CN206873953U - Construction discharging platform - Google Patents

Construction discharging platform Download PDF

Info

Publication number
CN206873953U
CN206873953U CN201720779890.XU CN201720779890U CN206873953U CN 206873953 U CN206873953 U CN 206873953U CN 201720779890 U CN201720779890 U CN 201720779890U CN 206873953 U CN206873953 U CN 206873953U
Authority
CN
China
Prior art keywords
support
fixedly connected
casing
fix bar
discharging platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720779890.XU
Other languages
Chinese (zh)
Inventor
薛少敬
陈军民
崔志永
李喜良
陈金成
樊立静
段来顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Zhong Shuo Architectural Engineering Co Ltd
Original Assignee
Hebei Zhong Shuo Architectural Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Zhong Shuo Architectural Engineering Co Ltd filed Critical Hebei Zhong Shuo Architectural Engineering Co Ltd
Priority to CN201720779890.XU priority Critical patent/CN206873953U/en
Application granted granted Critical
Publication of CN206873953U publication Critical patent/CN206873953U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses construction discharging platform, including bottom plate, right side at the top of the bottom plate is fixedly connected with the second guardrail, front side and rear side at the top of the bottom plate have been fixedly connected with the first guardrail, both sides at the top of first guardrail have been fixedly connected with casing, damping spring is fixedly connected with the center of the cabinet wall bottom, the both sides of the cabinet wall bottom slidably connect second support, connecting rod is connected with the surface of the second support.The utility model is by setting being used cooperatively for fix bar, baffle plate, casing, first support, connecting rod, damping spring, through hole, support bar and second support, solving existing construction discharging platform does not have protector, the problem of life security of user being threatened, the construction discharging platform, possesses the advantages of protection effect is good, the use of user is facilitated, it is simple in construction, it is worthy to be popularized.

Description

Construction discharging platform
Technical field
It the utility model is related to technical field of building construction, specially construction discharging platform.
Background technology
In recent years, with the high speed development of urban construction, urban land resource is fewer and fewer, thereby produces a large amount of height Layer building, skyscraper need to use construction with unloading in material transports such as template in construction process, steel pipe OR gate subracks Expect platform, existing construction is poor with discharging platform protection effect, therefore user is unloaded in construction with discharging platform During material, because the debris on building is more, the debris of high level can be caused to fall down unavoidably, so as to which the life of user can be threatened Life safety.
Utility model content
The purpose of this utility model is to provide construction discharging platform possess the advantages of protection effect is good, solves Existing construction discharging platform does not have protector, the problem of can be threatened to the life security of user.
To achieve the above object, the utility model provides following technical scheme:Construction discharging platform, including bottom Plate, the right side at the top of the bottom plate are fixedly connected with the second guardrail, and the front side and rear side at the top of the bottom plate have been fixedly connected with First guardrail, the both sides at the top of first guardrail have been fixedly connected with casing, fixed at the center of the cabinet wall bottom Damping spring is connected with, the both sides of the cabinet wall bottom slidably connect second support, the surface of the second support On be connected with connecting rod, the one end of the connecting rod away from second support is connected with first support, described first Fix bar is fixedly connected with the top of frame, the top of the damping spring is fixedly connected with fix bar, the fix bar both sides Bottom has been fixedly connected with support bar, and the inwall of the support bar one end and casing away from fix bar is slidably connected, described solid The outside of casing is extended at the top of fixed pole, baffle plate is fixedly connected with the top of the fix bar.
Preferably, the front side on the left of the bottom plate and rear side have been fixedly connected with location-plate, and two at the top of the location-plate Side offers positioning hole, and the through hole being used cooperatively with fix bar is offered at the top of the casing.
Preferably, the one end of the support bar away from fix bar is fixedly connected with the first sliding block, the cabinet wall both sides Bottom offer the first chute being used cooperatively with the first sliding block.
Preferably, the bottom of the second support is fixedly connected with the second sliding block, and the both sides of the cabinet wall bottom are equal Offer the second chute being used cooperatively with the second sliding block.
Preferably, it is flexibly connected on the surface of the first support by the first pivot pin with connecting rod, the connecting rod is remote One end from first support is flexibly connected by the second pivot pin with second support.
Compared with prior art, the beneficial effects of the utility model are as follows:
1st, the utility model is by setting fix bar, baffle plate, casing, first support, connecting rod, damping spring, through hole, branch Strut and second support are used cooperatively, and solving existing construction discharging platform does not have protector, can be to using The problem of life security of person threatens, the construction discharging platform, possesses the advantages of protection effect is good, facilitating makes The use of user, it is simple in construction, it is worthy to be popularized.
2nd, the utility model being used cooperatively by support bar, the first sliding block and the first chute, moves down fix bar Shi Gengjia is stable, avoid because fix bar by external force when, cause fix bar move down can run-off the straight situation, so as to shadow The stability of fix bar has been rung, by being used cooperatively for the second sliding block and the second chute, has slided second support more smooth, Avoid because the frictional force between second support and cabinet wall is larger, cause second support to be in the presence of damaging, extend The service life of second support, by being used cooperatively for location-plate and positioning hole, fixed effect can be played to bottom plate, is added The stability of bottom plate, make the stablizing effect of bottom plate more preferable.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the top view of the utility model structure;
Fig. 3 is the sectional view of the utility model casing;
Fig. 4 is the utility model A partial enlarged drawing;
Fig. 5 is the utility model B partial enlarged drawing.
In figure:1 bottom plate, 2 first guardrails, 3 second guardrails, 4 fix bars, 5 baffle plates, 6 casings, 7 positioning holes, 8 location-plates, 9 First support, 10 connecting rods, 11 damping springs, 12 through holes, 13 support bars, 14 first sliding blocks, 15 first chutes, 16 second Frame, 17 second sliding blocks, 18 second chutes.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-5, construction discharging platform, including bottom plate 1 are referred to, the front side in the left side of bottom plate 1 and rear side are fixed Location-plate 8 is connected with, the both sides at the top of location-plate 8 offer positioning hole 7, made by the cooperation of location-plate 8 and positioning hole 7 With can play fixed effect to bottom plate 1, add the stability of bottom plate 1, make the stablizing effect of bottom plate 1 more preferable, bottom plate 1 pushes up The second guardrail 3 is fixedly connected with the right side of portion, the front side at the top of bottom plate 1 and rear side have been fixedly connected with the first guardrail 2, the first shield The both sides at the top of column 2 have been fixedly connected with casing 6, and the top of casing 6 offers the casing of through hole 12 being used cooperatively with fix bar 4 Damping spring 11 is fixedly connected with the center of 6 inwall bottoms, the both sides of the inwall bottom of casing 6 slidably connect second support 16, the bottom of second support 16 is fixedly connected with the second sliding block 17, and the both sides of the inwall bottom of casing 6 offer and the second sliding block 17 the second chutes 18 being used cooperatively, by being used cooperatively for the second sliding block 17 and the second chute 18, slide second support 16 It is more smooth, avoid because the frictional force between second support 16 and the inwall of casing 6 is larger, cause second support 16 to damage Bad situation, the service life of second support 16 is extended, connecting rod 10 is connected with the surface of second support 16, connected The one end of bar 10 away from second support 16 is connected with first support 9, passes through the first pivot pin and company on the surface of first support 9 Extension bar 10 is flexibly connected, and the one end of connecting rod 10 away from first support 9 is flexibly connected by the second pivot pin with second support 16, the The top of one support 9 is fixedly connected with fix bar 4, and the top of damping spring 11 is fixedly connected with fix bar 4, the both sides of fix bar 4 Bottom be fixedly connected with support bar 13, the one end of support bar 13 away from fix bar 4 is fixedly connected with the first sliding block 14, casing The bottom of 6 inwall both sides offers the first chute 15 being used cooperatively with the first sliding block 14, passes through support bar 13, the first sliding block 14 and first chute 15 be used cooperatively, make fix bar 4 more stable when moving down, avoid because fix bar 4 is by external force When, cause fix bar 4 to move down the situation of meeting run-off the straight, so as to have impact on the stability of fix bar 4, support bar 13 is remote One end of fix bar 4 and the inwall of casing 6 are slidably connected, and the top of fix bar 4 extends to the outside of casing 6, the top of fix bar 4 Portion is fixedly connected with baffle plate 5.
In use, when building that debris is pounded to baffle plate 5 under placement in height, baffle plate 5 starts to move down, and is driven by baffle plate 5 Fix bar 4, support bar 13 is driven by fix bar 4, by the first sliding blocks 14 of drive of support 13 in the first chute 15 to moving down It is dynamic, first support 9 is driven by fix bar 4, connecting rod 10 is driven by first support 9, second is driven by connecting rod 10 Frame 16, drive the second sliding block 17 in the second chute 18 while slip by second support 16, fix bar 4 makes damping spring 11 Shrink, so that the stablizing effect of fix bar 4 is more preferable, reduces the extent of damage of baffle plate 5, add construction discharging platform pair The protection effect of user.
In summary:The construction discharging platform, by set fix bar 4, baffle plate 5, casing 6, first support 9, Connecting rod 10, damping spring 11, through hole 12, support bar 13 and second support 16 are used cooperatively, and are solved existing building and are applied Work discharging platform does not have protector, the problem of being threatened to the life security of user.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. construction discharging platform, including bottom plate (1), it is characterised in that:Right side at the top of the bottom plate (1) is fixedly connected There is the second guardrail (3), the front side and rear side at the top of the bottom plate (1) have been fixedly connected with the first guardrail (2), first guardrail (2) both sides at the top of have been fixedly connected with casing (6), and damping bullet is fixedly connected with the center of casing (6) the inwall bottom Spring (11), the both sides of casing (6) the inwall bottom slidably connect second support (16), the table of the second support (16) Connecting rod (10) is connected with face, the one end of the connecting rod (10) away from second support (16) is connected with first Frame (9), fix bar (4), the top of the damping spring (11) and fix bar are fixedly connected with the top of the first support (9) (4) it is fixedly connected, the bottom of fix bar (4) both sides has been fixedly connected with support bar (13), and the support bar (13) is remote One end of fix bar (4) and the inwall of casing (6) are slidably connected, and the outer of casing (6) is extended at the top of the fix bar (4) Portion, baffle plate (5) is fixedly connected with the top of the fix bar (4).
2. construction discharging platform according to claim 1, it is characterised in that:Front side on the left of the bottom plate (1) Location-plate (8) has been fixedly connected with rear side, and the both sides at the top of the location-plate (8) offer positioning hole (7), the casing (6) through hole (12) being used cooperatively with fix bar (4) is offered at the top of.
3. construction discharging platform according to claim 1, it is characterised in that:The support bar (13) is away from fixed One end of bar (4) is fixedly connected with the first sliding block (14), and the bottom of casing (6) the inwall both sides offers and the first sliding block (14) the first chute (15) being used cooperatively.
4. construction discharging platform according to claim 1, it is characterised in that:The bottom of the second support (16) The second sliding block (17) is fixedly connected with, the both sides of casing (6) the inwall bottom, which offer to coordinate with the second sliding block (17), to be made Second chute (18).
5. construction discharging platform according to claim 1, it is characterised in that:The surface of the first support (9) Upper to be flexibly connected by the first pivot pin with connecting rod (10), one end of the remote first support (9) of the connecting rod (10) passes through the Two pivot pins are flexibly connected with second support (16).
CN201720779890.XU 2017-06-30 2017-06-30 Construction discharging platform Expired - Fee Related CN206873953U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720779890.XU CN206873953U (en) 2017-06-30 2017-06-30 Construction discharging platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720779890.XU CN206873953U (en) 2017-06-30 2017-06-30 Construction discharging platform

Publications (1)

Publication Number Publication Date
CN206873953U true CN206873953U (en) 2018-01-12

Family

ID=61332320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720779890.XU Expired - Fee Related CN206873953U (en) 2017-06-30 2017-06-30 Construction discharging platform

Country Status (1)

Country Link
CN (1) CN206873953U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779271A (en) * 2019-03-14 2019-05-21 安徽宏志建设工程有限责任公司 A kind of building engineering construction steel platform for material unloading
CN109914821A (en) * 2019-04-05 2019-06-21 云南建投第二建设有限公司 Discharging platform is used in a kind of construction of high-rise public building

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779271A (en) * 2019-03-14 2019-05-21 安徽宏志建设工程有限责任公司 A kind of building engineering construction steel platform for material unloading
CN109779271B (en) * 2019-03-14 2024-01-19 安徽宏志建设集团有限公司 Unloading steel platform for building engineering construction
CN109914821A (en) * 2019-04-05 2019-06-21 云南建投第二建设有限公司 Discharging platform is used in a kind of construction of high-rise public building

Similar Documents

Publication Publication Date Title
CN107289240A (en) A kind of mining machinery damping base
CN206873953U (en) Construction discharging platform
CN212052812U (en) Rolling stone device for safety protection high slope blasting
CN206308968U (en) A kind of skyscraper vertical garbage transport channel
CN205637528U (en) Scaffold frame that building engineering used
CN208499156U (en) A kind of assembled architecture component shipping protector
CN203809982U (en) Mine electromechanical equipment operating platform
CN206189429U (en) Cofferdam for river channel revetment
CN207091926U (en) A kind of science of bridge building protector
CN209075904U (en) Steel tower climbs Defend, fall device guide rail fixing device for installing
CN207971743U (en) A kind of Hardware fitting cutter device
CN209854661U (en) Water conservancy construction slope protection structure
CN205834738U (en) Liftable machine tool structure
CN214365084U (en) Ground safety device for construction
CN204690599U (en) Road and bridge engineering protector
CN207974831U (en) Bamboo formula portal structure is cut in a kind of tunnel that blocking small-sized falling rocks
CN209353660U (en) A kind of portable electric stair shaft workbench
CN208235356U (en) A kind of environmental protection combined type sand-protecting barrier
CN208248268U (en) A kind of insulating board for building mobile device with shock-absorbing function
CN207211085U (en) Concrete gravity dam arrangement before rock
CN208152569U (en) A kind of new type formwork support protecting apptss
CN206366149U (en) A kind of height adjustable and the athletic training table tennis table with damping
CN207512774U (en) Adjacent foundation pits connecting structure of bottom plate
CN215759982U (en) Green building materials are with cavity building panel with antidetonation effect
CN205221557U (en) Glass frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180112

Termination date: 20200630

CF01 Termination of patent right due to non-payment of annual fee