CN109779271B - Unloading steel platform for building engineering construction - Google Patents

Unloading steel platform for building engineering construction Download PDF

Info

Publication number
CN109779271B
CN109779271B CN201910192106.9A CN201910192106A CN109779271B CN 109779271 B CN109779271 B CN 109779271B CN 201910192106 A CN201910192106 A CN 201910192106A CN 109779271 B CN109779271 B CN 109779271B
Authority
CN
China
Prior art keywords
platform
unloading
round steel
wall
seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910192106.9A
Other languages
Chinese (zh)
Other versions
CN109779271A (en
Inventor
聂鲁军
罗志军
王艳
白礼柱
黄军
胡汉雄
凌云
解芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hongzhi Construction Group Co ltd
Original Assignee
Anhui Hongzhi Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Hongzhi Construction Group Co ltd filed Critical Anhui Hongzhi Construction Group Co ltd
Priority to CN201910192106.9A priority Critical patent/CN109779271B/en
Publication of CN109779271A publication Critical patent/CN109779271A/en
Application granted granted Critical
Publication of CN109779271B publication Critical patent/CN109779271B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention belongs to the field of unloading steel platforms, in particular to an unloading steel platform for construction, which aims at solving the problems that the prior unloading steel platform is inconvenient to buffer a fixed plate and inconvenient to reduce rigid collision force between building materials and the fixed plate. The invention has reasonable design, simple structure and convenient operation, and is convenient for buffering the fixed plate, thereby reducing the rigid collision between the building material and the fixed plate in the unloading process.

Description

Unloading steel platform for building engineering construction
Technical Field
The invention relates to the technical field of unloading steel platforms, in particular to an unloading steel platform for construction engineering construction.
Background
Building equipment is an important component of a building, including facility equipment such as water supply, water discharge, heating, ventilation, air conditioning, electricity, elevator, communication, building intellectualization and the like, and a steel platform for unloading is an indispensable equipment in the building engineering, and in high-rise construction, building materials need to be transported through the steel platform for unloading.
When the required building materials are placed on the unloading platform through equipment such as a crane, and when the building materials are contacted with the unloading platform, under the action of large rigid collision, potential safety hazards exist, the existing unloading steel platform is inconvenient to buffer a fixed plate and inconvenient to reduce the rigid collision force between the building materials and the fixed plate, and therefore, the unloading steel platform for the building engineering construction is used for solving the problems.
Disclosure of Invention
The invention aims to solve the defects that the fixed plate is inconvenient to buffer and the rigid collision force between the building material and the fixed plate is inconvenient to reduce in the prior art, and provides a discharging steel platform for building engineering construction.
In order to achieve the above purpose, the present invention adopts the following technical scheme:
the utility model provides a building engineering construction is with steel platform of unloading, including three crossbeams, be equipped with the platform of unloading on being located one of three crossbeams below, be equipped with a plurality of round steel anchor clamps on the platform of unloading, and the platform of unloading passes through round steel anchor clamps fixed mounting on one of three crossbeams, the top welding of platform of unloading has the planking, plank's top fixed mounting has plank protection, the one end of wire rope is all fixedly connected with in both sides of platform of unloading, be equipped with round steel pull ring on other two crossbeams in the three crossbeams, and wire rope's the other end and the round steel pull ring fixed connection who corresponds, the top of platform of unloading is rectangle equidistant four risers that are provided with, the movable sleeve is equipped with same fixed plate on four risers, the top fixed mounting of riser has the limiting plate, movable sleeve has extension spring on the riser, extension spring's top welds on corresponding limiting plate, the bottom welding of extension spring is on the fixed plate, a plurality of spread grooves have, the top inner wall of spread groove is last rotation of connecting groove installs the baffle, the bottom of baffle extends to the one side of fixed plate, the one side of the rectangular spring is fixed connection to the rectangular spring seat is fixed to the corresponding compression groove on the inner wall of the rectangular spring seat, the compression groove is fixed connection of the compression groove is fixed to the first side of the compression groove is fixed connection, the compression groove is fixed to the compression groove is fixed on the inner wall of the compression groove is fixed to the compression groove, the bottom of triangle seat is fixed mounting on the platform of unloading, and the bottom of baffle contacts with corresponding triangle seat.
Preferably, the communication holes are formed in the other two of the three cross beams, the round steel pull ring penetrates through the communication holes, external threads are formed in the round steel pull ring, nuts are sleeved on the external threads, and the round steel pull ring is fixedly mounted on the corresponding cross beam through the nuts.
Preferably, four U-shaped buckles are arranged on the steel wire rope, the four U-shaped buckles are arranged at equal intervals, and the steel wire rope is fixedly connected to the corresponding round steel pull ring through the U-shaped buckles.
Preferably, one side of one of the three cross beams is fixedly provided with a thrust stop block, and the thrust stop block limits the position of the discharging table.
Preferably, the number of the first compression springs on the same side is three to six, and the three to six first compression springs on the same side are arranged at equal intervals, and the arrangement of the plurality of first compression springs provides enough elasticity for the baffle plate.
According to the steel platform for unloading for building engineering construction, the unloading platform is matched with the round steel pull ring through the unloading platform, the round steel anchor clamps, the planking, the plank protection, the steel wire ropes and the round steel pull ring, the unloading platform is fixedly arranged on the cross beam through the round steel anchor clamps, and the unloading platform is fixedly connected with the round steel pull ring through the steel wire ropes to strengthen and fix the unloading platform;
through fixed plate, limiting plate, extension spring, spread groove, baffle, first compression spring, rectangular channel, stabilizer bar, rectangular seat, second compression spring and triangle seat cooperate, when unloading, building material at first with fixed plate rigid contact for the fixed plate moves down and extension spring, under the effect of triangle piece, makes the rectangle seat upwards move and compress second compression spring, and the fixed plate moves down and drives the baffle and move down, under the effect of the hypotenuse of triangle seat, makes the baffle rotate and compress first compression spring, through extension spring, elastic deformation of first compression spring and second compression spring, cushions the fixed plate.
The invention has reasonable design, simple structure and convenient operation, and is convenient for buffering the fixed plate, thereby reducing the rigid collision between the building material and the fixed plate in the unloading process.
Drawings
FIG. 1 is a schematic structural view of a steel platform for unloading for construction of building engineering;
fig. 2 is a schematic structural diagram of a discharge table in a discharge steel platform for construction of building engineering;
fig. 3 is a schematic structural diagram of a portion a in fig. 2.
In the figure: the steel plate type steel plate anti-collision device comprises a beam 1, a discharging table 2, a round steel anchor clamp 3, a plate 4, a thick wood plate protection device 5, a steel wire rope 6, a round steel pull ring 7, a vertical plate 8, a fixing plate 9, a limiting plate 10, a tension spring 11, a connecting groove 12, a baffle 13, a first compression spring 14, a rectangular groove 15, a stabilizing rod 16, a rectangular seat 17, a second compression spring 18, a triangular seat 19 and a thrust stop block 20.
Description of the embodiments
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments.
Referring to fig. 1-3, a steel platform for unloading for construction engineering construction comprises three beams 1, wherein one beam 1 positioned at the lowest position in the three beams 1 is provided with an unloading platform 2, a plurality of round steel anchor clamps 3 are arranged on the unloading platform 2, the unloading platform 2 is fixedly arranged on one beam 1 in the three beams 1 through the round steel anchor clamps 3, a plank 4 is welded at the top of the unloading platform 2, a plank protection 5 is fixedly arranged at the top of the plank 4, one end of a steel wire rope 6 is fixedly connected at both sides of the unloading platform 2, round steel pull rings 7 are arranged on the other two beams 1 in the three beams 1, the other end of the steel wire rope 6 is fixedly connected with the corresponding round steel pull rings 7, four risers 8 are arranged at the top of the unloading platform 2 at equal intervals in a rectangular shape, one fixing plate 9 is movably sleeved on the four risers 8, a limiting plate 10 is fixedly arranged at the top of each riser 8, the vertical plate 8 is movably sleeved with an extension spring 11, the top end of the extension spring 11 is welded on a corresponding limiting plate 10, the bottom end of the extension spring 11 is welded on a fixed plate 9, the bottom of the fixed plate 9 is provided with a plurality of connecting grooves 12, the inner wall of the top of the connecting groove 12 is rotatably provided with a baffle 13, the bottom of the baffle 13 extends to the lower part of the fixed plate 9, one side of the baffle 13 is welded with one end of a plurality of first compression springs 14, the other end of the first compression springs 14 is welded on the inner wall of the corresponding connecting groove 12, one side inner wall of the connecting groove 12 is provided with a rectangular groove 15, the top inner wall of the rectangular groove 15 and the bottom inner wall are fixedly provided with the same stabilizer bar 16, a rectangular seat 17 is arranged in the rectangular groove 15 in a sliding manner, the rectangular seat 17 is movably sleeved on the corresponding stabilizer bar 16, the stabilizer bar 16 is movably sleeved with a second compression spring 18, one end of the second compression spring 18 is fixedly arranged on the inner wall of the rectangular groove 15, the other end of the second compression spring 18 is fixedly arranged on the corresponding rectangular seat 17, one side of the rectangular seat 17 extends into the connecting groove 12 and is fixedly provided with a triangular seat 19, the bottom of the triangular seat 19 is fixedly arranged on the discharging table 2, and the bottom of the baffle 13 is in contact with the corresponding triangular seat 19.
In the invention, the other two cross beams 1 of the three cross beams 1 are provided with the communication holes, the round steel pull ring 7 penetrates through the communication holes, the round steel pull ring 7 is provided with external threads, the external threads are sleeved with nuts, and the round steel pull ring 7 is fixedly arranged on the corresponding cross beam 1 through the nuts.
In the invention, four U-shaped buckles are arranged on the steel wire rope 6, the four U-shaped buckles are arranged at equal intervals, and the steel wire rope 6 is fixedly connected to the corresponding round steel pull ring 7 through the U-shaped buckles.
In the invention, one side of one beam 1 of the three beams 1 is fixedly provided with a thrust block 20, and the thrust block 20 limits the position of the unloading table 2.
In the present invention, the number of the first compression springs 14 on the same side is three to six, and the three to six first compression springs 14 on the same side are arranged at equal intervals, and the arrangement of the plurality of first compression springs 14 provides a sufficient elastic force for the baffle 13.
In the invention, when the steel platform is installed, firstly, the unloading platform 2 is fixedly installed on a cross beam through a round steel anchor clamp 3, then, a steel wire rope 6 on the unloading platform 2 penetrates through a round steel pull ring 7 and is fixed through a U-shaped buckle, so that the unloading platform 2 is reinforced and fixed, when the steel platform is unloaded, building materials are firstly in rigid contact with a fixed plate 9, the building materials can downwards act on the fixed plate 9, the fixed plate 9 downwards moves to stretch a tension spring 11, under the action of a triangular seat 19, a rectangular seat 17 upwards moves in a rectangular groove 15, the rectangular seat 17 compresses a second compression spring 18, the fixed plate 9 downwards moves to drive a baffle 13 to downwards move, under the action of the inclined edge of the triangular seat 19, the baffle 13 rotates and compresses a first compression spring 14, the fixed plate 9 is buffered by the elasticity of the tension spring 11, the first compression spring 14 and the second compression spring 18, and rigid collision between the building materials and the fixed plate 9 is reduced.
The foregoing is only a preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art, who is within the scope of the present invention, should make equivalent substitutions or modifications according to the technical scheme of the present invention and the inventive concept thereof, and should be covered by the scope of the present invention.

Claims (2)

1. The utility model provides a steel platform of unloading for building engineering construction, includes three crossbeam (1), is equipped with on one crossbeam (1) in the below in three crossbeam (1) and unloads platform (2), its characterized in that, be equipped with a plurality of round steel anchor clamps (3) on unloading platform (2), and unload platform (2) through round steel anchor clamps (3) fixed mounting on one crossbeam (1) in three crossbeam (1), the top welding of unloading platform (2) has deck (4), the top fixed mounting of deck (4) has thick plank protection (5), the both sides of unloading platform (2) all fixedly connected with wire rope (6) one end, be equipped with round steel pull ring (7) on two other crossbeams (1) in the three crossbeam, and the other end and the round steel pull ring (7) fixed connection of corresponding wire rope (6), the top of unloading platform (2) is rectangle equidistant and is provided with four risers (8), the movable sleeve is equipped with same fixed plate (9) on four risers (8), the top of riser (8) is equipped with extension spring (11) on the top of extension spring (11) fixed mounting on extension spring (11), a plurality of connecting grooves (12) are formed in the bottom of the fixed plate (9), a baffle plate (13) is rotatably mounted on the inner wall of the top of the connecting groove (12), the bottom of the baffle plate (13) is extended to the lower side of the fixed plate (9), one side of the baffle plate (13) is welded with one ends of a plurality of first compression springs (14), the other ends of the first compression springs (14) are welded on the inner wall of the corresponding connecting groove (12), a rectangular groove (15) is formed in the inner wall of one side of the connecting groove (12), the same stabilizer bar (16) is fixedly mounted on the inner wall of the top of the rectangular groove (15) and the inner wall of the bottom, a rectangular seat (17) is slidably mounted in the rectangular groove (15), the rectangular seat (17) is movably sleeved on the corresponding stabilizer bar (16), one end of the second compression spring (18) is fixedly mounted on the inner wall of the rectangular groove (15), the other end of the second compression spring (18) is fixedly mounted on the corresponding rectangular seat (17), one side of the rectangular seat (17) is extended to the inner wall of the rectangular groove (15) and is fixedly mounted on the bottom of the corresponding triangular seat (19), and the triangular seat (19) is fixedly mounted on the bottom of the corresponding triangular seat (19), and is fixedly mounted on the bottom of the triangular seat (19);
two other cross beams (1) of the three cross beams (1) are provided with communication holes, a round steel pull ring (7) penetrates through the communication holes, external threads are formed on the round steel pull ring (7), and nuts are sleeved on the external threads;
four U-shaped buckles are arranged on the steel wire rope (6) and are arranged at equal intervals;
one side of one beam (1) of the three beams (1) is fixedly provided with a thrust stop block (20), and the thrust stop block (20) limits the position of the discharging table (2).
2. A steel platform for unloading for construction engineering according to claim 1, wherein the number of the first compression springs (14) on the same side is three to six, and the three to six first compression springs (14) on the same side are arranged at equal intervals.
CN201910192106.9A 2019-03-14 2019-03-14 Unloading steel platform for building engineering construction Active CN109779271B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910192106.9A CN109779271B (en) 2019-03-14 2019-03-14 Unloading steel platform for building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910192106.9A CN109779271B (en) 2019-03-14 2019-03-14 Unloading steel platform for building engineering construction

Publications (2)

Publication Number Publication Date
CN109779271A CN109779271A (en) 2019-05-21
CN109779271B true CN109779271B (en) 2024-01-19

Family

ID=66489245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910192106.9A Active CN109779271B (en) 2019-03-14 2019-03-14 Unloading steel platform for building engineering construction

Country Status (1)

Country Link
CN (1) CN109779271B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110509204A (en) * 2019-08-21 2019-11-29 大同新成新材料股份有限公司 A kind of fixture and its method preparing ultra-thin carbon carbon composite panel
CN112942853B (en) * 2021-02-01 2022-04-22 浙江建设职业技术学院 Self-locking anti-overturning type discharging platform for building construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0734146U (en) * 1993-12-03 1995-06-23 株式会社フジタ Unloading gantry
CN206873953U (en) * 2017-06-30 2018-01-12 河北中硕建筑工程有限公司 Construction discharging platform
CN207032895U (en) * 2017-07-18 2018-02-23 西安建工第四建筑有限责任公司 A kind of removable discharging platform with automatically-controlled door
CN207348479U (en) * 2017-09-22 2018-05-11 张志军 A kind of discharging platform of construction
CN209837723U (en) * 2019-03-14 2019-12-24 安徽宏志建设工程有限责任公司 Constructional engineering construction is with steel platform of unloading

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0734146U (en) * 1993-12-03 1995-06-23 株式会社フジタ Unloading gantry
CN206873953U (en) * 2017-06-30 2018-01-12 河北中硕建筑工程有限公司 Construction discharging platform
CN207032895U (en) * 2017-07-18 2018-02-23 西安建工第四建筑有限责任公司 A kind of removable discharging platform with automatically-controlled door
CN207348479U (en) * 2017-09-22 2018-05-11 张志军 A kind of discharging platform of construction
CN209837723U (en) * 2019-03-14 2019-12-24 安徽宏志建设工程有限责任公司 Constructional engineering construction is with steel platform of unloading

Also Published As

Publication number Publication date
CN109779271A (en) 2019-05-21

Similar Documents

Publication Publication Date Title
CN109779271B (en) Unloading steel platform for building engineering construction
CN207402529U (en) A kind of switching mechanism
CN207844788U (en) A kind of buffer of elevator
CN209837723U (en) Constructional engineering construction is with steel platform of unloading
KR102062199B1 (en) Gondola supporting and fixing apparatus
CN108083171A (en) A kind of construction material lift equipment
KR101169218B1 (en) Hanging scaffold work chair
CN211971447U (en) Car platform bracket structure
JP2009269678A (en) Landing position detection device of elevator
CN207959016U (en) A kind of bridge construction Special hanging basket device
DE112014000114B4 (en) Adjustable false floor of a large double-decker conveyor basket and adjustment and movement of the same
CN210559219U (en) A operation platform for lift
CN210393352U (en) Elevator car frame
CN107651570A (en) A kind of monkey raising caging device
CN209922821U (en) Portable hoisting device is used to engineering fitment
CN210029677U (en) Elevator car bottom device
CN109750602B (en) Slamming-preventing quick emptying device for offshore hoisting
CN207046628U (en) A kind of bottom type rope broken protector
CN208120684U (en) A kind of anti-fall mechanism for stacker loading platforms
CN204689322U (en) The base that elevator traction machine is anti-tipping can be fixed
CN205652957U (en) Elevator car's buffering protection device that falls
CN208577343U (en) A kind of construction site steel fixation devices
CN214495003U (en) Multi-channel loading and unloading platform for butt joint of vehicles and ships with live cows
CN211496524U (en) Cargo lifter
CN219429429U (en) Passenger elevator safety protection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Building 1, Management Committee of Longgang Development Zone, Yaohai District, Hefei City, Anhui Province, 230000

Applicant after: Anhui Hongzhi Construction Group Co.,Ltd.

Address before: Rooms 703 and 706, Fortune Plaza, No. 278 Suixi Road, Luyang District, Hefei City, Anhui Province, 230041

Applicant before: ANHUI HONGZHI CONSTRUCTION ENGINEERING Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant