CN109775599A - One kind installing lifting device for electric pole collection electricity box - Google Patents

One kind installing lifting device for electric pole collection electricity box Download PDF

Info

Publication number
CN109775599A
CN109775599A CN201910224465.8A CN201910224465A CN109775599A CN 109775599 A CN109775599 A CN 109775599A CN 201910224465 A CN201910224465 A CN 201910224465A CN 109775599 A CN109775599 A CN 109775599A
Authority
CN
China
Prior art keywords
roller bearing
cabinet
fixed
electricity box
bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910224465.8A
Other languages
Chinese (zh)
Inventor
冯子刚
吕林
单海波
郭善清
李振勇
徐晓明
周月
徐晓坤
魏乐
催松娥
胡志远
王旭日
孙娜
田强
郑晓伟
门亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shandong Electric Power Co Gaomi Power Supply Co
State Grid Corp of China SGCC
Original Assignee
State Grid Shandong Electric Power Co Gaomi Power Supply Co
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shandong Electric Power Co Gaomi Power Supply Co, State Grid Corp of China SGCC filed Critical State Grid Shandong Electric Power Co Gaomi Power Supply Co
Priority to CN201910224465.8A priority Critical patent/CN109775599A/en
Publication of CN109775599A publication Critical patent/CN109775599A/en
Pending legal-status Critical Current

Links

Landscapes

  • Photovoltaic Devices (AREA)

Abstract

The invention discloses one kind to install lifting device for electric pole collection electricity box, including chassis, the one end on chassis is provided with fixed anchor ear, collection electricity box pulling apparatus and fixed pulley are installed on chassis, collecting electricity box pulling apparatus includes driving device and positioning device, driving device be include cabinet on fixed underpan and the energy-storage transmission device that box house is set, energy-storage transmission device includes the energy-stored spring that box house is mounted on by energy storage roller bearing, it is mounted on the transmission gear and be mounted on the coiling roller bearing that box house and transmission gear match that wall box is matched with roller bearing, it is located in the box body and is equipped with braking bayonet lock, energy storage roller bearing is equipped with handle, positioning device includes positioning supporting frame and clamping device, drawstring is set on coiling roller bearing, one end of drawstring is fixed on coiling roller bearing, the other end passes through cabinet and fixed pulley acts on collection table On case.The configuration of the present invention is simple, easy to operate, the situation for avoiding non-transformer that from can not constructing effectively improves working efficiency.

Description

One kind installing lifting device for electric pole collection electricity box
Technical field
The device that the present invention relates to a kind of to be promoted for collecting electricity box installation on utility poles.
Background technique
In the rural area upgrading of rural power grids at present, more collection electricity box are fixed and install on electric pole.Collection electricity box are divided into Multiple types, for 30-40 kilograms of weight of multi-epitope collection electricity box, with certain risk when installation, but if using hanging Vehicle installation, expense are excessively high.It is big using ladder installation risk, and need more people's cooperations.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of to collect the lifting device that electricity box are installed on electric pole.
Above-mentioned technical problem is solved, the present invention includes chassis, it is structurally characterized in that the one end on chassis is provided with fixed anchor ear, Collection electricity box pulling apparatus is installed on chassis, the other end opposite with fixed anchor ear positioned at chassis is equipped with fixed pulley, institute Stating collection electricity box pulling apparatus includes driving device and positioning device, driving device be include that cabinet on fixed underpan and being arranged exists The energy-storage transmission device of box house, the energy-storage transmission device include the energy storage bullet that box house is mounted on by energy storage roller bearing Spring is mounted on transmission gear and the coiling roller bearing for being mounted on box house that wall box is matched in roller bearing, is located in the box body It is provided with the braking bayonet lock matched with transmission gear, brakes and is provided with the check band body extended to outside cabinet on bayonet lock, it is described Cabinet outer end is provided with the handle of control energy storage roller bearing rotation, and the positioning device includes positioning supporting frame and clamping device, institute It states and drawstring is set on coiling roller bearing, one end of drawstring is fixed on coiling roller bearing, and the other end is pierced by cabinet pile warp chassis and positioning Fixed pulley acts in collection electricity box on device.
One end of the energy-stored spring is fixed on energy storage roller bearing, and the other end is fixed on the box inside close to energy storage roller bearing On wall.
The braking bayonet lock is hinged on the inner sidewall of cabinet, and one end is provided on the cabinet of braking bayonet lock side and is pacified The reset spring of braking bayonet lock is connected mounted in the cabinet other end, braking bayonet lock is equipped with the check band body for being pierced by cabinet.
Support frame as described above is multistage bending rack of the steel pipe through integrated bending forming, and the leading portion of support frame is u-bracket, U The inner sidewall at both ends of the bracket far from corner is correspondingly arranged on clamping block, is equipped with clamping device on a clamping block wherein, The u-bracket of the other end is connected with middle section bracket and back segment bracket obliquely, the back segment bracket and leading portion u-bracket institute shape At plane be parallel to each other, the fixed pulley is mounted on back segment bracket.
The clamping device includes the fixation lead screw being screwed on clamping block across bracket, is equipped with and is socketed in close to clamping block The pressure detecting module being connected on fixed lead screw and with bracket, and be socketed in fixed lead screw it is upper in pressure detecting module with Compression spring between bracket and the block that fixed lead screw is used for squeeze pressure spring is set.
The double-sided solar plate alarm being connected with pressure detecting module is provided on support frame as described above.
Advantageous effect of the present invention: the device is fixed on utility poles by chassis by anchor ear, when can be used with avoiding device The problem of chassis shakiness, the energy-storage transmission device installed on chassis replace electric energy by mechanical energy, avoid in the construction process Due to cannot connect to the inoperable situation of power supply, and the setting of the positioning device to match with energy-storage transmission device, Ke Yigen It is fixed on utility poles according to different construction heights, specified altitude assignment is located in so that collection electricity box be promoted, in positioning device The pressure detecting module and double-sided solar plate alarm of setting can effectively improve safety coefficient when device uses, and avoid The loss of work mistake bring.The configuration of the present invention is simple, easy to operate, the situation for avoiding non-transformer that from can not constructing effectively mentions High working efficiency.
Detailed description of the invention
Fig. 1 is overall structure of the present invention;
Fig. 2 is driving device schematic cross-sectional view of the present invention;
Fig. 3 is positioning device overlooking structure diagram of the present invention.
Specific embodiment
Referring to attached drawing, the present invention includes chassis, and chassis is rectangular slab, is equipped with fixed anchor ear in an end edge on chassis 2, the shape of fixed anchor ear 2 and the shape of electric pole are adapted when design, and fixed anchor ear 2 is equipped with screwing screw, pass through fixation Anchor ear 2 is fixed on utility poles by chassis, effectively avoids chassis mobile, and the other end opposite with fixed anchor ear 2 is pacified on chassis Equipped with fixed pulley 3;Collection electricity box pulling apparatus is installed, which includes driving device and positioning dress on chassis It sets, driving device includes the energy-storage transmission device installed inside the cabinet 6 and cabinet 6 being fixedly mounted on chassis, case when production Body 6 is positioned close on the chassis of fixed 2 side of anchor ear, and energy-storage transmission device includes being mounted on cabinet 6 by energy storage roller bearing 8 The energy-stored spring 9 of inside is also mounted on the transmission gear 10 matched in cabinet 6 relative to roller bearing and is mounted in cabinet 6 The coiling roller bearing 11 in portion, both its energy storage roller bearing 8 and coiling roller bearing 11, which are parallel to each other, when design is mounted on case by bearing both ends On the front-rear side walls of body 6, corresponding gear is installed on energy storage roller bearing 8 and coiling roller bearing 11, is rolled in energy storage roller bearing 8 and coiling The transmission gear 10 that both control interlocks is installed, transmission gear 10 is mounted on the side wall of cabinet 6 to be rolled with energy storage between axis 11 The gear installed on axis 8 and coiling roller bearing 11 matches, and the spragging gear of control transmission gear 10 is provided on transmission gear 10, It is hinged with the braking bayonet lock 12 of control spragging gear on the tank wall of installation 10 side of transmission gear, is located at braking bayonet lock 12 1 The reset spring 18 that one end is mounted on other end connection braking bayonet lock 12 on 6 inner wall of cabinet, braking clamp are provided on the cabinet 6 of side Pin 12 is equipped with the check band body 13 for being pierced by cabinet 6, and braking the other end on the hinged tank wall in one end of bayonet lock 12 may be stuck in braking On gear, by drop check band body 13 make brake bayonet lock 12 leave spragging gear, make energy storage roller bearing 8, transmission gear 10 with around 11 three of line roller bearing movement, take-off the brake rope body 13 block braking bayonet lock 12 again on the brake gear by reset spring 18, Make 10 stop motion of transmission gear, to make energy storage roller bearing 8 and 11 stop motion of coiling roller bearing, for controlling 10 work of transmission gear The arrestment mechanism of work can also be ratchet, ratchet structure;One end of its energy-stored spring 9 is fixed on energy storage roller bearing 8, and the other end is solid It is scheduled on 6 inner sidewall of cabinet close to energy storage roller bearing 8,6 outer end of cabinet is connected with the handle that control energy storage roller bearing 8 rotates when design 14, controlling the rotation of energy storage roller bearing 8 by handle 14 makes energy-stored spring 9 complete thermal energy storage process, and energy-stored spring 9 can also be used when production Clockwork spring substitution;Drawstring 17 is set on coiling roller bearing 11, and one end of drawstring 17 is fixed on coiling roller bearing 11, and the other end is pierced by The fixed pulley 3 on fixed pulley 3 and positioning device on 6 pile warp chassis of cabinet acts in collection electricity box, for drawing collection electricity box It is promoted, of course for 17 uniform force of drawstring and time saving and energy saving is made, is provided on the bottom plate that drawstring 17 is pierced by 6 position of cabinet Fixed pulley 3;Its positioning device, which is located above driving device, fixes on utility poles, and positioning device includes support frame used for positioning 15 and clamping device 16, support frame 15 is multistage bending rack of the steel pipe through integrated bending forming when design, before support frame 15 Section is analog-U shaped bracket and is adapted with the shape of electric pole that the inner sidewall at both ends of the U bracket far from corner is correspondingly arranged on card Tight block 19, is equipped with clamping device 16, the u-bracket of the other end is connected with middle section branch obliquely wherein on a clamping block 19 Frame and back segment bracket, back segment bracket are formed by plane with leading portion u-bracket and are parallel to each other, and pacify positioned at the end of back segment bracket Equipped with fixed pulley 3,15 shape and structure of support frame and electric pole is adapted and the clamping block 19 being arranged uses three-point mount when design Principle is identical as pedal principle when work people's climbing electric pole;And clamping device 16 includes being screwed onto clamping block across bracket Fixation lead screw 20 on 19 is equipped with close to clamping block 19 and is socketed in the pressure detecting mould being connected on fixed lead screw 20 and with bracket Block 21, and be socketed in the compression spring 22 on fixed lead screw 20 between pressure detecting module 21 and bracket and be arranged solid Fixed thread thick stick 20 is used for the block of squeeze pressure spring 22, and when production is equipped on support frame 15 to be connected with pressure detecting module 21 The double-sided solar plate alarm 23 connect, working efficiency when improving work reduce work risk, by rotating fixed lead screw 20, which hold out against clamping block 19, fixes support frame 15 on utility poles, tightens fixed lead screw 20 and passes through block and pressure detecting module 21 Squeeze pressure spring 22, the size for making pressure detecting module 21 will test power are transferred to double-sided solar plate alarm 23, if It is too low, it can cause to alarm, pressure detecting module 21, the structure of double-sided solar plate alarm 23 are known features, pressure detecting Module 21 and the electric connection mode of double-sided solar plate alarm 23 are known features.
In use, chassis to be fixed on to the bottom of electric pole by fixed anchor ear 2, then positioning device is adjusted to suitable Height, it is by the lead screw 20 that is tightened that support frame 15 is fixed on utility poles, by pulling check band body 13 to make braking clamp Pin 12 leaves transmission gear 10, the handle 14 being then rotatably connected on energy storage roller bearing 8, after the completion of making 9 energy storage of energy-stored spring, pine Opening check band body 13 makes braking bayonet lock 12 be stuck in transmission gear 10, and the drawstring 17 installed on coiling roller bearing 11 is finally passed through chassis It is then attached to the fixed pulley 3 being arranged in support in collection electricity box, after staff's climbing to the corresponding position of electric pole, pulls Check band body 13 makes energy-storage transmission device start to work, and collects electricity box and is raised to take-off the brake rope body 13 after certain altitude, then will collection Electricity box are fixed on utility poles, that is, complete collection electricity box installment work.
The above description is only a preferred embodiment of the present invention, is not intended to restrict the invention.Previous embodiment is to the present invention It is described in detail, it for those skilled in the art, still can be to skill documented by foregoing embodiments Art scheme is modified or equivalent replacement of some of the technical features.In every case in inventive concept range of the invention Within, any modification, equivalent substitution, improvement and etc. done are all included in the scope of protection of the present invention.

Claims (6)

1. one kind installs lifting device, including chassis for electric pole collection electricity box, it is characterised in that: described chassis one end is provided with It fixes anchor ear (2), is equipped on chassis and collects electricity box pulling apparatus, the other end opposite with fixed anchor ear (2) is pacified on the chassis Equipped with fixed pulley (3), the collection electricity box pulling apparatus includes driving device and positioning device, and driving device includes on fixed underpan Cabinet (6) and the setting energy-storage transmission device internal in cabinet (6), the energy-storage transmission device includes passing through energy storage roller bearing (8) it is mounted on the internal energy-stored spring (9) of cabinet (6), is mounted on the transmission gear (10) that cabinet (6) side wall is matched with roller bearing Be mounted on the internal coiling roller bearing (11) to match with transmission gear (10) of cabinet (6), be located in cabinet (6) and be provided with control The braking bayonet lock (12) of transmission gear (10), cabinet (6) outer end are provided with the handle of control energy storage roller bearing (8) rotation (14), the positioning device includes positioning supporting frame (15) and clamping device (16), and drawstring is arranged on the coiling roller bearing (11) (17), one end of drawstring (17) is fixed on coiling roller bearing (11), and the other end is pierced by cabinet (6) pile warp chassis and positioning device Fixed pulley (3) acts in collection electricity box.
2. according to claim 1 install lifting device for electric pole collection electricity box, it is characterised in that: the energy-stored spring (9) one end is fixed on energy storage roller bearing (8), and the other end is fixed on cabinet (6) inner sidewall of energy storage roller bearing (8).
3. according to claim 1 install lifting device for electric pole collection electricity box, it is characterised in that: the braking bayonet lock (12) it is hinged on the inner sidewall of cabinet (6), is provided with one end on the cabinet (6) of braking bayonet lock (12) side and is mounted on case The reset spring (18) of body (6) other end connection braking bayonet lock (12), braking bayonet lock (12) are equipped with the braking for being pierced by cabinet (6) It restricts body (13).
4. according to claim 1 install lifting device for electric pole collection electricity box, it is characterised in that: support frame as described above It (15) is multistage bending rack of the steel pipe through integrated bending forming, the leading portion of support frame (15) is u-bracket, and U bracket is separate to turn The inner sidewall at the both ends at angle is correspondingly arranged on clamping block (19), is equipped with clamping device on a clamping block (19) wherein (16), the u-bracket of the other end is connected with middle section bracket and back segment bracket obliquely, the back segment bracket and the U-shaped branch of leading portion Frame is formed by plane and is parallel to each other, and the fixed pulley (3) is mounted on back segment bracket.
5. according to claim 1 or 4 install lifting device for electric pole collection electricity box, it is characterised in that: the clamping Device (16) includes the fixation lead screw (20) being screwed on clamping block (19) across bracket, is equipped with and is socketed in close to clamping block (19) The pressure detecting module (21) being connected on fixed lead screw (20) and with bracket, and be socketed on fixed lead screw (20) and be located at pressure Compression spring (22) and setting between power detection module (21) and bracket are used for squeeze pressure spring in fixed lead screw (20) (22) block.
6. according to claim 1 or 4 install lifting device for electric pole collection electricity box, it is characterised in that: the support The two-sided sun alarm (23) being connected with pressure detecting module (21) is provided on frame (15).
CN201910224465.8A 2019-03-23 2019-03-23 One kind installing lifting device for electric pole collection electricity box Pending CN109775599A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910224465.8A CN109775599A (en) 2019-03-23 2019-03-23 One kind installing lifting device for electric pole collection electricity box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910224465.8A CN109775599A (en) 2019-03-23 2019-03-23 One kind installing lifting device for electric pole collection electricity box

Publications (1)

Publication Number Publication Date
CN109775599A true CN109775599A (en) 2019-05-21

Family

ID=66491276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910224465.8A Pending CN109775599A (en) 2019-03-23 2019-03-23 One kind installing lifting device for electric pole collection electricity box

Country Status (1)

Country Link
CN (1) CN109775599A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110745703A (en) * 2019-11-06 2020-02-04 国网山东省电力公司昌乐县供电公司 Collection table case pole installation hoisting device
CN112202074A (en) * 2020-11-17 2021-01-08 周宋宝 Pre-buried power distribution cabinet
CN114487512A (en) * 2022-02-22 2022-05-13 国网江苏省电力有限公司宿迁供电分公司 High-stability relay protection device test fixture and test method thereof

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4684031A (en) * 1985-07-15 1987-08-04 Frederick Sigurdur Bergman Material hoisting gin
JPH07196298A (en) * 1993-12-10 1995-08-01 Cascade Corp Method of holding load
US20100237305A1 (en) * 2009-03-18 2010-09-23 Miller Kevin L Method of improving the functionality of pole mounted electrical producing or consuming panels
DE202013100618U1 (en) * 2013-02-12 2013-04-08 Mei-Chin Hsueh Cheng Retractor for curtains
DE102012005424A1 (en) * 2012-03-20 2013-09-26 Hebö Maschinenfabrik GmbH Lifting device for use in balcony of building shell to lift balcony railing outside building shell, has rope deflecting unit arranged at end of carrier that is positioned perpendicular to base surface by foot and support element
CN203545583U (en) * 2013-09-16 2014-04-16 国家电网公司 Low-pressure meter box replacement device
CN105129627A (en) * 2015-07-23 2015-12-09 国家电网公司 Folding type suspension arm device supported by electric pole
CN205275101U (en) * 2015-12-12 2016-06-01 周义平 Portable automatic hoisting machine
CN106422214A (en) * 2015-08-12 2017-02-22 国龙寿 Electric lifting type telegraph pole climbing device
CN107086474A (en) * 2017-06-26 2017-08-22 国网河南省电力公司濮阳供电公司 A kind of electricity box install power assisting device
CN107720591A (en) * 2017-09-14 2018-02-23 北京卫星制造厂 A kind of wind spring drive-type steel wire rope winding mechanism based on assembly pulley row's rope
CN209835495U (en) * 2019-03-23 2019-12-24 国网山东省电力公司高密市供电公司 Be used for wire pole collection table case installation hoisting device

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4684031A (en) * 1985-07-15 1987-08-04 Frederick Sigurdur Bergman Material hoisting gin
JPH07196298A (en) * 1993-12-10 1995-08-01 Cascade Corp Method of holding load
US20100237305A1 (en) * 2009-03-18 2010-09-23 Miller Kevin L Method of improving the functionality of pole mounted electrical producing or consuming panels
DE102012005424A1 (en) * 2012-03-20 2013-09-26 Hebö Maschinenfabrik GmbH Lifting device for use in balcony of building shell to lift balcony railing outside building shell, has rope deflecting unit arranged at end of carrier that is positioned perpendicular to base surface by foot and support element
DE202013100618U1 (en) * 2013-02-12 2013-04-08 Mei-Chin Hsueh Cheng Retractor for curtains
CN203545583U (en) * 2013-09-16 2014-04-16 国家电网公司 Low-pressure meter box replacement device
CN105129627A (en) * 2015-07-23 2015-12-09 国家电网公司 Folding type suspension arm device supported by electric pole
CN106422214A (en) * 2015-08-12 2017-02-22 国龙寿 Electric lifting type telegraph pole climbing device
CN205275101U (en) * 2015-12-12 2016-06-01 周义平 Portable automatic hoisting machine
CN107086474A (en) * 2017-06-26 2017-08-22 国网河南省电力公司濮阳供电公司 A kind of electricity box install power assisting device
CN107720591A (en) * 2017-09-14 2018-02-23 北京卫星制造厂 A kind of wind spring drive-type steel wire rope winding mechanism based on assembly pulley row's rope
CN209835495U (en) * 2019-03-23 2019-12-24 国网山东省电力公司高密市供电公司 Be used for wire pole collection table case installation hoisting device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110745703A (en) * 2019-11-06 2020-02-04 国网山东省电力公司昌乐县供电公司 Collection table case pole installation hoisting device
CN112202074A (en) * 2020-11-17 2021-01-08 周宋宝 Pre-buried power distribution cabinet
CN112202074B (en) * 2020-11-17 2022-12-06 广州市鹏升电器设备有限公司 Pre-buried power distribution cabinet
CN114487512A (en) * 2022-02-22 2022-05-13 国网江苏省电力有限公司宿迁供电分公司 High-stability relay protection device test fixture and test method thereof
CN114487512B (en) * 2022-02-22 2023-09-29 国网江苏省电力有限公司宿迁供电分公司 High-stability relay protection device testing clamp and testing method thereof

Similar Documents

Publication Publication Date Title
CN109775599A (en) One kind installing lifting device for electric pole collection electricity box
CN105220844B (en) Railing and its installation method with solar thermal collector
CN209134341U (en) A kind of balcony photovoltaic bracket
CN106089004B (en) A kind of electric up-down curtain
CN108933560A (en) A kind of new-energy automobile solar panels regulating device
CN110395132A (en) A kind of new-energy automobile charging pile of high security
CN104460450B (en) Automatic and remote controlled rainproof drying device
CN208522687U (en) A kind of solar energy photovoltaic panel component and its control system
CN109617515A (en) A kind of photovoltaic power generation various collection plate installation and rotating device
CN213508131U (en) Energy-saving road construction attention device regulation and control device
CN210800494U (en) Wall-mounted security camera
CN208284071U (en) Fire automatic alarm device
CN209835495U (en) Be used for wire pole collection table case installation hoisting device
CN205895097U (en) Electric lift (window) curtain
CN215601273U (en) Wind-solar energy storage detection device applied to oil field pumping unit
CN212809422U (en) Gas leakage monitoring's siren convenient to dismantle and installation
CN208859259U (en) A kind of monitoring mounting device for eminence
CN108979295A (en) Portable power repairs safe purse seine
CN208734472U (en) A kind of double drive formula umbrella type wind energy conversion device
CN113188259A (en) Vacuum tube type solar heat collector
CN216042243U (en) Outdoor telescopic sunshade
CN2487855Y (en) Window-proof roller shutter
CN215952606U (en) Power pipeline fire prevention monitoring devices
CN108708145A (en) Clothes hanger
CN212204183U (en) Membrane structure building energy-saving lighting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190521