CN109823978A - The handling apparatus and its application method of curtain wall panel - Google Patents
The handling apparatus and its application method of curtain wall panel Download PDFInfo
- Publication number
- CN109823978A CN109823978A CN201910178777.XA CN201910178777A CN109823978A CN 109823978 A CN109823978 A CN 109823978A CN 201910178777 A CN201910178777 A CN 201910178777A CN 109823978 A CN109823978 A CN 109823978A
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- wall panel
- reel
- rope
- supporting element
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 21
- 239000000463 material Substances 0.000 claims description 12
- 210000004262 dental pulp cavity Anatomy 0.000 claims description 4
- 238000004804 winding Methods 0.000 claims description 4
- 230000005540 biological transmission Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 17
- 239000004575 stone Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 2
- 238000005096 rolling process Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000000919 ceramic Substances 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 238000007592 spray painting technique Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a kind of handling apparatus of curtain wall panel and its application methods, comprising: the supporting element being removably installed on scaffold;It is installed on reel on supporting element and free to rotate, is arranged on the reel for the flexible of handling curtain wall panel, by rotating reel, to release or pack up rope, thus the handling curtain wall panel;And it is installed on end of the rope far from reel and the elastic component for connecting with curtain wall panel, to reduce the shaking of curtain wall panel.The effective solution of the present invention problem of curtain wall panel handling difficulty, avoids manual handling, time saving and energy saving, and avoids occupying larger construction space using elevator and construct to influence other parts on building site, it is ensured that the safety of construction personnel improves construction efficiency.
Description
Technical field
The present invention relates to the realm of building construction, refer in particular to the handling apparatus and its application method of a kind of curtain wall panel.
Background technique
Modern architecture exterior wall can carry out decoration using multiple material mostly, and decorative means include spray painting, are laid with ceramic tile
Or stone material, wherein stone curtain wall uses extensively in the furnishing fields of heavy construction, and stone curtain wall is usually by stone panel and branch
Bearing structure composition, supporting structure generally includes cross beam and upright post, steel construction, connector etc., and stone curtain wall does not undertake main structure
Load is only used as the building enclosure of building.
When installing curtain wall panel, it is common practice to pass through in elevator transport sheet material to scaffold in advance, then by pacifying
Dress personnel install, but when one layer of building after the installation is completed extra plate need to be sent to by way of manpower relay
It is not only laborious during transport on upper one layer of scaffold, also there is biggish security risk;If being transported using trolley and elevator
Defeated mode, then since the construction space that crane occupies is larger, and to collect curtain wall panel on scaffold more inconvenient for trolley,
It takes time and effort, construction efficiency is lower.
Summary of the invention
It is an object of the invention to overcome the deficiencies of existing technologies, handling apparatus and its use of a kind of curtain wall panel are provided
Method solves the problems, such as that curtain wall panel handling is difficult, avoids manual handling, time saving and energy saving, and avoids occupying using elevator
Larger construction space is constructed to influence other parts on building site, it is ensured that the safety of construction personnel improves construction efficiency.
Realizing the technical solution of above-mentioned purpose is:
The present invention provides a kind of handling apparatus of curtain wall panel, comprising:
The supporting element being removably installed on scaffold;
It is installed on reel on the supporting element and free to rotate, the rope for handling curtain wall panel is arranged on the reel
Rope, by rotating the reel, to release or pack up rope, thus handling curtain wall panel;And
It is installed on end of the rope far from reel and the elastic component for connecting with curtain wall panel, to reduce the rolling of curtain wall panel
It is dynamic.
The present invention uses the handling apparatus of curtain wall panel, by installation supporting element on the opposite pipe support of scaffold, in turn
Reel is rotated to release the rope being set around on reel, by the elastic component of cable end and lower layer of scaffold of curtain wall panel phase
Connection rotates reel to opposite direction, so that rope is packed up, since elastic component makes curtain wall panel between curtain wall panel and rope
Material and rope elastic connection, it is possible to reduce shaking of the curtain wall panel in uphill process avoids curtain wall panel in the process of handling
It is middle to be hit because of shaking, it solves the problems, such as that curtain wall panel handling is difficult, avoids manual handling, it is time saving and energy saving, and avoid
Larger construction space is occupied using elevator to influence other parts on building site and construct, it is ensured that the safety of construction personnel mentions
High construction efficiency.
The handling apparatus of curtain wall panel of the present invention further improvement lies in that, further include that one end is fixedly connected on supporting element
And length-adjustable extensible member, the other end of the extensible member are equipped with reel, by adjusting the length of extensible member, to change reel
Position, so as to adjust rope decentralization position.
The handling apparatus of curtain wall panel of the present invention and its application method further improvement lies in that, which includes fixing
The fixing pipe being connected on supporting element and the moving tube for being slidably connected to fixing pipe and partially exposing, the moving tube is far from fixed
The end of pipe is equipped with reel, changes the length of moving tube exposed portion by the mobile moving tube, so that extensible member extends
Or shorten, so as to adjust the position of reel.
The handling apparatus of curtain wall panel of the present invention further improvement lies in that, the position which corresponds to reel is vertically pacified
Equipped with two pieces of opposite positioning plates, correspondence offers through-hole on two pieces of positioning plates, wears in the corresponding through-hole of two pieces of positioning plates
Equipped with rotation axis free to rotate, which is electrically connected with control motor, and fixing sleeve is equipped with reel in the rotation axis, leads to
The rotation of the control motor control rotation axis is crossed, so that reel be driven to rotate.
The handling apparatus of curtain wall panel of the present invention further improvement lies in that, which includes positioning pipe closed at one end
And it is inserted in the regulation pipe of the positioning pipe other end and part exposing, closed end and the remotely located pipe of regulation pipe of the positioning pipe
End is fixedly installed with clamping joint, which has the arc groove to match with the pipe support of scaffold, by adjusting the tune
The length of pipe exposed portion is saved to change the length of supporting element, so that the clamping joint at supporting element both ends correspondence resists scaffold phase
Pair two root canal framves, so that securing supports are on scaffold.
The handling apparatus of curtain wall panel of the present invention further improvement lies in that, which opens up close to the side of regulation pipe
Hole, the side which corresponds to hole open up it is fluted, the texturearunaperpendicular in hole side inner wall be equipped with rack gear;
It is rotated by pivoting lever with band moving gear, and then by the engaged transmission of wheel and rack to adjust the adjusting
The length of pipe exposed portion, to change the length of supporting element.
The handling apparatus of curtain wall panel of the present invention further improvement lies in that, which includes:
It the upper surface of is fixedly connected with plate, the top panel with rope and is vertically connected with secondary bar close to the position at edge;
With top panel be oppositely arranged and with secondary bar be correspondingly connected with below plate, the bottom of the lower panel be fixedly connected with for
The lifting cross bar that curtain wall panel is connected;And
Two mobile jibs being relatively arranged in the middle part of top panel and lower panel, the length of the mobile jib are less than the 1/2 of secondary bar length
Times, and connected between two mobile jibs being oppositely arranged by spring, so that top panel and lower panel elastic connection.
The handling apparatus of curtain wall panel of the present invention further improvement lies in that, which symmetrically sets along the center line of top panel
Several are equipped with, and the secondary bar is less than the diameter close to lower panel part close to the diameter of upper panel section, is arranged in the secondary bar
There is auxiliary spring, the end of the auxiliary spring is correspondingly connected with top panel and lower panel respectively.
The present invention provides a kind of application methods of the handling apparatus of curtain wall panel, include the following steps:
S11. rotation reel is to release the rope wound on reel until the rope is transferred to and put to the curtain wall panel of handling
The position set;
S12. elastic component is fixedly connected with the mode that curtain wall panel is connected through a screw thread;
S13. the reel is rotated to pack up the rope of winding on reel, so that curtain wall panel is hoisted to designated position.
The application method of the handling apparatus of curtain wall panel of the present invention further improvement lies in that, length is installed on the supporting element
Adjustable extensible member is spent, which includes the fixing pipe being fixedly installed on supporting element and be slidably connected to fixing pipe and portion
Divide the moving tube exposed, which is installed in moving tube;
Change the length of moving tube exposed portion by the mobile moving tube, so that extensible member elongates or shortens, thus
The position of reel is adjusted so that the rope on reel can vertically transfer to the position of the curtain wall panel placement to handling.
Detailed description of the invention
Fig. 1 is the perspective view of the handling apparatus of curtain wall panel of the present invention.
Fig. 2 is the supporting element partial structure diagram of the handling apparatus of curtain wall panel of the present invention.
Fig. 3 is the regulation pipe partial structure diagram of the handling apparatus of curtain wall panel of the present invention.
Fig. 4 is the gear parts structural schematic diagram of the handling apparatus of curtain wall panel of the present invention.
Fig. 5 is the elastic component partial structure diagram of the handling apparatus of curtain wall panel of the present invention.
Fig. 6 is the application method flow chart of the handling apparatus of curtain wall panel of the present invention.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples.
Refering to fig. 1, the present invention provides a kind of handling apparatus of curtain wall panel and its application methods, by installing supporting element
In on the opposite pipe support of scaffold, and then reel is rotated to release the rope being set around on reel, by the elastic component of cable end
It is connected with lower layer of curtain wall panel of scaffold, reel is rotated to opposite direction, so that rope is packed up, since elastic component is located at curtain
Make curtain wall panel and rope elastic connection between wallboard material and rope, it is possible to reduce rolling of the curtain wall panel in uphill process
It is dynamic, it avoids curtain wall panel from being hit during handling because of shaking, solves the problems, such as that curtain wall panel handling is difficult, keep away
Manpower-free carries, time saving and energy saving, and avoids occupying larger construction space using elevator and apply to influence other parts on building site
Work, it is ensured that the safety of construction personnel improves construction efficiency.With reference to the accompanying drawing to the handling apparatus of curtain wall panel of the present invention
And its application method is illustrated.
Refering to fig. 1, Fig. 1 is the perspective view of the handling apparatus of curtain wall panel of the present invention.Below with reference to Fig. 1, to curtain of the present invention
The handling apparatus of wallboard material is illustrated.
As shown in connection with fig. 1, the handling apparatus of curtain wall panel of the present invention, comprising:
The supporting element 11 being removably installed on scaffold;
It is installed on reel 1222 on supporting element 11 and free to rotate, is arranged on the reel 1222 for handling curtain wall panel
The rope 1223 of material, by rotating the reel 1222, to release or pack up rope 1223, thus handling curtain wall panel;And
It is installed on end of the rope 1223 far from reel 1222 and the elastic component 13 for connecting with curtain wall panel, to reduce curtain
The shaking of wallboard material.
Further, as shown in connection with fig. 5, which includes:
It the upper surface of is fixedly connected with plate 131, the top panel 131 with rope 1223 and is vertically connected with secondary bar close to the position at edge
1311;
With top panel 131 be oppositely arranged and with secondary bar 1311 be correspondingly connected with below plate 132, the bottom of the lower panel 132
It is fixedly connected with the lifting cross bar 1322 for being connected with curtain wall panel;And
Two mobile jibs 1321 at 132 middle part of top panel 131 and lower panel are relatively arranged on, the length of the mobile jib 1321 is less than
1/2 times of 1311 length of secondary bar, and connected between two mobile jibs 1321 being oppositely arranged by spring 133, so that top panel 131
With 132 elastic connection of lower panel.
Specifically, the secondary bar 1311 has several along the center line symmetrical setting of top panel 131, and the secondary bar 1311 is close
The diameter of 131 part of top panel is less than the diameter close to 132 part of lower panel, is arranged with auxiliary spring 134 in the secondary bar 1311, should
The end of auxiliary spring 134 is correspondingly connected with top panel 131 and lower panel 132 respectively.
Preferably, the diameter of auxiliary spring 134 is less than the diameter of 1321 upper spring 133 of mobile jib.
Again goodly, screw hole is offered on the lifting cross bar 1322, it is corresponding across curtain wall panel and screw hole by a bolt, make
Curtain wall panel is obtained to be fixed on lifting cross bar 1322.
As a better embodiment of the invention, as shown in connection with fig. 1, which further includes that one end is fixedly connected on support
On part 11 and length-adjustable extensible member 12, the direction of 12 telescopic adjustment of extensible member is parallel to the ground, the extensible member 12 it is another
One end is equipped with reel 1222, by adjusting the length of extensible member 12, to change the position of reel 1222, so as to adjust rope
The position of 1223 decentralizations.
Further, which includes the fixing pipe 121 being fixedly connected on supporting element 11 and is slidably connected to
The moving tube 122 of in fixing pipe 121 and part exposing, the moving tube 122 are equipped with reel far from the end of fixing pipe 121
1222, change the length of 122 exposed portion of moving tube by the mobile moving tube 122, so that the elongation of extensible member 12 or contracting
It is short, so as to adjust the position of reel 1222.
Preferably, the side of the moving tube 122 offers strip groove, the position that the strip groove is corresponded in fixing pipe 121 is opened
Equipped with bolt hole, the corresponding position of strip groove is screwed together in the bolt hole and resisted by a positioning bolt, thus fixed movement
The position of 122 relative fixing tube 121 of pipe.
In conjunction with described in Fig. 1, the position of the corresponding reel 1222 of the moving tube 122 is vertically installed with two pieces of opposite positioning plates
1221, correspondence offers through-hole on two pieces of positioning plates 1221, be equipped in the corresponding through-hole of two pieces of positioning plates 1221 can from
By the rotation axis rotated, fixing sleeve is equipped with reel 1222 in the rotation axis, by rotating the rotation axis to drive 1222 turns of reel
It is dynamic.
Preferably, being equipped with control motor 1211 in the fixing pipe 121, which is electrically connected with rotation axis,
Worker controls the direction of rotation axis rotation and rotation by operation control motor 1211 in use, and then drives reel
1222, to put down or pack up rope 1223.
As another better embodiment of the invention, in conjunction with shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, which includes
Positioning pipe 111 closed at one end and the regulation pipe 112 for being inserted in 111 other end of positioning pipe and partially exposing, should by adjusting
The length of 112 exposed portion of regulation pipe is to change the length of supporting element 11, so that the both ends of the supporting element 11 correspondence resists foot
Two opposite root canal framves of hand cradle, so that securing supports 11 are on scaffold.
Further, which opens up hole close to the side of regulation pipe 112, the corresponding hole of the regulation pipe 112
Side open up fluted 1121, the groove 1121 is perpendicular to being equipped with rack gear 1122, the i.e. groove 1121 inside the side of hole
Side side wall in opposite two sidewalls is equipped with rack gear 1122;
A control-rod 113 is equipped in the hole, the control-rod 113 close to groove 1121 end fixing sleeve be equipped with one with
The gear 1131 that rack gear 1122 is meshed;
It is rotated by rotating the control-rod 113 with band moving gear 1131, and then nibbling by gear 1131 and rack gear 1122
Transmission is closed to adjust the length of 112 exposed portion of regulation pipe, to change the length of supporting element 11.
Preferably, the closed end of the positioning pipe 111 and the end of the remotely located pipe 111 of regulation pipe 112 are fixedly installed with
Clamping joint 1111, the arc groove which there is pipe support corresponding with scaffold to match, by blocking positioning pipe 111
The arc groove of connector 1111 blocks the pipe support of corresponding scaffold, and then adjusts the position of regulation pipe 112, so that regulation pipe 112
On clamping joint 1111 also block corresponding pipe support so that supporting element 11 is stably supported on scaffold.
Concrete operations mode of the invention is as follows:
Scaffold is set up in outside of the building, and curtain wall panel is transported on scaffold using elevator, according to specifically applying
Work needs, and elevator is transported, to save construction space;After the completion of this layer of curtain wall panel lifts, prepare extra curtain wall panel
Material is transported to one layer of scaffold;Supporting element 11 is installed on upper one layer of scaffold, the clamping joint 1111 of positioning pipe 111 is passed through into arc
Shape slot resists the corresponding cross bar of this layer of scaffold, pivoting lever 113, and gear 1131 rotates with it and by gear 1131 and tune
The engagement of 112 inner rack 1122 of pipe is saved, so that regulation pipe 112 stretches out positioning pipe 111 upwards, until the clamping joint of regulation pipe 112
1111 resist another cross bar of this layer of scaffold, screw control-rod 113, so that supporting element 11 is vertically installed on scaffold;
Operation control motor 1211, so that rotation axis drives reel 1222 to rotate, to put down rope 1223, if the position that curtain wall panel is placed
It is inconsistent to set the position transferred with rope 1223, the length of adjustable extensible member 12 extracts moving tube 122 out until rope 1223
The position of decentralization and the position consistency of curtain wall panel;Curtain wall panel is connected by bolt with lifting cross bar 1322, Jin Ercao
Make control motor 1211, so that rope 1223 is packed up, so that curtain wall panel rises to one layer of scaffold, due in elastic component 13
The effect of spring 133 and auxiliary spring 134 ensure that curtain so that violent shaking will not occur during handling for curtain wall panel
The integrality of wallboard material;Curtain wall panel is unloaded, continues that curtain wall panel is installed in outside of the building, is made by pivoting lever 113
Gear 1131 is rotated and is engaged with rack gear 1122, so that regulation pipe 112 moves down, to remove support from scaffold
Part 11.
As shown in connection with fig. 6, the present invention also provides a kind of application methods of the handling apparatus of curtain wall panel, including walk as follows
It is rapid:
Step S11. rotation reel 1222 is executed to release the rope 1223 of winding on reel 1222, until the rope 1223
Transfer to the position of the curtain wall panel placement to handling;Then step S12 is executed
Step S12. is executed to be fixedly connected with elastic component 13 with the mode that curtain wall panel is connected through a screw thread;Then step is executed
Rapid S13
Step S13. rotation reel 1222 is executed to pack up the rope 1223 of winding on reel 1222, thus by curtain wall panel
It is hoisted to designated position.
Further, length-adjustable extensible member 12 is installed on the supporting element 11, which includes being fixedly mounted
In the fixing pipe 121 on supporting element 11 and the moving tube 122 for being slidably connected to fixing pipe 121 and partially exposing, the reel
1222 are installed in moving tube 122;
By the mobile length of the moving tube 122 to change 122 exposed portion of moving tube, so that the elongation of extensible member 12 or contracting
It is short, to adjust the position of reel 1222 so that the rope 1223 on reel 1222 can vertically transfer to the curtain to handling
The position that wallboard material is placed.
The concrete operations mode of application method actual implementation provided by the invention is as follows:
The length of supporting element 11 is adjusted, so that the both ends of supporting element 11 are respectively held against the corresponding two root canals frame of scaffold, from
And supporting element 11 is fixedly mounted on scaffold;According to the position that curtain wall panel is stacked, mobile moving tube 122 is to change moving tube
The length of 122 exposed portion, so that extensible member 12 elongates or shortens, so that the position of reel 1222 is adjusted, so that reel 1222
On rope 1223 can vertically transfer to curtain wall panel placement position, avoid rope 1223 tilt and in the process of handling
It is middle that fierce rock occurs;Rotation axis rotation is controlled by control motor 1211, to drive the rotation of reel 1222 to put down rope
The position that rope 1223 is placed to curtain wall panel;Curtain wall panel is passed through by bolt and is screwed together in elastic component, thus by curtain wall panel
It is fixedly connected with the elastic component 13 of 1223 end of rope, and then manipulates the control motor 1211 control rotation axis rotation, to drive
Curtain wall panel is hoisted to the position that scaffold upper supporting piece 11 is installed to withdraw rope 1223 by the rotation of reel 1222;Due to
It is provided with spring 133,1311 structure of auxiliary spring 134, mobile jib 1321 and secondary bar in elastic component, rope during handling can be eliminated
1223 shaking, and then guarantee that curtain wall panel can completely be hoisted to one layer of scaffold.
The present invention has been described in detail with reference to the accompanying drawings, those skilled in the art can be according to upper
It states and bright many variations example is made to the present invention.Thus, certain details in embodiment should not constitute limitation of the invention, this
Invention will be using the range that the appended claims define as protection scope of the present invention.
Claims (10)
1. a kind of handling apparatus of curtain wall panel characterized by comprising
The supporting element being removably installed on scaffold;
It is installed on reel on the supporting element and free to rotate, the rope for handling curtain wall panel is arranged on the reel
Rope, by rotating the reel, to release or pack up the rope, thus curtain wall panel described in handling;And
It is installed on end of the rope far from the reel and the elastic component for connecting with the curtain wall panel, described in reducing
The shaking of curtain wall panel.
2. the handling apparatus of curtain wall panel as described in claim 1, which is characterized in that further include described in one end is fixedly connected on
On supporting element and length-adjustable extensible member, the other end of the extensible member are equipped with the reel, described flexible by adjusting
The length of part, to change the position of the reel, so as to adjust the position of rope decentralization.
3. the handling apparatus of curtain wall panel as claimed in claim 2, which is characterized in that the extensible member includes being fixedly connected on
Fixing pipe on the supporting element and it is slidably connected to the fixing pipe and moving tube that part is exposed, the moving tube is separate
The end of the fixing pipe is equipped with the reel, changes the length of the moving tube exposed portion by the movement moving tube
Degree, so that the extensible member elongates or shortens, so as to adjust the position of the reel.
4. the handling apparatus of curtain wall panel as claimed in claim 3, which is characterized in that the moving tube corresponds to the reel
Position is vertically installed with two pieces of opposite positioning plates, and correspondence offers through-hole, two pieces of positioning plates on two pieces of positioning plates
Rotation axis free to rotate is equipped in corresponding through-hole, the rotation axis is electrically connected with control motor, and the rotation axis
Upper fixing sleeve is equipped with the reel, is rotated by rotation axis described in the control motor control, so that the reel be driven to rotate.
5. the handling apparatus and its application method of curtain wall panel as described in claim 1, which is characterized in that the supporting element packet
The regulation pipe for including positioning pipe closed at one end and being inserted in the positioning pipe other end and partially exposing, the envelope of the positioning pipe
Closed end is fixedly installed with clamping joint far from the end of the positioning pipe with the regulation pipe, and the clamping joint has and the foot
The arc groove that the pipe support of hand cradle matches, by adjusting the length of the regulation pipe exposed portion to change the length of the supporting element
Degree, so that the clamping joint at the supporting element both ends correspondence resists two opposite root canal framves of the scaffold, thus described in fixed
Supporting element is on the scaffold.
6. the handling apparatus of curtain wall panel as claimed in claim 5, which is characterized in that the positioning pipe is close to the regulation pipe
Side open up hole, the side that the regulation pipe corresponds to described hole opens up fluted, and the texturearunaperpendicular is in the hole
The side inner wall in hole is equipped with rack gear;
A control-rod is equipped in described hole, the control-rod is equipped with one and the tooth close to the end fixing sleeve of the groove
The gear that item is meshed;
By rotating the control-rod to drive the gear to rotate, and then pass through the engaged transmission of the gear and the rack gear
To adjust the length of the regulation pipe exposed portion, to change the length of the supporting element.
7. the handling apparatus of curtain wall panel as described in claim 1, which is characterized in that the elastic component includes:
It the upper surface of is fixedly connected with plate, the top panel with the rope and is vertically connected with secondary bar close to the position at edge;
With the top panel be oppositely arranged and with the secondary bar be correspondingly connected with below plate, the bottom of the lower panel is fixedly connected
There is the lifting cross bar for being connected with the curtain wall panel;And
The length of two mobile jibs being relatively arranged in the middle part of the top panel and the lower panel, the mobile jib is less than the secondary bar
1/2 times of length, and connected between two mobile jibs being oppositely arranged by spring, so that the top panel and lower panel bullet
Property connection.
8. the handling apparatus of curtain wall panel as claimed in claim 7, which is characterized in that the secondary bar is along the top panel
Heart line is symmetrically arranged with several, and the secondary bar is less than close to the diameter of the upper panel section close to the lower panel part
Diameter, be arranged with auxiliary spring in the secondary bar, the end of the auxiliary spring respectively with the top panel and the lower panel pair
It should connect.
9. a kind of application method of the handling apparatus of curtain wall panel as described in claim 1, which is characterized in that including walking as follows
It is rapid:
S11. the reel is rotated to release the rope wound on the reel until the rope is transferred to described in handling
The position that curtain wall panel is placed;
S12. the elastic component is fixedly connected with the mode that the curtain wall panel is connected through a screw thread;
S13. the reel is rotated to pack up the rope of winding on the reel, so that the curtain wall panel is hoisted to specific bit
It sets.
10. the application method of the handling apparatus of curtain wall panel as claimed in claim 9, which is characterized in that on the supporting element
Length-adjustable extensible member is installed, the extensible member includes that the fixing pipe being fixedly installed on the supporting element and sliding connect
It is connected to the moving tube of the fixing pipe and part exposing, the reel is installed in the moving tube;
Change the length of the moving tube exposed portion by the movement moving tube, so that extensible member elongation or contracting
It is short, to adjust the position of the reel so that the rope on the reel can vertically transfer to the curtain to handling
The position that wallboard material is placed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910178777.XA CN109823978A (en) | 2019-03-11 | 2019-03-11 | The handling apparatus and its application method of curtain wall panel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910178777.XA CN109823978A (en) | 2019-03-11 | 2019-03-11 | The handling apparatus and its application method of curtain wall panel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109823978A true CN109823978A (en) | 2019-05-31 |
Family
ID=66868697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910178777.XA Pending CN109823978A (en) | 2019-03-11 | 2019-03-11 | The handling apparatus and its application method of curtain wall panel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109823978A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112343355A (en) * | 2020-11-16 | 2021-02-09 | 吴德强 | A promote pusher jack for fitment stone material curtain stone material board installation |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1962395A (en) * | 2006-11-25 | 2007-05-16 | 刘春雨 | Single-beam attached frame suspended transportation device of portable suspended transportation machine |
CN101264848A (en) * | 2007-03-16 | 2008-09-17 | 张良 | Cargo hoister for building |
CN201151627Y (en) * | 2007-09-26 | 2008-11-19 | 林国琳 | Portable building hoist |
CN103216095A (en) * | 2013-05-15 | 2013-07-24 | 南通海洲建设集团有限公司 | Safety device for building overhanging discharging platform |
US20170275994A1 (en) * | 2014-06-06 | 2017-09-28 | Mmc Innovations Llp | Temporary Support and Raising Device |
CN108455449A (en) * | 2018-02-24 | 2018-08-28 | 深圳广田方特科建集团有限公司 | A kind of interior rail type mobile curtain wall Lift-on/Lift-off System |
CN108569629A (en) * | 2018-06-06 | 2018-09-25 | 中冶天工集团天津有限公司 | A kind of jack up high level modular architectural hanging device and construction method |
CN209778151U (en) * | 2019-03-11 | 2019-12-13 | 中国建筑第八工程局有限公司 | Lifting appliance for lifting curtain wall plates |
-
2019
- 2019-03-11 CN CN201910178777.XA patent/CN109823978A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1962395A (en) * | 2006-11-25 | 2007-05-16 | 刘春雨 | Single-beam attached frame suspended transportation device of portable suspended transportation machine |
CN101264848A (en) * | 2007-03-16 | 2008-09-17 | 张良 | Cargo hoister for building |
CN201151627Y (en) * | 2007-09-26 | 2008-11-19 | 林国琳 | Portable building hoist |
CN103216095A (en) * | 2013-05-15 | 2013-07-24 | 南通海洲建设集团有限公司 | Safety device for building overhanging discharging platform |
US20170275994A1 (en) * | 2014-06-06 | 2017-09-28 | Mmc Innovations Llp | Temporary Support and Raising Device |
CN108455449A (en) * | 2018-02-24 | 2018-08-28 | 深圳广田方特科建集团有限公司 | A kind of interior rail type mobile curtain wall Lift-on/Lift-off System |
CN108569629A (en) * | 2018-06-06 | 2018-09-25 | 中冶天工集团天津有限公司 | A kind of jack up high level modular architectural hanging device and construction method |
CN209778151U (en) * | 2019-03-11 | 2019-12-13 | 中国建筑第八工程局有限公司 | Lifting appliance for lifting curtain wall plates |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112343355A (en) * | 2020-11-16 | 2021-02-09 | 吴德强 | A promote pusher jack for fitment stone material curtain stone material board installation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106988768B (en) | Tunnel arch erects the new type mechanical device and operating method of construction | |
JP3158320U (en) | crane | |
CN114560385A (en) | Industrial factory building steel structure hoisting device and construction method thereof | |
CN116516837A (en) | Prefabricated box girder paving device and paving method | |
KR102144434B1 (en) | Installation of temporary apparatus for curtain wall and temporary apparatus for curtain wall | |
CN109823978A (en) | The handling apparatus and its application method of curtain wall panel | |
KR100514133B1 (en) | Carrier for curtain-wall panel establishing use and curtain-wall establishing method using the same | |
CN113955636A (en) | Hoisting equipment for assembly type building construction | |
CN218320396U (en) | Hoisting device for steel structure section bar | |
CN109680966B (en) | Steel construction support column locking lifting frame | |
CN209778151U (en) | Lifting appliance for lifting curtain wall plates | |
CN106246094A (en) | A kind of novel mounting attachment and using method thereof | |
CN216129243U (en) | Auxiliary lifting machine for wallboard for assembly type building | |
CN112279041B (en) | Tower crane manned lifting device | |
CN213537073U (en) | Channel is hoist device for lining board | |
CN210416591U (en) | Adjusting equipment for short-distance loading and transporting curb | |
CN208166363U (en) | A kind of brick handling bogey for building | |
CN113684933A (en) | Steel column butt joint support frame and steel column butt joint construction method | |
CN207513201U (en) | A kind of roofing cornices installation mobile device | |
CN219469435U (en) | Hoisting device for fire-fighting equipment installation | |
CN219217353U (en) | Winch bracket | |
CN218234401U (en) | Steel construction wallboard installation construction equipment | |
CN221739692U (en) | Pipeline lifting sling for building construction | |
CN217897244U (en) | Spider people safety device is used in curtain cleaning maintenance | |
CN220487147U (en) | Positioning device for curtain wall construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190531 |