CN109758696A - A method of the fire-fighting O&M terminal system based on BIM application - Google Patents
A method of the fire-fighting O&M terminal system based on BIM application Download PDFInfo
- Publication number
- CN109758696A CN109758696A CN201811639463.7A CN201811639463A CN109758696A CN 109758696 A CN109758696 A CN 109758696A CN 201811639463 A CN201811639463 A CN 201811639463A CN 109758696 A CN109758696 A CN 109758696A
- Authority
- CN
- China
- Prior art keywords
- fire
- fighting
- information
- terminal
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Landscapes
- Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
Abstract
The invention belongs to fire-fighting domains, are related to a kind of method of fire-fighting O&M terminal system based on BIM application, include the following steps: Step 1: establishing architecture information BIM model according to architectural design scheme;Step 2: according to BIM model foundation fire-fighting relevant information data library;Step 3: integrating fire-fighting relevant parameter and linkage information based on fire-fighting relevant information data library;Step 4: by fire-fighting relevant parameter and linkage information feedback in receiving terminal in building;Step 5: receiving terminal and fire-fighting center receive terminal synchronized links in building;Step 6: setting mobile terminal, mobile terminal is connected to fire-fighting center and receives terminal, and receives end message with synchronous fire-fighting center and synchronize, and obtains the operating status of fire-fighting relevant parameter;Step 7: BIM model generates corresponding data information according to the operating status of fire-fighting relevant parameter.The present processes are able to achieve quickly correctly is rescued at building fire initial stage.
Description
Technical field
The invention belongs to fire-fighting domains, are related to the method that Initial Stage of Fire is efficiently put out a fire, and are answered more particularly, to one kind based on BIM
The method of fire-fighting O&M terminal system.
Background technique
BIM (Building Information Modeling) i.e. Building Information Model is collecting construction-engineering project
On the basis of every relevant information data, it is established that three-dimensional building model is had by digital information analogue simulation building
Real information.It has information completeness, information relevance, consistency on messaging, visualization, harmony, simulation, optimization property
With can go out this eight big feature of figure.In China, BIM concept enters construction market in 21 century and is developed so far, increasingly multiplexing
Journey technical staff starts to grasp and can skillfully be designed using BIM technology.Fire often will cause great lives and properties peace
Entirely, often whether Initial Stage of Fire can cope with rapidly the tendency for determining fire.Often fireman can only come from alarm relevant information
Judge the intensity of a fire and opposite solution of fire, often information inaccurately brings some interference to fire fighter, and to existing
Be unfamiliar with also can to kindling initial stage gold rescue and attack time affect, for building in the case of tend not to
Make quickly correctly reply.
Summary of the invention
The present invention provides a kind of method of fire-fighting O&M terminal system based on BIM application, realizes at building fire initial stage
Quickly correctly rescued.
To realize the above-mentioned technical purpose, the technical solution that the application takes, a kind of fire-fighting O&M terminal based on BIM application
The method of system, includes the following steps:
Step 1: establishing architecture information BIM model according to architectural design scheme;
Step 2: according to BIM model foundation fire-fighting relevant information data library;
Step 3: integrating fire-fighting relevant parameter and linkage information based on fire-fighting relevant information data library;
Step 4: by fire-fighting relevant parameter and linkage information feedback in receiving terminal in building;
Step 5: receiving terminal and fire-fighting center receive terminal synchronized links in building;
Step 6: setting mobile terminal, mobile terminal is connected to fire-fighting center and receives terminal, and connects with synchronous fire-fighting center
It receives end message to synchronize, obtains the operating status of fire-fighting relevant parameter;
Step 7: BIM model generates corresponding data information according to the operating status of fire-fighting relevant parameter.
As the improved technical solution of the application, step 1 further include after establishing Building Information Model, with as-built drawing and
It is checked after finishing, it is consistent with scene to reach Building Information Model.
As the improved technical solution of the application, the fire-fighting relevant information data library established in step 2 includes all kinds of fire-fightings
The model information of system is established, including fire hydrant, spray nozzle, large space scanning system and all kinds of fire sensors.
As the improved technical solution of the application, fire-fighting relevant parameter includes that the position of fire hydrant, water flow refer in step 3
Show the signal of device, the signal of wet alarm valve, water signal, fireproof tank in roof water signal, each section pipe in fire cistern
Hydraulic signal and fire pump pressure stabilizing pump signal in road.
Beneficial effect
The present invention is directed to kindling initial stage, by the above method, the fire fighting reaction time is substantially increased, in conjunction with architecture information mould
Type, the parameter of real-time sync site relevant device and live fire-fighting system current operating conditions, certainly according to Building Information Model
Dynamic planning fire route, cooperates first person, and more intuitive shorten is familiar with the time to building.Cooperate coherent signal, it can be
Relatively reasonable scheme is made before not reaching scene, reaches good extinguishing effect in incipient fire.Constituent parts can usually be monitored
Business equipment operating status prevents producer, enterprise, relevant unit to reduce operating cost and closes removal relevant device and cause fire
It cannot effectively be saved in first time.
Detailed description of the invention
Fig. 1 the present processes detail flowchart.
Specific embodiment
To keep purpose and the technical solution of the embodiment of the present invention clearer, below in conjunction with the attached of the embodiment of the present invention
Figure, is clearly and completely described the technical solution of the embodiment of the present invention.Obviously, described embodiment is of the invention
A part of the embodiment, instead of all the embodiments.Based on described the embodiment of the present invention, those of ordinary skill in the art
Every other embodiment obtained, shall fall within the protection scope of the present invention under the premise of being not necessarily to creative work.
The application is in the basic principle for carrying out the taken technical solution of intensity of a fire prevention to Initial Stage of Fire:
1, real-time parameter cooperates Building Information Model, and link information.
2, the terminal method of three kinds of corresponding fire-fightings is arranged in cooperation Building Information Model.
3, cooperate Building Information Model, observe each equipment running status method in real time.
4, cooperate Building Information Model, generate optimal fire route.
Embodiment
A method of the fire-fighting O&M terminal system based on BIM application includes the following steps:
Step 1: architecture information BIM model is established according to architectural design scheme, and after establishing Building Information Model, with
It is checked after as-built drawing and finishing, it is consistent with scene to reach Building Information Model;
Step 2: according to BIM model foundation fire-fighting relevant information data library;The fire-fighting relevant information data library of foundation includes
The model information of all kinds of fire-fighting systems is established, including fire hydrant, spray nozzle, large space scanning system and all kinds of fire sensing
Device;
Step 3: integrating fire-fighting relevant parameter and linkage information based on fire-fighting relevant information data library;Fire-fighting relevant parameter
Water signal, roof disappear in the signal of position, water flow indicator, the signal of wet alarm valve, fire cistern including fire hydrant
Hydraulic signal and fire pump pressure stabilizing pump signal in caisson water signal, each section pipeline;
Step 4: by fire-fighting relevant parameter and linkage information feedback in receiving terminal in building;
Step 5: receiving terminal and fire-fighting center receive terminal synchronized links in building;
Step 6: setting mobile terminal, mobile terminal is connected to fire-fighting center and receives terminal, and connects with synchronous fire-fighting center
It is synchronous to receive end message;
Step 7: BIM model generates corresponding data information according to the operating status of fire-fighting relevant parameter.
When concrete application, when building begins to use, generated by sensor and relevant electromagnetic valve related real
When information, the position including being not limited only to fire hydrant, the signal of water flow indicator, the signal of wet alarm valve, in fire cistern
Water signal, fireproof tank in roof water signal, hydraulic signal in each section pipeline, the transmission such as fire pump pressure stabilizing pump signal are synchronous
It is sent to Building Information Model and receives terminal in building, be located at the obvious open area of building.
As shown in Figure 1, related sensor alarm (sensor) in Building Information Model, alarm bell sounds when fire occurs
(apparatus assembly work) is built interior fire-fighting O&M terminal and is received fire information (real-time parameter), synchronous to receive eventually with fire-fighting center
It holds (fire-fighting center fire-fighting O&M terminal), fireman's responding, the related linkage information of fighting terminal publication and fireman's mobile terminal
(mobile terminal) is synchronous, and wherein information includes the current operating conditions such as relevant device valve, and whether water pump is opened, pressure and current
Lift determines the position of sensor-triggered by threedimensional model by Building Information Model and sensor, and display design is opposite
One or two the fire hydrant position answered, and live fire-fighting system current operating conditions, are planned automatically according to Building Information Model
Fire route, cooperates first person, and more intuitive shorten is familiar with the time to building.Cooperate coherent signal, can not reach
Relatively reasonable scheme is made before scene, reaches good extinguishing effect in incipient fire.Correlation can also usually monitored in real time
Parameter information, prevent relevant enterprise producer for reduce operating cost and close removal relevant device.
The above is only embodiments of the present invention, and the description thereof is more specific and detailed, and but it cannot be understood as right
The limitation of the invention patent range.It should be pointed out that for those of ordinary skill in the art, not departing from the present invention
Under the premise of design, various modifications and improvements can be made, these are all belonged to the scope of protection of the present invention.
Claims (4)
1. a method of the fire-fighting O&M terminal system based on BIM application, which comprises the steps of:
Step 1: establishing architecture information BIM model according to architectural design scheme;
Step 2: according to BIM model foundation fire-fighting relevant information data library;
Step 3: integrating fire-fighting relevant parameter and linkage information based on fire-fighting relevant information data library;
Step 4: by fire-fighting relevant parameter and linkage information feedback in receiving terminal in building;
Step 5: receiving terminal and fire-fighting center receive terminal synchronized links in building;
Step 6: setting mobile terminal, mobile terminal is connected to fire-fighting center and receives terminal, and receives eventually with synchronous fire-fighting center
Client information is synchronous, obtains the operating status of fire-fighting relevant parameter;
Step 7: BIM model generates corresponding data information according to the operating status of fire-fighting relevant parameter.
2. a kind of method of fire-fighting O&M terminal system based on BIM application according to claim 1, which is characterized in that
Step 1 further include after establishing Building Information Model, with as-built drawing and finishing after checked, to reach Building Information Model
It is consistent with scene.
3. a kind of method of fire-fighting O&M terminal system based on BIM application according to claim 1, which is characterized in that
The fire-fighting relevant information data library established in step 2 includes the model information foundation of all kinds of fire-fighting systems, including fire hydrant, spray
Spray head, large space scanning system and all kinds of fire sensors.
4. a kind of method of fire-fighting O&M terminal system based on BIM application according to claim 1, which is characterized in that
Fire-fighting relevant parameter includes the position of fire hydrant, the signal of water flow indicator, the signal of wet alarm valve, fire water in step 3
Pool inner water amount signal, fireproof tank in roof water signal, hydraulic signal and fire pump pressure stabilizing pump signal in each section pipeline.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811639463.7A CN109758696A (en) | 2018-12-29 | 2018-12-29 | A method of the fire-fighting O&M terminal system based on BIM application |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811639463.7A CN109758696A (en) | 2018-12-29 | 2018-12-29 | A method of the fire-fighting O&M terminal system based on BIM application |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109758696A true CN109758696A (en) | 2019-05-17 |
Family
ID=66453088
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811639463.7A Withdrawn CN109758696A (en) | 2018-12-29 | 2018-12-29 | A method of the fire-fighting O&M terminal system based on BIM application |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109758696A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111913619A (en) * | 2020-07-08 | 2020-11-10 | 广州番禺职业技术学院 | Fire-fighting data reading and interaction method based on BIM lightweight |
CN112288985A (en) * | 2020-10-26 | 2021-01-29 | 上海今维物联网科技有限公司 | Fire emergency escape path generation method and device based on BIM data real-time updating and computer equipment |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130257850A1 (en) * | 2012-03-30 | 2013-10-03 | Honeywell International Inc. | Extracting data from a 3d geometric model by geometry analysis |
CN204390397U (en) * | 2015-02-10 | 2015-06-10 | 厦门合道工程设计集团有限公司 | Based on the automatic fire alarm infosystem of BIM |
CN205015926U (en) * | 2015-09-16 | 2016-02-03 | 王金刚 | Multidimension BIM building fire system |
CN106975191A (en) * | 2017-04-18 | 2017-07-25 | 江苏省冶金设计院有限公司 | A kind of fire-fighting system and its rescue mode |
CN107169214A (en) * | 2017-05-24 | 2017-09-15 | 辽宁工程技术大学 | A kind of BUILDINGS MODELS design method |
CN109033716A (en) * | 2018-09-05 | 2018-12-18 | 深圳市赛为智能股份有限公司 | Fire incident data processing method, terminal and storage medium based on BIM |
-
2018
- 2018-12-29 CN CN201811639463.7A patent/CN109758696A/en not_active Withdrawn
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130257850A1 (en) * | 2012-03-30 | 2013-10-03 | Honeywell International Inc. | Extracting data from a 3d geometric model by geometry analysis |
CN204390397U (en) * | 2015-02-10 | 2015-06-10 | 厦门合道工程设计集团有限公司 | Based on the automatic fire alarm infosystem of BIM |
CN205015926U (en) * | 2015-09-16 | 2016-02-03 | 王金刚 | Multidimension BIM building fire system |
CN106975191A (en) * | 2017-04-18 | 2017-07-25 | 江苏省冶金设计院有限公司 | A kind of fire-fighting system and its rescue mode |
CN107169214A (en) * | 2017-05-24 | 2017-09-15 | 辽宁工程技术大学 | A kind of BUILDINGS MODELS design method |
CN109033716A (en) * | 2018-09-05 | 2018-12-18 | 深圳市赛为智能股份有限公司 | Fire incident data processing method, terminal and storage medium based on BIM |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111913619A (en) * | 2020-07-08 | 2020-11-10 | 广州番禺职业技术学院 | Fire-fighting data reading and interaction method based on BIM lightweight |
CN111913619B (en) * | 2020-07-08 | 2022-06-14 | 广州番禺职业技术学院 | Fire-fighting data reading and interaction method based on BIM lightweight |
CN112288985A (en) * | 2020-10-26 | 2021-01-29 | 上海今维物联网科技有限公司 | Fire emergency escape path generation method and device based on BIM data real-time updating and computer equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103839371B (en) | A kind of indoor unmanned safety patrol inspection system | |
CN108259625A (en) | A kind of escape and rescue method based on Buildings Modeling and personnel's running fix | |
CN110187666A (en) | A kind of underground pipe gallery environmental unit operation monitoring system | |
CN105288923A (en) | Monitoring system for intelligent fire hydrant and intelligent fire hydrant | |
CN203154692U (en) | Intelligent firefighting patrol inspection equipment | |
CN109758696A (en) | A method of the fire-fighting O&M terminal system based on BIM application | |
CN204390397U (en) | Based on the automatic fire alarm infosystem of BIM | |
CN106251552B (en) | A kind of region Intelligent fire-fighting monitoring, alarming platform | |
CN102542719A (en) | Intelligent fire protection system based on building information modeling (BIM) | |
CN106482785A (en) | A kind of pipe gallery monitoring and warning system | |
CN101231778A (en) | Camera shooting self-extinguishing warning system | |
CN206388307U (en) | A kind of novel intelligent Hydrology feelings observe early warning system | |
CN105178392B (en) | Pipeline closing or blocking monitoring method and system for fire water supply system | |
CN205042029U (en) | Fire control monitoring system based on intelligence shower head | |
CN205759288U (en) | One remotely monitors automatic fire protection system | |
CN115631617A (en) | Internet of things fire fighting equipment early warning method and system based on data processing | |
CN215387273U (en) | Fire hydrant intelligent monitoring system | |
CN108159621A (en) | A kind of ship's fire fighting water lines leakage monitor | |
CN204522094U (en) | Structural fire protection is to water monitoring system | |
CN113269521A (en) | Multifunctional later-period service system for constructional engineering | |
CN209187990U (en) | A kind of interior extinction by automatic sprinkling system | |
Safayet et al. | Development of building information modeling (BIM)-based real-time fire alert system to reduce fire impact in Bangladesh | |
CN111272218A (en) | Integrated intelligent pump room management system based on VR environment | |
CN205862504U (en) | City complex fire management system | |
CN202584338U (en) | BIM based intelligent firing-fighting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190517 |