CN109786275A - A kind of lead welding procedure and its lead for integrated antenna package - Google Patents

A kind of lead welding procedure and its lead for integrated antenna package Download PDF

Info

Publication number
CN109786275A
CN109786275A CN201910000122.3A CN201910000122A CN109786275A CN 109786275 A CN109786275 A CN 109786275A CN 201910000122 A CN201910000122 A CN 201910000122A CN 109786275 A CN109786275 A CN 109786275A
Authority
CN
China
Prior art keywords
lead
solder
laser
welding
integrated antenna
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910000122.3A
Other languages
Chinese (zh)
Inventor
王伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910000122.3A priority Critical patent/CN109786275A/en
Publication of CN109786275A publication Critical patent/CN109786275A/en
Pending legal-status Critical Current

Links

Landscapes

  • Laser Beam Processing (AREA)

Abstract

The present invention provides a kind of lead welding procedure for integrated antenna package, realizes that lead is connect with chip and metal framework or substrate by laser welding;The chip interconnection is the completion of the welding process of index wire and chip, lead and metal framework or two solder joints of substrate.In welding process, lead, frame or substrate and chip pad are heated by LASER SPECKLE direct irradiation, and 2-10 μm of spot diameter, laser irradiation time 20-200ms;The technique can quickly carry out connection reliable and stable between chip pad and metal framework or substrate, and chip pad and metal framework or substrate will not melt due to not reaching fusing point, and avoiding problems stress problems existing for mechanical and thermal damage and conventional bonding process.

Description

A kind of lead welding procedure and its lead for integrated antenna package
Technical field
The present invention relates to ic manufacturing technology field more particularly to a kind of lead welding for integrated antenna package Technique and its lead.
Background technique
Since American Kiel ratio is in nineteen fifty-nine invention integrated circuit, IC industry is grown rapidly nearly 60 years.Collection At circuit also from national defence leading-edge field is only applied to, to throughout each corner of national economy.IC design, chip manufacturing, Four subdivision fields of packaging and testing also all correspondingly, from scratch, from small to large, are developed so far by Moore's Law.Relative to Other three subdivision fields, integrated antenna package progress speed obviously lag.To find out its cause, mainly lead on line technique is always The lead key closing process invented before continuing to use 70 years.Lead on line is chip and the extraneous bridge for realizing Electricity Federation network, is integrated electricity Road perfection is applied to the tie of complete electronic set.Chip size is constantly reduced according to Moore's Law in three-dimensional, and wire bonding Impact of the technique due to bonding force to chip, the increasingly severe reliability for affecting integrated circuit.Lead key closing process can It is an important component of semiconductor device reliability by property, it is especially very big on the influence of the long-term reliability of circuit, according to state Outer statistical data shows that the failure of bonding system accounts for the 25%~30% of entire semiconductor device failure mode ratio.Stringent control The production technology environment of device processed and the bonding technology quality of lead are particularly important.In addition, the diminution of lead spacing also highlights The bottleneck of bonding technology development.It changes leads of IC on line technique and has become problem urgently to be resolved.
Before several years, when laser welding technology is used for the welding of circuit board electronic component outer pin, the speed of laser welding The maturity of degree, precision and technique is also welded far from the lead for being suitable for integrated circuit.The lead key of integrated circuit at that time Speed is closed up to 25000 lines/hour, that is, 50000 solder joints/hour, i.e. 72 milliseconds/solder joint.The development of bonding technology has connect Proximal pole causes, and the laser welding technology of mature common power can't be suitable for (60ms/ point), high-precision (± 2 μ at high speed M) lead welding.
The lead welding procedure that patent CN105458435A is researched and developed before 3 years can only be used in semiconductor power device, right It is not applicable for welding in the lead of integrated circuit.Main cause has three:
1. speed, the precision of lead welding: bonding wire craft at that time is designed for semiconductor power device, and emphasis is Welding can by the large scale lead of high current and high heat-sinking capability, so, bonding wire speed is slower compared with integrated circuit, and precision It is lower.
2. the complexity of movement: the patent is the design of semiconductor power device lead welding, pin configuration and band like form It is only applicable to linearly operating.And between two solder joints of internal lead of integrated circuit, lead needs to do more complicated movement in the sky To reach the bank of design.The linkage of the two kinds of wire rods and three beams of laser of the patent is not suitable for doing complicated movement.
3. cored solder characteristic: the requirement of the speed and precision of leads of IC welding needs cored solder to have preferable Wellability, and the cored solder in the patent is in the requirement for also failing to reach integrated antenna package at that time.
The lead in integrated antenna package field is at present with gold, copper (to avoid aoxidizing, plating palladium), diameter: 15 μm -- and 50 μm;Half The lead of conductor power device is based on crude aluminum line, diameter: 200 μm -- and 500 μm.Lead on line uses bonding technology.However, key Close bonding force in technical process and strong influence generated to the reliability of the impact of chip to integrated circuit and power device, to Thereafter the application of complete electronic set brings huge hidden danger.Therefore, a kind of lead Welder for integrated antenna package is researched and developed Skill is a urgent problem to be solved.
Summary of the invention
The invention solves the above technical problem, a kind of lead welding procedure for integrated antenna package is provided and its is drawn Line, this technique can quickly carry out connection reliable and stable between chip pad and metal framework or substrate, and chip pad and Metal framework or substrate will not melt due to not reaching fusing point, avoid stress existing for mechanical and thermal damage and conventional bonding process Problem.
In order to solve the above technical problems, the technical solution adopted by the present invention is that:
A kind of lead welding procedure for integrated antenna package realizes lead connection, brazing process by soldering processes It is realized using laser;The lead connection is the welding process of index wire and chip, lead and frame or two solder joints of substrate It completes.
Detailed process is as follows for this technique:
(1) laser parameter of laser source is adjusted are as follows: laser power (200--2000W), laser focus spot diameter (2--10 μm), laser pulse duration (20--200ms) etc..
The welding of (2) first solder joints: lead is waited for that welding end is sent to 0.2-2mm above chip pad (aluminium) prewelding station, is used Lead is moved downward to fitting chip weldering by laser welding head alignment lead and chip pad (aluminium) preheating for adjusting specified parameter At pad, laser pulse is opened.The cored solder of fusing soaks weld pad simultaneously and lead forms spherical solder joint;After cooling, that is, complete the The welding of one solder joint.
The welding of (3) second solder joints: lead is waited for that welding end is sent to 0.2-1mm above metal framework (copper) prewelding station, is used The laser welding head alignment lead and metal framework (copper) prewelding station for adjusting specified parameter, are moved downward to ferroalloy for lead Belong to frame (copper) prewelding station, opens laser pulse.The cored solder of fusing soaks frame (copper) simultaneously and lead forms spherical weldering Point;After cooling, that is, complete the welding of the second solder joint;To one lead of complete solder.
Further, in the welding process, the lead is that gold wire or copper lead are accompanied by cored solder, and lead specification is disconnected Face is wide, it is thick be 15-50 μm.
Further, in the welding process, the heating of lead, frame and chip pad is added by LASER SPECKLE direct irradiation Heat, 2-10 μm of spot diameter, laser irradiation time 20-200ms.
Further, the laser source can be optical fiber laser, gas laser or solid-state laser.
Further, the cored solder is alloy layer solder, weight percentage, chemical component are as follows: Cu 20-29%, Sn 25.0-35.0%, Ag 3.0-14.5%, Ti 3.0-9.0%, Zn 9.0-15.5%, In are surplus.
Above-mentioned lead cored solder chemical component preferably (wt, %): Cu 27.5%, Sn 33.5%, Ag 12.5%, Ti 7.5%, Zn 15.5%, In are surplus.
Above-mentioned lead cored solder chemical component preferably (wt, %): Cu 27.5%, Sn 34.5%, Ag 13.5%, Ti 5.5%, Zn 15.5%, In are surplus.
Above-mentioned lead cored solder chemical component preferably (wt, %): Cu 28.0%, Sn 35.0%, Ag 14.5%, Ti 4.5%, Zn 14.5%, In are surplus.
Above-mentioned lead cored solder chemical component preferably (wt, %): Cu 26.5%, Sn 35.0%, Ag 12.5%, Ti 6.5%, Zn 14.5%, In are surplus.
The preparation process of the lead is cored solder preparation, copper strips preparation, hot pressing.Specific preparation process is as follows:
1) (wt, %): Cu 20-29%, Sn 25.0-35.0%, Ag 3.0-14.5%, Ti are matched by alloying component 3.0-9.0%, Zn 9.0-15.5%, In are surplus, using vacuum induction melting, prepare brazing solder ingot;Fusion process In, brazing filler metal alloy is de-gassed using graphite crucible, heat preservation degassing time is 20min.
2) homogenizing annealing: homogenization temperature is 520 DEG C, keeps the temperature 12h, furnace cooling;
3) hot extrusion cogging: alloy cast ingot heating temperature is 500 DEG C, soaking time 2h, is squeezed into specification 50mm × thickness Spend the plate of 20mm;
4) hot rolling/intermediate annealing:
Firstly, gained plate after hot extrusion cogging is heated to 480 DEG C, 2h is kept the temperature;Then hot rolling is carried out, it is hot per pass Roll volume under pressure be 0.1-0.3mm, 3 passages of every rolling progress intermediate annealing process, 480 DEG C of annealing temperature, annealing time 20min;Solder is hot-rolled down to a thickness of 3-8mm;
5) 15-25mm wide, 6-16mm thick copper belt is hot pressed into 10-20um wide, 10-15um are thick to be drawn with alloy strip Line.
The advantages and positive effects of the present invention are: this technique is to realize lead and chip and gold by laser welding Belong to frame or substrate connection.In welding process, lead, frame or substrate and chip pad are heated by LASER SPECKLE direct irradiation, 2-10 μm of spot diameter, laser irradiation time 20-200ms;The technique can quickly carry out chip pad and metal framework or substrate Between reliable and stable connection, and chip pad and metal framework or substrate will not melt due to not reaching fusing point, this it is avoided that Stress problem existing for mechanical and thermal damage and conventional bonding process.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of lead in the present invention;
Schematic diagram when Fig. 2 is present invention welding;
Fig. 3 is lead sectional view.
In figure:
1, red copper;2, cored solder;3, laser beam.
Specific embodiment
Specific embodiments of the present invention will now be described in detail with reference to the accompanying drawings.
Laser welding process undergoes development in more than 20 years, becomes more consummate day by day, and welding control precision has reached micron dimension, welds Rate is connect close to millisecond magnitude, bonding technology can be replaced completely.Especially laser beam welding is without applying pressure, pad Heat affected zone is minimum, provides reliable guarantee for lead on line.
Laser technology obtains the progress that attracts people's attention in recent years, picosecond laser, the reaching its maturity of femtosecond laser (stability, Consistency).Especially mature picosecond laser, pulse width is short enough, and energy is enough to melt the soldering for welding lead Material, completes the stressless precise and tiny welding of lead.
This invention is exactly to melt cored solder using state-of-the-art laser welding technology to carry out lead welding, realizes collection The technology interconnected at the lead of circuit or semiconductor power device.
It is brazed and is generally divided into solder (lower than 450 DEG C) and solder brazing (generally greater than 450 DEG C), in chip package production certainly So low temperature solder can be selected to reduce thermal damage;Laser welding accurately controls, the welding process of high speed and minimum heated Many advantages, such as zone of influence, makes only choosing of the laser soldering processes as leads of IC on line technique.
The technical solution adopted in the present invention is as follows:
A kind of lead welding procedure for integrated antenna package, this technique are that lead connection is realized by soldering processes, Brazing process is realized using laser;The lead connection is the weldering of index wire and chip, lead and frame or two solder joints of substrate The completion of termination process.
In the welding process, the lead is gold wire or copper lead is accompanied by cored solder, and lead specification is that section is wide, thick It is 15-50 μm.
The cored solder is alloy layer solder, weight percentage, chemical component are as follows: Cu 20-29%, Sn 25.0-35.0%, Ag 3.0-14.5%, Ti 3.0-9.0%, Zn 9.0-15.5%, In are surplus.
Embodiment 1: above-mentioned lead cored solder chemical component is preferably (wt, %): Cu 27.5%, Sn 33.5%, Ag 12.5%, Ti 7.5%, Zn 15.5%, In 3.5%.
Embodiment 2: above-mentioned lead cored solder chemical component is preferably (wt, %): Cu 27.5%, Sn 34.5%, Ag 13.5%, Ti 5.5%, Zn 15.5%, In 3.5%.
Embodiment 3: above-mentioned lead cored solder chemical component is preferably (wt, %): Cu 28.0%, Sn 35.0%, Ag 14.5%, Ti 4.5%, Zn 14.5%, In 3.5%.
Embodiment 4: above-mentioned lead cored solder chemical component is preferably (wt, %): Cu 26.5%, Sn 35.0%, Ag 12.5%, Ti 6.5%, Zn 14.5%, In 3.5%.
Following table is one group of proportion experiment embodiment of cored solder
Ingredient (wt, %) Cu Sn Ag Ti Zn In
Cored solder A 27.5 33.5 12.5 7.5 15.5 3.5
Cored solder B 27.5 34.5 13.5 5.5 15.5 3.5
Cored solder C 28.0 35.0 14.5 4.5 14.5 3.5
Cored solder D 26.5 35.0 12.5 6.5 14.5 3.5
Following table is lead (line width 20um, thick 15um) tensile test made by the cored solder of above-mentioned four kinds of different ratios.
Tensile test (g) 1 2 3 4 5 6 7
Cored solder A 5.02 4.87 4.95 5.08 5.05 4.93 4.88
Cored solder B 5.03 4.97 5.11 5.05 5.03 4.98 5.01
Cored solder C 5.05 5.01 5.07 4.97 5.03 5.06 4.95
Cored solder D 4.89 4.91 4.99 5.01 4.93 4.93 4.90
Go out from tensile test interpretation of result, the cored solder pulling force of all proportions is average, data are good, wherein cored solder B It shows more prominent.It may is that influence of the component of Cu to pulling force is big.
Lead made by cored solder A, B, C, D (line width 25um, thick 20um) bonding wire wellability compares:
In same welding parameter (LASER SPECKLE diameter 5um, laser power 200W, laser pulse 30ms), welding process The wellability of cored solder A is significantly better than other three kinds, and the wellability of cored solder C is worst.It may is that the component of Ti to wellability It influences big.In short, heterogeneity can all generate different shadows to the physicochemical property of lead welding quality, electric conductivity, thermal conductivity, solder joint It rings.
It is that cored solder is integrated with wire bonding that this lead, which changes pin configuration,;To improve speed of welding and precision.Increase Ti element is to improve cored solder activity, wellability, to improve speed of welding and precision.
The preparation process of above-mentioned lead is cored solder preparation, copper strips preparation, hot pressing.Specific preparation process is as follows:
1) alloy (Cu/Sn/Ag/Ti/Zn/In) composition proportion (wt, %): Cu 20-29%, Sn 25.0-35.0% is pressed, Ag 3.0-14.5%, Ti 3.0-9.0%, Zn 9.0-15.5%, In are surplus, using vacuum induction melting, preparation soldering Expect alloy pig;In fusion process, brazing filler metal alloy is de-gassed using graphite crucible, heat preservation degassing time is 20min;
2) homogenizing annealing: homogenization temperature is 520 DEG C, keeps the temperature 12h, furnace cooling;
3) hot extrusion cogging: alloy cast ingot heating temperature is 500 DEG C, soaking time 2h, is squeezed into specification 50mm × thickness Spend the plate of 20mm;
4) hot rolling/intermediate annealing:
Firstly, gained plate after hot extrusion cogging is heated to 480 DEG C, 2h is kept the temperature;Then hot rolling is carried out, it is hot per pass Roll volume under pressure be 0.1-0.3mm, 3 passages of every rolling progress intermediate annealing process, 480 DEG C of annealing temperature, annealing time 20min;Solder is hot-rolled down to a thickness of 3-8mm;
5) 15-25mm wide, 6-16mm thick copper belt is hot pressed into 10-20um wide, 10-15um are thick to be drawn with alloy strip Line.
Detailed process is as follows for this welding procedure:
(1) laser parameter of laser source is adjusted are as follows: laser power (200-2000W), laser focus spot diameter (2-10 μ M), laser pulse duration (20-200ms) etc..The laser source may is that optical fiber laser, gas laser or solid-state swash Light device.
The welding of (2) first solder joints: lead is waited for that welding end is sent to 0.2-2mm above chip pad (aluminium) prewelding station, is used Lead is moved downward to fitting chip weldering by laser welding head alignment lead and chip pad (aluminium) preheating for adjusting specified parameter At pad, laser pulse is opened.The cored solder of fusing soaks weld pad simultaneously and lead forms spherical solder joint;After cooling, that is, complete the The welding of one solder joint.
The welding of (3) second solder joints: lead is waited for that welding end is sent to 0.2-1mm above metal framework (copper) prewelding station, is used The laser welding head alignment lead and metal framework (copper) prewelding station for adjusting specified parameter, are moved downward to ferroalloy for lead Belong to frame (copper) prewelding station, opens laser pulse.The cored solder of fusing soaks frame (copper) simultaneously and lead forms spherical weldering Point;After cooling, that is, complete the welding of the second solder joint;To one lead of complete solder.
In above-mentioned welding process, the heating of lead, frame and chip pad is heated by LASER SPECKLE direct irradiation, and hot spot is straight 2-10 μm of diameter, laser irradiation time 20-200ms.
Since cored solder has been attached to lead wire body, laser irradiation lead, cored solder melts, and beam of laser is done directly weldering It connects.This process reform three beams of laser is single beam laser, to adapt to do the needs of compound action in the air, improves equipment all parts Link the operability accurately controlled.In the welding process, lead, frame or substrate and chip pad are by LASER SPECKLE for this technique Direct irradiation heating, 2-10 μm of spot diameter, laser irradiation time 20-200ms.This technique can quickly carry out chip pad and gold Belong to connection reliable and stable between frame or substrate, and chip pad and metal framework or substrate will not melt due to not reaching fusing point Change, avoiding problems stress problems existing for mechanical and thermal damage and conventional bonding process.
Lead shape of the invention is different from conventional wire, can do aerial compound action;The cored solder proportion of lead is led The wellability for causing soldering allows speed of welding to promote integrated circuit level, the variation of welding procedure, so that at a high speed, again Miscellaneous movement can execute.
The embodiments of the present invention have been described in detail above, but content is only the preferred embodiment of the present invention, It should not be considered as limiting the scope of the invention.All changes and improvements made in accordance with the scope of the present invention, should all It still belongs within this patent covering scope.

Claims (10)

1. a kind of lead welding procedure for integrated antenna package, which is characterized in that detailed process is as follows:
(1) laser parameter of laser source is adjusted are as follows: laser power 200-2000W, 2-10 μm of laser focus spot diameter, laser arteries and veins Rush duration 20-200ms;
The welding of (2) first solder joints: lead is waited for that welding end is sent to 0.2-2mm above chip pad prewelding station, is referred to adjusting Laser welding head alignment lead and the chip pad preheating for determining parameter, lead is moved downward at fitting chip pad, opens and swashs Light pulse;The cored solder of fusing soaks weld pad simultaneously and lead forms spherical solder joint;After cooling, that is, complete the welding of the first solder joint;
The welding of (3) second solder joints: lead is waited for that welding end is sent to 0.2-1mm above metal framework prewelding station, is referred to adjusting The laser welding head alignment lead and metal framework prewelding station for determining parameter, are moved downward to the fitting pre- welder of metal framework for lead Laser pulse is opened in position;The cored solder of fusing soaks frame simultaneously and lead forms spherical solder joint;After cooling, that is, complete second Solder joint welding;To one lead of complete solder.
2. a kind of lead welding procedure for integrated antenna package according to claim 1, it is characterised in that: welding In the process, the lead is gold wire or copper lead is accompanied by cored solder, and it is 15-50 μm that lead specification is wide, thick for section.
3. a kind of lead welding procedure for integrated antenna package according to claim 2, it is characterised in that: welding In the process, the heating of lead, frame and chip pad is heated by LASER SPECKLE direct irradiation, and 2-10 μm of spot diameter, laser shines Penetrate time 20-200ms.
4. a kind of lead welding procedure for integrated antenna package according to claim 4, it is characterised in that: described to swash Light source is optical fiber laser, gas laser or solid-state laser.
5. a kind of lead welding procedure for integrated antenna package according to claim 2, it is characterised in that: the pricker Solder is alloy layer solder, weight percentage, chemical component are as follows: Cu 20-29%, Sn 25.0-35.0%, Ag 3.0-14.5%, Ti 3.0-9.0%, Zn 9.0-15.5%, In are surplus.
6. a kind of lead welding procedure for integrated antenna package according to claim 5, it is characterised in that: the pricker Solder is alloy layer solder, weight percentage, chemical component are as follows: Cu 27.5%, Sn 34.5%, Ag 13.5%, Ti 5.5%, Zn 15.5%, In are surplus.
7. a kind of lead welding procedure for integrated antenna package according to claim 5, it is characterised in that: the pricker Solder is alloy layer solder, weight percentage, chemical component are as follows: Cu 27.5%, Sn 33.5%, Ag 12.5%, Ti 7.5%, Zn 15.5%, In are surplus.
8. a kind of lead welding procedure for integrated antenna package according to claim 5, it is characterised in that: the pricker Solder is alloy layer solder, weight percentage, chemical component are as follows: Cu 28.0%, Sn 35.0%, Ag 14.5%, Ti 4.5%, Zn 14.5%, In are surplus.
9. a kind of lead welding procedure for integrated antenna package according to claim 5, it is characterised in that: the pricker Solder is alloy layer solder, weight percentage, chemical component are as follows: Cu 26.5%, Sn 35.0%, Ag 12.5%, Ti 6.5%, Zn 14.5%, In are surplus.
10. a kind of preparation method of lead for integrated circuit packaging lead welding procedure according to claim 5, It is characterized in that, specific preparation process is as follows:
1) ingredient being carried out according to the solder chemical component, brazing solder ingot is prepared using vacuum induction melting;
2) homogenizing annealing: homogenization temperature is 520 DEG C, keeps the temperature 12h, furnace cooling;
3) hot extrusion cogging: alloy cast ingot heating temperature is 500 DEG C, soaking time 2h, is squeezed into specification 50mm × thickness The plate of 20mm;
4) hot rolling/intermediate annealing:
Firstly, gained plate after hot extrusion cogging is heated to 480 DEG C, 2h is kept the temperature;Then hot rolling is carried out, per pass under hot rolling Pressure amount be 0.1-0.3mm, 3 passages of every rolling progress intermediate annealing process, 480 DEG C of annealing temperature, annealing time 20min; Solder is hot-rolled down to a thickness of 3-8mm;
5) 15-25mm wide, 6-16mm thick copper belt and alloy strip are hot pressed into the thick lead of 10-20um wide, 10-15um.
CN201910000122.3A 2019-01-01 2019-01-01 A kind of lead welding procedure and its lead for integrated antenna package Pending CN109786275A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910000122.3A CN109786275A (en) 2019-01-01 2019-01-01 A kind of lead welding procedure and its lead for integrated antenna package

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910000122.3A CN109786275A (en) 2019-01-01 2019-01-01 A kind of lead welding procedure and its lead for integrated antenna package

Publications (1)

Publication Number Publication Date
CN109786275A true CN109786275A (en) 2019-05-21

Family

ID=66499690

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910000122.3A Pending CN109786275A (en) 2019-01-01 2019-01-01 A kind of lead welding procedure and its lead for integrated antenna package

Country Status (1)

Country Link
CN (1) CN109786275A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111180343A (en) * 2019-12-31 2020-05-19 深圳源明杰科技股份有限公司 Packaging method and packaging device of smart card

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040211761A1 (en) * 2003-04-24 2004-10-28 Rumer Christopher L. Method and apparatus for bonding a wire to a bond pad on a device
US20060219672A1 (en) * 2005-03-31 2006-10-05 Ruben David A Laser bonding tool with improved bonding accuracy
US20090029542A1 (en) * 2006-07-10 2009-01-29 Texas Instruments Incorporated Methods and systems for laser assisted wirebonding
WO2011114945A1 (en) * 2010-03-16 2011-09-22 常陽機械株式会社 Method and apparatus for determining acceptance/rejection of fine diameter wire bonding
CN105458434A (en) * 2015-12-04 2016-04-06 王伟 Lead welding technique for packaging semiconductor power device
CN107731772A (en) * 2017-09-13 2018-02-23 北京无线电测量研究所 A kind of wedge bonding lead ruggedized construction and reinforcement means

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040211761A1 (en) * 2003-04-24 2004-10-28 Rumer Christopher L. Method and apparatus for bonding a wire to a bond pad on a device
US20060219672A1 (en) * 2005-03-31 2006-10-05 Ruben David A Laser bonding tool with improved bonding accuracy
US20090029542A1 (en) * 2006-07-10 2009-01-29 Texas Instruments Incorporated Methods and systems for laser assisted wirebonding
WO2011114945A1 (en) * 2010-03-16 2011-09-22 常陽機械株式会社 Method and apparatus for determining acceptance/rejection of fine diameter wire bonding
CN105458434A (en) * 2015-12-04 2016-04-06 王伟 Lead welding technique for packaging semiconductor power device
CN107731772A (en) * 2017-09-13 2018-02-23 北京无线电测量研究所 A kind of wedge bonding lead ruggedized construction and reinforcement means

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111180343A (en) * 2019-12-31 2020-05-19 深圳源明杰科技股份有限公司 Packaging method and packaging device of smart card

Similar Documents

Publication Publication Date Title
CN106517828B (en) It is a kind of that molybdenum group glass/kovar alloy laser soldering method is connected by addition Mo-Mn-Ni metal intermediate layer
CN100483707C (en) Lead frame for semiconductor device
CN109530838B (en) Method for laser welding of power semiconductor chip
CN107170691B (en) A kind of method for being superimposed on microbonding disk or carrying out automatic wedge bonding side by side
CN104507271A (en) Plug-in component technology and surface mount technology combination based PCBA (printed circuit board assembly) machining method and PCBA
CN107382044A (en) A kind of method of thin transparent glass laser transmission welding
CN102172805B (en) Low-cost anti-aging brazing filler material used for electronic packaging and preparation method thereof
CN107931840A (en) A kind of titanium nickel dissimilar welded joint induced with laser monotectic and uniform grain Reaction Welding method
CN107096988A (en) One kind quickly prepares electronic package material Cu3The method of Sn intermetallic compounds
CN109786275A (en) A kind of lead welding procedure and its lead for integrated antenna package
CN106425103B (en) A kind of welding method of infrared laser to non-ferrous metal
CN105458434B (en) A kind of lead welding procedure for semiconductor power device encapsulation
EP1474266B1 (en) Method for producing a wire bonding connection
CN107160019A (en) The welder and method of a kind of micro-channel heat sink for semi-conductor laser lamination
CN108465971A (en) A kind of preparation method of low melting point Sn-Zn-Bi brazing filler metal alloys
CN107309522A (en) A kind of welding method of microwave components pin joint welding printed board
CN109590633A (en) Lead welding filler metal and its preparation method and application for integrated antenna package
CN103151430B (en) Nano metal particles realize the preparation method of the low-temperature metal interface connection of LED
CN107297569B (en) A kind of titanium copper dissimilar metal connector welding method
CN109590634A (en) A kind of low Ti high intensity silver-based medium temperature active solder and preparation method thereof
CN105458435B (en) A kind of lead bonding device and technique for semiconductor power device encapsulation
CN111250893A (en) Lead-free solder, preparation method and application thereof, and metal terminal
CN108465892B (en) Fluxing agent-free ultrasonic low-temperature brazing method for copper-based material under atmospheric condition and application
CN103264202B (en) A kind of brazing layer pre-deposited method
CA1175297A (en) Process for brazing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20220415

AD01 Patent right deemed abandoned