JP2004225411A - Anchoring bolt device for bridge pier or the like - Google Patents
Anchoring bolt device for bridge pier or the like Download PDFInfo
- Publication number
- JP2004225411A JP2004225411A JP2003015573A JP2003015573A JP2004225411A JP 2004225411 A JP2004225411 A JP 2004225411A JP 2003015573 A JP2003015573 A JP 2003015573A JP 2003015573 A JP2003015573 A JP 2003015573A JP 2004225411 A JP2004225411 A JP 2004225411A
- Authority
- JP
- Japan
- Prior art keywords
- coupler
- anchor bolt
- pier
- bolts
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Images
Abstract
Description
【0001】
【発明の属する技術分野】
この発明は、橋脚などのアンカーボルト装置に関する。
【0002】
【従来の技術】
図5に示すように、一般に、橋梁の鋼製橋脚1(被定着構造体)は、アンカーフレーム3を介してフーチング2(基礎構造体)に定着されている。アンカーフレーム3のアンカーボルト3aは、垂直をなしてフーチング2に埋設されるとともに、上端部が橋脚1に連結されている(例えば特許文献1参照)。
【0003】
【特許文献1】
特開平10−266128号公報(第1頁、第1図)
【0004】
【発明が解決しようとする課題】
平成14年に改訂された道路橋示方書・同解説 V耐震設計編(社団法人 日本道路協会刊)では、地震動を発生する確率の高いレベルIと発生する確率は低いが大きな強度を持つレベルIIに分け、耐震性能の照査に反映させ、レベルIに対応する耐震性能1とレベルIIに対応する耐震性能2〜3を設定している。
耐震性能2では、
「塑性化を考慮した部材のみに塑性変形を生じ、その塑性変形が当該部材の修復が容易に行いうる範囲内で適切に定め、塑性化を考慮する部材としては、確実にエネルギー吸収を図ることができ、かつ速やかに修復を行うことが可能な部材を選定する」とし、
耐震性能3では、
「塑性化を考慮した部材のみに塑性変形を生じ、その塑性変形が当該部材の保有する塑性変形性能を越えない範囲内で適切に定め、塑性化を考慮する部材としては、確実にエネルギー吸収を図ることができる部材を選定する」としている。
【0005】
ところで、通常、ボルトに予期せぬ引張軸力が作用すると、ねじ谷に応力集中が起きて、十分な伸び変形を伴わずに脆性的に破断することがあるのは良く知られている。図5の橋脚用アンカーボルト3aでこのような変形ないし破断が起きた場合、ほぼ全体がフーチング2内に埋まっているため、その状況を把握したり取替えたりするのは困難を極め、上記のような耐震性能2や耐震性能3の部材要求を十分満足しているとは言えない状況にある。従って、現況ではアンカーボルトは塑性化させずに、橋脚躯体を塑性化させる構造としている。しかしながら、橋脚躯体を塑性化させた場合でも復旧が大がかりなものとなり、工期と費用が掛かることが課題として残されている。
【0006】
【課題を解決するための手段】
発明者は、上記の事情に鑑み、アンカーボルトの設計においては、レベルIの地震動に対応できるよう使用材質や断面サイズなどを常時における十分な安全率を見込んで決定するのは当然であるが、レベルIIの地震動である大地震などの予期せぬ大荷重に対して、ある程度の損傷を許容しつつ損傷を制御する部材を組み込むのが合理的であるとの着想を得て、本発明をなした。
【0007】
すなわち、本発明は、基礎構造体(例えば橋梁のフーチング)と被定着構造体(例えば橋脚)とに跨るアンカーボルトを有し、被定着構造体を基礎構造体に定着させるアンカーボルト装置において、アンカーボルトを被定着構造体の側において2つに分割し(この分割部位より基礎構造体とは逆側に被定着構造体への止着部がある。)、この分割部位に介在させたカプラーによって分割ボルトどうしを着脱可能に連結してなり、上記カプラーの降伏強さが、上記アンカーボルトすなわち各分割ボルトの降伏強さより小さいことを特徴とする。これによって、レベルIIの地震動である大地震などの大荷重が作用したときは、損傷が専らカプラーで発生するように制御することができ、ボルトにまで損傷が及ぶのを回避ないしは抑制することができる。カプラーは、基礎構造体の外に配置できるので、容易に点検でき、取替えなどの補修作業も簡単に行うことができる。
【0008】
上記カプラーの最大強度が、上記アンカーボルトの降伏強さより大きく、アンカーボルトの最大強度より小さいことが望ましい。これによって、ボルトの変形をある程度は認めてカプラーの破断ひいては交換数を減らし、経済性を高めることができる。
【0009】
上記カプラーは、上記2つの分割ボルトどうしの対峙端部とそれぞれねじ結合される一対の嵌合部と、これら嵌合部を繋ぐように延びる損傷制御部とを有し、この損傷制御部が、嵌合部より細く、分割ボルトとの連結状態の嵌合部より降伏しやすくなっている。これによって、損傷制御部の断面や長さを調節することにより、損傷の制御を的確に行なうことができる。
【0010】
上記損傷制御部が、応力集中を回避する円柱などの形状をなし、その両端に上記嵌合部が滑らかに連なっていることが望ましい。これによって、損傷制御部が破断する際、延性的な挙動をさせることができる。
【0011】
上記被定着構造体には基礎構造体に面するベース部材が設けられ、このベース部材に基礎構造体側の分割ボルトを通す挿通孔が形成されており、上記基礎構造体側の嵌合部の外径が、上記挿通孔の内径より大きいことが望ましい。これによって、カプラーが破断して、被定着構造体が基礎構造体から離れて倒壊等しようとした場合、ベース部材が基礎構造体側嵌合部に突き当たり、倒壊等を防止することができる。
【0012】
【発明の実施の形態】
以下、本発明の一実施形態を、図面を参照して説明する。
図1は、橋梁における橋脚定着構造を示したものである。地盤には、鉄筋コンクリートからなるフーチング20(基礎構造体)が構築され、このフーチング20にアンカーフレーム30(アンカー構造体)を介して橋脚10(被定着構造体)が定着されている。
【0013】
図1および図2に示すように、鋼製橋脚10は、例えば断面四角形をなして垂直に延びる橋脚本体11と、この橋脚本体11の下側部に設けられたベースフレーム12とを備えている。ベースフレーム12は、橋脚本体11の下端部に溶接されたベースプレート13(ベース部材)と、このベースプレート13の上側に離れて橋脚本体11の側部に溶接されたベースフランジ14と、これらフランジ14とプレート13とを繋ぐ複数の縦リブ15とを有している。ベースプレート13は、フーチング20の上面に載せられている。図3に示すように、ベースプレート13には、後記ボルト32を通す挿通孔13aが形成されている。ベースフランジ14には、後記ボルト34を通す挿通孔14aが形成されている。
【0014】
図1および図2に示すように、アンカーフレーム30は、垂直に延びるとともに橋脚本体11を囲むように並べられた複数本のアンカーボルト装置31と、水平な枠状をなしてこれらアンカーボルト装置31を連ねる上下一対のアンカービーム38U,38Lと、これら上下のアンカービーム38U,38Lを連ねるブレース39とを備えている。図1に示すように、下側のアンカービーム38Uは勿論、上側のアンカービーム30Lもフーチング20の内部に埋まっている。各アンカービーム38U,38Lは、上下に対をなすビームプレート38aと、これらビームプレート38aどうしを繋ぐ複数の縦リブ38bとを有している。各ビームプレート38aには、後記ボルト32を通す挿通孔38cが形成されている。
【0015】
本発明の主要部に係るアンカーボルト装置31について説明する。
図1に示すように、アンカーボルト装置31は、長尺のフーチング側ボルト32(基礎構造体側の分割ボルト)と、カプラー33と、短尺の橋脚側ボルト34(被定着構造体側の分割ボルト)とを一直線に連ねることによって構成されている。すなわち、アンカーボルトが、橋脚10の側において2つに分割され、そこに介在させたカプラー33によって分割ボルト32,34どうしを連結することによって構成されている。
【0016】
長尺のフーチング側ボルト32は、垂直をなして上下のアンカービーム38U,38Lの挿通孔38cに通されている。そして、下端に位置するボルト頭部(ないしはナット)32aと上側部に螺合されたナット37とによる締め付けによって、アンカービーム38U,38Lに固定されている。図1および図3に示すように、フーチング側ボルト32は、その大部分がアンカービーム38U,38Lやブレース39と一緒にフーチング20内に埋め込まれるとともに、上端部がフーチング20から上に突出されている。図3に示すように、この突出部分が、橋脚10のベースプレート13の挿通孔13aに通されている。フーチング側ボルト32には、鉛直度調節ナット36がベースプレート13の下面に当接するようにしてねじ込まれている。
【0017】
短尺の橋脚側ボルト34は、垂直をなしてベースフランジ14の挿通孔14aに通されている。橋脚側ボルト34の上端部(橋脚への止着部)には、ダブルナット35がねじ込まれ、ベースフランジ14の上面に押し当てられている。
橋脚側ボルト34の下端部とフーチング側ボルト32の上端部とは、ベースフランジ14とベースプレート13との間において上下に離れて対峙している。これらボルト34,32の対峙端部どうしの間にカプラー33が介在されている。
【0018】
カプラー33は、軸線を鉛直に向けた円柱形状のロッド部33a(損傷制御部)と、このロッド部33aの上下両端部に同軸をなすようにして設けられた一対の円筒形状の嵌合部33bとを有している。ロッド部33aの太さ(直径)および長さは、後述する損傷制御機能を発揮し得る所定の大きさに設定されている。このロッド部33aより嵌合部33bの外直径が大きく(例えば約1.2倍に)なっている。この嵌合部33bの外直径は、ベースプレート13の挿通孔13aの内直径より大きくなっている。ロッド部33aと嵌合部33bの外周面どうしは、R付きのテーパー面33dを介して滑らかに連なっている。嵌合部33bの内周面に雌ねじ33cが刻設されており、この雌ねじ33cにボルト34,32がそれぞれねじ込まれている。これによって、上下のボルト34,32どうしがカプラー33を介して着脱可能に連結されている。そして、ナット35,36の締め付けによってアンカーボルト装置31が橋脚10に固定されている。ひいては、橋脚10がアンカーフレーム30を介してフーチング20に定着されている。
なお、橋脚10のベースフランジ14とベースプレート13との間のボルト34,32およびカプラー33は、2枚の縦リブ15によって両側から挟まれている。
【0019】
ここで、ボルト32,34のレベルIの地震動に対応する常時許容軸力をFba、降伏強さをFby、最大強度をFbmaxとし、カプラー33の降伏強さをFcy、最大強度をFcmaxとすると、次式の関係が成り立つように設定されている。なお、レベIIに対応する許容軸力はFcmaxと同等またはそれよりやや小さく(勿論レベルIに対応するFbaより大きく)設定する。
Fba<Fcy<Fby<Fcmax<Fbmax …(式1)
【0020】
例えば、この実施形態においては、ボルト32,34の材質は、S35CNで構成され、ボルトサイズは、M30が採用されている。そして、常時許容軸力Fba=106.6kN、降伏強さFby=171.1kN、最大強度Fbmax=286.1kNに設定されている。一方、カプラー33の材質は、極低降伏点鋼のLY225(降伏点225N/mm2保証鋼)で構成され、ロッド部33aの直径は28mmφに設定されている。(なお、ロッド部33aの長さは、45mmに設定されている。)そして、降伏強さFcy=140.4kN、最大強度Fcmax=199.0kNに設定されている。
なお、この実施形態におけるアンカーボルト装置31のフーチング20への埋設部分の長さは、約700mm程度、フーチング20より上の橋脚対応部分の長さは、約250mm程度になっている。
【0021】
上記のように構成された橋脚定着構造の施工手順の一例を説明する。
図4に示すように、アンカーフレーム30のフーチング側ボルト32と、アンカービーム38U,38Lと、ブレース39とを組み立てておく。フーチング側ボルト32の上端部には、鉛直度調節ナット36を螺合しておく。カプラー33と橋脚側ボルト34は、未だ取り付けないでおく。このカプラー33とボルト34が付いていない状態のアンカーフレーム30を現場の地中に据え付け、フーチング20用の型枠や鉄筋を設置したうえで、コンクリートを打設してフーチング20を構築する。これによって、アンカーフレーム30がフーチング20に埋め込まれる。この時、アンカーフレーム30周辺のフーチング20上面には、浅い凹部20aを形成し、ナット36を含むボルト32の上端部が露出するようにしておく。
【0022】
コンクリートが硬化した後、橋脚10の建て込みを行なう。すなわち、橋脚10を上から降ろして行き、下端のベースプレート13の挿通孔13aにフーチング側ボルト32の上端部を差し入れ、ベースプレート13をナット36のワッシャー36a上に載せる。次いで、ナット36によって橋脚10の鉛直度を調節する。そして、フーチング側ボルト32の上端部にカプラー33の下側の嵌合部33bを連結する。また、上側の嵌合部33bに連結された橋脚側ボルト34のナット35を締め付ける。これにより、橋脚10をアンカーボルト装置31に固定でき、ひいてはフーチング20に定着することができる。なお、カプラー33と橋脚側ボルト34とは、建込み作業前に橋脚10に予め仮止めしておいてもよく(図4の状態)、橋脚10をフーチング20上に降ろした後で初めから取り付けることにしてもよい。その後、凹部20aをコンクリートで埋める。
【0023】
作用を説明する。
この橋脚定着構造によれば、設計段階において、ボルト32,34の降伏強さFbyや破断強さFbmaxは、計算により求めることができる。この計算結果に基づいて、関係式(1)が満たされるように、カプラー33を設計できる。カプラー33の材質は、ボルト32,34の材質とは無関係に選定でき、低降伏比鋼などの延性に富む鋼材を使用するのが適当である。また、嵌合部33bの外径をボルト32,34の約1.8倍としたとき、ロッド部33aの外径は、ボルト32,34の約1.5倍以下の範囲で設定可能である。(約1.5倍以下という制限があるのは、カプラー33においてロッド部33aが嵌合部33bより降伏を起こしやすくするためである。)また、ロッド部33aの長さは自由に設定可能である。
【0024】
こうして、関係式(1)を満たした橋脚定着構造が構築されることにより、レベルIIの大地震などによる損傷を専らカプラー33のロッド部33aで発生させるように制御することができる。すなわち、レベルIIの大地震などでアンカーボルト装置31に極めて大きな(Fcy以上の)軸力が作用した場合、まずカプラー33のロッド部33aを降伏させて塑性変形させることができる。これによって、外力エネルギーを吸収することができる。そして、作用軸力がボルト32,34の降伏強さを超えた(Fby以上)場合でも、上述したようにカプラー33が十分にエネルギー吸収しているので、ボルト32,34の特にねじ谷での塑性変形量を小さくすることができ、ひいては脆性的破壊を回避することができる。
【0025】
例えば、この実施形態のLY225からなるカプラー33の場合、約30%程度の塑性ひずみまでは安定した変形が期待できるので、アンカーボルト装置31全体で21.2mm程度の伸び(うち、カプラー33の伸びが13.5mm、ボルト32,34の伸びが7.7mm)まで安定した挙動を得ることができる。これに対して、アンカーボルト装置全体を1本のボルトで構成した従来型(図5)では、同じ軸力作用時でも12mm程度の伸びに留まる。すなわち、本実施形態のアンカーボルト装置31は、従来型の約1.8倍ものエネルギー吸収能を有することになる。
【0026】
更に大きな(Fcmax以上の)軸力が作用した場合、カプラー33のロッド部33aが破断に至る。ここで、ロッド部33aは、応力集中の起きる部位の無い円柱形状になっているので、ねばりのある延性的な(ねじ谷部で発生するような脆性破断ではない)破断形態にすることができる。
カプラー33の下側の嵌合部33bは、破断後においてもフーチング側ボルト32の上端部に残っている。橋脚10が倒壊しようとすると、この下側嵌合部33bにベースプレート13が突き当たる。これによって、橋脚10の倒壊を防ぐことができる。
【0027】
カプラー33は、外部に露出されているので、容易に点検することができる。どの程度の軸力が作用したかを把握するのも可能である。そして、耐震性能2、3の段階で、カプラー33が伸び変形を来たしているときは、そのカプラー33を簡単に取り替えることができる。カプラー33とボルト32,34の強度比から,ボルト32,34が想定以上の損傷を受けることはないので、特にフーチング20内のボルト32を取り替える必要が生じることはなく、復旧作業を大幅に簡略化できる。なお、レベルIIの地震動を受けたカプラー33を取り替える理由は、地震のような変動荷重では塑性履歴が解らないので,例え変形が元に戻っていたとしても、塑性変形により材料自体が脆化している可能性があるからである。ただし、大地震後は必ず取り替えるのではなく、例えば伸びの発生を記録するような装置を付けておき(伸びたら簡単に切れるテープのようなものをカプラーに貼り付けておく)、変形が生じたもののみを取り替えることにすれば、コスト削減や復旧作業の簡略化ができるので望ましい。
【0028】
本発明は、上記実施形態に限定されず、種々の形態を採用可能である。
例えば、堅固な基礎構造体にボルトで固定されている機械設備(被定着構造体)などの定着ボルトにも活用できる。
ボルト32,34とカプラー33の強度設定は、基本的にはFcy<Fbyでありさえすればよい。例えば、Fcmax<Fbyになるように設計してもよい。この場合、カプラー33が先に破断を来たすので、地震のエネルギー吸収は少なくなるが、ボルト32,34にはまったく損傷を与えないようにすることができる。一方、関係式(1)のように設定した場合には、ボルト32,34の変形をある程度は認めてエネルギー吸収を大きくすることで、より大きな地震に対応できるようにすると共に、カプラー33の破断ひいては交換数を減らし、経済性を高めることもできる。
Fcy<Fbyでありさえすれば、2つの分割ボルト32,34の材質、ボルトサイズ、強度などが互いに異なっていてもよい。
【0029】
【発明の効果】
以上説明したように、本発明によれば、レベルIIの大地震などの大荷重が作用したときは、損傷が専らカプラーで発生するように制御することができ、ボルトにまで損傷が及ぶのを回避ないしは抑制することができる。カプラーは、基礎構造体の外に配置できるので、容易に点検でき、取替えなどの補修作業も簡単に行うことができる。
【図面の簡単な説明】
【図1】本発明の一実施形態に係る橋梁の橋脚定着構造の正面図である。
【図2】図1のII−II線に沿う上記橋脚定着構造の平面断面図である。
【図3】図2のIII−III線に沿って上記橋脚定着構造の要部を拡大して示す正面断面図である。
【図4】上記橋脚定着構造の施工手順を、フーチング構築後、橋脚の建て込み時の状態で示す正面図である。
【図5】従来の橋脚定着構造の正面図である。
【符号の説明】
10 橋脚(被定着構造体)
11 橋脚本体
12 ベースフレーム
13 ベースプレート(ベース部材)
14 ベースフランジ
13a,14a 挿通孔
15 縦リブ
20 フーチング(基礎構造体)
20a 凹部
30 アンカーフレーム(アンカー構造体)
31 アンカーボルト装置
32 フーチング側ボルト(基礎構造体側の分割ボルト)
32a ボルト頭部ないしはナット
33 カプラー
33a ロッド部(損傷制御部)
33b 嵌合部
33c 雌ねじ
33d テーパー面
34 橋脚側ボルト(被定着構造体側の分割ボルト)
35,36,37 ナット
38U,38L アンカービーム
38a ビームプレート
38b 縦リブ
38c 挿通孔
39 ブレース[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to an anchor bolt device for a pier or the like.
[0002]
[Prior art]
As shown in FIG. 5, generally, a steel pier 1 (fixed structure) of a bridge is fixed to a footing 2 (foundation structure) via an anchor frame 3. The anchor bolt 3a of the anchor frame 3 is vertically embedded in the
[0003]
[Patent Document 1]
JP-A-10-266128 (
[0004]
[Problems to be solved by the invention]
According to the Road Bridge Specifications and Revised in 2002, the V-Seismic Design Edition (published by Japan Road Association), Level I with high probability of generating seismic motion and Level II with low probability but high strength of generating The
In
`` Plastic deformation occurs only in members that take plasticization into account, and the plastic deformation must be appropriately determined within the range where the member can be easily repaired. That can be repaired quickly. "
In seismic performance 3,
`` Plastic deformation occurs only in members that take plasticization into account, and the plastic deformation is appropriately determined within the range that does not exceed the plastic deformation performance possessed by the member. Select members that can be achieved. "
[0005]
By the way, it is well known that, when an unexpected tensile axial force acts on a bolt, stress concentration occurs in the thread root and brittle fracture may occur without sufficient elongation deformation. When such deformation or breakage occurs in the anchor bolt 3a for a pier in FIG. 5, since the whole is buried in the
[0006]
[Means for Solving the Problems]
In view of the above circumstances, in the design of the anchor bolt, it is natural that the inventor always determines the material to be used, the cross-sectional size, and the like in consideration of a sufficient safety factor at all times so as to cope with the level I earthquake motion. Based on the idea that it is reasonable to incorporate a member that controls damage while allowing a certain amount of damage to unexpected large loads such as a large earthquake that is a level II seismic motion, the present invention was developed. did.
[0007]
That is, the present invention provides an anchor bolt device having an anchor bolt that straddles a foundation structure (for example, footing of a bridge) and a structure to be fixed (for example, a pier), and anchors the structure to be fixed to the foundation structure. The bolt is divided into two parts on the side of the structure to be fixed (there is a fastening portion to the structure to be fixed on the side opposite to the base structure from the division part), and a coupler interposed in this division part The split bolts are detachably connected to each other, and the yield strength of the coupler is smaller than the yield strength of the anchor bolts, that is, the split bolts. Thus, when a large load such as a large earthquake that is a level II seismic motion is applied, it is possible to control the damage so that it occurs exclusively in the coupler, thereby avoiding or suppressing damage to the bolt. it can. Since the coupler can be disposed outside the substructure, it can be easily inspected and repair work such as replacement can be easily performed.
[0008]
It is desirable that the maximum strength of the coupler be greater than the yield strength of the anchor bolt and less than the maximum strength of the anchor bolt. As a result, deformation of the bolt is recognized to some extent, and the number of replacements of the coupler and thus the number of replacements can be reduced, thereby improving the economy.
[0009]
The coupler has a pair of fitting portions each of which is screw-coupled to a facing end portion of the two split bolts, and a damage control portion extending so as to connect the fitting portions. It is thinner than the fitting part, and is more likely to yield than the fitting part in a state of connection with the split bolt. Thus, by controlling the cross section and the length of the damage control unit, it is possible to accurately control the damage.
[0010]
It is desirable that the damage control section has a shape of a cylinder or the like for avoiding stress concentration, and the fitting section is smoothly connected to both ends thereof. Thereby, when the damage control unit breaks, a ductile behavior can be caused.
[0011]
The fixing member is provided with a base member facing the base structure. The base member has an insertion hole through which a division bolt on the base structure side is inserted, and an outer diameter of a fitting portion on the base structure side. Is preferably larger than the inner diameter of the insertion hole. Thus, when the coupler is broken and the structure to be fixed separates from the base structure and tries to collapse or the like, the base member collides with the fitting portion on the base structure side and the collapse or the like can be prevented.
[0012]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
FIG. 1 shows a pier anchoring structure in a bridge. A footing 20 (foundation structure) made of reinforced concrete is constructed on the ground, and a pier 10 (fixed structure) is fixed to the
[0013]
As shown in FIGS. 1 and 2, the
[0014]
As shown in FIGS. 1 and 2, the
[0015]
The
As shown in FIG. 1, the
[0016]
The long footing-
[0017]
The short bridge
The lower end of the
[0018]
The
The
[0019]
Here, if the always allowable axial force corresponding to the level I earthquake motion of the
Fba <Fcy <Fby <Fcmax <Fbmax (Equation 1)
[0020]
For example, in this embodiment, the material of the
In this embodiment, the length of the portion of the
[0021]
An example of a construction procedure of the pier anchoring structure configured as described above will be described.
As shown in FIG. 4, the
[0022]
After the concrete has hardened, the
[0023]
The operation will be described.
According to the pier anchoring structure, in the design stage, the yield strength Fby and the breaking strength Fbmax of the
[0024]
In this way, by constructing the pier anchoring structure satisfying the relational expression (1), it is possible to control so that the damage due to the level II large earthquake or the like is generated exclusively by the
[0025]
For example, in the case of the coupler LY225 of this embodiment, stable deformation can be expected up to a plastic strain of about 30%, so that the entire
[0026]
When a larger axial force (more than Fcmax) acts, the
The lower
[0027]
Since the
[0028]
The present invention is not limited to the above embodiment, but can adopt various modes.
For example, the present invention can also be used for fixing bolts such as mechanical equipment (fixed structure) fixed to a solid foundation structure with bolts.
The strength settings of the
As long as Fcy <Fby, the materials, bolt sizes, strengths, and the like of the two divided
[0029]
【The invention's effect】
As described above, according to the present invention, when a large load such as a large level II earthquake is applied, it is possible to control the damage to occur exclusively in the coupler, and to prevent damage to the bolt. It can be avoided or suppressed. Since the coupler can be disposed outside the substructure, it can be easily inspected and repair work such as replacement can be easily performed.
[Brief description of the drawings]
FIG. 1 is a front view of a pier anchoring structure of a bridge according to an embodiment of the present invention.
FIG. 2 is a plan sectional view of the pier anchoring structure taken along the line II-II of FIG.
FIG. 3 is an enlarged front sectional view showing a main part of the pier anchoring structure along a line III-III in FIG. 2;
FIG. 4 is a front view showing a construction procedure of the pier anchoring structure in a state where the pier is built after the footing is constructed.
FIG. 5 is a front view of a conventional pier anchoring structure.
[Explanation of symbols]
10 Bridge pier (fixed structure)
11
14
31
32a bolt head or
35, 36, 37
Claims (6)
アンカーボルトを被定着構造体の側において2つに分割し、そこに介在させたカプラーによって分割ボルトどうしを着脱可能に連結してなり、上記カプラーの降伏強さが、上記アンカーボルトの降伏強さより小さいことを特徴とするアンカーボルト装置。An apparatus that has an anchor bolt that straddles the base structure and the structure to be fixed, and that fixes the structure to be fixed to the base structure,
The anchor bolt is divided into two parts on the side of the structure to be fixed, and the divided bolts are detachably connected to each other by a coupler interposed therebetween, and the yield strength of the coupler is greater than the yield strength of the anchor bolt. An anchor bolt device characterized by being small.
アンカーボルトを橋脚の側において2つに分割し、そこに介在させたカプラーによって分割ボルトどうしを着脱可能に連結してなり、上記カプラーの降伏強さが、上記アンカーボルトの降伏強さより小さいことを特徴とする橋脚用アンカーボルト装置。In a device having anchor bolts spanning a footing as a foundation structure in a bridge and a pier as a structure to be fixed, and fixing the pier to the footing,
The anchor bolt is divided into two parts on the pier side, and the split bolts are detachably connected to each other by a coupler interposed therebetween, and the yield strength of the coupler is smaller than the yield strength of the anchor bolt. Characteristic anchor bolt device for piers.
上記基礎構造体側の嵌合部の外径が、上記挿通孔の内径より大きいことを特徴とする請求項4または5に記載のカプラー。A base member facing the base structure is provided in the structure to be fixed, and an insertion hole through which a division bolt on the base structure side is formed is formed in the base member.
The coupler according to claim 4, wherein an outer diameter of the fitting portion on the foundation structure side is larger than an inner diameter of the insertion hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003015573A JP2004225411A (en) | 2003-01-24 | 2003-01-24 | Anchoring bolt device for bridge pier or the like |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2003015573A JP2004225411A (en) | 2003-01-24 | 2003-01-24 | Anchoring bolt device for bridge pier or the like |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2004225411A true JP2004225411A (en) | 2004-08-12 |
Family
ID=32903281
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2003015573A Ceased JP2004225411A (en) | 2003-01-24 | 2003-01-24 | Anchoring bolt device for bridge pier or the like |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2004225411A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009024367A (en) * | 2007-07-18 | 2009-02-05 | Nippon Steel Corp | Column base fixing structure of steel column |
JP2011102475A (en) * | 2009-11-10 | 2011-05-26 | Hitachi Metals Techno Ltd | Column base structure |
JP2013087484A (en) * | 2011-10-17 | 2013-05-13 | Global Logistic Properties Inc | Seismic isolator rotation amount control mechanism |
JP2014020071A (en) * | 2012-07-17 | 2014-02-03 | Nagoya Institute Of Technology | Seismic strengthening method for reinforced-concrete anchor part of steel bridge pier |
JP2015105539A (en) * | 2013-11-29 | 2015-06-08 | 首都高速道路株式会社 | Joining structure between existing column and footing |
JP2018003304A (en) * | 2016-06-28 | 2018-01-11 | センクシア株式会社 | Anchor reinforcing structure, anchor reinforcing method and anchor reinforcing member |
CN108824171A (en) * | 2018-08-08 | 2018-11-16 | 南昌大学 | A kind of damping marmem anchor bolt and its setting method suitable for head tower cable-stayed bridge |
JP7082462B2 (en) | 2017-08-17 | 2022-06-08 | センクシア株式会社 | Anchor reinforcement structure, anchor reinforcement method and anchor reinforcement member |
JP7082463B2 (en) | 2017-08-17 | 2022-06-08 | センクシア株式会社 | Anchor reinforcement structure and anchor reinforcement method |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03183873A (en) * | 1989-12-14 | 1991-08-09 | Kajima Corp | Steel damper |
JP2000240010A (en) * | 1999-02-22 | 2000-09-05 | Sumitomo Heavy Ind Ltd | Structure of connecting part of bridge pier and footing, and method for constructing the connecting part |
-
2003
- 2003-01-24 JP JP2003015573A patent/JP2004225411A/en not_active Ceased
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03183873A (en) * | 1989-12-14 | 1991-08-09 | Kajima Corp | Steel damper |
JP2000240010A (en) * | 1999-02-22 | 2000-09-05 | Sumitomo Heavy Ind Ltd | Structure of connecting part of bridge pier and footing, and method for constructing the connecting part |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009024367A (en) * | 2007-07-18 | 2009-02-05 | Nippon Steel Corp | Column base fixing structure of steel column |
JP2011102475A (en) * | 2009-11-10 | 2011-05-26 | Hitachi Metals Techno Ltd | Column base structure |
JP2013087484A (en) * | 2011-10-17 | 2013-05-13 | Global Logistic Properties Inc | Seismic isolator rotation amount control mechanism |
JP2014020071A (en) * | 2012-07-17 | 2014-02-03 | Nagoya Institute Of Technology | Seismic strengthening method for reinforced-concrete anchor part of steel bridge pier |
JP2015105539A (en) * | 2013-11-29 | 2015-06-08 | 首都高速道路株式会社 | Joining structure between existing column and footing |
JP2018003304A (en) * | 2016-06-28 | 2018-01-11 | センクシア株式会社 | Anchor reinforcing structure, anchor reinforcing method and anchor reinforcing member |
JP7082462B2 (en) | 2017-08-17 | 2022-06-08 | センクシア株式会社 | Anchor reinforcement structure, anchor reinforcement method and anchor reinforcement member |
JP7082463B2 (en) | 2017-08-17 | 2022-06-08 | センクシア株式会社 | Anchor reinforcement structure and anchor reinforcement method |
CN108824171A (en) * | 2018-08-08 | 2018-11-16 | 南昌大学 | A kind of damping marmem anchor bolt and its setting method suitable for head tower cable-stayed bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101632255B1 (en) | Earthquake resisting design method on the basis of pc binding articulation construction method | |
KR101460258B1 (en) | Moment frame connector | |
CN110359633A (en) | A kind of concrete foot joint of the replaceable energy consumption connection component containing high ductility | |
CN204152236U (en) | A kind of external prestressing strengthening device | |
US20120180423A1 (en) | Yielding Rod to Counter Seismic Activity | |
CN110005096B (en) | Self-resetting concrete shear wall with built-in shape memory alloy | |
JP2004225411A (en) | Anchoring bolt device for bridge pier or the like | |
CN112081305A (en) | Self-resetting square concrete filled steel tube column base node with friction type anchoring device | |
CN111364611B (en) | Assembly type prestress self-resetting node | |
JP3895337B2 (en) | Tower structure | |
KR100492335B1 (en) | Reinforcement method to resist earthquakes for lower structure of bridge and there of apparatus | |
JP3740683B2 (en) | Column base fixing bracket and column base structure using the same | |
CN112160638A (en) | Double-connecting-beam structure with buckling restrained brace and construction method thereof | |
KR100492336B1 (en) | Reinforcement method to resist earthquakes for lower structure of bridge and there of apparatus | |
CN212478276U (en) | Self-resetting square concrete filled steel tube column base node with friction type anchoring device | |
US11499331B2 (en) | Ductile anchor attachment (DAA) mechanism | |
JP3161220B2 (en) | Exposed column base | |
CN211396269U (en) | Novel replaceable RC connecting beam | |
CN209686579U (en) | A kind of steel structure earthquake-resistant beam-to-column joint structure | |
JP3470697B2 (en) | Exposed column base | |
JP4591891B2 (en) | Tensile member fixture and tension member with fixture | |
JP2008014118A (en) | Low fixing degree pile head joint structure with bearing body | |
JP2009068295A (en) | Elevated structure | |
JP2015196981A (en) | Reinforcing structure of existing earth retaining wall | |
CN217174348U (en) | C-shaped steel-friction damper combined energy dissipation structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20050720 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070302 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080205 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20080403 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080513 |
|
A045 | Written measure of dismissal of application |
Free format text: JAPANESE INTERMEDIATE CODE: A045 Effective date: 20080930 |