CN109784750A - Finishing progress and the unmanned long-range policing algorithm of quality - Google Patents
Finishing progress and the unmanned long-range policing algorithm of quality Download PDFInfo
- Publication number
- CN109784750A CN109784750A CN201910079697.9A CN201910079697A CN109784750A CN 109784750 A CN109784750 A CN 109784750A CN 201910079697 A CN201910079697 A CN 201910079697A CN 109784750 A CN109784750 A CN 109784750A
- Authority
- CN
- China
- Prior art keywords
- construction
- finishing
- owner
- supervisor
- quality
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to decorations technical fields, and disclose finishing progress and the unmanned long-range policing algorithm of quality, the following steps are included: 1) equipment installation allotment, host computer client is assembled in telecottage, and the cloud servers such as host computer client and fitting-up service platform and owner's communication terminal are networked in order to carry out real time data inquiry and data interaction.The finishing progress and the unmanned long-range policing algorithm of quality, the process that supervisor uploads according to unit in charge of construction completes photo and specification is evaluated and checked and accepted, and it is fed back to owner's communication terminal, if there is substantive query to construction quality or be discontented in owner, opinion is returned into supervisor, supervisor is responsible for linking up and supervising with construction party, ensure that qualitative problems of construction is solved in time, problem feedback speed is fast, processing problem speed is fast, improves fitting-out work progress and owner's customer satisfaction.
Description
Technical field
The present invention relates to decorations technical field, specially a kind of finishing progress and the unmanned long-range monitoring of quality are calculated
Method.
Background technique
Finishing always is that a no small engineering, the expense in finishing are also one for general family
Very big expense, therefore, everyone can attach great importance to the finishing of own home, with regard to being afraid of the decoration quality in own home only
It closes, has spent a pile unjust money, so everyone can be double cautious when finishing, but the complexity for the engineering fitted up, no
It is that professional person is easy for that hole can be fallen into, along with present decoration company and construction team proficiency are irregular, trip
Hitting team everywhere has, and quality progress does not allow owner to trust really, for the family of oneself, intelligently takes a significant amount of time and keeps in building site,
Even if but keep always in building site, for the not professional of finishing, the quality of finishing is known nothing at all, being difficult to ensure will not go out
Existing quality problems.
And present part decoration company can finishing progress and quality to owner carry out one report, but its accuracy according to
Old to there is very big problem, construction speed retardance, owner is unknown so having no way of supervising, and quality supervision dynamics is inadequate, existing feedback
System is low with Quality Feedback degree to finishing progress, carries out suggestion and report situations to handle in time to owner, anti-
It is still to be improved in the accuracy of feedback, so propose that a kind of technical solution is set forth above to solve the problems, such as.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of finishing progress and the unmanned long-range policing algorithm of quality,
Have in time precisely feedback finishing progress situation to owner, it is ensured that the advantages that decoration quality, solve and present part finishing
Company can carry out a report to owner in finishing progress and quality, but its accuracy still has very big problem, construction speed
Retardance, owner is unknown, and so having no way of supervising, quality supervision dynamics is inadequate, and existing feedback system is to finishing progress and Quality Feedback
Degree is low, carries out suggestion and report situations to handle in time to owner, still to be improved in the accuracy of feedback
The problem of.
(2) technical solution
To realize above-mentioned finishing progress situation of precisely feeding back in time to owner, it is ensured that the purpose of decoration quality, the present invention mention
For following technical solution: a kind of finishing progress and the unmanned long-range policing algorithm of quality, comprising the following steps:
1) equipment installation allotment is assembled host computer client in telecottage, and by host computer client and is filled
Repair the cloud servers such as decoration service platform and owner's communication terminal network in order to carry out real time data inquiry and
Data interaction, in the in-site installation monitor component of fitting-out work, monitor component is for monitoring construction site real time status, convenient for answering
To emergency case;
2) finishing material logistics information obtains, after owner determines decorating scheme and the relevant finishing material inventory in house,
Institute related to cloud servers inquiries such as the shared fitting-up service platforms of its information networking is utilized in host computer client
There is the logistics information of material, and logistics information is shared into relevant construction personnel and supervisor, supervisor's real-time tracing
Finishing material logistics information, it is ensured that finishing material can accurately be sent to construction site as scheduled, guarantee that finishing progress will not be because of dress
Repair problem of materials extension;
3) finishing material quality inspection is checked and accepted, and after finishing material reaches construction site in batches according to the construction time, supervisor is negative
Duty check according to industry internal standard to quality, quantity and producer of material etc. and quality inspection is checked and accepted, and carries out to relevant material
Sampling observation, the material of sampling observation is taken pictures by supervisor uploads to host computer client, and the algorithm in host computer client is automatic
Complete image data is formed after the data to arrange that identification uploads and feeds back to owner, and owner is online by owner's communication terminal
Determination;
4) unit in charge of construction complete node process after preliminary quality inspection, in order to guarantee that multiple processes guarantee both quality and quantity to complete, using point
Walk quality inspection method, associated construction unit according to owner determine arrangement and method for construction in the requirement to procedure technology, in strict accordance with
Scheme constructs to finishing process, and in the main node of construction, unit in charge of construction is in real time by the progress of finishing and details
It is uploaded in the system of host computer client etc. taking pictures, and requires picture clear, the algorithm in host computer client
Time watermark and uploader watermark are automatically generated, avoids the appearance faked, during upload, unit in charge of construction must be by process
Installation gimmick and step etc., added text and practice of construction picture check supervision, associated construction list for owner and supervisor
Position needs to carry out upload of taking pictures to completed process, supervisor is according to work order in the case where completing process construction
The process that position uploads completes photo and specification is evaluated and checked and accepted, and it is whole to be fed back to owner's mobile communication
Opinion is returned to supervisor, supervisor is negative if owner has substantive query to construction quality or is discontented with by end
Duty is linked up and is supervised with construction party, it is ensured that qualitative problems of construction is solved in time;
5) supervisor construction site is checked and accepted, and after unit in charge of construction completes node process, supervisor is to scene to node work
The point-to-point examination of Cheng Jinhang, supervisor require to carry out an acceptance inspection according to procedure technology in the determining decorating scheme of owner, and according to
The case where examination, the evaluation uploaded Fu Dai to node engineering of taking pictures, after being checked and accepted by node, supervisor agrees to and notifies to construct
Unit carries out the construction of next step, and after unit in charge of construction completes the process, supervisor again carries out an acceptance inspection to process, takes pictures again
It uploads and is attached to feedback opinion;
6) final acceptance of construction after construction personnel constructs to the house of owner, completes all working procedures, completes entire
After the decoration in house, supervisor carries out the final acceptance of construction last to house, and supervisor will carry out whole finishing effect
Last quality inspection meets the requirements and determines completion of works after decorating scheme;
7) the finishing progress and Quality Feedback that owner's real-time query fitting case, unit in charge of construction and supervisor upload, electricity
Algorithm in brain server client can automatically generate the relevant finishing being easily understood and be supplied to owner into situation, and owner can be
Line checks the finishing progress and quality in oneself house whenever and wherever possible;
8) information preservation is fitted up, the algorithm in host computer client is by collecting the progress and construction feelings that each side uploads
After condition, automatic arranging forms the progress details archives about the whole series finishing, and is automatically stored, and forms finishing progress archives, owner
Can before checking oneself at any time in the future house finishing progress situation, and can for later finishing problem dispute number be provided
According to service support.
Preferably, monitor component described in step 1 includes camera, main control singlechip, power supply, wireless communication module, sound
Light crossing-signal and air quality sensor, the output end and camera, main control singlechip, power supply, wireless telecommunications mould of the power supply
The input terminal of block, combined aural and visual alarm and air quality sensor is electrically connected.
Preferably, owner's communication terminal includes mobile phone and computer, and mobile phone is applied by APP or the wechat public
Number equal database with host computer client carries out data interconnection.
Preferably, the air quality sensor includes concentration of formaldehyde sensor, can detecte first in the air of construction site
Aldehyde concentration information, and host computer client is transmitted information to, when concentration abnormality, supervisor makes urgent prevention and arranges
Apply, prevent that concentration of formaldehyde is exceeded to bring harm, wireless communication module be used for and host computer client and owner's mobile communication it is whole
End forms information interconnection, facilitates information exchange.
(3) beneficial effect
Compared with prior art, the present invention provides a kind of finishing progress and the unmanned long-range policing algorithm of quality, have
Below the utility model has the advantages that
1, the finishing progress and the unmanned long-range policing algorithm of quality, using the finishing logistics information acquisition side in step 2)
Formula, supervisor can be with real-time tracing finishing material logistics informations, it is ensured that and finishing material can accurately be sent to construction site as scheduled,
Guarantee that finishing progress will not delay because of finishing material problem, it, can be with using the finishing material quality inspection examination mode in step 3)
There are good monitoring, supervisor and owner to have good control to finishing material quality of materials early period in finishing, it is ensured that dress
Engineering total quality is repaired, the method that step 4) uses substep quality inspection can find the problem, and solve the problems, such as in time, avoid occurring
Individual node process influences the problem of entire fitting-out work quality, and greatly reduces the difficulty that fitting-out work problem is done over again
Degree and cost, the process that supervisor uploads according to unit in charge of construction completes photo and specification is evaluated and checked and accepted,
And it is fed back to owner's communication terminal, if owner has substantive query to construction quality or is discontented with, will anticipate
To see and return to supervisor, supervisor is responsible for linking up and supervising with construction party, it is ensured that qualitative problems of construction is solved in time,
Problem feedback speed is fast, and processing problem speed is fast, improves fitting-out work progress and owner's customer satisfaction.
2, the finishing progress and the unmanned long-range policing algorithm of quality can be with by installing monitoring module in construction site
The real time information for monitoring construction site in real time, can find the problem, and can handle some urgent bursting problems in time,
And after the algorithm in host computer client is by collecting the progress and condition of construction that each side uploads, automatic arranging, which is formed, to be closed
It in the progress details archives of the whole series finishing, and is automatically stored, forms finishing progress archives, owner can check at any time certainly in the future
The finishing progress situation in oneself house in the past, and data service can be provided for finishing problem dispute later and supported, finishing service
Follow-up service obtains database support, and owner client is enable more to trust.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical solution in the embodiment of the present invention is clearly and completely retouched
It states, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on the present invention
In embodiment, every other implementation obtained by those of ordinary skill in the art without making creative efforts
Example, shall fall within the protection scope of the present invention.
Embodiment one: a kind of finishing progress and the unmanned long-range policing algorithm of quality, comprising the following steps:
1) equipment installation allotment is assembled host computer client in telecottage, and by host computer client and is filled
Repair the cloud servers such as decoration service platform and owner's communication terminal network in order to carry out real time data inquiry and
Data interaction, in the in-site installation monitor component of fitting-out work, monitor component is for monitoring construction site real time status, convenient for answering
To emergency case;
2) finishing material logistics information obtains, after owner determines decorating scheme and the relevant finishing material inventory in house,
Institute related to cloud servers inquiries such as the shared fitting-up service platforms of its information networking is utilized in host computer client
There is the logistics information of material, and logistics information is shared into relevant construction personnel and supervisor, supervisor's real-time tracing
Finishing material logistics information, it is ensured that finishing material can accurately be sent to construction site as scheduled, guarantee that finishing progress will not be because of dress
Repair problem of materials extension;
3) finishing material quality inspection is checked and accepted, and after finishing material reaches construction site in batches according to the construction time, supervisor is negative
Duty check according to industry internal standard to quality, quantity and producer of material etc. and quality inspection is checked and accepted, and carries out to relevant material
Sampling observation, the material of sampling observation is taken pictures by supervisor uploads to host computer client, and the algorithm in host computer client is automatic
Complete image data is formed after the data to arrange that identification uploads and feeds back to owner, and owner is online by owner's communication terminal
Determination;
4) unit in charge of construction complete node process after preliminary quality inspection, in order to guarantee that multiple processes guarantee both quality and quantity to complete, using point
Walk quality inspection method, associated construction unit according to owner determine arrangement and method for construction in the requirement to procedure technology, in strict accordance with
Scheme constructs to finishing process, and in the main node of construction, unit in charge of construction is in real time by the progress of finishing and details
It is uploaded in the system of host computer client etc. taking pictures, and requires picture clear, the algorithm in host computer client
Time watermark and uploader watermark are automatically generated, avoids the appearance faked, during upload, unit in charge of construction must be by process
Installation gimmick and step etc., added text and practice of construction picture check supervision, associated construction list for owner and supervisor
Position needs to carry out upload of taking pictures to completed process, supervisor is according to work order in the case where completing process construction
The process that position uploads completes photo and specification is evaluated and checked and accepted, and it is whole to be fed back to owner's mobile communication
Opinion is returned to supervisor, supervisor is negative if owner has substantive query to construction quality or is discontented with by end
Duty is linked up and is supervised with construction party, it is ensured that qualitative problems of construction is solved in time;
5) supervisor construction site is checked and accepted, and after unit in charge of construction completes node process, supervisor is to scene to node work
The point-to-point examination of Cheng Jinhang, supervisor require to carry out an acceptance inspection according to procedure technology in the determining decorating scheme of owner, and according to
The case where examination, the evaluation uploaded Fu Dai to node engineering of taking pictures, after being checked and accepted by node, supervisor agrees to and notifies to construct
Unit carries out the construction of next step, and after unit in charge of construction completes the process, supervisor again carries out an acceptance inspection to process, takes pictures again
It uploads and is attached to feedback opinion;
6) final acceptance of construction after construction personnel constructs to the house of owner, completes all working procedures, completes entire
After the decoration in house, supervisor carries out the final acceptance of construction last to house, and supervisor will carry out whole finishing effect
Last quality inspection meets the requirements and determines completion of works after decorating scheme;
7) the finishing progress and Quality Feedback that owner's real-time query fitting case, unit in charge of construction and supervisor upload, electricity
Algorithm in brain server client can automatically generate the relevant finishing being easily understood and be supplied to owner into situation, and owner can be
Line checks the finishing progress and quality in oneself house whenever and wherever possible;
8) information preservation is fitted up, the algorithm in host computer client is by collecting the progress and construction feelings that each side uploads
After condition, automatic arranging forms the progress details archives about the whole series finishing, and is automatically stored, and forms finishing progress archives, owner
Can before checking oneself at any time in the future house finishing progress situation, and can for later finishing problem dispute number be provided
According to service support.
Monitor component includes camera, main control singlechip, power supply, wireless communication module, combined aural and visual alarm and sky in step 1
Makings quantity sensor, the output end and camera, main control singlechip, power supply, wireless communication module, combined aural and visual alarm and sky of power supply
The input terminal of makings quantity sensor is electrically connected.
Owner's communication terminal includes mobile phone and computer, and mobile phone passes through APP application or wechat public platform etc. and computer
The database of host client carries out data interconnection.
Air quality sensor includes concentration of formaldehyde sensor, can detecte construction site air formaldehyde concentration information,
And host computer client is transmitted information to, when concentration abnormality, supervisor makes urgent precautionary measures, and it is dense to prevent formaldehyde
Spend it is exceeded bring harm, wireless communication module is used to form information with host computer client and owner's communication terminal mutual
Even, facilitate information exchange.
The beneficial effects of the present invention are: the finishing progress and the unmanned long-range policing algorithm of quality, using in step 2)
Logistics information acquisition modes are fitted up, supervisor can be with real-time tracing finishing material logistics information, it is ensured that finishing material can be as
Phase is accurately sent to construction site, guarantees that finishing progress will not delay because of finishing material problem, using the finishing material in step 3)
Expect that mode is checked and accepted in quality inspection, there can be good monitoring to quality of materials early period in finishing, supervisor and owner are to finishing material
There is good control, it is ensured that fitting-out work total quality, the method that step 4) uses substep quality inspection can find the problem in time,
And solve the problem of that avoiding occurring individual node process influences entire fitting-out work quality, and greatly reduce
The difficulty and cost that fitting-out work problem is done over again, the process that supervisor uploads according to unit in charge of construction completes photo and process is said
It is bright to be evaluated and checked and accepted, and it is fed back to owner's communication terminal, if there is substance to construction quality in owner
Query or discontented, opinion is returned into supervisor, supervisor is responsible for linking up and supervising with construction party, it is ensured that engineering matter
Amount problem is solved in time, and problem feedback speed is fast, and processing problem speed is fast, improves fitting-out work progress and owner client
Satisfaction can monitor the real time information of construction site in real time, can find in time by installing monitoring module in construction site
Problem, and some urgent bursting problems can be handled, and the algorithm in host computer client is by collecting each side
After the progress and condition of construction of upload, automatic arranging forms the progress details archives about the whole series finishing, and is automatically stored, shape
At finishing progress archives, owner can checking oneself at any time in the future before house finishing progress situation, and can be with
Finishing problem dispute provides data service and supports afterwards, and finishing serve future services to obtain database support, enables owner client
More trust solve and present part decoration company can carry out a report to owner in finishing progress and quality, but it is quasi-
Still there is very big problem in true property, construction speed retardance, owner is unknown, and so having no way of supervising, quality supervision dynamics is inadequate, have
Feedback system to finishing progress it is low with Quality Feedback degree, owner is carried out suggestion and reported situations to handle in time
Deng the problem still to be improved in the accuracy of feedback.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (4)
1. the progress of finishing and the unmanned long-range policing algorithm of quality, which comprises the following steps:
1) equipment installation allotment assembles host computer client in telecottage, and host computer client and finishing is filled
The cloud servers such as decorations service platform and owner's communication terminal are networked in order to carry out real time data inquiry and data
Interaction, in the in-site installation monitor component of fitting-out work, monitor component is prominent convenient for reply for monitoring construction site real time status
Heat condition;
2) finishing material logistics information obtains, after owner determines decorating scheme and the relevant finishing material inventory in house, in electricity
Brain server client utilizes all materials related to cloud servers inquiries such as the shared fitting-up service platforms of its information networking
The logistics information of material, and logistics information is shared into relevant construction personnel and supervisor, supervisor's real-time tracing finishing
Material stream information, it is ensured that finishing material can accurately be sent to construction site as scheduled, guarantee that finishing progress will not be because of finishing material
Material problem is delayed;
3) finishing material quality inspection is checked and accepted, after finishing material reaches construction site in batches according to the construction time, responsible pair of supervisor
Quality, quantity and producer of material etc. check according to industry internal standard and quality inspection is checked and accepted, and inspect by random samples to relevant material,
The material of sampling observation is taken pictures by supervisor uploads to host computer client, in the algorithm automatic identification in host computer client
Complete image data is formed after the data to arrange of biography and feeds back to owner, and by owner's communication terminal, determination is owner online
It can;
4) unit in charge of construction completes preliminary quality inspection after node process, in order to guarantee that multiple processes guarantee both quality and quantity to complete, using substep matter
The method of inspection, associated construction unit is according to the requirement to procedure technology in the determining arrangement and method for construction of owner, in strict accordance with scheme
It constructs to finishing process, in the main node of construction, the progress of finishing and details etc. are in real time clapped by unit in charge of construction
According to uploading in the system of host computer client, and require picture clear, the algorithm in host computer client is automatic
Time watermark and uploader watermark are generated, avoids the appearance faked, during upload, unit in charge of construction must be by the peace of process
Gimmick and step etc., added text and practice of construction picture are filled, checks supervision for owner and supervisor, associated construction unit exists
In the case where completing process construction, need to carry out upload of taking pictures to completed process, supervisor is according in unit in charge of construction
The process of biography completes photo and specification is evaluated and checked and accepted, and is fed back to owner's communication terminal, such as
If owner has substantive query or discontented to construction quality, opinion is returned into supervisor, supervisor be responsible for
Construction party is linked up and is supervised, it is ensured that qualitative problems of construction is solved in time;
5) supervisor construction site is checked and accepted, after unit in charge of construction completes node process, supervisor to it is live to node engineering into
The point-to-point examination of row, supervisor require to carry out an acceptance inspection according to procedure technology in the determining decorating scheme of owner, and according to examination
The case where, the evaluation uploaded Fu Dai to node engineering of taking pictures, after being checked and accepted by node, supervisor agrees to and notifies construction cell
The construction of next step is carried out, after unit in charge of construction completes the process, supervisor again carries out an acceptance inspection to process, upload of taking pictures again
And it is attached to feedback opinion;
6) final acceptance of construction after construction personnel constructs to the house of owner, completes all working procedures, completes entire house
Decoration after, supervisor carries out the final acceptance of construction last to house, and supervisor will carry out whole finishing effect last
Quality inspection, meet the requirements and after decorating scheme determine completion of works;
7) the finishing progress and Quality Feedback that owner's real-time query fitting case, unit in charge of construction and supervisor upload, computer master
Algorithm in machine client can automatically generate the relevant finishing being easily understood and be supplied to owner into situation, owner can online with
When check the finishing progress and quality in oneself house everywhere;
8) information preservation is fitted up, the progress and condition of construction that the algorithm in host computer client is uploaded by collecting each side
Afterwards, automatic arranging forms the progress details archives about the whole series finishing, and is automatically stored, and forms finishing progress archives, Ye Zhuke
With the finishing progress situation in the house before checking oneself at any time in the future, and data can be provided for finishing problem dispute later
Service support.
2. finishing progress according to claim 1 and the unmanned long-range policing algorithm of quality, it is characterised in that: in step 1
The monitor component includes camera, main control singlechip, power supply, wireless communication module, combined aural and visual alarm and air quality sensing
Device, the output end and camera, main control singlechip, power supply, wireless communication module, combined aural and visual alarm and air quality of the power supply
The input terminal of sensor is electrically connected.
3. finishing progress according to claim 1 and the unmanned long-range policing algorithm of quality, it is characterised in that: the owner
Communication terminal includes mobile phone and computer, and mobile phone passes through APP application or wechat public platform etc. and host computer client
Database carries out data interconnection.
4. finishing progress according to claim 2 and the unmanned long-range policing algorithm of quality, it is characterised in that: the air
Mass sensor includes concentration of formaldehyde sensor, can detecte construction site air formaldehyde concentration information, and information is transmitted
Host computer client is given, when concentration abnormality, supervisor makes urgent precautionary measures, prevents that concentration of formaldehyde is exceeded to bring danger
Evil, wireless communication module are used to form information interconnection with host computer client and owner's communication terminal, and information is facilitated to hand over
Mutually.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910079697.9A CN109784750A (en) | 2019-01-28 | 2019-01-28 | Finishing progress and the unmanned long-range policing algorithm of quality |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910079697.9A CN109784750A (en) | 2019-01-28 | 2019-01-28 | Finishing progress and the unmanned long-range policing algorithm of quality |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109784750A true CN109784750A (en) | 2019-05-21 |
Family
ID=66502682
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910079697.9A Pending CN109784750A (en) | 2019-01-28 | 2019-01-28 | Finishing progress and the unmanned long-range policing algorithm of quality |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109784750A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111401718A (en) * | 2020-03-10 | 2020-07-10 | 陶建军 | One-stop management system and method for building industry |
CN111429015A (en) * | 2020-03-30 | 2020-07-17 | 广州粤建三和软件股份有限公司 | Block chain system for monitoring house decoration quality |
CN112381378A (en) * | 2020-11-10 | 2021-02-19 | 湖北福泰建筑装饰工程有限公司 | Digital monitoring method suitable for building decoration component |
CN113269411A (en) * | 2021-05-08 | 2021-08-17 | 成都亲生命科技有限公司 | Decoration system based on internet technology assembly decoration construction and convenient for customer quality inspection |
CN113610487A (en) * | 2021-07-06 | 2021-11-05 | 江苏金小满信息科技有限公司 | Construction process record archiving system and method |
CN113723772A (en) * | 2021-08-14 | 2021-11-30 | 浙江宏瑞达工程管理有限公司 | Construction project supervision and acceptance method, system, storage medium and intelligent terminal |
CN113723902A (en) * | 2021-07-30 | 2021-11-30 | 太逗科技集团有限公司 | Decoration supervision service method and device |
CN114330939A (en) * | 2020-09-27 | 2022-04-12 | 南京铭创测控科技有限公司 | Quality inspection platform and method for remote real-time monitoring engineering |
CN117499241A (en) * | 2023-11-03 | 2024-02-02 | 广东省建筑工程监理有限公司 | Intelligent supervision data dynamic processing method and system |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011012525A (en) * | 2009-06-30 | 2011-01-20 | Arch Directions Co Ltd | Video image communication device for construction sites such as condominium building repair worksite |
CN104780223A (en) * | 2015-04-30 | 2015-07-15 | 广东志高空调有限公司 | Whole construction process monitoring system and monitoring method based on cloud computing technology |
CN105120218A (en) * | 2015-08-31 | 2015-12-02 | 王韬 | Video cloud-monitoring system used for decorating |
CN105160534A (en) * | 2015-08-19 | 2015-12-16 | 河南鑫山信息科技有限公司 | Home decoration network platform system and use method |
CN105303304A (en) * | 2015-10-15 | 2016-02-03 | 贵州省邮电规划设计院有限公司 | Method for engineering field management based on handheld terminal |
CN106204343A (en) * | 2016-09-11 | 2016-12-07 | 国家电网公司 | A kind of construction quality control system and method based on mobile terminal |
CN106408187A (en) * | 2016-09-13 | 2017-02-15 | 安徽广行物联科技有限公司 | Transparent regulation system for interior decoration design and construction |
CN106651678A (en) * | 2016-12-16 | 2017-05-10 | 北京家装云网络科技有限公司 | Novel home decoration supervision process management method and system |
CN107025611A (en) * | 2017-04-25 | 2017-08-08 | 成都泰和易装网络科技有限公司 | A kind of implementation method of interior decoration service platform |
CN108469739A (en) * | 2018-03-01 | 2018-08-31 | 深圳市百创网络科技有限公司 | Remote home packing quality control system based on Internet of Things, video and artificial intelligence |
CN109165841A (en) * | 2018-08-21 | 2019-01-08 | 麦格创科技(深圳)有限公司 | A kind of project management platform and project management method based on cloud service |
-
2019
- 2019-01-28 CN CN201910079697.9A patent/CN109784750A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2011012525A (en) * | 2009-06-30 | 2011-01-20 | Arch Directions Co Ltd | Video image communication device for construction sites such as condominium building repair worksite |
CN104780223A (en) * | 2015-04-30 | 2015-07-15 | 广东志高空调有限公司 | Whole construction process monitoring system and monitoring method based on cloud computing technology |
CN105160534A (en) * | 2015-08-19 | 2015-12-16 | 河南鑫山信息科技有限公司 | Home decoration network platform system and use method |
CN105120218A (en) * | 2015-08-31 | 2015-12-02 | 王韬 | Video cloud-monitoring system used for decorating |
CN105303304A (en) * | 2015-10-15 | 2016-02-03 | 贵州省邮电规划设计院有限公司 | Method for engineering field management based on handheld terminal |
CN106204343A (en) * | 2016-09-11 | 2016-12-07 | 国家电网公司 | A kind of construction quality control system and method based on mobile terminal |
CN106408187A (en) * | 2016-09-13 | 2017-02-15 | 安徽广行物联科技有限公司 | Transparent regulation system for interior decoration design and construction |
CN106651678A (en) * | 2016-12-16 | 2017-05-10 | 北京家装云网络科技有限公司 | Novel home decoration supervision process management method and system |
CN107025611A (en) * | 2017-04-25 | 2017-08-08 | 成都泰和易装网络科技有限公司 | A kind of implementation method of interior decoration service platform |
CN108469739A (en) * | 2018-03-01 | 2018-08-31 | 深圳市百创网络科技有限公司 | Remote home packing quality control system based on Internet of Things, video and artificial intelligence |
CN109165841A (en) * | 2018-08-21 | 2019-01-08 | 麦格创科技(深圳)有限公司 | A kind of project management platform and project management method based on cloud service |
Non-Patent Citations (1)
Title |
---|
何文: "浅谈建筑装饰装修工程监理的三控制", 《广东建材》 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111401718A (en) * | 2020-03-10 | 2020-07-10 | 陶建军 | One-stop management system and method for building industry |
CN111429015A (en) * | 2020-03-30 | 2020-07-17 | 广州粤建三和软件股份有限公司 | Block chain system for monitoring house decoration quality |
CN111429015B (en) * | 2020-03-30 | 2023-04-07 | 广州粤建三和软件股份有限公司 | Block chain system for monitoring house decoration quality |
CN114330939A (en) * | 2020-09-27 | 2022-04-12 | 南京铭创测控科技有限公司 | Quality inspection platform and method for remote real-time monitoring engineering |
CN112381378A (en) * | 2020-11-10 | 2021-02-19 | 湖北福泰建筑装饰工程有限公司 | Digital monitoring method suitable for building decoration component |
CN113269411A (en) * | 2021-05-08 | 2021-08-17 | 成都亲生命科技有限公司 | Decoration system based on internet technology assembly decoration construction and convenient for customer quality inspection |
CN113610487A (en) * | 2021-07-06 | 2021-11-05 | 江苏金小满信息科技有限公司 | Construction process record archiving system and method |
CN113723902A (en) * | 2021-07-30 | 2021-11-30 | 太逗科技集团有限公司 | Decoration supervision service method and device |
CN113723772A (en) * | 2021-08-14 | 2021-11-30 | 浙江宏瑞达工程管理有限公司 | Construction project supervision and acceptance method, system, storage medium and intelligent terminal |
CN113723772B (en) * | 2021-08-14 | 2024-03-05 | 浙江宏瑞达工程管理有限公司 | Method and system for supervising and accepting constructional engineering, storage medium and intelligent terminal |
CN117499241A (en) * | 2023-11-03 | 2024-02-02 | 广东省建筑工程监理有限公司 | Intelligent supervision data dynamic processing method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109784750A (en) | Finishing progress and the unmanned long-range policing algorithm of quality | |
CN109559251A (en) | Construction method for inspecting, device and terminal based on Building Information Model | |
CN103856774A (en) | Intelligent detection system and method for video surveillance | |
CN104461708B (en) | Mission bit stream processing method and system | |
CN114140999B (en) | Project supervision system based on communication of Internet of things | |
CN105719068A (en) | Outgoing maintenance management method and system | |
KR101874098B1 (en) | DlAGNOSTIC AND MANAGING METHOD OF NEW RENEWABLE ENERGY APPATUS USING MOBILE DEVICE AND THE SYSTEM THEREOF | |
CN111476425A (en) | Engineering project cost progress supervision system and method | |
KR102269616B1 (en) | System for providing smart manufacturing solution for factoryless manufacturing companies | |
CN206298231U (en) | Elevator repair and maintenance managing device based on bluetooth and Mobile Data Communication Technology | |
CN106096872A (en) | A kind of factory's substandard product report processing system and method | |
CN105869226A (en) | Face-recognition-based automatic roll-call system and method for prisons | |
CN115862177A (en) | Equipment inspection method and device | |
CN107885189A (en) | Supply equipment monitoring method and device | |
CN110751454A (en) | Cable accessory installation process control system and method | |
CN118446450A (en) | Workshop safety production management and control method and system and risk assessment method and system | |
CN107169627A (en) | A kind of electric energy meter quality management-control method and system based on augmented reality | |
CN110940315B (en) | Plug-in photo acquisition equipment for relay protection and safety automatic device and automatic comparison method | |
CN111835583B (en) | Attribute inspection method and device for products of Internet of things and computer equipment | |
CN111652592A (en) | Work examination management method and system | |
CN103780884A (en) | Video monitoring engineering project supervision system and method | |
CN113869473A (en) | Intelligent checking method and device for fixed value of power distribution terminal | |
CN109214767A (en) | A kind of roof waterproof renovation project Quality Process supervising platform | |
CN112184153A (en) | Community service platform system based on internet technology | |
CN109583596A (en) | The property complaint management method and Property Management System of assembled architecture platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190521 |
|
WD01 | Invention patent application deemed withdrawn after publication |