CN109778928A - One kind underpining the prestressed reaction frame of pile foundation offer and its application method for giving - Google Patents

One kind underpining the prestressed reaction frame of pile foundation offer and its application method for giving Download PDF

Info

Publication number
CN109778928A
CN109778928A CN201910154178.4A CN201910154178A CN109778928A CN 109778928 A CN109778928 A CN 109778928A CN 201910154178 A CN201910154178 A CN 201910154178A CN 109778928 A CN109778928 A CN 109778928A
Authority
CN
China
Prior art keywords
pile foundation
hydraulic jack
filling pad
top surface
reaction beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910154178.4A
Other languages
Chinese (zh)
Inventor
王枫
蒋炯玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Maple Stone Hall Engineering Technology Co Ltd
Original Assignee
Suzhou Maple Stone Hall Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Maple Stone Hall Engineering Technology Co Ltd filed Critical Suzhou Maple Stone Hall Engineering Technology Co Ltd
Priority to CN201910154178.4A priority Critical patent/CN109778928A/en
Publication of CN109778928A publication Critical patent/CN109778928A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses one kind to underpin the prestressed reaction frame of pile foundation offer for giving, it is characterized by comprising the reaction beam being mounted on outside pile foundation and two pack supports, the bottom of two pack supports through bolt locking be installed on pile foundation two sides on underpinning cap of pile foundation structure top surface, the both ends of the reaction beam are connected with the top surface of two pack supports respectively, and the reaction beam is set to the surface of the pile foundation;Supporting and limiting device is additionally provided on the top surface of the pile foundation, the bottom of the supporting and limiting device is butted on the top surface of the pile foundation, is butted on the bottom surface of the reaction beam at the top of the supporting and limiting device.The present invention efficiently solves the sedimentation of pile foundation, reduces security risk.

Description

One kind underpining the prestressed reaction frame of pile foundation offer and its application method for giving
Technical field
The present invention relates to a kind of building field, more particularly to it is a kind of for underpin pile foundation provide prestressed reaction frame and Its application method.
Background technique
In the prior art, pile foundation is mainly used for the carrying and support of building.But since ground is in a period of time Afterwards, it may appear that more or less sedimentation will lead to the security risks such as building inclination in this way.Or subsequent load-carrying has been more than to set The load-carrying of meter can also have biggish security risk.
Therefore, in order to guarantee the safety built, it will do it underpining for pile foundation, that is, carry out the staking replacement of pile foundation.But It is that in the use process after pile foundation underpinning, can be generated after extraneous load gradually applies up by increased single pile itself Certain sedimentation, in this way in contingency question, the security risk of building is not able to be resolved.
Summary of the invention
It is an object of the present invention to provide one kind for passing through to the prestressed reaction frame of pile foundation offer and its application method is underpined Using the structure and method, the settlement issues for underpining pile foundation are effectively solved, guarantee the safety used.
In order to achieve the above objectives, the technical solution adopted by the present invention is that: one kind for underpin pile foundation provide it is prestressed Reaction frame, including the reaction beam and two pack supports being mounted on outside pile foundation, the bottom of two pack supports is installed on stake through bolt locking Base two sides to which on underpinning cap of pile foundation structure top surface, the both ends of the reaction beam are connected with the top surface of two pack supports respectively, institute State the surface that reaction beam is set to the pile foundation;Supporting and limiting device, the support limit are additionally provided on the top surface of the pile foundation The bottom of position device is butted on the top surface of the pile foundation, and the bottom surface of the reaction beam is butted at the top of the supporting and limiting device On.
In above-mentioned technical proposal, the bolt embedment is on to underpinning cap of pile foundation structure top surface.
In above-mentioned technical proposal, the supporting and limiting device includes plural groups filling pad, filling pad described in plural groups by Under it is supreme stacking be placed on the top surface of the pile foundation, filling pad described in bottommost is butted on the pile foundation top surface, top institute The top surface for stating filling pad is butted on the bottom surface of the reaction beam.
In above-mentioned technical proposal, it is additionally provided with a hydraulic jack, the hydraulic jack is removably placed in the stake On the top surface of base, the output shaft of the hydraulic jack is butted on the bottom surface of the reaction beam.
In above-mentioned technical proposal, it is additionally provided with a cushion block, the cushion block is placed on the pile foundation top surface, U described in bottommost Type gasket is butted on the top surface of the cushion block, and the stage of the hydraulic jack is removably placed in the top surface of the cushion block On.
In above-mentioned technical proposal, the hydraulic jack is placed on pile foundation top surface, installs filling pad described in plural groups Afterwards, the filling pad surrounds the hydraulic jack, and the hydraulic jack is made to be inserted in the U-type groove of the filling pad It is interior;There are gaps between ambient and the hydraulic jack inside the filling pad, are used for hydraulic jack prestressing force Taking-up after the completion of application.
In above-mentioned technical proposal, the bracket includes bottom plate and the riser that is installed vertically in the middle part of plate top surface, the bottom Plate is lock on ground through the bolt, and the end of the reaction beam is connected with the top of the riser.
In order to achieve the above objectives, present invention employs a kind of for providing the use of prestressed reaction frame to underpining pile foundation Method the steps include:
After 1. pile foundation completes, first pre-buried multiple groups bolt, the top of pile foundation on the mattess on the outside of pile foundation It is exposed at the top of mattess;
2. reaction beam passes through the bracket of two sides and is bolted fixation, make reaction beam that the surface of pile foundation is set;
3. first cushion block is placed on the top surface of pile foundation, then hydraulic jack is placed on the top surface of cushion block;
4. the output shaft of hydraulic jack is driven to stretch out, the size of the axle power output of hydraulic jack can be by hydraulic jack Hydraulic meter reading conversion obtain or using pressure sensor obtain;
5. hydraulic jack output shaft continues to stretch out, until pressure value and setting above hydralic pressure gauge or pressure sensor Value is consistent, and in this process, the position of reaction beam is constant, and such hydraulic jack can generate a vertical force down and push Pile foundation generates part and sinks to deforming, to complete prestressed application;
6. covering filling pad in the outside of jack, the thickness of the filling pad is identical or different, described U-shaped There is spacing between the inner wall of gasket and the outer wall of jack, do not contact, be then successively superimposed multiple groups filling pad, until most pushing up The filling pad in portion is close to the bottom surface of reaction beam;After completing prestress application, and filling pad is placed after completing, and holding is answered in advance The stabilization of force value, the deformation between pile foundation and reaction beam due to sinking at the top of the stress of system itself, the deformation of strain and pile foundation The superposition of two kinds of factors will appear gap, and the same or different filling pad of thickness is inserted into gap according to this, as gap compared with Tightly, auxiliary external force can be applied with hand hammer to hammer;
7. unclamping hydraulic jack, that is, the output shaft retraction of hydraulic jack, it is certain that such pile foundation can rise recovery Slight distance, since filling pad is against on the bottom surface of reaction beam, using multiple groups filling pad between pile foundation and reaction beam into Row limit, prevents the rebound of pile foundation and existing upper lift, to effectively maintain prestressing force;
8. after 48 hours, the position first between range estimation filling pad and reaction beam is with the presence or absence of variation, if do not become Change, after visual inspection is without exception, hydraulic jack is put between pile foundation and reaction beam, is pressurizeed again using hydraulic jack Illustrate that stress is in effective maintenance state, by the hydraulic of multiple pressure to the stress numerical of setting if whole system does not change Jack is removed again, and directly in pile foundation and the surface casting concrete of reaction beam, reaction beam, pile foundation and filling pad are covered Protection is buried, interference and erosion of the outside climatic to reaction frame system in subsequent use process are prevented, if hydraulic jack Have found that stress has the case where loose and self-heating unloading after multiple pressure, then repeat 4.~8. the step of, until qualified;
In above-mentioned technical proposal, the step 8. in, lead to not continue to erect if reaction beam occurs bending and deformation If pressure, then illustrates that the stress of reaction beam cannot access satisfaction, need replacing the bigger reaction beam of intensity, resume at step 2. until qualified.
In above-mentioned technical proposal, the cushion block size matches with the pile foundation top dimension or the size of the cushion block Greater than the outer diameter of filling pad.
Due to the above technical solutions, the present invention has the following advantages over the prior art:
1. the prestressing force for just applying a constant load in the present invention before underpining pile foundation and using uses single pile subsequent Deformation in the process is fulfiled ahead of schedule, and after completing this deformation that prestress application mechanism and foundation platform structure is permanent Rigid connection, this building safety hidden danger can be obtained by effective solution
2. the cooperation of position-limit mechanism and reaction beam can by the setting of support limit mechanism and reaction beam in the present invention Pile foundation is pushed, so that pile foundation is squeezed pile foundation installation position, prevents the subsequent settlement issues of pile foundation, effectively improve the safety of building Property, reduce security risk;
3. first reaction beam is fixed in the present invention, the thrust of jack and the fixation of reaction beam, such energy are recycled It is enough to be pushed away under pile foundation, push pile foundation to sink in advance, recycle filling pad to after sinking pile foundation and reaction frame be supported, both It can guarantee the case where pile foundation is sunk when subsequent use, effectively improve the safety of building, reduce security risk, and It is low in cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram in the embodiment of the present invention one;
Fig. 2 is the structural schematic diagram in the embodiment of the present invention one at reaction frame top;
Fig. 3 is the structural schematic diagram of filling pad in the embodiment of the present invention one.
Wherein: 1, reaction beam;2, bracket;3, bolt;4, pile foundation;5, to underpinning cap of pile foundation structure;6, cushion block;7, U-shaped Gasket;8, hydraulic jack;9, bottom plate;10, riser.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and embodiments:
Embodiment one: referring to shown in Fig. 1~3, one kind underpining the prestressed reaction frame of pile foundation offer, including installation for giving Reaction beam 1 and two pack supports 2 outside pile foundation 4, the bottoms of two pack supports 2 locked through bolt 3 be installed on 4 two sides of pile foundation to On 5 top surface of underpinning cap of pile foundation structure, the both ends of the reaction beam are connected with the top surface of two pack supports respectively, and the reaction beam is set It is placed in the surface of the pile foundation;Supporting and limiting device, the bottom of the supporting and limiting device are additionally provided on the top surface of the pile foundation Portion is butted on the top surface of the pile foundation, is butted on the bottom surface of the reaction beam at the top of the supporting and limiting device.
The bolt embedment is on to underpinning cap of pile foundation structure top surface.
Ginseng as shown in FIGS. 1 and 2, the supporting and limiting device includes plural groups filling pad 7, filling pad described in plural groups by Under it is supreme stacking be placed on the top surface of the pile foundation, filling pad described in bottommost is butted on the pile foundation top surface, top institute The top surface for stating filling pad is butted on the bottom surface of the reaction beam.
It is additionally provided with a hydraulic jack 8, the hydraulic jack is removably placed on the top surface of the pile foundation, described The output shaft of hydraulic jack is butted on the bottom surface of the reaction beam.
It is additionally provided with a cushion block 6, the cushion block is placed on the pile foundation top surface, and filling pad described in bottommost is butted on described On the top surface of cushion block, the stage of the hydraulic jack is removably placed on the top surface of the cushion block.In the present embodiment, Cushion block can be made the outer diameter that equal with pile foundation top dimension or cushion block size is slightly larger than filling pad, can play complete Supporting role, prevent hydraulic jack or filling pad from damaging the top of pile foundation.If intensity is enough at the top of pile foundation Words, cushion block, which also can be omitted, not to be had to.
The hydraulic jack is placed on pile foundation top surface, after installing filling pad described in plural groups, the filling pad The hydraulic jack is surrounded, is inserted in the hydraulic jack in the U-type groove of the filling pad;In the filling pad There are gaps between the ambient in portion and the hydraulic jack, for taking after the completion of hydraulic jack prestress application Out.
In the present embodiment, after pile foundation completes, meeting casting concrete layer on the ground of pile foundation periphery at this time can On the ground by bolt embedment, bracket and reaction beam and bolt are then attached fixation.Hydraulic jack is placed on stake again Above base, the output shaft of hydraulic jack stretches out, and withstands on its output shaft above reaction beam, and hydraulic jack works on, when The output shaft of hydraulic jack reach certain dynamics after (by observing the hydralic pressure gauge of hydraulic jack or separately placing one A more accurate pressure sensor), that is, hydraulic jack pushes pile foundation to sink a certain distance, by pile foundation bottom Soil compacting compresses, and the pile foundation later period is made to be difficult to continue to sink.Wherein, since the cost of hydraulic jack is higher, then It is supported using multiple groups filling pad, finally removes hydraulic jack, it in this way being capable of effectively save cost.
Wherein, there are many thickness of filling pad, can be 1 centimetre, 2 centimetres, the different thickness such as 3 centimetres, in U-shaped pad When piece is placed, the filling pad of corresponding thickness can choose, wherein filling pad is made i.e. using steel disc or iron plate Can, it is low in cost, it is good that functions and effects are made.
The bracket includes bottom plate 9 and the riser being installed vertically in the middle part of plate top surface 10, and the bottom plate is through the bolt It lock on ground, the end of the reaction beam is connected with the top of the riser.
In order to achieve the above objectives, present invention employs a kind of for providing the use of prestressed reaction frame to underpining pile foundation Method the steps include:
After 1. pile foundation completes, first pre-buried multiple groups bolt, the top of pile foundation on the mattess on the outside of pile foundation It is exposed at the top of mattess;
2. reaction beam passes through the bracket of two sides and is bolted fixation, make reaction beam that the surface of pile foundation is set;
3. first cushion block is placed on the top surface of pile foundation, then hydraulic jack is placed on the top surface of cushion block;
4. the output shaft of hydraulic jack is driven to stretch out, the size of the axle power output of hydraulic jack can be by hydraulic jack The conversion of hydraulic meter reading obtain or obtained using pressure sensor (pressure sensor setting hydraulic jack and cushion block it Between);
5. hydraulic jack output shaft continues to stretch out, until pressure value and setting above hydralic pressure gauge or pressure sensor Value is consistent, and in this process, the position of reaction beam is constant, and such hydraulic jack can generate a vertical force down and push Pile foundation generates part and sinks to deforming, to complete prestressed application;
6. covering filling pad in the outside of jack, the thickness of the filling pad is identical or different, described U-shaped There is spacing between the inner wall of gasket and the outer wall of jack, do not contact, be then successively superimposed multiple groups filling pad, until most pushing up The filling pad in portion is close to the bottom surface of reaction beam;After completing prestress application, and filling pad is placed after completing, and holding is answered in advance The stabilization of force value, the deformation between pile foundation and reaction beam due to sinking at the top of the stress of system itself, the deformation of strain and pile foundation The superposition of two kinds of factors will appear gap, and the same or different filling pad of thickness is inserted into gap according to this, as gap compared with Tightly, auxiliary external force can be applied with hand hammer to hammer;
7. unclamping hydraulic jack, that is, the output shaft retraction of hydraulic jack, it is certain that such pile foundation can rise recovery Slight distance, since filling pad is against on the bottom surface of reaction beam, using multiple groups filling pad between pile foundation and reaction beam into Row limit, prevents the rebound of pile foundation and existing upper lift, to effectively maintain prestressing force;
8. after 48 hours, the position first between range estimation filling pad and reaction beam is with the presence or absence of variation, if do not become Change, after visual inspection is without exception, hydraulic jack is put between pile foundation and reaction beam, is pressurizeed again using hydraulic jack Illustrate that stress is in effective maintenance state, by the hydraulic of multiple pressure to the stress numerical of setting if whole system does not change Jack is removed again, and directly in pile foundation and the surface casting concrete of reaction beam, reaction beam, pile foundation and filling pad are covered Protection is buried, interference and erosion of the outside climatic to reaction frame system in subsequent use process are prevented, if hydraulic jack Have found that stress has the case where loose and self-heating unloading after multiple pressure, then repeat 4.~8. the step of, until qualified;
The step 8. in, if reaction beam occurs bending and deformation and leads to not continue to vertical pressure, say The stress of bright reaction beam cannot access satisfaction, need replacing the bigger reaction beam of intensity, resume at step 2., until closing Lattice.
The cushion block size and the pile foundation top dimension match or the size of the cushion block is greater than the outer of filling pad Diameter.It can prevent hydraulic jack and filling pad from damaging the top of pile foundation in this way.Wherein, if the intensity at the top of pile foundation is sufficient It is enough, cushion block can be not provided with.
In the present embodiment, using the setting of filling pad, both hydraulic jack was disassembled convenient for subsequent, also could Guarantee pile foundation and reaction beam contact range, guarantees support quality.

Claims (10)

1. one kind underpins the prestressed reaction frame of pile foundation offer for giving, it is characterised in that: anti-outside pile foundation including being mounted on Power beam and two pack supports, the bottoms of two pack supports through bolt locking be installed on pile foundation two sides to underpinning cap of pile foundation structure top surface On, the both ends of the reaction beam are connected with the top surface of two pack supports respectively, and the reaction beam is set to the surface of the pile foundation; Supporting and limiting device is additionally provided on the top surface of the pile foundation, the bottom of the supporting and limiting device is butted on the top surface of the pile foundation On, it is butted at the top of the supporting and limiting device on the bottom surface of the reaction beam.
2. according to claim 1 underpin the prestressed reaction frame of pile foundation offer for giving, it is characterised in that: the bolt It is embedded in advance on underpinning cap of pile foundation structure top surface.
3. according to claim 1 underpin the prestressed reaction frame of pile foundation offer for giving, it is characterised in that: the support Limiting device includes plural groups filling pad, and filling pad described in plural groups stacks the top surface for being placed in the pile foundation from the bottom to top On, filling pad described in bottommost is butted on the pile foundation top surface, and the top surface of filling pad described in top is butted on the reaction beam Bottom surface on.
4. according to claim 3 underpin the prestressed reaction frame of pile foundation offer for giving, it is characterised in that: be additionally provided with one Hydraulic jack, the hydraulic jack are removably placed on the top surface of the pile foundation, the output of the hydraulic jack Axis is butted on the bottom surface of the reaction beam.
5. according to claim 4 underpin the prestressed reaction frame of pile foundation offer for giving, it is characterised in that: be additionally provided with one Cushion block, the cushion block are placed on the pile foundation top surface, and filling pad described in bottommost is butted on the top surface of the cushion block, described The stage of hydraulic jack is removably placed on the top surface of the cushion block.
6. according to claim 4 underpin the prestressed reaction frame of pile foundation offer for giving, it is characterised in that: described hydraulic Jack is placed on pile foundation top surface, and after installing filling pad described in plural groups, the filling pad is by the hydraulic jack It surrounds, is inserted in the hydraulic jack in the U-type groove of the filling pad;Ambient and institute inside the filling pad State between hydraulic jack that there are gaps, for the taking-up after the completion of hydraulic jack prestress application.
7. according to claim 1 underpin the prestressed reaction frame of pile foundation offer for giving, it is characterised in that: the bracket Including bottom plate and the riser being installed vertically in the middle part of plate top surface, the bottom plate is lock on ground through the bolt, described anti- The end of power beam is connected with the top of the riser.
8. it is a kind of for providing the application method of prestressed reaction frame to underpining pile foundation, it the steps include:
1. after pile foundation completes, first pre-buried multiple groups bolt, the top of pile foundation are exposed on the mattess on the outside of pile foundation In the top of mattess;
2. reaction beam passes through the bracket of two sides and is bolted fixation, make reaction beam that the surface of pile foundation is set;
3. first cushion block is placed on the top surface of pile foundation, then hydraulic jack is placed on the top surface of cushion block;
4. the output shaft of hydraulic jack is driven to stretch out, the size of the axle power output of hydraulic jack can be by the liquid of hydraulic jack Pressure meter reading conversion is obtained or is obtained using pressure sensor;
5. hydraulic jack output shaft continues to stretch out, until pressure value and setting value one above hydralic pressure gauge or pressure sensor It causes, in this process, the position of reaction beam is constant, and such hydraulic jack can generate a vertical force down and push pile foundation It generates part to sink to deforming, to complete prestressed application;
6. covering filling pad in the outside of jack, the thickness of the filling pad is identical or different, the filling pad Inner wall and jack outer wall between have spacing, do not contact, be then successively superimposed multiple groups filling pad, until top U Type gasket is close to the bottom surface of reaction beam;After completing prestress application, and filling pad is placed after completing, and prestress value is kept Stabilization, due to sink at the top of the stress of system itself, the deformation of strain and pile foundation two kinds of deformation between pile foundation and reaction beam The superposition of factor will appear gap, and the same or different filling pad of thickness is inserted into gap according to this, can if gap is tighter It is hammered with applying auxiliary external force with hand hammer;
7. unclamping hydraulic jack, that is, the output shaft retraction of hydraulic jack, such pile foundation, which can rise, restores centainly micro- Small distance is limited using multiple groups filling pad between pile foundation and reaction beam since filling pad is against on the bottom surface of reaction beam Position prevents the rebound of pile foundation and existing upper lift, to effectively maintain prestressing force;
8. after 48 hours, the position first between range estimation filling pad and reaction beam is with the presence or absence of variation, if do not changed, Visually inspect it is without exception after, hydraulic jack is put between pile foundation and reaction beam, is forced into again using hydraulic jack The stress numerical of setting illustrates that stress is in effective maintenance state, by hydraulic the thousand of multiple pressure if whole system does not change Jin top is removed again, and directly in pile foundation and the surface casting concrete of reaction beam, the covering of reaction beam, pile foundation and filling pad is covered Protection is buried, interference and erosion of the outside climatic to reaction frame system in subsequent use process are prevented, if hydraulic jack is multiple Have found that stress has the case where loose and self-heating unloading after pressure, then repeat 4.~8. the step of, until qualified;
9. according to claim 8 for providing the application method of prestressed reaction frame to underpining pile foundation, feature exists In: the step 8. in, if reaction beam occurs bending and deformation and leads to not continue to vertical pressure, illustrate counter-force The stress of beam cannot access satisfaction, need replacing the bigger reaction beam of intensity, resume at step 2., until qualified.
10. according to claim 8 for providing the application method of prestressed reaction frame to underpining pile foundation, feature exists In: the cushion block size matches with the pile foundation top dimension or the size of the cushion block is greater than the outer diameter of filling pad.
CN201910154178.4A 2019-03-01 2019-03-01 One kind underpining the prestressed reaction frame of pile foundation offer and its application method for giving Pending CN109778928A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910154178.4A CN109778928A (en) 2019-03-01 2019-03-01 One kind underpining the prestressed reaction frame of pile foundation offer and its application method for giving

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910154178.4A CN109778928A (en) 2019-03-01 2019-03-01 One kind underpining the prestressed reaction frame of pile foundation offer and its application method for giving

Publications (1)

Publication Number Publication Date
CN109778928A true CN109778928A (en) 2019-05-21

Family

ID=66486020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910154178.4A Pending CN109778928A (en) 2019-03-01 2019-03-01 One kind underpining the prestressed reaction frame of pile foundation offer and its application method for giving

Country Status (1)

Country Link
CN (1) CN109778928A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204780907U (en) * 2015-07-06 2015-11-18 广东省建筑科学研究院集团股份有限公司 Stake device is sealed in stake of prestressed anchorage pole static pressure among civil engineering
WO2016130013A1 (en) * 2015-02-13 2016-08-18 Tiliaventus B.V. Construction having foundation for reducing effects of earthquakes
CN106400859A (en) * 2016-11-16 2017-02-15 贵州正业工程技术投资有限公司 Static pressure applying system for pretest pile
CN106836839A (en) * 2016-11-29 2017-06-13 大连久鼎祥瑞特种工程技术研究院有限公司 Fabric structure jacking increasing layer method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016130013A1 (en) * 2015-02-13 2016-08-18 Tiliaventus B.V. Construction having foundation for reducing effects of earthquakes
CN204780907U (en) * 2015-07-06 2015-11-18 广东省建筑科学研究院集团股份有限公司 Stake device is sealed in stake of prestressed anchorage pole static pressure among civil engineering
CN106400859A (en) * 2016-11-16 2017-02-15 贵州正业工程技术投资有限公司 Static pressure applying system for pretest pile
CN106836839A (en) * 2016-11-29 2017-06-13 大连久鼎祥瑞特种工程技术研究院有限公司 Fabric structure jacking increasing layer method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王星华等: "《复杂条件下长大直径桥梁桩基计算理论与试验研究》", 31 January 2018, 中国铁道出版社 *

Similar Documents

Publication Publication Date Title
CN109505317B (en) Compression resistance, resistance to plucking and horizontal static load test equipment of high stake
KR100890455B1 (en) Loading apparatus using gravitational method and apparatus of manufacturing preflex composite girder using the loading apparatus
US20120291380A1 (en) Foundation for a Wind Turbine Utilizing a Slurry of Low Viscosity Grout
CN102433845A (en) Novel temporary solidification system used for continuous beam cantilever construction
CN103603381A (en) Detection device and detection method for buttress single-pile vertical uplift static load test
CN113373996A (en) Uneven settlement adjusting device for iron tower column base and underpinning and lifting construction method
CN109778928A (en) One kind underpining the prestressed reaction frame of pile foundation offer and its application method for giving
CN111945725A (en) Prestress intelligent applying system and method for anchor cable supporting structure
CN102966051A (en) Deviation-rectifying and resetting device for bridge pier column
CN212294677U (en) End type prestressed inclined pile
CN101586344B (en) Square pressure-bearing grid-embedded wind power generation power foundation of wind power generating set
CN203049472U (en) Bridge pier stud deviation-rectifying reset device
CN212670670U (en) Loading device and test equipment for foundation pile compression-resistant static load test
CN110700332A (en) Existing building reinforcing pile foundation static load test counterforce device and test method thereof
JP2011017218A (en) Method for installing and recovering earth pressure gauge, and structure for installing the earth pressure gauge
JP2006322166A (en) Ground reinforcing method
CN202482777U (en) Novel temporary solidification system for bridge construction
KR100400701B1 (en) Method and apparatus for lifting upper portion of bridge
CN111894049A (en) Loading device and test equipment for foundation pile compression-resistant static load test
KR102123747B1 (en) Hydraulic jack module system used in floor reinforcement method
CN102660970B (en) Elastic jacking and point-by-point differential declining device arranged between building and pile top and construction method
CN107144472B (en) Multi-shape multi-scale surrounding rock pressure simulation test system and test method
KR102382028B1 (en) Preloading method for reinforcing pile by total lifting
CN102704398B (en) Jacking construction method of capping beam
CN214363685U (en) Assembly quality of interim lock stake of pile pressing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190521