equipment is provided with counter, the loading and Quantity Landed for record strip bucket.
CN201910280492.7A 2019-03-08 2019-04-09 Drawing frame quick feeding system and feeding method thereof Active CN109853093B (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201920301449 2019-03-08
CN2019101770459 2019-03-08
CN201910177045 2019-03-08
CN201920301449X 2019-03-08

Publications (2)

Publication Number Publication Date
CN109853093A true CN109853093A (en) 2019-06-07
CN109853093B CN109853093B (en) 2023-09-15

Family

ID=66911951

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201910280492.7A Active CN109853093B (en) 2019-03-08 2019-04-09 Drawing frame quick feeding system and feeding method thereof
CN201920475624.7U Withdrawn - After Issue CN210237886U (en) 2019-03-08 2019-04-09 Quick feeding system of drawing frame

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201920475624.7U Withdrawn - After Issue CN210237886U (en) 2019-03-08 2019-04-09 Quick feeding system of drawing frame

Country Status (1)

Country Link
CN (2) CN109853093B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331483A (en) * 2019-06-27 2019-10-15 武汉裕大华纺织服装集团有限公司 A kind of whole process intelligence Spinning process line

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853093B (en) * 2019-03-08 2023-09-15 武汉裕大华纺织服装集团有限公司 Drawing frame quick feeding system and feeding method thereof

Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB626675A (en) * 1945-12-19 1949-07-19 Joy Mfg Co Apparatus for transferring coal and the like from a mine shuttle car to a conveyor
GB1283310A (en) * 1969-12-24 1972-07-26 Schubert & Salzer Maschinen A method and arrangement for supplying sliver to a spinning machine
EP0296546A1 (en) * 1987-06-24 1988-12-28 Maschinenfabrik Rieter Ag Spinning machine producing yarn from staple fibre sliver
EP0344507A1 (en) * 1988-05-31 1989-12-06 Maschinenfabrik Rieter Ag Transport system between textile machines, in particular between ring spinning machines and winding machines
CN1070380A (en) * 1991-09-12 1993-03-31 巴马格股份公司 Spinning machine
JPH07310245A (en) * 1994-05-13 1995-11-28 Howa Mach Ltd Roving bobbin conveyer
ITMI961030A0 (en) * 1995-06-10 1996-05-22
JPH09301638A (en) * 1996-05-13 1997-11-25 Hara Shiyokuki Seisakusho:Kk Method of carrying out left/right independent spinning by one unit of drawing frame and drawing frame therefor
EP1422326A1 (en) * 2002-11-06 2004-05-26 Saurer GmbH & Co. KG Transport system for roving-bobbins
JP2004230435A (en) * 2003-01-31 2004-08-19 Mitsubishi Heavy Ind Ltd Transporting device for metallic band coil
US20070225858A1 (en) * 2006-03-24 2007-09-27 Lauyans & Company Control system for a pallet load transport system
CN101550619A (en) * 2008-04-01 2009-10-07 立达英格尔施塔特有限公司 Track with a linear can driving part
CN203866454U (en) * 2014-04-01 2014-10-08 淮北颐丰纺织有限公司 Barrel exchanging device of drawing frame
KR101482519B1 (en) * 2013-07-16 2015-01-22 주식회사 티에스피지 Multi Deep Pallet Shuttle Control System Configuration and Working Method
CN106743029A (en) * 2016-12-19 2017-05-31 深圳市鸿志软件有限公司 Manually choose and automatic replenishment in intensive warehouse
CN206278559U (en) * 2016-11-29 2017-06-27 深圳罗伯泰克科技有限公司 A kind of automatic logistics go out Input System
CN206680639U (en) * 2017-04-14 2017-11-28 宁夏恒达纺织科技股份有限公司 Drawing frame moves sliver can protection device certainly
CN208181927U (en) * 2018-04-18 2018-12-04 芜湖楚睿智能科技有限公司 A kind of vertical warehouse of novel automatic
CN109132303A (en) * 2018-07-13 2019-01-04 广州盛原成自动化科技有限公司 Loading and unloading method and loading and unloading system
CN208472262U (en) * 2018-06-01 2019-02-05 周鑫 A kind of drawing frame automatic can_doffing system
CN210237886U (en) * 2019-03-08 2020-04-03 武汉裕大华纺织服装集团有限公司 Quick feeding system of drawing frame

Patent Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB626675A (en) * 1945-12-19 1949-07-19 Joy Mfg Co Apparatus for transferring coal and the like from a mine shuttle car to a conveyor
GB1283310A (en) * 1969-12-24 1972-07-26 Schubert & Salzer Maschinen A method and arrangement for supplying sliver to a spinning machine
EP0296546A1 (en) * 1987-06-24 1988-12-28 Maschinenfabrik Rieter Ag Spinning machine producing yarn from staple fibre sliver
EP0344507A1 (en) * 1988-05-31 1989-12-06 Maschinenfabrik Rieter Ag Transport system between textile machines, in particular between ring spinning machines and winding machines
CN1070380A (en) * 1991-09-12 1993-03-31 巴马格股份公司 Spinning machine
JPH07310245A (en) * 1994-05-13 1995-11-28 Howa Mach Ltd Roving bobbin conveyer
ITMI961030A0 (en) * 1995-06-10 1996-05-22
JPH09301638A (en) * 1996-05-13 1997-11-25 Hara Shiyokuki Seisakusho:Kk Method of carrying out left/right independent spinning by one unit of drawing frame and drawing frame therefor
EP1422326A1 (en) * 2002-11-06 2004-05-26 Saurer GmbH & Co. KG Transport system for roving-bobbins
JP2004230435A (en) * 2003-01-31 2004-08-19 Mitsubishi Heavy Ind Ltd Transporting device for metallic band coil
US20070225858A1 (en) * 2006-03-24 2007-09-27 Lauyans & Company Control system for a pallet load transport system
CN101550619A (en) * 2008-04-01 2009-10-07 立达英格尔施塔特有限公司 Track with a linear can driving part
KR101482519B1 (en) * 2013-07-16 2015-01-22 주식회사 티에스피지 Multi Deep Pallet Shuttle Control System Configuration and Working Method
CN203866454U (en) * 2014-04-01 2014-10-08 淮北颐丰纺织有限公司 Barrel exchanging device of drawing frame
CN206278559U (en) * 2016-11-29 2017-06-27 深圳罗伯泰克科技有限公司 A kind of automatic logistics go out Input System
CN106743029A (en) * 2016-12-19 2017-05-31 深圳市鸿志软件有限公司 Manually choose and automatic replenishment in intensive warehouse
CN206680639U (en) * 2017-04-14 2017-11-28 宁夏恒达纺织科技股份有限公司 Drawing frame moves sliver can protection device certainly
CN208181927U (en) * 2018-04-18 2018-12-04 芜湖楚睿智能科技有限公司 A kind of vertical warehouse of novel automatic
CN208472262U (en) * 2018-06-01 2019-02-05 周鑫 A kind of drawing frame automatic can_doffing system
CN109132303A (en) * 2018-07-13 2019-01-04 广州盛原成自动化科技有限公司 Loading and unloading method and loading and unloading system
CN210237886U (en) * 2019-03-08 2020-04-03 武汉裕大华纺织服装集团有限公司 Quick feeding system of drawing frame

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110331483A (en) * 2019-06-27 2019-10-15 武汉裕大华纺织服装集团有限公司 A kind of whole process intelligence Spinning process line

Also Published As

Publication number Publication date
CN109853093B (en) 2023-09-15
CN210237886U (en) 2020-04-03

Similar Documents

Publication Publication Date Title
CN109853093A (en) The quick feeding system of drawing frame and its method of feeding
CN106843218A (en) Workshop homing guidance device dispatching method
CN207308369U (en) Agricultural glass pillar steel pipe automatic sensing conveying device
CN101648185A (en) System for sorting articles
CN109051634B (en) Conveying belt coding control system
CN208979799U (en) A kind of shunt conveying device up and down
CN107442438A (en) The rectilinear halved belt sorter of straight line and its control system and method
CN207390468U (en) A kind of glass intelligent distribution device
CN108160504A (en) A kind of mail sorting machine of identifying processing fragile article
CN109607144A (en) A kind of orbit transports line and delivery method
CN104509971A (en) Cigarette filter stick end-surface quality on-line test and rejection device and test method of cigarette filter sticks
CN104859092B (en) Intelligent production line
CN109816862A (en) Can automatic recognition cargo position automatic vending machine
CN210237885U (en) Drawing frame multi-feeding position system
CN109993892A (en) A kind of automatic vending machine and out pallet piling up method
CN201061913Y (en) Flexible pipe socket conveying means with feeding, distribution, storage and locating constitutions
CN201619895U (en) Ship loader with functions of replacing cabins and returning charge
CN107650253B (en) Ferrite core magnetic sintering process is to grinding process automatic loading distribution system
CN206068787U (en) The control system of furniture item assemble production line
CN206345310U (en) A kind of visual global system for logistics delivery
CN102861832B (en) Automatic basketing system for workpieces
CN211786745U (en) Automatic logistics system of target station
CN211443921U (en) Coffee machine detection production line
CN205972789U (en) Remove letter sorting equipment
CN203222125U (en) Automatic tyre assembling apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant