CN109763828A - Push-bench tunneling construction method - Google Patents

Push-bench tunneling construction method Download PDF

Info

Publication number
CN109763828A
CN109763828A CN201811645766.XA CN201811645766A CN109763828A CN 109763828 A CN109763828 A CN 109763828A CN 201811645766 A CN201811645766 A CN 201811645766A CN 109763828 A CN109763828 A CN 109763828A
Authority
CN
China
Prior art keywords
push
bench
construction method
tunneling construction
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811645766.XA
Other languages
Chinese (zh)
Inventor
李占先
韩仲慧
王可用
刘小果
路刚
袁洋
郭勇
曹晶
李腾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 14th Bureau Group Co Ltd
Original Assignee
China Railway 14th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 14th Bureau Group Co Ltd filed Critical China Railway 14th Bureau Group Co Ltd
Priority to CN201811645766.XA priority Critical patent/CN109763828A/en
Publication of CN109763828A publication Critical patent/CN109763828A/en
Pending legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention provides a kind of push-bench tunneling construction method, push-bench tunneling construction method includes: to carry out prediction calculating to the boring parameter of push-bench according to the buried depth, geological condition and environmental condition of push-bench;Detecting/monitoring is carried out to ground sedimentation and deformation situation in push-bench work, and is verified according to boring parameter of the monitoring result to prediction;Boring parameter includes soil pressure force value, and the theoretical calculation formula of soil pressure force value is as follows: P0=K × γ × H;Wherein, P0For the calculated value of push-bench earth balance pressure power, K is the lateral pressure coefficient of soil, and γ is the bulk density of soil, and H is the influence depth of push pipe;The soil pressure force value actually used is P, standby pressure P1, the calculation formula of practical soil pressure force value is as follows: P=P0+P1.The technical solution provided through the invention is able to solve push-bench tunneling construction effect problem of poor in the prior art.

Description

Push-bench tunneling construction method
Technical field
The present invention relates to no-excavation construction method fields, in particular to a kind of push-bench tunneling construction method.
Background technique
Currently, jacking pipe construction process is a kind of construction method of no-dig technique, by the construction method can in few excavation or Person carries out piping laying in the case where not excavating.At work, the top power that push-bench generates is for overcoming pipe for jacking pipe construction process Pipeline is headed by the gradient of design into soil layer, and the earthwork is transported by the frictional force in road and surrounding soil.With push pipe The work of machine, pipeline will be entered in received well by passing through soil layer in active well.
But the construction effect of push-bench tunneling construction in the prior art is bad, is easy to cause larger construction deviation.
Summary of the invention
The main purpose of the present invention is to provide a kind of push-bench tunneling construction methods, to solve push pipe in the prior art Machine tunneling construction effect problem of poor.
To achieve the goals above, the present invention provides a kind of push-bench tunneling construction methods, comprising: according to push-bench Buried depth, geological condition and environmental condition carry out prediction calculating to the boring parameter of push-bench;It is heavy to ground in push-bench work It drops deformation and carries out detecting/monitoring, and verified according to boring parameter of the monitoring result to prediction;Boring parameter includes soil pressure The theoretical calculation formula of force value, soil pressure force value is as follows: P0=K × γ × H;Wherein, P0For the theory of push-bench earth balance pressure power Calculated value, K are the lateral pressure coefficient of soil, and γ is the bulk density of soil, and H is the influence depth of push pipe;The soil pressure force value actually used For P, standby pressure P1, the calculation formula of practical soil pressure force value is as follows: P=P0+P1
Further, boring parameter further includes amount of being unearthed, and the theoretical calculation formula for amount of being unearthed is as follows: V0=(π/4) × D2× L× N;Wherein, V0For the calculated value for the amount of being unearthed, N is void side's coefficient, and D is the diameter that push-bench tunnels the cave to be formed, L The length in the cave to be formed is tunneled for push-bench;The unearthed amount actually used is V, 0.98V0≤V≤V0
Further, boring parameter further includes fltting speed, push-bench tunneling construction method further include: is promoted in push-bench When, detected by fltting speed of the soil pressure sensor to shield structure jack, and to the fltting speed of shield structure jack into Row adjustment, so that the fltting speed of shield structure jack matches with unearthed speed, to keep soil pressure force value appropriate.
Further, push-bench tunneling construction method further include: using automatic guiding system and deviation-rectifying system to push pipe The axis and posture of machine are controlled.
Further, the axis and posture of push-bench control using automatic guiding system and deviation-rectifying system specific It include: to be detected using automatic guiding system to the posture of shield, to observe the position of shield and design the level of axis partially Difference and vertical deflection, and propelling cylinder is adjusted to control tunneling direction by horizontal departure and vertical deflection.
Further, adjustment tunneling direction includes: deviation adjustment angle α, wherein 10 '≤α≤20 '.
Further, push-bench tunneling construction method further includes synchronizing note using synchronous grouting technique in push pipe Slurry, synchronous grouting technique includes: to fill the gap of head Yu tube coupling part, and to establish mud sleeve to tail slip casting;Wherein, machine The grouting amount of endnote slurry is V1, the void volume between head and steel pipe is V2, 3V2≤V1≤6V2
Further, synchronous grouting technique further include: after establishing mud sleeve, the route along driving carries out benefit slurry, to repair Mud sleeve loss is mended, the benefit slurry amount for mending slurry along the line is V3, 3V2≤V3≤5V2
Further, synchronous grouting technique further include: the hole slip casting in tunnel installs slip casting in the sealing collar at hole Pipe and ball valve are to carry out slip casting.
Further, push-bench tunneling construction method further include: in the tunneling process of push-bench, by push-bench to knife Additive is injected in disk or native storehouse, cutterhead rotates so that additive is mixed with soil quarrel, to increase the creeping of the soil body.
It applies the technical scheme of the present invention, the practical soil pressure force value that construction method through the invention is calculated, and root It is excavated according to soil pressure force value, construction parameter can be synthesized and coordinated and be optimized in this way, to improve construction effect.Therefore, The push-bench tunneling construction method provided through the invention is able to solve push-bench tunneling construction effect in the prior art not Great question.
Specific embodiment
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase Mutually combination.Below in conjunction with embodiment, the present invention will be described in detail.
The embodiment of the invention provides a kind of push-bench tunneling construction methods, which includes: root Prediction calculating is carried out to the boring parameter of push-bench according to the buried depth, geological condition and environmental condition of push-bench;It works in push-bench When detecting/monitoring is carried out to ground sedimentation and deformation situation, and verified according to boring parameter of the monitoring result to prediction;Driving ginseng Number includes soil pressure force value, and the theoretical calculation formula of soil pressure force value is as follows: P0=K × γ × H, the formula are bright golden classical formulas; Wherein, P0For the calculated value of push-bench earth balance pressure power, K is the lateral pressure coefficient of soil, and γ is the bulk density of soil, and H is top The influence depth of pipe;The soil pressure force value actually used is P, standby pressure P1, the calculation formula of practical soil pressure force value is as follows: P =P0+P1
Using push-bench tunneling construction method provided by the invention, the practical soil pressure force value that can be calculated, and according to Soil pressure force value is excavated, and can construction parameter be synthesized and coordinated and be optimized in this way, to improve construction effect.Therefore, lead to Push-bench tunneling construction method provided by the invention is crossed, it is bad to be able to solve push-bench tunneling construction effect in the prior art Problem.
When being tunneled using earth pressure balance mode, the setting of soil pressure is the key that construction, contains propulsive force, fltting speed With the correlation of unearthed amount three, play a leading role to jacking construction axial line control and stratum settlement control.For sand Speech: K=0.34-0.45, for clay: K=0.5-0.7 is controlled are as follows: P with soil pressure when lowest level steel pipe jacking0= 0.5 × 20 × 13.1=131Kpa.Because the engineering is stringent to settlement request, consider 10-20Kpa as standby pressure, practical control Value processed is according to 131+20=151Kpa.
It is measured in construction by being located at the pressure gauge of cutterhead and gas-tight silo, measures and believe in conjunction with geology, buried depth and ground monitoring The feedback analysis of breath optimizes and revises the setting value of soil pressure, fltting speed, propulsive force and grouting amount in due course, to ensure that ground becomes Shape controls within the limits prescribed.
Soil pressure is in gas-tight silo with the control of the aperture of screw conveyor revolving speed and unearthed door, i.e., with amount control of being unearthed.Driving Parameter further includes amount of being unearthed, and the theoretical calculation formula for amount of being unearthed is as follows: V0=(π/4) × D2×L×N.Wherein, V0For the amount of being unearthed Calculated value, N is void side coefficient, and D tunnels the diameter in the cave to be formed for push-bench, and L tunnels the hole to be formed for push-bench The length in cave;The unearthed amount actually used is V, 0.98V0≤V≤V0.Theoretical every meter amount of being unearthed: V=(π/4) × D2×L×N =(π/4) × 2 × 2 × 1.3=4.04m3/m。
N is void side's coefficient, determines that the N value of soft soil layer is generally 1.3 or so according to live reality.Using earth pressure balance When mode is tunneled, practical amount control of being unearthed is unearthed amount between theoretical 98%~100%, to maintain certain soil pressure, guarantees The stabilization of the push pipe front soil body.
How much amount of being unearthed directly influences the stabilization of cutterhead earth balance pressure power and excavation face, and control soil discharge quantity is control earth's surface The important measures of deformation.When keeping certain earth balance pressure power, revolving speed of the soil discharge quantity depending on conveyer, and helical feed The revolving speed and push-bench of machine promote jack fltting speed to coordinate, preferably holding earth pressure balance.
In the present embodiment, boring parameter further includes fltting speed.Push-bench tunneling construction method further include: in push-bench It when propulsion, is detected by fltting speed of the soil pressure sensor to shield structure jack, and to the propulsion of shield structure jack speed Degree is adjusted, so that the fltting speed of shield structure jack matches with unearthed speed, to keep soil pressure force value appropriate.Top By controlling soil pressure sensor detection data the fltting speed of shield structure jack when pipe machine promotes, keep shield driving fast Degree matches with unearthed speed, to keep appropriate soil pressure force value.
In the present embodiment, push-bench tunneling construction method further include: use automatic guiding system and deviation-rectifying system pair The axis and posture of push-bench are controlled.Using such setting, the precision of construction can be preferably improved.
Specifically, being carried out using automatic guiding system and deviation-rectifying system to the axis and posture of push-bench in the present embodiment Control specifically includes: being detected using posture of the automatic guiding system to shield, to observe position and the design axis of shield Horizontal departure and vertical deflection, and propelling cylinder is adjusted to control tunneling direction by horizontal departure and vertical deflection.
In the present embodiment, adjustment tunneling direction includes: deviation adjustment angle α, wherein 10 '≤α≤20 '.
Specifically, push-bench uses automatic guiding system and deviation-rectifying system.Wherein, shield driving direction controlling and correction packet It includes:
Shield attitude monitoring is carried out using automatic guiding system and manual measurement auxiliary.The system can be intuitively round-the-clock Deviation and trend in shield machine master control room Dynamically Announce shield current vertical and horizontal position and Tunnel Design axis.According to This adjustment control tunneling direction;
Propelling cylinder is adjusted by the direction of division operation push-bench to control tunneling direction.
Specifically, the direction controlling and correction points for attention in correction are as follows: direction adjustment is unsuitable too fast, excessive, prevents Only increase surface subsidence;Boring parameter should be adjusted in time according to face strata condition, and warning should be set when adjusting tunneling direction Value and limits value, should just carry out correction program when reaching warning value, calculate correction curve, and pose adjustment is referring to entangling when correction Inclined curve carries out;Direction controlling is of crucial importance when push-bench originates arrival, should want according to the related technology for originating, reaching driving It asks, carries out measurement and positioning work.
Specifically, push pipe jacking direction controlling should meet following requirements: establishing stringent setting-out review system, and carry out original Record.Stringent setting-out repetition measurement system is had to comply with before jacking, it is ensured that measurement is perfectly safe.Reacting wall must be avoided in jacking Shift and deformation, timing repetition measurement simultaneously adjust in time;Jacking correction must be measured frequently, be finely tuned more, and deviation adjustment angle should be maintained at 10 ' ~20 ', be not greater than 0.5 °, and deviation warning line is set;On the one hand initial propulsion stage, correction will slow down fltting speed, and one Aspect constantly adjusts oil cylinder marshalling and head correction;Before jacking must position to each rice, every section pipe, absolute altitude calculated in advance, Ensure correct when jacking;Synchronous grouting state modulator.
For reduce push pipe when Guan Zhouyu soil frictional resistance, while filling due to push-bench caliber it is slightly larger caused by gap, Simultaneous implantation mud is needed when push pipe, mud is formed by injected hole of the slip casting machine through pipeline to steel pipe top, the injection soil body Thixotropic slurry set.Injection slurries are that bentonite, soda ash etc. are made into slurries (specific formula and performance indicator see the table below shown), are infused Before slurry, 4 grouting orifice tubes and valve need to be arranged in every section steel pipe.
Must adhere to when mud jacking " with top with pressure, hole-specifically mud jacking, completely mend slurry, slurry amount it is uniform " principle, grouting pressure control It makes identical as support pressure.Grouting pipeline divides general pipeline and branch pipe, and general pipeline uses the coating steel pipe of diameter 50mm, and branch pipe is using straight The rubber tube of diameter 50mm.Valve is set in each injected hole and branch pipe and the junction general pipeline, to control mud sleeve quality.Note Three lines of slurry point, first is that push pipe tail synchronous grouting, second is that pipeline mends slurry along the line, third is that slip casting at hole.
Specifically, push-bench tunneling construction method further includes synchronizing slip casting using synchronous grouting technique in push pipe, Synchronous grouting technique includes: to fill the gap of head Yu tube coupling part, and to establish mud sleeve to tail slip casting;Wherein, tail The grouting amount of slip casting is V1, the void volume between head and steel pipe is V2, 3V2≤V1≤6V2
Tail synchronous slip casting: thixotropic slurry is responsible for by Φ 50 to tail slip casting, with fill between head and tube coupling gap with And the gap that correction generates, and establish mud sleeve.Diaphragm pressure gage should be installed before slip casting at head, control slip casting pressure Power should confirm whether tail grouting pressure has been established before every section pipe opens top, to ensure that slurries are sensible;Grouting amount is head 3~6 times or so of gap between steel pipe, and be adjusted according to monitoring result.
In the present embodiment, synchronous grouting technique further include: after establishing mud sleeve, the route along driving carries out benefit slurry, It is covered and is lost with mending slip, the benefit slurry amount for mending slurry along the line is V3, 3V2≤V3≤5V2
Slurry is mended along the line: covering and loses for mending slip, need to be carried out mending slurry along the line, be opened ball valve one by one in tube coupling jacking, by One closes, and never slurries are unilateral, are largely distributed, and distinguish with synchronous grouting, measures respectively.Grouting amount is head and steel 3~5 times or so of gap between pipe, and be adjusted according to monitoring result.
Specifically, synchronous grouting technique further include: the hole slip casting in tunnel installs Grouting Pipe in the sealing collar at hole With ball valve to carry out slip casting.
Specifically, push-bench tunneling construction method further include: in the tunneling process of push-bench, by push-bench to cutterhead Additive is injected in face or native storehouse, cutterhead rotates so that additive is mixed with soil quarrel, to increase the creeping of the soil body.
Good quarrel land reform is exactly that the dedicated unit configured by push-bench injects additive into cutterhead face or native storehouse, utilizes knife The Stirring of disk or native storehouse agitating device stirring mix additive with soil quarrel.Earth pressure balanced push-bench construction is successful Key is that the soil body for excavating excavation face is adjusted to a kind of " Plastic Flow state " in pressure chamber.It is needed when excavation A certain number of additives are added into the soil body, to increase the creeping for excavating the soil body to the full extent, will be sprayed in driving It gushes, mud lining, excavation face unstability, casting are unsmooth etc. because construction failure possibility occurrence caused by soil mass property is bad drops to It is minimum.
Being cut, land reform is good to select foam, modified alta-mud and polymer as main additive, is selected according to Different Strata Add appropriate number of additive and reasonable injection technology.
It is as good in do not done quarrel land reform, it may appear that following problem: in silty clay with regard to the formation condition that this bid section tunnel is passed through When middle driving, quarrel soil is not easy smoothly to export from native storehouse.Taking following technical measures is the mistake in driving silty clay or silt The additives such as foam are added in Cheng Zhong, Xiang Tucang, the workability of quarrel soil can be improved, will not in front of cutterhead mud lining.
The filling line of configuration plus foam in shield.On excavation cabin bulkhead, cutterhead disk, helical feed machine drum body Inlet is set, and each inlet can inject foam.
Foaming agent stoste is stored in bubble chamber, is pumped in foam gun after being diluted with water by foam pump, in foam gun It is mixed with compressed air, hair tonic foam, corresponding position is filled by the injection hole on shield machine.Made by the stirring of cutterhead It is uniformly mixed with quarrel soil, so as to improve the creeping of quarrel soil.
For section by stratum, the foam dope using concentration 3% is fixed tentatively, foam volume expansion rate is 15 times, foam Injection rate is 45%.The then dosage of every meter of foaming agent are as follows:
V1=1 × 3.14 × 1 × 1 × 0.45/15 × 0.03=0.0028m3
The bentonite slurry of 1:8 is added simultaneously, adds the additives such as suitable soda ash, CMC in slurries.Bentonite slurry is mixed Amount is advisable with meeting in bottom fine particle content not less than 20%.In view of the filter loss on stratum, for originating stratum, temporarily Determining incorporation is 10%.Every meter of bentonite slurry dosage: V2=3.14 × 1 × 1 × 0.10=0.3m3
According to small pipe shed construct encountered in barrier situation, disturbance in judgement object location, if within the scope of platform, can slave station Interior earth's surface excavation excavates barrier, and enclosing is arranged when excavating on platform, excavates hole as circle, diameter is in vertical range Interior covering barrier is principle, reinforced concrete core-tube, thickness 15cm is arranged when excavating, it is ensured that excavate the stabilization in hole.If nothing Method is excavated, can first construction obstacle object two sides push pipe, after the completion of to be onstructed, opened in Obstacle Position slip casting in pipe and in tube wall Mouth abolishes barrier.In jack-in process, smooth jacking whens to guarantee to encounter old friend's canopy pile foundation, the old sleeper etc. do not verified, top Pipe machine knife disk is designed as spoke type structure, in order to personnel open a position into cabin using pneumatic pick or concrete cutting machine cut place Manage the barriers such as pile foundation, dark culvert and reinforced concrete sleeper.Use pre-grouting to push pipe area according to geological condition before opening a position Face carries out grouting and reinforcing.
Thixotropic slurry is replaced using cement slurry immediately after every push pipe top is complete.Pressure injection thixotropic slurry system is utilized when displacement And pipeline carries out.Pressure injection sequence are as follows: from first segment pipe successively pressure injection backward, the previous section Guan Shiying of pressure injection is by subsequent tube coupling mud jacking Hole is opened, and overflows the thixotropic slurry in original pipeline from subsequent tube coupling mud jacking hole under the pressure of cement slurry, until subsequent The pressure injection of leading portion pipe cement slurry can be stopped after cement slurry by emerging in injected hole, it is ensured that thixotropic slurry is all replaced.
After push-bench reaches received well, directly push-bench is integrally hung out using 100 tons of cranes, using large flat lorry Using night transition to starting well, debugging is reinstalled by gantry crane in starting well, carries out second jacking construction.
Being cut, land reform is good to select foam, modified alta-mud and polymer as main additive, is selected according to Different Strata Add appropriate number of additive and reasonable injection technology.
The control of push-bench boring parameter is mainly comprising soil pressure control, soil discharge quantity and fltting speed control, synchronous grouting control System, push-bench gesture stability etc..Be familiar with push-bench performance and operating method in construction, and according to push pipe buried depth, geological condition and Environmental condition etc. carries out prediction calculating to boring parameter, while following jacking closely and being monitored instead to ground sedimentation and deformation Feedback, to verify the reasonability of construction parameter or according to monitoring result, synthesizes and coordinates construction parameter, is optimized.
It can be seen from the above description that being applied the above embodiments of the present invention realized the following chievements: improving Work efficiency fruit, convenient for operation.
The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, for the skill of this field For art personnel, the invention may be variously modified and varied.All within the spirits and principles of the present invention, made any Modification, equivalent replacement, improvement etc., should all be included in the protection scope of the present invention.

Claims (10)

1. a kind of push-bench tunneling construction method characterized by comprising
Prediction calculating is carried out according to the boring parameter of the buried depth, geological condition and environmental condition of the push-bench to push-bench;
Detecting/monitoring is carried out to ground sedimentation and deformation situation in push-bench work, and according to monitoring result to the driving of prediction Parameter is verified;
The boring parameter includes soil pressure force value, and the theoretical calculation formula of the soil pressure force value is as follows:
P0=K × γ × H;
Wherein, P0For the calculated value of push-bench earth balance pressure power, K is the lateral pressure coefficient of soil, and γ is the bulk density of soil, and H is The influence depth of push pipe;
The soil pressure force value actually used is P, standby pressure P1, the calculation formula of practical soil pressure force value is as follows:
P=P0+P1
2. push-bench tunneling construction method according to claim 1, which is characterized in that the boring parameter further includes being unearthed Amount, the theoretical calculation formula of the unearthed amount are as follows:
V0=(π/4) × D2×L×N;
Wherein, V0For the calculated value for the amount of being unearthed, N is void side's coefficient, and D is the diameter that the push-bench tunnels the cave to be formed, L is the length that the push-bench tunnels the cave to be formed;
The unearthed amount actually used is V, 0.98V0≤V≤V0
3. push-bench tunneling construction method according to claim 1, which is characterized in that the boring parameter further includes promoting Speed, the push-bench tunneling construction method further include:
When the push-bench promotes, detected by fltting speed of the soil pressure sensor to shield structure jack, and to institute The fltting speed for stating shield structure jack is adjusted, so that the fltting speed of the shield structure jack matches with unearthed speed, To keep soil pressure force value appropriate.
4. push-bench tunneling construction method according to claim 1, which is characterized in that the push-bench tunneling construction method Further include:
The axis and posture of the push-bench are controlled using automatic guiding system and deviation-rectifying system.
5. push-bench tunneling construction method according to claim 4, which is characterized in that use the automatic guiding system with And the deviation-rectifying system carries out control to the axis and posture of the push-bench and specifically includes:
It is detected using posture of the automatic guiding system to shield, to observe the position of the shield and design axis Horizontal departure and vertical deflection, and propelling cylinder is adjusted to control driving side by the horizontal departure and the vertical deflection To.
6. push-bench tunneling construction method according to claim 1, which is characterized in that adjusting tunneling direction includes:
Deviation adjustment angle α, wherein 10 '≤α≤20 '.
7. push-bench tunneling construction method according to claim 1, which is characterized in that the push-bench tunneling construction method It further include that slip casting is synchronized using synchronous grouting technique in push pipe, the synchronous grouting technique includes:
To tail slip casting, to fill the gap of head Yu tube coupling part, and mud sleeve is established;Wherein, the slip casting of the tail slip casting Amount is V1, the void volume between the head and steel pipe is V2, 3V2≤V1≤6V2
8. push-bench tunneling construction method according to claim 7, which is characterized in that the synchronous grouting technique is also wrapped It includes:
After establishing mud sleeve, the route along driving carries out benefit slurry, is covered and is lost with mending slip, and the benefit slurry amount for mending slurry along the line is V3, 3V2≤V3≤5V2
9. push-bench tunneling construction method according to claim 7, which is characterized in that the synchronous grouting technique is also wrapped It includes:
Hole slip casting in tunnel installs Grouting Pipe and ball valve in the sealing collar at hole to carry out slip casting.
10. push-bench tunneling construction method according to claim 1, which is characterized in that the push-bench tunneling construction side Method further include:
In the tunneling process of the push-bench, additive, the knife are injected into cutterhead face or native storehouse by the push-bench Disk rotates so that the additive is mixed with soil quarrel, to increase the creeping of the soil body.
CN201811645766.XA 2018-12-30 2018-12-30 Push-bench tunneling construction method Pending CN109763828A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811645766.XA CN109763828A (en) 2018-12-30 2018-12-30 Push-bench tunneling construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811645766.XA CN109763828A (en) 2018-12-30 2018-12-30 Push-bench tunneling construction method

Publications (1)

Publication Number Publication Date
CN109763828A true CN109763828A (en) 2019-05-17

Family

ID=66453142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811645766.XA Pending CN109763828A (en) 2018-12-30 2018-12-30 Push-bench tunneling construction method

Country Status (1)

Country Link
CN (1) CN109763828A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111337165A (en) * 2020-03-05 2020-06-26 五邑大学 Pressure measurement system of shield spiral conveyor and calculation method thereof
CN111577302A (en) * 2020-04-20 2020-08-25 中交天和机械设备制造有限公司 TBM (tunnel boring machine) pressure injection type concrete support control system and method
CN113309524A (en) * 2021-03-19 2021-08-27 中铁四局集团有限公司 Method for controlling influence of rectangular pipe jacking tunneling in shallow soil-covered stratum on surrounding environment
CN113338983A (en) * 2021-07-30 2021-09-03 中国建筑第七工程局有限公司 Large-diameter mud-water balance pipe jacking construction method suitable for high-water-level rock geology
WO2021184507A1 (en) * 2020-03-20 2021-09-23 中铁十四局集团有限公司 Stratum deformation control method and apparatus for shield construction process and non-volatile storage medium
CN114578871A (en) * 2022-01-30 2022-06-03 扬州地龙机械有限公司 Pressure compensation system of push bench based on industrial data intelligent analysis
CN116398146A (en) * 2023-03-20 2023-07-07 广东华顶工程技术有限公司 Construction method of rectangular pipe-jacking tunnel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09165994A (en) * 1995-12-19 1997-06-24 Ishikawajima Harima Heavy Ind Co Ltd Shaft joint shield
JPH116391A (en) * 1997-06-18 1999-01-12 Hanshin Kensetsu:Kk Equipment for internal push method
CN101793153A (en) * 2009-08-04 2010-08-04 上海隧道工程股份有限公司 Construction method of shield for passing through heavy-caliber pipeline in short distance
CN105863656A (en) * 2016-04-07 2016-08-17 国家电网公司 Shield tunneling method
CN106522973A (en) * 2016-09-27 2017-03-22 徐工集团凯宫重工南京有限公司 Deviation rectifying system of shield tunneling machine

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09165994A (en) * 1995-12-19 1997-06-24 Ishikawajima Harima Heavy Ind Co Ltd Shaft joint shield
JPH116391A (en) * 1997-06-18 1999-01-12 Hanshin Kensetsu:Kk Equipment for internal push method
CN101793153A (en) * 2009-08-04 2010-08-04 上海隧道工程股份有限公司 Construction method of shield for passing through heavy-caliber pipeline in short distance
CN105863656A (en) * 2016-04-07 2016-08-17 国家电网公司 Shield tunneling method
CN106522973A (en) * 2016-09-27 2017-03-22 徐工集团凯宫重工南京有限公司 Deviation rectifying system of shield tunneling machine

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
杨其新 等: "《地下工程施工与管理》", 31 August 2015, 西南交通大学出版社 *
胡中雄: "《土力学与环境土工学》", 31 July 1997, 同济大学出版社 *
胡长明 等: "土压平衡盾构穿越含砂土层地表变形规律与控制技术", 《西安建筑科技大学学报(自然科学版)》 *
闫富有: "《地下工程施工(第2版)》", 30 June 2018, 黄河水利出版社 *
黄兴安: "《市政工程质量通病防治手册》", 30 November 1999, 中国建筑工业出版 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11927098B2 (en) 2019-03-20 2024-03-12 China Railway 14Th Bureau Group Co., Ltd. Method and apparatus for controlling stratum deformation in shield construction process, and non-volatile storage medium
CN111337165A (en) * 2020-03-05 2020-06-26 五邑大学 Pressure measurement system of shield spiral conveyor and calculation method thereof
CN111337165B (en) * 2020-03-05 2021-07-13 五邑大学 Pressure measurement system of shield spiral conveyor and calculation method thereof
WO2021184507A1 (en) * 2020-03-20 2021-09-23 中铁十四局集团有限公司 Stratum deformation control method and apparatus for shield construction process and non-volatile storage medium
CN111577302A (en) * 2020-04-20 2020-08-25 中交天和机械设备制造有限公司 TBM (tunnel boring machine) pressure injection type concrete support control system and method
CN113309524A (en) * 2021-03-19 2021-08-27 中铁四局集团有限公司 Method for controlling influence of rectangular pipe jacking tunneling in shallow soil-covered stratum on surrounding environment
CN113309524B (en) * 2021-03-19 2023-09-12 中铁四局集团有限公司 Control method for influence of rectangular pipe jacking tunneling of shallow earth stratum on surrounding environment
CN113338983A (en) * 2021-07-30 2021-09-03 中国建筑第七工程局有限公司 Large-diameter mud-water balance pipe jacking construction method suitable for high-water-level rock geology
CN113338983B (en) * 2021-07-30 2024-03-12 中国建筑第七工程局有限公司 Large-pipe-diameter mud-water balance jacking pipe construction method suitable for high-water-level rock geology
CN114578871A (en) * 2022-01-30 2022-06-03 扬州地龙机械有限公司 Pressure compensation system of push bench based on industrial data intelligent analysis
CN114578871B (en) * 2022-01-30 2022-11-08 扬州地龙机械有限公司 Pressure compensation system of push bench based on industrial data intelligent analysis
CN116398146A (en) * 2023-03-20 2023-07-07 广东华顶工程技术有限公司 Construction method of rectangular pipe-jacking tunnel

Similar Documents

Publication Publication Date Title
CN109763828A (en) Push-bench tunneling construction method
CN105804761B (en) Construction method suitable for liquefied sand stratum shield near-distance passing through building
CN104265307B (en) Non-uniform-hardness stratum earth pressure balance shield tunnel underpassing railway existing line construction method
CN103334770B (en) One is grown up reverse-slope tunnel ultra high water pressure rich water zone of fracture construction method
CN104500077B (en) A kind of shallow-depth-excavation tunnel passes through cottage area construction method
CN107842374B (en) The novel inert slurry of shield and combination grouting process for upper soft lower hard water rich strata
CN109594990B (en) Large-section jacking pipe construction method for complex stratum
CN205172598U (en) Pipe curtain spouts a supporting construction soon
CN106761782A (en) A kind of tunneling construction method for wearing operation tunnel under shield in rich water powder land floor
CN104532821A (en) Extra-large karst cave bottom treatment construction method
CN105736004A (en) Balanced shield mud air-pressure cabin opening pressure maintaining and wall protecting construction method for shield tunneling
CN110159284A (en) Strand hydraulic reclamation stratum shield machine is ultra-shallow earth-covered, big longitudinal slope originates construction method
CN110863833B (en) Tunneling parameter control process of tunnel shield tunneling starting end boulder area shield tunneling machine
CN107747488B (en) The construction method of big cross section shape of a hoof shield launching
CN102926759A (en) Long-distance tunneling construction method for big-diameter slurry shield underwater shallow earthing
CN109681236A (en) Big cross section water-rich sand layer shield driving synchronous grouting method
CN102400694A (en) Reinforcement method for combined part of shield tunnel and mining-method tunnel
CN110080789A (en) A kind of shield sky, which pushes away, spells section of jurisdiction construction
CN110130936A (en) It dashes forward in a kind of shield tunneling process and meets the construction method of untreated solution cavity or crack
CN108691552A (en) Big cross section shape of a hoof shield cutting receives construction method
CN108265706A (en) A kind of engineering pile and pile-formation process in solution cavity geology
CN111997653A (en) Shield tunnel segment wall post-grouting construction method
CN206888992U (en) A kind of water-bed mine shield tunnel combination docking structure form
CN110130909B (en) Construction method for shield to penetrate existing station in silt stratum
CN111156005A (en) Construction method for tunnel to pass through subway station at close distance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Lei Shengxiang

Inventor after: Li Teng

Inventor after: Li Zhanxian

Inventor after: Han Zhonghui

Inventor after: Wang Keyong

Inventor after: Liu Xiaoguo

Inventor after: Lu Gang

Inventor after: Yuan Yang

Inventor after: Guo Yong

Inventor after: Cao Jing

Inventor before: Li Zhanxian

Inventor before: Han Zhonghui

Inventor before: Wang Keyong

Inventor before: Liu Xiaoguo

Inventor before: Lu Gang

Inventor before: Yuan Yang

Inventor before: Guo Yong

Inventor before: Cao Jing

Inventor before: Li Teng