CN109763618A - A kind of building decoration dried hanging method - Google Patents

A kind of building decoration dried hanging method Download PDF

Info

Publication number
CN109763618A
CN109763618A CN201910053827.1A CN201910053827A CN109763618A CN 109763618 A CN109763618 A CN 109763618A CN 201910053827 A CN201910053827 A CN 201910053827A CN 109763618 A CN109763618 A CN 109763618A
Authority
CN
China
Prior art keywords
wall
fixing piece
sliding block
nut
decorative panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910053827.1A
Other languages
Chinese (zh)
Other versions
CN109763618B (en
Inventor
吴富贵
舒颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN BUILDING DECORATION (GROUP) CO Ltd
Original Assignee
SHENZHEN BUILDING DECORATION (GROUP) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN BUILDING DECORATION (GROUP) CO Ltd filed Critical SHENZHEN BUILDING DECORATION (GROUP) CO Ltd
Priority to CN201910053827.1A priority Critical patent/CN109763618B/en
Publication of CN109763618A publication Critical patent/CN109763618A/en
Application granted granted Critical
Publication of CN109763618B publication Critical patent/CN109763618B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The present invention relates to building decoration dry hanging technology fields, disclose a kind of building decoration dried hanging method, the device that the method is related to includes: wall, wall fixing piece, apart from regulating part, linkage fasteners and decorative panel fixing piece.The present invention can be used in the cladding method of building decoration, whole device is fixed on to the outside of wall by setting wall fixing piece, and it is provided in device apart from the adjustable wall brick of regulating part at a distance from wall, linkage fasteners and decorative panel fixing piece can be free to slide simultaneously, improve the freedom degree of whole device installation, and decorative panel fixing piece can be installed additional according to the size of wall brick, so that when the later period replaces wall brick, the size of wall brick can be replaced, improve the freedom degree of user, entire method is fixed wall and wall brick by nut and fastening screw, eliminate the use of the construction materials such as cement, facilitate the disassembly in later period, so that whole device can be with secondary use, it is more environmentally friendly.

Description

A kind of building decoration dried hanging method
Technical field
The present invention relates to building decoration dry hanging technology field, specifically a kind of building decoration dried hanging method.
Background technique
Dry-hanging method is a kind of novel construction technology in current wall decoration.This method passes through steelframe and connector pendant will Decorative board is connect with metope or building body, without the need of grouting and pasting.Its principle is to set main stress point on the body construction, Decorative panel is fixed on building by metal hanger, forms decorative cover.
Chinese patent (notification number: CN107165369B) discloses a kind of exterior wall dried hanging structure and its dried hanging method, it is intended to Current wall brick dried hanging hang structure can effectively be solved in the presence of structure is complicated, difficulty of construction is big, material loss is big, long in time limit by providing one kind The exterior wall dried hanging structure and its dried hanging method of problem.Exterior wall dried hanging structure includes external wall, wall brick and cladding mechanism.Cladding machine Structure includes the expansion bolt connecting with external wall and the horizontal mounting plate that is connected with expansion bolt.The plate face of horizontal mounting plate It is equipped with plate face groove.It is inner cavity filled that binder is equipped in horizontal mounting plate.The bottom surface of plate face groove is equipped with several and bonding The inner cavity filled connecting hole being connected of agent.This method is fixed wall brick and exterior wall by way of gluing, but wall after gluing Brick is difficult to carry out secondary use again, to generate waste.
Summary of the invention
The present invention provides a kind of building decoration dried hanging method, solves the problems mentioned above in the background art.
To achieve the above object, the invention provides the following technical scheme:
A kind of building decoration dried hanging method, the device that the method is related to includes: wall, wall fixing piece, apart from regulating part, Linkage fasteners and decorative panel fixing piece;
The wall fixing piece includes cylinder, and shaft is fixedly connected on the left of the cylinder, and shaft is rotatablely connected baffle, cylinder right side It is fixedly connected with fixed link, column body is slidably connected the first screw rod, is fixedly connected with triangle jacking block, the first screw rod on the left of the first screw rod Right side is threadedly coupled the first nut;
Described to include the first adjustment seat and the second adjustment seat apart from regulating part, the first adjustment seat left side and fixed link right side are solid Fixed connection, the second adjustment seat right side are fixedly connected with the first sliding block, and the first sliding block is equipped with the first fastening screw;
The decorative panel fixing piece includes the second sliding block, and the second sliding block right end is fixedly connected with third sliding block, and third sliding block lower part is left Side is fixedly connected with fixed clamp plate, third sliding block lower right Slideslip connection activity grip block, and second sliding block is equipped with the Two fastening screws, the third sliding block are equipped with third fastening screw;
Described method includes following steps:
1) installation of wall fixing piece;
1-1) according to the demand of mounting process, through-hole is drilled out on wall, is inserted into cylinder in each through-hole;
The first nut 1-2) is rotated, the first nut drives the first screw rod to move right, so that triangle jacking block moves right, baffle quilt Triangle jacking block is strutted to both sides, so that baffle rotates, baffle is contacted with wall inner wall, to pass through cylinder and baffle for wall Body clamps, and completes the connection of wall fixing piece and wall;
2) apart from the installation of regulating part;
2-1) the first screw rod left end is screwed in the first adjustment seat;
The second nut and third nut 2-2) are screwed on the first screw rod;
Second adjustment seat 2-3) is screwed in the right end of the first screw rod;
2-4) the second nut is rotated to the left along the second screw rod, is consolidated the second screw rod and the first adjustment seat by the second nut It is fixed;
2-5) third nut is rotated to the right along the second screw rod, is consolidated the second screw rod and the second adjustment seat by third nut It is fixed;
3) installation of linkage fasteners;
3-1) first connecting rod is inserted into the first sliding block;
Second sliding block 3-2) is inserted among the first sliding block of every two;
The position for 3-3) regulating first connecting rod screws the first fastening screw, by the first fastening screw by first connecting rod and One sliding block is fixed;
4) installation of decorative panel fixing piece;
4-1) second connecting rod is inserted into third sliding block, screws the second fastening screw and third after regulating the position of second connecting rod Fastening screw, so that the position of first connecting rod and second connecting rod be fixed;
4-2) wall brick is placed on inside four decorative panel fixing pieces up and down, the side up and down of wall brick is placed on movable grip block With the centre of fixed clamp plate;
Bolt 4-3) is passed through into movable grip block and fixed clamp plate, screws in the 4th nut in the threaded portion of bolt, and will 4th nut tightening.
As a preferred technical solution of the present invention, the one side of close triangle jacking block is inclined-plane on the left of the baffle.
As a preferred technical solution of the present invention, the flapper entire wall fixing piece when being horizontal position Diameter is less than the diameter of through-hole.
As a preferred technical solution of the present invention, in step 2), according to the needs of mounting process, the first screw rod is adjusted The depth of the first adjustment seat and the second adjustment seat is screwed in, to adjust the distance between final wall brick and wall.
It is in step 3), solid in two connecting rods according to the difference of wall brick height as a preferred technical solution of the present invention Determine to install decorative panel fixing piece on the first connecting rod between part additional, to guarantee that the upper of each wall brick has decorative panel to fix below Part, so that wall brick is completely fixed.
As a preferred technical solution of the present invention, in step 4), according to the difference of wall brick width, in two decorative panels Install decorative panel fixing piece on second connecting rod between fixing piece additional, following there are two decorative panels to guarantee each wall brick upper Fixing piece, so that wall brick is completely fixed.
As a preferred technical solution of the present invention, it is equipped with connecting material outside the wall brick, is set outside connecting material There is ornament materials.
The present invention has following usefulness:
The present invention can be used in the cladding method of building decoration, and whole device is fixed on wall by setting wall fixing piece Outside, and while linkage fasteners and dress apart from the adjustable wall brick of regulating part at a distance from wall are provided in device Plaque fixing piece can be free to slide, improves the freedom degree of whole device installation, and can be added according to the size of wall brick Decorative panel fixing piece is filled, so that can replace the size of wall brick when the later period replaces wall brick, improve the freedom degree of user, Entire method is fixed wall and wall brick by nut and fastening screw, eliminates the use of the construction materials such as cement, convenient The disassembly in later period, so that whole device can be more environmentally friendly with secondary use.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this hair Bright some embodiments for those of ordinary skill in the art without any creative labor, can be with It obtains other drawings based on these drawings.
Fig. 1 is a kind of structural schematic diagram of building decoration dried hanging method;
Fig. 2 is the partial enlargement diagram of A in building decoration dried hanging method a kind of;
Fig. 3 is the partial enlargement diagram of B in building decoration dried hanging method a kind of;
Fig. 4 is the partial enlargement diagram of C in building decoration dried hanging method a kind of;
Fig. 5 is the partial enlargement diagram of D in building decoration dried hanging method a kind of;
Fig. 6 is a kind of left view of building decoration dried hanging method;
Fig. 7 is a kind of structural schematic diagram of wall brick in building decoration dried hanging method.
In figure: 1, wall;2, wall fixing piece;3, apart from regulating part;4, linkage fasteners;5, decorative panel fixing piece;6, Baffle;7, triangle jacking block;8, shaft;9, cylinder;10, through-hole;11, fixed link;12, the first nut;13, the first screw rod;14, One adjustment seat;15, the second screw rod;16, the second nut;17, third nut;18, the second adjustment seat;19, the first sliding block;20, One fastening screw;21, first connecting rod;22, the second fastening screw;23, the second sliding block;24, third sliding block;25, second connecting rod; 26, third fastening screw;27, movable grip block;28, the 4th nut;29, bolt;30, fixed clamp plate;31, wall brick;32, even Connect material;33, ornament materials.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Embodiment one
Fig. 1-6 is please referred to, a kind of building decoration dried hanging method, the device that the method is related to includes: wall 1, wall are fixed Part 2, apart from regulating part 3, linkage fasteners 4 and decorative panel fixing piece 5;
The wall fixing piece 2 includes cylinder 9, and shaft 8 is fixedly connected on the left of the cylinder 9, and shaft 8 is rotatablely connected baffle 6, column Fixed link 11 is fixedly connected on the right side of body 9,9 internal slide of cylinder connects the first screw rod 13, is fixedly connected with three on the left of the first screw rod 13 Angle jacking block 7 is threadedly coupled the first nut 12 on the right side of first screw rod 13;
It is described to include the first adjustment seat 14 and the second adjustment seat 18,14 left side of the first adjustment seat and fixation apart from regulating part 3 It is fixedly connected on the right side of bar 11,18 right side of the second adjustment seat is fixedly connected with the first sliding block 19, and it is tight that the first sliding block 19 is equipped with first Gu screw 20;
The decorative panel fixing piece 5 includes the second sliding block 23, and 23 right end of the second sliding block is fixedly connected with third sliding block 24, third sliding block 24 lower left sides are fixedly connected with fixed clamp plate 30,24 lower right Slideslip connection activity grip block 27 of third sliding block, and described Two sliding blocks 23 are equipped with the second fastening screw 22, and the third sliding block 24 is equipped with third fastening screw 26;
Described method includes following steps:
1) installation of wall fixing piece 2;
1-1) according to the demand of mounting process, through-hole 10 is drilled out on wall 1, and cylinder 9, the gear are inserted into each through-hole 10 The diameter of entire wall fixing piece 2 is less than the diameter of through-hole 10 when the rotation of plate 6 is horizontal position, therefore baffle 6 is rotated as water It is flat-shaped, through-hole 10 can be passed completely through;
The first nut 12 1-2) is rotated, the first nut 12 drives the first screw rod 13 to move right, so that triangle jacking block 7 moves right Dynamic, 6 left side of baffle is inclined-plane close to the one side of triangle jacking block 7, therefore when triangle jacking block 7 and baffle 6 contact, 6 quilt of baffle Triangle jacking block 7 is strutted to both sides, so that baffle 6 rotates, baffle 6 is contacted with 1 inner wall of wall, to pass through cylinder 9 and gear Plate 6 clamps wall 1, completes the connection of wall fixing piece 2 and wall 1;
2) apart from the installation of regulating part 3;
2-1) 13 left end of the first screw rod is screwed in the first adjustment seat 14;
The second nut 16 and third nut 17 2-2) are screwed on the first screw rod 13;
The right end that second adjustment seat 18 2-3) is screwed in the first screw rod 13 adjusts the first screw rod 13 according to the needs of mounting process The depth of the first adjustment seat 14 and the second adjustment seat 18 is screwed in, to adjust the distance between final wall brick 31 and wall 1;
2-4) the second nut 16 is rotated to the left along the second screw rod 15, by the second nut 16 by the second screw rod 15 and first Adjustment seat 14 is fixed;
2-5) third nut 17 is rotated to the right along the second screw rod 15, by third nut 17 by the second screw rod 15 and second Adjustment seat 18 is fixed;
3) installation of linkage fasteners 4;
3-1) first connecting rod 21 is inserted into the first sliding block 19;
Second sliding block 23 3-2) is inserted among the first sliding block of every two 19, according to the difference of 31 height of wall brick, at two Decorative panel fixing piece 5 is installed on first connecting rod 21 between linkage fasteners 4 additional, to guarantee that the upper of each wall brick 31 has below Decorative panel fixing piece 5, so that wall brick 31 is completely fixed, it, can be in the first sliding block of every two when the size of wall brick 31 becomes smaller Two or more second sliding block 23 of insertion among 19, so that multiple decorative panel fixing pieces 5 are fixed on first connecting rod 21, To guarantee that the upper of wall brick 31 can fix upper decoration plate fixing piece 5 below, guarantee the stability that wall brick 31 is installed;
The position for 3-3) regulating first connecting rod 21 screws the first fastening screw 20, is connected by the first fastening screw 20 by first Bar 21 and the first sliding block 19 are fixed;
4) installation of decorative panel fixing piece 5;
4-1) second connecting rod 25 is inserted into third sliding block 24, screws the second fastening screw after regulating the position of second connecting rod 25 22 and third fastening screw 26, to the position of first connecting rod 21 and second connecting rod 25 be fixed, not according to 31 width of wall brick Together, decorative panel fixing piece 5 is installed on the second connecting rod 25 between two decorative panel fixing pieces 5 additional, to guarantee each wall brick 31 It is upper it is following there are two decorative panel fixing pieces 5,, can be with when the size of wall brick 31 becomes smaller so that wall brick 31 is completely fixed Two or more third sliding block 24 can be inserted among every two third sliding block 24, thus by multiple decorative panel fixing pieces 5 are fixed on second connecting rod 25, to guarantee wall brick 31 upper, following all there are two decorative panel fixing pieces 5 that wall brick 31 is fixed Firmly, guarantee the stability that wall brick 31 is installed;
4-2) wall brick 31 is placed on inside four decorative panel fixing pieces 5 up and down, the side up and down of wall brick 31 is placed on activity The centre of grip block 27 and fixed clamp plate 30;
Bolt 29 4-3) is passed through into movable grip block 27 and fixed clamp plate 30, screws in the 4th nut in the threaded portion of bolt 29 28, and the 4th nut 28 is screwed.
Embodiment two
Fig. 1 and 7 are please referred to, other contents of the present embodiment are the same as example 1, the difference is that: outside the wall brick 31 Equipped with connecting material 32, ornament materials 33 is equipped with outside connecting material 32.Common 31 outside of wall brick is other there is no installing Accessory, when certain wall bricks 31 need decorative performance, can in the outer brush of wall brick 31 connecting material 32, such as glue or Person's cement etc. can install ornament materials 33 additional outside connecting material 32, improve the aesthetics of wall brick 31.
The present invention can be used in the cladding method of building decoration, be fixed whole device by the way that wall fixing piece 2 is arranged It is provided with apart from the adjustable wall brick 31 of regulating part 3 at a distance from wall 1 in the outside of wall 1, and in device, while connecting rod Fixing piece 4 and decorative panel fixing piece 5 can be free to slide, improve the freedom degree of whole device installation, and can basis The size of wall brick 31 installs decorative panel fixing piece 5 additional, so that the size of wall brick 31 can be replaced when the later period replaces wall brick 31, The freedom degree of user is improved, entire method is fixed wall 1 and wall brick 31 by nut and fastening screw, eliminates cement The use of equal construction materials, facilitates the disassembly in later period, so that whole device can be more environmentally friendly with secondary use.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.

Claims (7)

1. a kind of building decoration dried hanging method, which is characterized in that the device that the method is related to includes: wall (1), wall are solid Determine part (2), apart from regulating part (3), linkage fasteners (4) and decorative panel fixing piece (5);
The wall fixing piece (2) includes cylinder (9), is fixedly connected shaft (8) on the left of the cylinder (9), and shaft (8) rotation connects It connecing baffle (6), is fixedly connected fixed link (11) on the right side of cylinder (9), cylinder (9) internal slide connects the first screw rod (13), and first It is fixedly connected triangle jacking block (7) on the left of screw rod (13), is threadedly coupled the first nut (12) on the right side of the first screw rod (13);
Described to include the first adjustment seat (14) and the second adjustment seat (18) apart from regulating part (3), first adjustment seat (14) is left It is fixedly connected, is fixedly connected on the right side of the second adjustment seat (18) with the first sliding block (19), the first sliding block on the right side of side and fixed link (11) (19) the first fastening screw (20) are equipped with;
The decorative panel fixing piece (5) includes the second sliding block (23), and the second sliding block (23) right end is fixedly connected with third sliding block (24), Third sliding block (24) lower left side is fixedly connected fixed clamp plate (30), third sliding block (24) lower right Slideslip connection activity folder It holds plate (27), second sliding block (23) is equipped with the second fastening screw (22), and it is tight that the third sliding block (24) is equipped with third Gu screw (26);
Described method includes following steps:
The installation of wall fixing piece (2);
According to the demand of mounting process, through-hole (10) are drilled out on wall (1), are inserted into cylinder (9) in each through-hole (10);
It rotates the first nut (12), the first nut (12) drives the first screw rod (13) to move right, so that triangle jacking block (7) is to the right Mobile, baffle (6) is strutted by triangle jacking block (7) to both sides, so that baffle (6) rotates, baffle (6) and wall (1) inner wall Contact completes the connection of wall fixing piece (2) and wall (1) to clamp wall (1) by cylinder (9) and baffle (6);
Installation apart from regulating part (3);
2-1) the first screw rod (13) left end is screwed in the first adjustment seat (14);
The second nut (16) and third nut (17) 2-2) are screwed on the first screw rod (13);
Second adjustment seat (18) 2-3) are screwed in the right end of the first screw rod (13);
2-4) the second nut (16) is rotated to the left along the second screw rod (15), by the second nut (16) by the second screw rod (15) fixed with the first adjustment seat (14);
2-5) third nut (17) is rotated to the right along the second screw rod (15), by third nut (17) by the second screw rod (15) fixed with the second adjustment seat (18);
The installation of linkage fasteners (4);
3-1) first connecting rod (21) are inserted into the first sliding block (19);
Second sliding block (23) 3-2) is inserted among the first sliding block of every two (19);
The position for 3-3) regulating first connecting rod (21) screws the first fastening screw (20), will by the first fastening screw (20) First connecting rod (21) and the first sliding block (19) are fixed;
The installation of decorative panel fixing piece (5);
4-1) second connecting rod (25) are inserted into third sliding block (24), screw second tightly after regulating the position of second connecting rod (25) Gu screw (22) and third fastening screw (26), so that the position of first connecting rod (21) and second connecting rod (25) be fixed;
Wall brick (31) 4-2) is placed on four decorative panel fixing pieces (5) inside up and down, the side up and down of wall brick (31) is placed In the centre of movable grip block (27) and fixed clamp plate (30);
Bolt (29) 4-3) are passed through into movable grip block (27) and fixed clamp plate (30), are screwed in the threaded portion of bolt (29) 4th nut (28), and the 4th nut (28) is screwed.
2. a kind of building decoration dried hanging method according to claim 1, which is characterized in that close on the left of the baffle (6) The one side of triangle jacking block (7) is inclined-plane.
3. a kind of building decoration dried hanging method according to claim 1 or 2, which is characterized in that the baffle (6), which rotates, is The diameter of entire wall fixing piece (2) is less than the diameter of through-hole (10) when horizontal position.
4. a kind of building decoration dried hanging method according to claim 1, which is characterized in that in step 2, according to erector The needs of skill adjust the depth that the first screw rod (13) screw in the first adjustment seat (14) and the second adjustment seat (18), to adjust most The distance between whole wall brick (31) and wall (1).
5. a kind of building decoration dried hanging method according to claim 1, which is characterized in that in step 3), according to wall brick (31) difference of height installs decorative panel fixing piece (5) additional on the first connecting rod (21) between two linkage fasteners (4), from And guarantee that the upper of each wall brick (31) has decorative panel fixing piece (5) below, so that wall brick (31) is completely fixed.
6. a kind of building decoration dried hanging method according to claim 1, which is characterized in that in step 4), according to wall brick (31) difference of width installs decorative panel fixing piece (5) additional on the second connecting rod (25) between two decorative panel fixing pieces (5), To guarantee each wall brick (31) it is upper it is following there are two decorative panel fixing piece (5), so that wall brick (31) is completely fixed.
7. a kind of building decoration dried hanging method according to claim 1, which is characterized in that be equipped with outside the wall brick (31) Connecting material (32), connecting material (32) is external to be equipped with ornament materials (33).
CN201910053827.1A 2019-01-21 2019-01-21 Dry hanging method for building decoration Active CN109763618B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910053827.1A CN109763618B (en) 2019-01-21 2019-01-21 Dry hanging method for building decoration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910053827.1A CN109763618B (en) 2019-01-21 2019-01-21 Dry hanging method for building decoration

Publications (2)

Publication Number Publication Date
CN109763618A true CN109763618A (en) 2019-05-17
CN109763618B CN109763618B (en) 2020-06-02

Family

ID=66454937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910053827.1A Active CN109763618B (en) 2019-01-21 2019-01-21 Dry hanging method for building decoration

Country Status (1)

Country Link
CN (1) CN109763618B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008274651A (en) * 2007-04-27 2008-11-13 Sumitomo Kinzoku Kozan Siporex Kk Alc burying anchor metal fitting, alc panel and alc panel installing structure
US20140096472A1 (en) * 2012-10-05 2014-04-10 Fiber Cement Foam Systems Insulation, LLC Method and A Device to Attach Building Trims
CN206397039U (en) * 2017-01-21 2017-08-11 深圳唐彩装饰设计工程有限公司 Stone material dry suspending installation system
CN207144374U (en) * 2017-07-21 2018-03-27 中建八局第一建设有限公司 A kind of decorative board for wall installation basic skeleton
CN207314724U (en) * 2017-09-13 2018-05-04 广东顶固集创家居股份有限公司 Can three-dimensional regulation formula wallboard suspension member and wallboard installing structure
CN207761076U (en) * 2017-03-18 2018-08-24 王德志 A kind of novel building exterior wall deformation joint system and its application construction
CN108797856A (en) * 2018-06-09 2018-11-13 重庆铝途新型材料有限公司 A kind of aluminum curtain walls being easily installed dismounting

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008274651A (en) * 2007-04-27 2008-11-13 Sumitomo Kinzoku Kozan Siporex Kk Alc burying anchor metal fitting, alc panel and alc panel installing structure
US20140096472A1 (en) * 2012-10-05 2014-04-10 Fiber Cement Foam Systems Insulation, LLC Method and A Device to Attach Building Trims
CN206397039U (en) * 2017-01-21 2017-08-11 深圳唐彩装饰设计工程有限公司 Stone material dry suspending installation system
CN207761076U (en) * 2017-03-18 2018-08-24 王德志 A kind of novel building exterior wall deformation joint system and its application construction
CN207144374U (en) * 2017-07-21 2018-03-27 中建八局第一建设有限公司 A kind of decorative board for wall installation basic skeleton
CN207314724U (en) * 2017-09-13 2018-05-04 广东顶固集创家居股份有限公司 Can three-dimensional regulation formula wallboard suspension member and wallboard installing structure
CN108797856A (en) * 2018-06-09 2018-11-13 重庆铝途新型材料有限公司 A kind of aluminum curtain walls being easily installed dismounting

Also Published As

Publication number Publication date
CN109763618B (en) 2020-06-02

Similar Documents

Publication Publication Date Title
CN206942035U (en) A kind of metope integration installation structure
CN205804726U (en) Single-beam back-bolt type stone curtain wall
CN108560889A (en) A kind of big Machine for sticking ceramic tile of the vertical flatness error of anti-hollowing
CN205990740U (en) A kind of levelling component of metope and the veneer wall system applying this structure
CN207988526U (en) The erecting by overhang of unit type curtain wall plate
CN106760092B (en) Seamless hanging system for ceramic thin plate-glass composite plate
CN109372176B (en) Suspended ceiling and suspended ceiling mounting method
CN204475767U (en) Wall decoration building materials hang special part
CN109763618A (en) A kind of building decoration dried hanging method
CN206070818U (en) A kind of cladding connector of curtain wall
CN103321382B (en) Connecting piece and construction method for mounting building decorative stone panel
CN108240089B (en) Metope component and metope installation method
CN205444782U (en) Install pendant structure of wall ceramic tile fast
CN104612358B (en) A kind of hanging method of wall decoration building materials
CN205917951U (en) Light trough furred ceiling falls a grade device
CN210828023U (en) Top surface deformation joint decorative structure
CN112282183A (en) Quick adjustment connection structure of assembled abnormal shape furred ceiling fossil fragments
CN220725507U (en) Keel support bracket
CN211037512U (en) Assembled structure for installing veneer
CN109339351A (en) Roofing solar energy light collecting ejection device
CN211447377U (en) Assembled pottery board curtain wall construction
CN213297020U (en) Assembled fitment wall and top surface handing-over department binding off device
CN214739179U (en) Quick adjustment connection structure of assembled abnormal shape furred ceiling fossil fragments
CN111910897A (en) Cement mortar leveling fixing support structure and construction method
CN209443699U (en) A kind of inner wall decoration board fixer of assembled architecture

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant