KR100400701B1 - Method and apparatus for lifting upper portion of bridge - Google Patents

Method and apparatus for lifting upper portion of bridge Download PDF

Info

Publication number
KR100400701B1
KR100400701B1 KR10-2001-0033513A KR20010033513A KR100400701B1 KR 100400701 B1 KR100400701 B1 KR 100400701B1 KR 20010033513 A KR20010033513 A KR 20010033513A KR 100400701 B1 KR100400701 B1 KR 100400701B1
Authority
KR
South Korea
Prior art keywords
bridge
bolt
jack
wedge
friction plate
Prior art date
Application number
KR10-2001-0033513A
Other languages
Korean (ko)
Other versions
KR20020095523A (en
Inventor
조영철
Original Assignee
조영철
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 조영철 filed Critical 조영철
Priority to KR10-2001-0033513A priority Critical patent/KR100400701B1/en
Publication of KR20020095523A publication Critical patent/KR20020095523A/en
Application granted granted Critical
Publication of KR100400701B1 publication Critical patent/KR100400701B1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

본 발명은 교각 상에 설치되는 상판 등의 교량상부를 잭으로 인상할 수 있도록 하기 위한 교량상부 인상방법 및 그 장치에 관한 것으로, 교각 철근 배치상태를 탐사하는 단계, 철근을 피해서 다수의 홈을 형성하는 단계, 홈에 쐐기부를 갖는 볼트의 일단을 삽입하는 단계, 볼트의 쐐기부에 쐐기부재를 결합하는 단계, 볼트에 마찰판을 갖는 잭받침대를 결합하는 단계, 볼트의 타단에 너트를 결합하여 마찰판이 교각의 측면에 가압되도록 하는 단계, 잭받침대 상에 잭을 설치하는 단계 및 잭으로 교량상부를 인상하는 단계 등의 구성으로 이루어져 있으며, 마찰판과 교각 사이의 마찰력으로 교량상부의 하중을 지지하기 때문에 큰 지지력을 얻을 수 있고, 그 지지성능을 주변 여건에 맞게 쉽게 조정할 수 있으며, 잭지지대의 설치가 용이하며, 교각을 파손하지 않아도 되기 때문에 교각에 무리가 따르지 않으며, 작업 후에는 잭지지대의 철거가 용이하고, 콘크리트의 양생에 소요되던 기간을 없앨 수 있어 작업기간이 단축된다는 효과를 제공한다.The present invention relates to a bridge upper lifting method and apparatus therefor for raising a bridge upper part such as a top plate installed on a bridge with a jack, exploring a bridge reinforcement arrangement state, to form a plurality of grooves to avoid reinforcing bars Step of inserting one end of the bolt having a wedge portion in the groove, Coupling the wedge member to the wedge portion of the bolt, Coupling the jack support having a friction plate to the bolt, Coupling the nut to the other end of the bolt friction plate is It consists of the steps of pressurizing the side of the bridge, installing the jack on the jack support, and raising the upper part of the bridge with the jack. It can get supporting force, and its supporting performance can be easily adjusted to the surrounding conditions, easy to install jack support, and to break the piers. Because they do not follow the crowd on the pier, after work provides the effect that the demolition of the jack support easy and can eliminate the period of time required for the release of the concrete curing shorten the duration of the operation.

Description

교량상부 인상방법 및 그 장치{Method and apparatus for lifting upper portion of bridge}Lifting method of bridge upper part and its device {Method and apparatus for lifting upper portion of bridge}

본 발명은 교량상부 인상장치에 관한 것으로, 특히 교각 상에 설치되는 상판 등의 교량상부를 잭으로 인상할 수 있도록 하기 위한 교량상부 인상방법 및 그 장치에 관한 것이다.BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a bridge top pulling apparatus, and more particularly, to a bridge top pulling method and apparatus for allowing a top of a bridge such as a top plate installed on a bridge to be pulled up by a jack.

일반적으로, 교량은 교각과 교각의 상부에 걸쳐 설치되는 교량빔과 상판 등의 상부구조물로 구성되어 있고, 그 교량 상판과 빔은 설치후 작용하는 신축응력에 따른 팽창 또는 수축, 지진력 완충을 할 수 있도록 일단은 고정되고 다른 일단은 가동단의 상태로 교각 위에 걸쳐서 설치된다.In general, the bridge is composed of bridges and upper structures, such as bridge beams and top plates, which are installed over the bridges and the tops of the bridges. One end is fixed and the other end is installed over the piers in the state of movable end.

이와 같은 교량은 설치 후 시간이 경과됨에 따라 여러 가지 형태의 자연적 또는 인위적 요인으로 인하여 상판이나 교좌장치가 파손되면, 이를 보수하거나 교체하여주어야 한다. 또, 구형의 교좌장치를 상대적으로 높이가 높은 신형의 교좌장치로 교체하여주어야 할 경우도 있으며, 이 경우 교량상부를 인상시키는 작업이 필요하다.Such bridges must be repaired or replaced as time passes after installation, if the top plate or bridge system is damaged due to various types of natural or artificial factors. In addition, it may be necessary to replace the old bridge device with a new one with a relatively high height, in which case it is necessary to raise the upper bridge.

일반적으로 교량 보수는 교량상판이나 빔 구조물을 철거 또는 해체함이 없이 보수를 요하는 부위의 교량상부만을 유압 잭을 사용하여 들어 올려서 보수하는 방법이 이용되고 있다. 유압 잭을 이용하여 상판 등의 교량상부를 들어 올리기 위해서는 교각과 교량상부 사이에 유압 잭을 설치할 수 있는 공간이 있어야 한다.In general, a bridge repair is performed by using a hydraulic jack to lift a bridge upper part of a part requiring repair without dismantling or dismantling a bridge deck or beam structure. In order to lift the upper part of the bridge by using the hydraulic jack, there must be a space for installing the hydraulic jack between the bridge and the upper part of the bridge.

즉, 교각과 교량상부 사이에 유압 잭을 설치할 수 있는 공간이 있는 경우에는 별문제가 없으나, 예를 교각과 교량상부 사이에 설치되는 교좌장치로 경질 고무판을 사용한 교량의 경우 교각과 교량상부 사이에 잭을 설치할 수 있는 공간이 없다. 이러한 경우 교각의 측면을 일정 이상 부수고, 거기에 새로이 철근 등을 넣어 교각 측면으로 돌출되는 콘크리트 구조물을 새로이 형성하여 유압 잭이 설치될 수 있도록 하는 방식을 이용한다. 이와 관련하여 첨부된 도 1과 도 2를 참조하여 종래의 교량상부 인상방법의 일 예를 설명한다.In other words, if there is a space for installing hydraulic jack between the bridge and the upper part of the bridge, there is no problem, but for example, a bridge using a hard rubber plate as a bridge device installed between the bridge and the upper part of the bridge, the jack between the bridge and the upper part of the bridge There is no space to install it. In this case, the side of the pier is crushed more than a certain amount, and a new reinforcing bar, such as to form a new concrete structure protruding to the side of the pier to use a hydraulic jack can be installed. In this regard, an example of a conventional bridge upper pulling method will be described with reference to FIGS. 1 and 2.

도 1은 종래의 교량상부 인상방법을 설명하기 위한 교량의 측면도이고, 도 2는 도 1 교량에서의 작업 과정을 설명하기 위한 블록도이다.1 is a side view of a bridge for explaining a conventional bridge upper lifting method, Figure 2 is a block diagram for explaining the operation of the bridge in FIG.

즉, 교각(52)과 교량상부(54) 사이에 교좌장치로 경질고무판(60) 등 그 두께가 얇은 것을 사용한 경우, 교각(52) 상면에는 유압잭(70)을 설치할 수 없다. 이 경우, 종래에는 도 1에 나타낸 바와 같이 교량의 교각(52)의 상부 측면을 부분적으로 파쇄하고(단계 1), 거기에 철근(53)을 넣어 교각(52)에 있는 철근(53a)과 연결한 다음(단계 2), 거푸집으로 둘러싸고(단계 3), 콘크리트를 타설(단계 4)하여 7~8일정도 양생하여 교각(52) 측면에 잭지지대(56)를 일체로 형성하고(단계 5), 그 위에 유압잭(70)을 설치하여(단계 6) 교량상부(54)를 인상하였다(단계 7).That is, when the thickness of the hard rubber plate 60 such as the hard rubber plate 60 is used as the bridge device between the bridge 52 and the bridge upper portion 54, the hydraulic jack 70 cannot be provided on the top surface of the bridge 52. In this case, conventionally, as shown in FIG. 1, the upper side of the bridge 52 of the bridge is partially crushed (step 1), and the reinforcement 53 is put there to connect with the reinforcement 53a of the bridge 52. Then (step 2), surrounded by formwork (step 3), the concrete is poured (step 4) to cure for 7-8 days to form a jack support 56 integrally on the side of the piers 52 (step 5) The hydraulic jack 70 was installed thereon (step 6) to raise the bridge upper portion 54 (step 7).

이러한 교량상부 인상공법을 이용하는 경우, 교각(52)의 파쇄작업이 매우 힘들다.In the case of using such an upper bridge raising method, the crushing work of the bridge 52 is very difficult.

또, 교각(52)의 파쇄과정에서 작용하는 충격으로 인하여 교각(52)에 균열이 생길 수 있다.In addition, a crack may occur in the piers 52 due to the impact acting in the fracture process of the piers 52.

또, 경우에 따라서는 교량상부(54) 인상중에 그 위로 차량이 통행하여야 하는데, 이 경우 기존 교각(52)과 콘크리트를 새로이 타설하여 양생한 부분 사이의 접합 강도가 약하기 때문에 안전성 면에도 문제가 있다.In some cases, the vehicle must pass over the upper portion of the bridge 54. In this case, there is a problem in terms of safety because the joint strength between the existing bridge 52 and the newly-cast portion is weak. .

그 외에 콘크리트 양생에 시간이 많이 걸릴 뿐만 아니라, 교량보수가 끝난 후 잭지지대(110)의 제거작업이 매우 힘들다.In addition to the concrete curing takes a lot of time, after the bridge repair is completed, the removal of the jack support 110 is very difficult.

물론, 교각의 높이가 낮은 경우에는 교각 옆쪽 지면상에 임시구조물을 설치하여 잭지지대를 마련할 수도 있으나, 이 역시 비경제적이며 힘들고 어려운 작업이다.Of course, when the height of the pier is low, it is possible to provide a jack support by installing a temporary structure on the ground side of the pier, but this is also uneconomical, difficult and difficult work.

본 발명의 목적은 교각을 많이 파손하지 않으면서도 큰 지지력으로 교량상부를 인상할 수 있을 뿐만 아니라 잭지지대의 설치가 쉽고, 작업 후에는 잭지지대의 철거가 간편한 교량상부 인상방법을 제공하는데 있다.An object of the present invention is to provide a bridge upper lifting method that can not only raise the bridge upper portion with a large support force without damaging the pier, but also easy installation of the jack support, easy to remove the jack support after work.

본 발명의 다른 목적은 본 발명의 방법을 구현하기 위한 교량상부 인상장치를 제공하는데 있다.Another object of the present invention is to provide an upper bridge lifting device for implementing the method of the present invention.

도 1은 종래의 교량상부 인상방법을 설명하기 위한 교량의 측면도이고,1 is a side view of a bridge for explaining a conventional bridge upper lifting method,

도 2는 도 1 교량에서의 작업 과정을 설명하기 위한 블록도,FIG. 2 is a block diagram illustrating a working process in the bridge shown in FIG. 1;

도 3은 본 발명에 따른 교량상부 인상장치가 설치된 상태를 나타낸 교량의 측단면도이고,3 is a side cross-sectional view of a bridge showing a state where the upper bridge lifting apparatus according to the present invention is installed,

도 4는 본 발명에 따른 교량상부 인상장치가 설치된 상태를 나타낸 교량의 정면도,4 is a front view of the bridge showing a state in which the upper bridge lifting apparatus according to the present invention is installed,

도 5는 잭지지대가 고정된 상태를 보여주는 부분확대 단면도,5 is a partially enlarged cross-sectional view showing a state in which the jack support is fixed,

도 6은 교각 양측의 잭지지대를 텐션바로 연결한 상태를 나타낸 측단면도,Figure 6 is a side cross-sectional view showing a state in which the jack support on both sides of the piers connected by the tension bar,

도 7과 도 8은 도 3∼도 5에서 설명한 마찰판을 교각에 밀착시켜주기 위한 볼트와 너트, 쐐기부재 및 보강판의 분리 사시도,7 and 8 are an exploded perspective view of the bolt and nut, the wedge member and the reinforcing plate for bringing the friction plate described in FIGS.

도 9는 본 발명에 따른 교량상부 인상방법에 따른 작업과정을 설명하기 위한 블록도이다.9 is a block diagram for explaining a work process according to the bridge upper lifting method according to the present invention.

* 도면의 주요부분에 대한 부호의 설명 *Explanation of symbols on the main parts of the drawings

50 : 교량 52 : 교각50: bridge 52: bridge

53 : 홈 54 : 교량상부53: home 54: the upper bridge

70 : 잭 100 : 교량상부 인상장치70: jack 100: bridge upper lifting device

110 : 잭지지대 112 : 수평판110: jack support 112: horizontal plate

114 : 마찰판 115 : 볼트구멍114: friction plate 115: bolt hole

116 : 보강판 120 : 볼트116: reinforcement plate 120: bolt

122 : 쐐기부 123 : 볼트지지대122: wedge 123: bolt support

130 : 쐐기부재 140 : 너트130: wedge member 140: nut

150 : 보강판 160 : 수평보강판150: reinforcing plate 160: horizontal reinforcing plate

162 : 텐션바162: tension bar

본 발명의 목적은 교각의 지지를 받는 교량상부를 인상하기 위한 교량상부 인상방법에 있어서, 교각 내부의 철근 배치상태를 탐사하는 단계, 교각의 측면에 탐사된 철근을 피해서 다수의 홈을 형성하는 단계, 홈에 쐐기부를 갖는 볼트의 일단을 삽입하는 단계, 볼트의 쐐기부에 쐐기부재를 결합하는 단계, 볼트의 타단에 마찰판을 갖는 잭받침대를 결합하는 단계, 볼트의 타단에 너트를 결합하여 마찰판이 교각의 측면에 가압되도록 하는 단계, 잭받침대 상에 잭을 설치하는 단계 및 잭으로 교량상부를 인상하는 단계를 포함하는 것을 특징으로 하는 교량상부 인상방법에 의해 달성 가능하다.SUMMARY OF THE INVENTION An object of the present invention is a method of raising a bridge top for lifting a bridge supported by a bridge, the method comprising: exploring the arrangement state of reinforcing bars inside a bridge, and forming a plurality of grooves by avoiding the bars that are explored on the side of the bridge Inserting one end of the bolt having a wedge portion in the groove, Coupling the wedge member to the wedge portion of the bolt, Coupling jack jack having a friction plate on the other end of the bolt, Coupling the nut on the other end of the bolt It is achievable by the bridge upper lifting method comprising the step of being pressed to the side of the bridge, the step of installing the jack on the jack support and the step of raising the upper bridge with the jack.

위 너트를 완전히 결합하기 전에 볼트를 인장하는 단계를 더 포함하는 구성으로 하는 것이 좋다.It is preferable that the configuration further includes the step of tensioning the bolt before the upper nut is completely engaged.

위 볼트의 저면에 볼트지지대를 삽입하는 단계와 마찰판과 너트 사이에 보강판을 삽입하는 단계를 더 포함하는 구성으로 하는 것이 더욱 좋다.It is more preferable that the configuration further comprises the step of inserting the bolt support on the bottom of the upper bolt and the step of inserting the reinforcement plate between the friction plate and the nut.

교량상부 인상 후, 위 교각 양측면에 설치되는 마찰판을 서로 연결하여 당겨주는 단계를 더 포함하는 구성으로 하는 것이 더욱 바람직하다.After the upper portion of the bridge, it is more preferable to further include a step of connecting and pulling the friction plates installed on both sides of the upper pier.

본 발명의 다른 목적은 교각에 설치하여 잭을 이용해 교량상부를 인상할 수 있도록 하기 위한 교량상부 인상장치에 있어서, 교각의 측면에 접촉가능한 마찰판을 구비하여 잭을 지지할 수 있는 잭받침대, 교각의 측면에 형성된 구멍에 삽입할 수 있고, 일단에 쐐기부가 형성되어 있는 볼트, 쐐기부에 결합되는 쐐기부재 및 볼트의 타단에 결합되어 마찰판을 교각의 측면에 가압하여주는 너트를 포함하는 것을 특징으로 하는 교량상부 인상장치에 의해 달성 가능하다.Another object of the present invention is to install a bridge on the bridge to raise the upper portion of the bridge using a jack, a jack support for supporting the jack with a friction plate that can contact the side of the pier It can be inserted into a hole formed in the side, and the wedge is formed at one end, the wedge member is coupled to the wedge portion and coupled to the other end of the bolt, characterized in that it comprises a nut for pressing the friction plate to the side of the piers Achievable by the bridge upper lifting device.

위 쐐기부는 쐐기형태의 너트가 볼트의 일단에 나사결합되어 형성된 구성으로 하여도 된다.The upper wedge portion may have a configuration in which a wedge-shaped nut is screwed to one end of the bolt.

위 구멍에 삽입되어 볼트의 저면을 지지하여주기 위한 볼트지지대, 마찰판과 너트 사이에 결합되는 보강판을 더 포함하는 구성으로 하는 것이 바람직하다.It is preferable to further include a bolt support inserted into the upper hole to support the bottom of the bolt, and a reinforcing plate coupled between the friction plate and the nut.

위 교각 상면에 설치되어 교각 양측면의 마찰판을 연결하여 당겨주는 텐션바를 더 포함하는 구성으로 하는 것이 더욱 좋다.It is better to have a configuration further comprising a tension bar installed on the upper surface of the pier connecting the friction plate of both sides of the pier.

이하, 첨부된 도면을 참조하여 본 발명의 바람직한 실시 예를 상세하게 설명한다.Hereinafter, exemplary embodiments of the present invention will be described in detail with reference to the accompanying drawings.

도 3은 본 발명에 따른 교량상부 인상장치가 설치된 상태를 나타낸 교량의 측단면도이고, 도 4는 본 발명에 따른 교량상부 인상장치가 설치된 상태를 나타낸 교량의 정면도, 도 5는 잭지지대가 고정된 상태를 보여주는 부분확대 단면도이다.Figure 3 is a side cross-sectional view of the bridge showing a state in which the upper bridge lifting device according to the present invention is installed, Figure 4 is a front view of the bridge showing a state in which the bridge upper lifting device according to the present invention, Figure 5 is a jack support fixed It is a partially enlarged cross-sectional view showing the state.

도 3과 도 4에는 교각(52)과 이 교각(52)의 지지를 받는 교량상부(54)로 이루어진 교량이 도시되어 있다. 교각(52)은 지면 상에 기둥모양으로 설치되어 그 위의 교량빔, 상판 등의 교량상부(54)를 지지하여주며, 교량상부(54)의 상면으로 차량이 통행한다.3 and 4 show a bridge consisting of a bridge 52 and an upper portion 54 supported by the bridge 52. The bridge 52 is installed in a columnar shape on the ground to support the upper portion 54 of the bridge beam, the upper plate, and the like, and the vehicle passes through the upper surface of the upper portion 54 of the bridge.

도 3에 나타낸 바와 같이 교각(52)과 교량상부(54) 사이에는 경질고무판(60)이 설치되어 있어, 교각(52) 상면과 교량상부(54) 사이에 잭(70)을 설치할 공간이 없는 경우, 교각(52)의 측면에 잭지지대(110)를 설치하여 잭(70)을 설치할 수 있도록 하여야 한다.As shown in FIG. 3, a hard rubber plate 60 is provided between the bridge 52 and the upper portion 54, and there is no space for installing the jack 70 between the upper surface of the bridge 52 and the upper portion 54. In this case, the jack support 110 should be installed on the side of the piers 52 to allow the jack 70 to be installed.

도시된 바와 같이 본 발명에 따른 교량상부 인상장치(100)는 잭(70)을 지지하여주기 위한 잭지지대(110)를 구비하고 있다. 이 잭지지대(110)는 수평으로 배치되어 잭(70)의 저면을 지지하여주는 수평판(112), 교각(52)의 측면에 밀착되는 마찰판(114) 및 수평판(112) 저면을 지지하여주는 보강판(116)으로 되어 있다. 마찰판(114)에는 볼트공(115)이 형성되어 있다. 이러한 잭지지대(110)는 교량상부(54)의 무게를 고려하여 그 마찰판(114), 보강판(116), 수평판(112)의 두께를 결정하여 만들어야 한다.As shown, the upper bridge lifting device 100 according to the present invention is provided with a jack support 110 for supporting the jack (70). The jack support 110 is horizontally arranged to support the bottom of the horizontal plate 112, the friction plate 114 and the horizontal plate 112 in close contact with the side of the pier 52 to support the bottom of the jack 70 The note is made of a reinforcing plate 116. A bolt hole 115 is formed in the friction plate 114. The jack support 110 should be made by determining the thickness of the friction plate 114, the reinforcement plate 116, the horizontal plate 112 in consideration of the weight of the upper bridge (54).

도시된 바와 같이 교각(52)의 측면에는 다수의 홈(53)이 형성되어 있다. 이 홈(53)에는 마찰판(114)을 교각(52)의 측면에 가압하기 위한 볼트(120)가 결합되어 있다. 이 볼트(120)의 안쪽 끝단에는 쐐기부(122)가 형성되어 있다. 이 쐐기부(122)는 볼트(120)에 일체로 형성하여도 되고, 경우에 따라서는 볼트(122)의 끝단에 나사결합되는 쐐기형태의 너트를 이용하여도 된다.As shown, a plurality of grooves 53 are formed at the side of the piers 52. A bolt 120 for pressing the friction plate 114 to the side of the piers 52 is coupled to the groove 53. The wedge part 122 is formed in the inner end of the bolt 120. The wedge portion 122 may be formed integrally with the bolt 120, or in some cases may use a wedge-shaped nut screwed to the end of the bolt 122.

쐐기부(122)에는 링형태의 쐐기부재(130)가 결합되어 있다. 쐐기부재(130)는 볼트(120)의 쐐기부(122)와의 작용으로 볼트(120)가 홈(53)에서 빠지는 것을 막기 위한 것이다. 볼트(120) 및 쐐기부재(130)와 관련하여서는 도 7과 도 8을 참조하여 뒤에서 더 자세히 설명된다.The wedge part 122 is coupled to the ring-shaped wedge member 130. The wedge member 130 is to prevent the bolt 120 from falling out of the groove 53 by the action of the wedge portion 122 of the bolt 120. The bolt 120 and the wedge member 130 are described in more detail later with reference to FIGS. 7 and 8.

도시된 바와 같이 볼트(120)의 하면쪽 홈(53)에는 볼트지지대(123)가 삽입되어 있다. 이 볼트지지대(123)는 반드시 필요한 것은 아니지만 보다 큰 힘으로 안정적으로 잭지지대(110)를 지지하기 위해서는 설치하는 것이 바람직하다.As shown, the bolt support 123 is inserted into the lower groove 53 of the bolt 120. The bolt support 123 is not necessarily required, but it is preferable to install the bolt support 123 to support the jack support 110 stably with a greater force.

또 너트(140)와 마찰판(114) 사이에는 보강판(150)을 삽입하여 마찰판(114) 전체면이 균일하게 교각(52)의 외면에 밀착되도록 하는 것이 좋다.In addition, by inserting the reinforcing plate 150 between the nut 140 and the friction plate 114, it is preferable that the entire surface of the friction plate 114 is in close contact with the outer surface of the piers 52.

즉, 홈(53)에 쐐기부(122)가 형성된 볼트(120)를 삽입하고, 쐐기부재(130)를 볼트(120)에 끼워 파이프 등으로 충분히 밀어 넣어 가압한 후 볼트지지대(123)를 홈(53)에 삽입하고, 그 바깥쪽으로 볼트구멍(115)이 형성되어 있는 마찰판(114)을 교각(52)에 밀착시킨 상태에서 그 표면에 보강판(150)을 덧댄 후 너트(140)를 채운 후 볼트(120)를 인장기를 이용하여 계산된 힘으로 바깥쪽으로 잡아당긴다. 이 때 볼트(120)의 쐐기부(122)는 쐐기부재(130)를 점점 확장시키고, 쐐기부재(130)는 홈(53)의 안쪽에 고정되어 바깥쪽으로 빠지지 않는다. 정해진 하중으로 볼트(120)를 바깥쪽으로 잡아 당기면 볼트(120)는 잡아당기는 힘에 비례하여 늘어나게 된다. 그 상태에서 너트(140)를 충분히 잠그면, 하중을 제거하더라도 볼트(120)는 인장된 상태를 유지하게 된다. 이에 따라 각 볼트(120)는 그 볼트(120)의 인장에 사용된 하중 만큼의 힘으로 너트(140)를 잡아당기게 되고, 너트(140)는 보강판(150)을 통해 마찰판(114)을 교각(52)쪽으로 가압하게 된다.That is, the bolt 120 having the wedge portion 122 formed therein is inserted into the groove 53, and the wedge member 130 is inserted into the bolt 120 and sufficiently pushed into a pipe or the like to press the bolt support 123. Inserting the reinforcing plate 150 on the surface thereof while the friction plate 114 having the bolt hole 115 is formed on the pier 52 and inserted into the outer side thereof, and the nut 140 is filled. The bolt 120 is then pulled outward with the calculated force using a tensioner. At this time, the wedge portion 122 of the bolt 120 gradually expands the wedge member 130, and the wedge member 130 is fixed to the inside of the groove 53 and does not fall outward. When the bolt 120 is pulled outward with a predetermined load, the bolt 120 is stretched in proportion to the pulling force. If the nut 140 is sufficiently locked in this state, the bolt 120 will remain in tension even if the load is removed. Accordingly, each bolt 120 pulls the nut 140 with a force equal to the load used to tension the bolt 120, and the nut 140 pierches the friction plate 114 through the reinforcing plate 150. To 52.

마찰판(114)과 교각(52) 간의 마찰계수를 μ, 볼트(120)를 인장시키는 하중을 T, 볼트(120)의 개수를 n이라 하면 마찰판(114)과 교각(52) 사이에 작용하는 마찰력으로 지지할 수 있는 하중 W는 다음 식으로 표시된다.If the friction coefficient between the friction plate 114 and the piers 52 is µ, the load for tensioning the bolts 120 is T, and the number of bolts 120 is n, the frictional force acting between the friction plate 114 and the piers 52. The load W that can be supported by is expressed by the following equation.

W= nTμ이 된다.W = nTμ.

즉, 교량상부(54)의 무게가 100톤이고, 마찰판(114)과 교각(52) 사이의 마찰계수가 0.2이고, 사용된 볼트(120)의 수가 10개인 경우 볼트(120)를 50톤으로 인장하여 너트(140)를 잠그면 된다. 물론, 실제로는 안전성을 고려하여 볼트(120)의 수를 늘리거나, 볼트(120)를 인장시키는 힘을 훨씬 더 증가시켜 작업을 하여야 한다.That is, when the weight of the upper portion of the bridge 54 is 100 tons, the friction coefficient between the friction plate 114 and the bridge 52 is 0.2, and the number of bolts 120 used is 10, the bolt 120 is 50 tons. The nut 140 may be locked by tension. In practice, of course, in consideration of safety, it is necessary to increase the number of bolts 120 or to increase the force for tensioning the bolts 120 even more.

즉, 본 발명에서는 마찰판(114)과 교각(52) 사이에 작용하는 마찰력으로 교량상부(54)의 하중을 지지한다. 마찰판(114)과 교각(52) 사이에 작용하는 마찰력은 볼트(120)를 인장시키는 힘이나, 볼트(120)의 개수로 조정할 수 있기 때문에 본 발명은 교량상부(54)의 무게에 상관없이 적용할 수 있다.That is, in the present invention, the load on the upper bridge portion 54 is supported by the frictional force acting between the friction plate 114 and the bridge 52. The frictional force acting between the friction plate 114 and the piers 52 can be adjusted by the tension of the bolts 120 or the number of bolts 120, so the present invention is applicable regardless of the weight of the upper portion of the bridge 54. can do.

도 6은 교각 양측의 잭지지대를 텐션바로 연결한 상태를 나타낸 측단면도이다.6 is a side cross-sectional view illustrating a state in which jack supports on both sides of the piers are connected by tension bars.

앞에서 설명한 바와 같은 과정으로 잭지지대(110)를 설치하여 교량상부(54)를 들어 올린 후 마찰판(114) 상부쪽이 벌어지는 것을 막기 위해 교각(52) 상면에 수평보강판(160)을 설치하고, 이를 마찰판(114)에 용접 또는 볼트와 너트 등을 이용하는 별도의 방법으로 조립한 다음 두 수평보강판(160)을 텐션바(162)로 연결하여 서로 당겨주도록 하면 더욱 좋다.After installing the jack support 110 in the above-described process to lift the upper portion of the bridge 54, the horizontal reinforcing plate 160 is installed on the upper surface of the bridge 52 to prevent the upper side of the friction plate 114 is opened, It is better to assemble this by welding or a separate method using bolts and nuts, etc. to the friction plate 114, and then connect the two horizontal reinforcing plates 160 to the tension bar 162 to pull each other.

도 7과 도 8은 도 3∼도 5에서 설명한 마찰판을 교각에 밀착시켜주기 위한 볼트와 너트, 쐐기부재 및 보강판의 분리 사시도이다.7 and 8 are separated perspective views of bolts and nuts, wedge members, and reinforcing plates for bringing the friction plates described with reference to FIGS. 3 to 5 into close contact with the piers.

도 7과 도 8에서 알 수 있는 바와 같이 볼트(120)의 일측 끝단에는 쐐기부(122)가 설치된다. 이 쐐기부(122)는 도 7에 나타낸 바와 같이 그 외면이 일측으로 갈수록 경사진 쐐기형태의 너트를 볼트(120)의 일단에 나사결합하여 구성하여도 되고, 도 8에 나타낸 바와 같이 쐐기부(122)를 볼트(120)의 일단에 일체로형성하여도 된다. 이러한 볼트(120)의 타단에는 나선(125)이 형성되어 있어야 함은 물론이고, 그 나선(125) 바깥쪽으로 볼트(120)를 인장할 때 인장기가 잡을 수 있도록 돌출부(127)를 형성하여 두는 것이 좋다.As can be seen in FIGS. 7 and 8, the wedge portion 122 is installed at one end of the bolt 120. As shown in FIG. 7, the wedge part 122 may be configured by screwing a wedge-shaped nut inclined toward one side thereof to one end of the bolt 120, and as shown in FIG. 8. 122 may be integrally formed with one end of the bolt 120. The other end of the bolt 120 should be formed of the spiral 125, as well as forming the protrusion 127 so that the tensioner can catch when tensioning the bolt 120 to the outside of the spiral 125 good.

쐐기부재(130)는 일측이 절개된 링모양으로 구성하는 것이 좋으며, 그 내주면은 일측으로 갈수록 그 내부가 좁아지도록 되어 있어, 쐐기부(122)가 일정 이상 삽입되면 그 외경이 점점 커진다.The wedge member 130 is preferably configured to have a ring-shaped cut one side, the inner circumferential surface thereof is narrowed toward the one side, the outer diameter is gradually increased when the wedge portion 122 is inserted more than a predetermined.

보강판(150)은 볼트(120)의 당김력에 의해 너트(140)가 마찰판(114)에 작용시키는 힘이 마찰판(114) 전체면에 균일하게 작용되도록 하기 위한 것이고, 너트(140)는 볼트(120)의 바깥쪽 끝단에 결합되어 볼트(120)가 인장된 상태를 유지할 수 있도록 하여 마찰판(114)에 가압력을 작용시킬 수 있도록 하기 위한 것이다.The reinforcement plate 150 is for the force that the nut 140 acts on the friction plate 114 by the pulling force of the bolt 120 to uniformly act on the entire surface of the friction plate 114, the nut 140 is bolt Is coupled to the outer end of the 120 to maintain the tensioned state of the bolt 120 is to be able to apply a pressing force to the friction plate 114.

도 9는 본 발명에 따른 교량상부 인상방법에 따른 작업과정을 설명하기 위한 블록도이다.9 is a block diagram for explaining a work process according to the bridge upper lifting method according to the present invention.

앞에서 설명한 도 3∼도 8을 함께 참조하여 본 발명의 교량상부 인상방법에 의한 작업과정을 설명하면 다음과 같다.Referring to Figures 3 to 8 described above with reference to the working process by the bridge upper lifting method of the present invention as follows.

먼저, 인상하고자하는 교량상부(54)를 지지하고 있는 교각(52)의 상단 부근을 초음파탐사 등으로 철근의 배치상태를 파악한다(단계 11). 그런 다음 철근이 없는 곳을 골라 교각(52)의 상단 측면에 드릴로 다수의 홈(53)을 형성한다(단계 12). 그런 다음 쐐기부(122)가 있는 볼트(120)의 일측 끝단을 홈(53)으로 삽입하고, 또 쐐기부재(130)를 쐐기부(122)에 결합한다(단계 13). 이 때 쐐기부재(130)가 충분히 삽입되어 홈(53)의 내주면과 쐐기부(122) 사이에 끼이도록 파이프 등을이용할 수 있다. 각각의 홈(53)에 볼트(120)를 설치 후, 볼트(120)의 하면에 볼트지지대(150)를 삽입하고(단계 14), 볼트(120)가 설치된 교각(52) 측면에 마찰판(114)을 갖는 잭지지대(110)를 부착한다(단계 15). 마찰판(114) 바깥쪽으로 보강판(150)을 대고(단계 16), 그 바깥쪽에서 너트(140)를 결합한다(단계 17). 너트(140)를 볼트(120)에 결합한 상태에서 인장기계로 볼트(120)의 끝단을 잡고 바깥쪽으로 잡아당긴다(단계 18). 볼트(120)를 인장시키는 인장력은 안전성을 고려하여 앞에서 설명한 바와 같은 방식으로 미리 계산해둔다. 볼트(120)를 계산된 힘으로 인장 시킨 상태에서 너트(140)를 충분히 조여, 볼트(120)가 인장된 상태를 유지할 수 있도록 한 다음, 볼트(120)를 당기고 있던 힘을 해제한다(단계 19). 위와 같은 과정으로 잭지지대(110)가 설치된 후, 잭지지대(110) 상면에 잭(70)을 설치하고(단계 20), 잭업하여 교량상부(54)를 인상시킨다(단계 21). 그런 다음 교각(52) 상면에 수평보강판(160)을 각각 배치하여, 해당측면 마찰판(114)의 상단에 각각 용접 또는 볼트, 너트 등을 이용하는 별도의 방법으로 조립한(단계 22) 다음, 두 수평보강판(160)을 텐션바(162)로 연결하여 마찰판(114)의 상단부분이 교량상부(54)의 하중에 의해 벌어지지 않도록 한다(단계 23).First, the arrangement state of the reinforcing bars is grasped by an ultrasonic probe in the vicinity of the upper end of the bridge 52 supporting the upper bridge portion 54 to be lifted (step 11). Then select a place without reinforcing bars to form a plurality of grooves 53 by drilling on the upper side of the pier 52 (step 12). Then, one end of the bolt 120 with the wedge portion 122 is inserted into the groove 53, and the wedge member 130 is coupled to the wedge portion 122 (step 13). At this time, the wedge member 130 may be sufficiently inserted to use a pipe or the like so as to be sandwiched between the inner circumferential surface of the groove 53 and the wedge portion 122. After installing the bolts 120 in each of the grooves 53, the bolt support 150 is inserted into the lower surface of the bolts 120 (step 14), and the friction plate 114 is provided on the side of the piers 52 on which the bolts 120 are installed. Attach the jack support 110 with (step 15). Hold the reinforcement plate 150 out of the friction plate 114 (step 16) and engage the nut 140 from the outside (step 17). With the nut 140 coupled to the bolt 120, hold the end of the bolt 120 with the tensioning machine and pull it outward (step 18). The tensile force for tensioning the bolt 120 is calculated in advance in the manner described above in consideration of safety. Tighten the nut 140 sufficiently while the bolt 120 is tensioned with the calculated force to allow the bolt 120 to remain in tension, and then release the force that was pulling the bolt 120 (step 19 ). After the jack support 110 is installed in the above process, the jack support 110 is installed on the upper surface of the jack support 110 (step 20), and jacked up to raise the bridge upper portion 54 (step 21). Then, each of the horizontal reinforcing plate 160 is placed on the upper surface of the pier 52, and assembled in a separate method using welding or bolts, nuts, etc. on the upper side of the corresponding side friction plate 114 (step 22), and then The horizontal reinforcing plate 160 is connected to the tension bar 162 so that the upper end portion of the friction plate 114 is not opened by the load of the upper bridge portion 54 (step 23).

작업완료 후에는 그 역순으로 작업을 하여 잭지지대(110)를 교각(52)에서 분리하면 재사용할 수 있다. 볼트(120) 등 분리가 어려운 것은 홈(53) 바깥쪽으로 돌출된 부분만 절단하여 버리고, 홈(53)에는 콘크리트나 방수재 등을 채워 메꾸면 된다.After the work is completed, the work in the reverse order to separate the jack support 110 from the piers 52 can be reused. Difficult to separate, such as bolt 120 is to cut only the portion protruding to the outside of the groove 53, fill the groove 53 filled with concrete or waterproof material.

이상의 설명에서 알 수 있는 바와 같이 본 발명에 따른 교량상부 인상방법 및 그 장치를 이용하는 경우, 마찰판과 교각 사이의 마찰력으로 교량상부의 하중을 지지하기 때문에 큰 지지력을 얻을 수 있고, 그 지지성능을 주변 여건에 맞게 쉽게 조정할 수 있으며, 잭지지대의 설치가 용이하다.As can be seen from the above description, in the case of using the upper bridge lifting method and the device according to the present invention, since the load on the upper bridge is supported by the friction force between the friction plate and the bridge, a large bearing force can be obtained, and the supporting performance is increased. It can be easily adjusted to the conditions and easy to install the jack support.

홈을 형성하는 것 외에는 교각을 파손하지 않아도 되기 때문에 교각에 무리가 따르지 않는다.The bridges do not have to be damaged because the bridges do not have to be damaged except for forming grooves.

작업 후에는 잭지지대의 철거가 용이하다.After work it is easy to dismantle the jack support.

콘크리트의 양생에 소요되던 기간을 없앨 수 있어 작업기간이 단축된다.The period of work for curing concrete can be eliminated, thus reducing the working period.

Claims (8)

교각의 지지를 받는 교량상부를 인상하기 위한 교량상부 인상방법에 있어서,In the bridge top raising method for raising the bridge top supported by the bridge, 상기 교각 내부의 철근 배치상태를 탐사하는 단계;Exploring the reinforcement state of the interior of the pier; 상기 교각의 측면에 탐사된 철근을 피해서 다수의 홈을 형성하는 단계;Forming a plurality of grooves by avoiding the explored rebars on the side of the pier; 상기 홈에 쐐기부를 갖는 볼트의 일단을 삽입하는 단계;Inserting one end of a bolt having a wedge into the groove; 상기 볼트의 쐐기부에 쐐기부재를 결합하는 단계;Coupling a wedge member to the wedge portion of the bolt; 상기 볼트의 타단에 마찰판을 갖는 잭받침대를 결합하는 단계;Coupling a jack support having a friction plate to the other end of the bolt; 상기 볼트의 타단에 너트를 결합하여 상기 마찰판이 상기 교각의 측면에 가압되도록 하는 단계;Coupling a nut to the other end of the bolt to press the friction plate against the side of the piers; 상기 잭받침대 상에 잭을 설치하는 단계; 및Installing a jack on the jack support; And 상기 잭으로 상기 교량상부를 인상하는 단계를 포함하는 것을 특징으로 하는 교량상부 인상방법.And lifting the bridge upper portion with the jack. 제 1항에 있어서, 상기 너트를 완전히 결합하기 전에 상기 볼트를 인장하는 단계를 더 포함하는 것을 특징으로 하는 교량상부 인상방법.8. The method of claim 1 further comprising tensioning the bolt prior to fully engaging the nut. 제 1항에 있어서, 상기 볼트의 저면에 볼트지지대를 삽입하는 단계와 상기 마찰판과 상기 너트 사이에 보강판을 삽입하는 단계를 더 포함하는 것을 특징으로 하는 교량상부 인상방법.The method of claim 1, further comprising inserting a bolt support on the bottom of the bolt and inserting a reinforcing plate between the friction plate and the nut. 제 1항 내지 제 3항 중 어느 한 항에 있어서, 상기 교각 양측면에 설치되는 상기 마찰판을 서로 연결하여 당겨주는 단계를 더 포함하는 것을 특징으로 하는 교량상부 인상방법.The method according to any one of claims 1 to 3, further comprising the step of pulling the friction plates connected to each other on both sides of the bridge to pull each other. 교각에 설치하여 잭을 이용해 교량상부를 인상할 수 있도록 하기 위한 교량상부 인상장치에 있어서,In the bridge upper lifting device to be installed in the bridge to be able to use the jack to raise the upper portion of the bridge, 상기 교각의 측면에 접촉가능한 마찰판을 구비하여 상기 잭을 지지할 수 있는 잭받침대;A jack base capable of supporting the jack with a friction plate contactable to the side of the piers; 상기 교각의 측면에 형성된 구멍에 삽입할 수 있고, 일단에 쐐기부가 형성되어 있는 볼트;A bolt which can be inserted into a hole formed at a side of the pier and has a wedge formed at one end thereof; 상기 쐐기부에 결합되는 쐐기부재; 및A wedge member coupled to the wedge portion; And 상기 볼트의 타단에 결합되어 상기 마찰판을 상기 교각의 측면에 가압하여주는 너트를 포함하는 것을 특징으로 하는 교량상부 인상장치.And a nut coupled to the other end of the bolt to press the friction plate to the side of the pier. 제 5항에 있어서, 상기 쐐기부는 쐐기형태의 너트가 상기 볼트의 일단에 나사결합되어 구성된 것을 특징으로 하는 교량상부 인상장치.According to claim 5, The wedge portion bridge upper lifting device, characterized in that the wedge-shaped nut is screwed to one end of the bolt. 제 5항 또는 제 6항에 있어서, 상기 구멍에 삽입되어 상기 볼트의 저면을 지지하여주기 위한 볼트지지대, 상기 마찰판과 상기 너트 사이에 결합되는 보강판을더 포함하는 것을 특징으로 하는 교량상부 인상장치.7. The upper bridge lifting device according to claim 5 or 6, further comprising a bolt support inserted into the hole to support the bottom of the bolt, and a reinforcing plate coupled between the friction plate and the nut. . 제 5항 또는 제 6항에 있어서, 상기 교각 상면에 설치되어 상기 교각 양측면의 상기 마찰판을 연결하여 당겨주는 텐션바를 더 포함하는 것을 특징으로 하는 교량상부 인상장치.7. The upper portion of the bridge upper lifting apparatus according to claim 5 or 6, further comprising a tension bar installed on the upper surface of the pier to draw and connect the friction plates on both sides of the pier.
KR10-2001-0033513A 2001-06-14 2001-06-14 Method and apparatus for lifting upper portion of bridge KR100400701B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR10-2001-0033513A KR100400701B1 (en) 2001-06-14 2001-06-14 Method and apparatus for lifting upper portion of bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR10-2001-0033513A KR100400701B1 (en) 2001-06-14 2001-06-14 Method and apparatus for lifting upper portion of bridge

Publications (2)

Publication Number Publication Date
KR20020095523A KR20020095523A (en) 2002-12-27
KR100400701B1 true KR100400701B1 (en) 2003-10-08

Family

ID=27709154

Family Applications (1)

Application Number Title Priority Date Filing Date
KR10-2001-0033513A KR100400701B1 (en) 2001-06-14 2001-06-14 Method and apparatus for lifting upper portion of bridge

Country Status (1)

Country Link
KR (1) KR100400701B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101103983B1 (en) 2008-12-22 2012-01-06 조영철 Shock Absorbing Device and Structural Bearing having the same
KR20210131702A (en) 2020-04-24 2021-11-03 김진수 Hydraulic jack of bridge repair

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100450863B1 (en) * 2002-04-01 2004-10-06 (주)알티에스 Method and apparatus for pulling up an upper structure of bridge
KR20030095159A (en) * 2002-06-24 2003-12-18 김해영 Jacking system of bridge repair
KR100692952B1 (en) * 2005-02-16 2007-03-12 (주)알티에스 Railroad crane and method for carrying out replacement of an upper structure of a railway bridge utilizing the same
KR100977280B1 (en) * 2008-03-25 2010-08-23 서울메트로 a pulling plate of beam the bridge pier
CN102995571B (en) * 2012-09-05 2015-06-24 武汉二航路桥特种工程有限责任公司 Method for prepressing single large-tonnage temporary steel pipe support and then resisting beam bottom during dismantling bridge beam body, and device thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR970025442A (en) * 1997-03-11 1997-06-24 김희림 Manufacturing method of dietary supplement based on silkworm pupa
JPH09177031A (en) * 1995-12-27 1997-07-08 Kawaju Koji Kk Provisionally receiving facility for jack in repair work of main girder constituting elevated bridge, etc.
KR19990001958A (en) * 1997-06-18 1999-01-15 김정현 Jack restraint device for raising upper structure of bridge and repairing method using the same
KR20010002155A (en) * 1999-06-11 2001-01-05 이승영 Method and Apparatusd for shifting shoz device mounted at bridge
KR200227911Y1 (en) * 2000-12-26 2001-06-15 박재만 Assembling bracket to lift up upper structure
KR20020094652A (en) * 2001-06-12 2002-12-18 주식회사 하이콘엔지니어링 A Method Repairing the Bridge for Preventing Fall thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09177031A (en) * 1995-12-27 1997-07-08 Kawaju Koji Kk Provisionally receiving facility for jack in repair work of main girder constituting elevated bridge, etc.
KR970025442A (en) * 1997-03-11 1997-06-24 김희림 Manufacturing method of dietary supplement based on silkworm pupa
KR19990001958A (en) * 1997-06-18 1999-01-15 김정현 Jack restraint device for raising upper structure of bridge and repairing method using the same
KR20010002155A (en) * 1999-06-11 2001-01-05 이승영 Method and Apparatusd for shifting shoz device mounted at bridge
KR200227911Y1 (en) * 2000-12-26 2001-06-15 박재만 Assembling bracket to lift up upper structure
KR20020094652A (en) * 2001-06-12 2002-12-18 주식회사 하이콘엔지니어링 A Method Repairing the Bridge for Preventing Fall thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101103983B1 (en) 2008-12-22 2012-01-06 조영철 Shock Absorbing Device and Structural Bearing having the same
KR20210131702A (en) 2020-04-24 2021-11-03 김진수 Hydraulic jack of bridge repair

Also Published As

Publication number Publication date
KR20020095523A (en) 2002-12-27

Similar Documents

Publication Publication Date Title
KR100837608B1 (en) J.K Bracket Method
KR100966890B1 (en) Pile pressure Method for repair of bridge and pressure apparatus
KR100566665B1 (en) A temporary bearing for jacking up upper structure of bridge
KR102145521B1 (en) Bridge bearing for replacement and replacement method.
KR100400701B1 (en) Method and apparatus for lifting upper portion of bridge
US7300230B2 (en) Pile anchor head for an underpinning pile and method of preloading the same
KR101140433B1 (en) Method for fabricating prestressed steel composite girder
JP2006257741A (en) Tool for placing rubber support
JPH0782709A (en) Reinforcing method for concrete structure, employing hollow pc steel bar
KR100450863B1 (en) Method and apparatus for pulling up an upper structure of bridge
JP2004225411A (en) Anchoring bolt device for bridge pier or the like
JPH1150418A (en) Temporary receive work of bridge girder and frame base therefor
JP7186670B2 (en) Concrete floor slab repair method
CN211815509U (en) Low-retraction anchoring device for wedge-shaped prestressed tendons
JPH1121816A (en) Bridge structure
KR100516769B1 (en) A reinforcement method by anchoring & tensioning steel strand.
KR20210001147U (en) Shear connector for steel frame structure and bridge structure with the same
KR100614051B1 (en) An apparatus for raising span of bridge
JP2006194025A (en) Reinforcing method for existing bridge girder
JP3413751B2 (en) Restoration support gantry repair method and apparatus
KR102619855B1 (en) Construction method for continuous bridge using single supporter
KR20030066205A (en) Apparatus for anchoring reinforcing steel material and construction method for reinforcing concrete structures using the same
JP2002294631A (en) Structure for mounting horizontal force damping device of structural body and its installation method
KR100475585B1 (en) Method and apparatus for reinforcing P.S.C. beams for bridges
KR100393103B1 (en) Method for reinforcing resistance force of a bridge using repulsing force of elastic fulcrum

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20120911

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20130902

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20140829

Year of fee payment: 12

FPAY Annual fee payment

Payment date: 20150921

Year of fee payment: 13

FPAY Annual fee payment

Payment date: 20160912

Year of fee payment: 14

FPAY Annual fee payment

Payment date: 20170912

Year of fee payment: 15

LAPS Lapse due to unpaid annual fee