CN109755164A - Wafer handling and inflation system - Google Patents

Wafer handling and inflation system Download PDF

Info

Publication number
CN109755164A
CN109755164A CN201711087048.0A CN201711087048A CN109755164A CN 109755164 A CN109755164 A CN 109755164A CN 201711087048 A CN201711087048 A CN 201711087048A CN 109755164 A CN109755164 A CN 109755164A
Authority
CN
China
Prior art keywords
wafer
filling device
gas filling
handling
control cabinet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711087048.0A
Other languages
Chinese (zh)
Inventor
邱义君
黄俊凯
吕至诚
陈春忠
傅承祖
蔡升富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Precision Polytron Technologies Inc
Foxsemicon Integrated Technology Shanghai Inc
Original Assignee
Beijing Precision Polytron Technologies Inc
Foxsemicon Integrated Technology Shanghai Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Precision Polytron Technologies Inc, Foxsemicon Integrated Technology Shanghai Inc filed Critical Beijing Precision Polytron Technologies Inc
Priority to CN201711087048.0A priority Critical patent/CN109755164A/en
Publication of CN109755164A publication Critical patent/CN109755164A/en
Pending legal-status Critical Current

Links

Abstract

A kind of handling of wafer and inflation system, it includes a wafer handler and a gas filling device, the wafer handler is for loading and unloading wafer cassette, the gas filling device is to connect the wafer cassette, the wafer handler includes the control cabinet of a pedestal and a control wafer cassette handling, the pedestal include a bracket, one be installed in the plummer on the bracket and one be located at the plummer below accommodating cavity, the plummer is located in the accommodating cavity to load the wafer cassette, the control cabinet and the gas filling device.

Description

Wafer handling and inflation system
Technical field
The present invention relates to a kind of wafer handling for wafer cassette and inflation systems.
Background technique
In the technique of large-sized semiconductor crystal wafer, usually using front open type wafer box (FOUP:Front Opening Unified Pod) as the device for storing and conveying wafer.The wafer cassette has an enclosure space, is beneficial to prevent ring around Dust, aqueous vapor and the oxygen in border enter and react with wafer and defect (such as circuit breaking or short circuit) is caused to generate, to improve The manufacturing yield of wafer.
However, under manufacture of semiconductor technology constantly miniature situation, from a processing step to next in silicon wafer process A processing step high latency allowed (Queue Time) is shorter and shorter, so that production efficiency reduces or product is good Rate is deteriorated, and the high latency for resulting in the need for extending silicon wafer process is to improve product yield.Therefore, it is necessary to use a wafer to fill Handler is used to load wafer cassette and take a breath to the wafer cassette using a gas filling device, to remove in the wafer cassette Moisture and oxygen, the high latency in silicon wafer process be appropriately extended can.However, in the prior art, controlling the crystalline substance The control device of circle handler is usually separately positioned with the wafer handler, therefore, needs additional space to place State control device.
Summary of the invention
In view of the foregoing, it is necessary to provide a kind of handling of wafer and inflation system, to solve the above technical problems.
A kind of handling of wafer and inflation system comprising a wafer handler and a gas filling device, the wafer Handler is for loading and unloading wafer cassette, and the gas filling device is to connect the wafer cassette, the wafer handler packet The control cabinet of a pedestal and a control wafer cassette handling is included, the pedestal includes a bracket, one is installed in holding on the bracket Microscope carrier and an accommodating cavity below the plummer, the plummer is to load the wafer cassette, the control cabinet And the gas filling device is located in the accommodating cavity.
Further, the bracket, the plummer and a shell, which enclose, sets to form the accommodating cavity.
Further, the shell is mounted at the bracket.
Further, the gas filling device and the control cabinet are arranged side by side in the accommodating cavity, and the gas Body filling device is between the control cabinet and the bracket.
Further, the gas filling device is fixed on the bracket, and the control cabinet is fixed on the plummer court To the surface of the accommodating cavity.
Further, the control cabinet and the gas filling device are communicated to connect with a Cloud Server respectively, the cloud Server sends to the control cabinet and accuses instruction, and the control cabinet controls the dress of the wafer cassette according to the control instruction It unloads, the Cloud Server sends triggering command to the gas filling device and pause instruction, the gas filling device receive Start to inflate and be evacuated to the wafer cassette when triggering command, the gas filling device, which receives the pause instruction, to be stopped It inflates and is evacuated to the wafer cassette.
Wafer handling of the invention and inflation system, the gas filling device and the control cabinet are contained in described together In accommodating cavity, so that whole wafer handling and inflation system are compact-sized, production space is saved.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the wafer handling and inflation system in a preferred embodiment of the present invention.
Fig. 2 is that wafer shown in FIG. 1 loads and unloads and schematic diagram is disassembled in the part of inflation system.
Fig. 3 is the hardware architecture diagram of wafer shown in FIG. 1 handling and the gas filling device in inflation system.
Main element symbol description
Wafer handling and inflation system 1
Wafer handler 300
Gas filling device 100
Wafer cassette 200
Pedestal 31
Control cabinet 35
Bracket 311
Plummer 313
Shell 315
Accommodating cavity 316
Cloud Server 2
Inflatable component 101
Vacuum elements 102
First filter element 11
Air pressure sensing and regulating element 12
Switch valve 13
Sensing flux and regulating element 14
Second filter element 15
Airtight element 16、16’
Gas ducting 111
Temperature and humidity sensing element 17
Anti-return element 18
Air pressure sensing element 19
Suction element 20
Pump-line 112
The present invention that the following detailed description will be further explained with reference to the above drawings.
Specific embodiment
It please refers to Fig.1 to Fig.3, the wafer handling of a better embodiment of the invention and inflation system 1 comprising a wafer Handler 300 and a gas filling device 100, for being inflated to wafer cassette 200 to protect the crystalline substance in wafer cassette 200 Circle.
The wafer handler 300 includes a pedestal 31 and a control cabinet 35.
The pedestal 31 protrudes out the plummer 313 to be formed perpendicular to 311 direction of bracket including 311, one edge of a bracket, And one be located at 313 lower section of the plummer and enclose accommodating made of setting as the bracket 311, plummer 313 and a shell 315 Chamber 316.The plummer 313 is for loading the wafer cassette 200.The control cabinet 35 is contained in the accommodating cavity 316, is used In the handling for controlling the wafer cassette 200.The shell 315 is mounted at the bracket 311, so that the wafer fills Unload and the installation of inflation system 1 and maintenance process it is simple.
In present embodiment, the control cabinet 35 is communicated with a Cloud Server 2 by wired or wireless mode.The cloud Server 2 sends control instruction to the control cabinet 35, and the control cabinet controls the wafer cassette according to the control instruction 200 handling.
The gas filling device 100 is contained in the accommodating cavity 316.In present embodiment, the gas filling dress It sets 100 to be arranged side by side with the control cabinet 35 in the accommodating cavity 316, and the gas filling device 100 is located at the control Between case 35 and the bracket 311 processed.The gas filling device is fixed on the bracket 311, and the control cabinet 35 is fixed on The lower surface of the plummer.The control cabinet 35 in other embodiments, the gas filling device 100 and the control Arrangement of the case 35 in the accommodating cavity 316 can be set as needed.
The gas filling device 100 includes an inflatable component 101 and a vacuum elements 102.The inflatable component 101 is used for When receiving a triggering command, the gas for meeting humidity and air pressure requirement is filled with the wafer cassette 200.The vacuum elements 102 For the gas in the wafer cassette 200 being extracted out, and detects when the inflatable component 101 starts gas being filled with the wafer cassette 200 Survey the humidity value and temperature value of institute's gas bleeding.
In the present embodiment, which is communicated with Cloud Server 2 by wired or wireless mode. The Cloud Server 2 is for sending the triggering command to the inflatable component 101 and the vacuum elements 102 simultaneously, so that notice should Inflatable component 101 starts to inflate to the wafer cassette 200, and the vacuum elements 102 is notified to start to be evacuated from the wafer cassette 200. The gas filling device 100 is also used to the humidity value for the gas that the vacuum elements 102 are detected and humidity value being sent to the cloud Server 2.To which, the Cloud Server 2 can calculate the one opposite of the gas according to the humidity value and temperature value for the gas detected Humidity value, and the rh value is compared with a predetermined rh value, it is somebody's turn to do when the rh value of the gas is equal to When predetermined rh value, which sends a pause to the inflatable component 101 and the vacuum elements 102 simultaneously and refers to It enables, so that the inflatable component 101 be notified to stop inflating to the wafer cassette 200, and the vacuum elements 102 is notified to stop from the crystalline substance Circle box 200 is evacuated.At this point, 100 operation suspension of gas filling device.
In another embodiment, the inflatable component 101 can with the vacuum elements 102 by wired or wireless mode into Row communication.When the vacuum elements 102 judge according to the humidity value and atmospheric pressure value of the gas detected the rh value of the gas When equal to the predetermined rh value, which stops being evacuated from the wafer cassette 200, and to the inflatable component 101 A pause instruction is sent, so that the inflatable component 101 be notified to stop inflating to the wafer cassette 200.
Wherein, the humidity and the gas of air pressure requirement of meeting is compression drying air (CDA) or nitrogen.
The inflatable component 101 connects a gas source (not shown), which is used for the gas exported to the gas source Body is filled with the wafer cassette 200 after being handled.In the present embodiment, the inflatable component 101 include one first filter element 11, One air pressure sensing and regulating element 12, a switch valve 13, a sensing flux and regulating element 14, one second filter element 15, one Airtight element 16 and for connecting first filter element 11, the air pressure sensing and regulating element 12, the switch valve 13, the stream The gas ducting 111 of amount sensing and regulating element 14, second filter element 15 and the airtight element 16.The inflatable component 101 are connect by first filter element 11 with the gas source, and are connect by the airtight element 16 with the wafer cassette 200. The air pressure sensing and regulating element 12, the switch valve 13, the sensing flux and regulating element 14 and second filter element 15 It is sequentially arranged between first filter element 11 and the airtight element 16.In other embodiments, the air pressure sensing with The order of connection of regulating element 12, the switch valve 13, the sensing flux and regulating element 14 and second filter element 15 It can change as needed.
The gas that first filter element 11 is used to export the gas source is filtered, to prevent the particle in the gas Pollute or damage the wafer in the wafer cassette 200.In the present embodiment, which is a pneumatic filter.
The air pressure sensing and regulating element 12 are used to sense the atmospheric pressure value of the filtered gas, and by the air pressure of the gas Value is adjusted within the scope of a preset air pressure value.In the present embodiment, the air pressure sensing and regulating element 12 include an air pressure transmission Sensor and an air pressure valve.The preset air pressure value range is -1kpa to -6kpa.
The switch valve 13 can be at opening or closing state.After allowing filtering when the switch valve 13 is in the open state The gas pass through, the filtered gas can be prevented to pass through when the switch valve 13 is in close state.That is, closing can be passed through The switch valve 13, which controls the inflatable component 101, to be stopped inflating to the wafer cassette 200.
The sensing flux and regulating element 14 are used to sense the flow of the filtered gas, and by the flow tune of the gas Within the scope of section to a predetermined amount of flow value.In the present embodiment, which is 0 to 100 liter/min.
Second filter element 15 will be for that will flow through first filter element 11, the air pressure sensing and regulating element 12, be somebody's turn to do The gas of switch valve 13 and the sensing flux and regulating element 14 is further filtered, to remove first filter element 11, the particle that the air pressure sensing and regulating element 12, the switch valve 13 and the sensing flux and regulating element 14 itself generate To further ensure that the cleannes of the gas.In the present embodiment, which is a pneumatic filter.
In the present embodiment, the vacuum elements 102 are anti-including an airtight element 16 ', a temperature and humidity sensing element 17, one Back-flow component 18, an air pressure sensing element 19, a suction element 20 and for connecting the airtight element 16 ', the temperature and humidity sense Survey the pump-line 112 of element 17, the anti-return element 18, the air pressure sensing element 19 and the suction element 20.
The suction element 20 includes a bleeding point (not shown), which is used to be formed in the bleeding point negative Pressure, to make the gas in the wafer cassette 200 be extracted under the action of negative pressure and enter the vacuum elements 102.In this embodiment party In formula, which is a vacuum pump.The airtight element 16 ', the temperature and humidity sensing element 17, the anti-return element 18 and the air pressure sensing element 19 be sequentially connected between the wafer cassette 200 and the suction element 20.In other embodiment party In formula, the company of the airtight element 16 ', the temperature and humidity sensing element 17, the anti-return element 18 and the air pressure sensing element 19 Connecing sequence can also change as needed.
The airtight element 16 ' is used to for the temperature and humidity sensing element 17 being tightly connected to the wafer cassette 200, thus prevent by The gas of extraction is revealed when entering the temperature and humidity sensing element 17.Wherein, the airtight element 16 ' and the airtight 16 structure class of element Seemingly, this is not repeated.
The temperature and humidity sensing element 17 is used to sense the humidity value and temperature value of the extracted gas, the humidity of the gas Value corresponds to the rh value of the gas with temperature value.In the present embodiment, which includes a temperature Quick resistance and a humistor.When the rh value for the gas detected is equal to the predetermined rh value, the gas source It closes, i.e., the inflatable component 101 stops inflation.
The air pressure sensing element 19 is used to sense the atmospheric pressure value of the extracted gas.In the present embodiment, the air pressure Sensing element 19 is a baroceptor.
The atmospheric pressure value that the anti-return element 18 is used to work as the gas that the air pressure sensing element 19 measures is greater than a predetermined gas The gas backstreaming in the vacuum elements 102 is prevented when pressure value (e.g., becoming barotropic state), that is, prevent the air pressure of external environment from falling Pour into the wafer cassette 200.In the present embodiment, which is a check-valves.
The gas filling device 100 and the control cabinet 35 are non-interference.
Wafer handling of the invention and inflation system 1, the gas filling device 100 and control cabinet 35 are contained in institute together It states in accommodating cavity 316, so that whole wafer handling and inflation system 1 are compact-sized, saves production space, and shell 315 is removable It unloads, so that wafer handling and the installation of inflation system 1 and maintenance process are simple, meets 6S standard requirements.Furthermore the gas is filled out It fills and sets 100 and controlled by Cloud Server 2, have no effect on the normal operation and maintenance of wafer handler 300.
The above is only better embodiment of the invention, not the limitation to the present invention in any form, though The right present invention has been that better embodiment is disclosed above, is not intended to limit the invention, any person skilled in the art, Without departing from the scope of the present invention, when the technology contents using the disclosure above are modified or are modified to With the equivalent implementations of variation, but without departing from the technical solutions of the present invention, according to the technical essence of the invention to Any simple modification, equivalent change and modification that upper embodiment is done, all of which are still within the scope of the technical scheme of the invention.

Claims (6)

1. a kind of wafer handling and inflation system comprising a wafer handler and a gas filling device, the wafer dress For loading and unloading wafer cassette, the gas filling device includes handler to connect the wafer cassette, the wafer handler One pedestal and the control cabinet of a control wafer cassette handling, the pedestal include a bracket, one are installed in carrying on the bracket Platform and one be located at accommodating cavity below the plummer, the plummer to load the wafer cassette, the control cabinet and The gas filling device is located in the accommodating cavity.
2. wafer as described in claim 1 handling and inflation system, which is characterized in that further include one being installed on the bracket Shell, the bracket, the plummer and the shell, which enclose, to be set to form the accommodating cavity.
3. wafer handling as claimed in claim 2 and inflation system, which is characterized in that the shell is movably installed in the branch Frame.
4. wafer handling as described in claim 1 and inflation system, which is characterized in that the gas filling device and the control Case processed is arranged side by side in the accommodating cavity, and the gas filling device is between the control cabinet and the bracket.
5. wafer handling as claimed in claim 4 and inflation system, which is characterized in that the gas filling device is fixed on institute Bracket is stated, the control cabinet is fixed on the plummer towards the surface of the accommodating cavity.
6. wafer handling as described in claim 1 and inflation system, which is characterized in that the control cabinet and gas filling Device is communicated to connect with a Cloud Server respectively, and the Cloud Server sends to the control cabinet and accuses instruction, the control cabinet The handling of the wafer cassette are controlled according to the control instruction, the Cloud Server sends to the gas filling device and triggers Instruction and pause instruction, the gas filling device start to inflate and be evacuated to the wafer cassette when receiving the triggering command, The gas filling device, which receives the pause instruction, to be stopped inflating and being evacuated to the wafer cassette.
CN201711087048.0A 2017-11-07 2017-11-07 Wafer handling and inflation system Pending CN109755164A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711087048.0A CN109755164A (en) 2017-11-07 2017-11-07 Wafer handling and inflation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711087048.0A CN109755164A (en) 2017-11-07 2017-11-07 Wafer handling and inflation system

Publications (1)

Publication Number Publication Date
CN109755164A true CN109755164A (en) 2019-05-14

Family

ID=66400750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711087048.0A Pending CN109755164A (en) 2017-11-07 2017-11-07 Wafer handling and inflation system

Country Status (1)

Country Link
CN (1) CN109755164A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111952226B (en) * 2019-05-16 2024-03-26 华景电通股份有限公司 Wafer carrier monitoring system and monitoring method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203466172U (en) * 2012-11-05 2014-03-05 圣凰科技有限公司 Gas filling device with flow control for wafer carrier
CN104167382A (en) * 2013-05-16 2014-11-26 昕芙旎雅有限公司 Load port device
CN106505023A (en) * 2015-09-08 2017-03-15 古震维 A kind of with the wafer handler for blowing off function
CN206179838U (en) * 2016-11-23 2017-05-17 北京亿微纳科技有限公司 Wafer automatic loading equipment
CN107068604A (en) * 2017-03-14 2017-08-18 大族激光科技产业集团股份有限公司上海分公司 Wafer cassette conveys Load System

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203466172U (en) * 2012-11-05 2014-03-05 圣凰科技有限公司 Gas filling device with flow control for wafer carrier
CN104167382A (en) * 2013-05-16 2014-11-26 昕芙旎雅有限公司 Load port device
CN106505023A (en) * 2015-09-08 2017-03-15 古震维 A kind of with the wafer handler for blowing off function
CN206179838U (en) * 2016-11-23 2017-05-17 北京亿微纳科技有限公司 Wafer automatic loading equipment
CN107068604A (en) * 2017-03-14 2017-08-18 大族激光科技产业集团股份有限公司上海分公司 Wafer cassette conveys Load System

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111952226B (en) * 2019-05-16 2024-03-26 华景电通股份有限公司 Wafer carrier monitoring system and monitoring method thereof

Similar Documents

Publication Publication Date Title
KR100799415B1 (en) Purge system for a product container and table for use in the purge system
US9607873B2 (en) Apparatus and operation method thereof
KR102355512B1 (en) Systems, apparatus, and methods for an improved load port
US20150024671A1 (en) Efem and load port
US20150206780A1 (en) Wafer storage apparatus having gas charging portions and semiconductor manufacturing apparatus using the same
KR20030002299A (en) Substrate processing apparatus, substrate processing method, semiconductor device fabricating method, and conveying unit
TW201718108A (en) Gas injection device
CN110137101A (en) Disconnecting device and the manufacturing method for cutting off product
US20150235885A1 (en) Purge system, pod used with purge system, and load port apparatus
CN109755164A (en) Wafer handling and inflation system
CN109326546A (en) Gas filling device and gas-filling system for wafer cassette
CN115346899A (en) Pressure control device and pressure control method
TWI630153B (en) Foup loading and air filling system
JP2011114319A (en) Gas-replacing device and gas replacement method
CN109326545A (en) Gas filling device and gas-filling system for wafer cassette
TW201347067A (en) Load lock device
TWI447056B (en) Method for storing wafers
TWI715624B (en) Nozzle unit
CN112071797B (en) Vacuum chuck system for wafer loading
TW201910226A (en) Air filling device for foup and air filling system
TW201910225A (en) Air filling device for foup and air filling system
TWM441929U (en) Wafer-box load port with air filling structure
CN108807225B (en) Gas supply device, method for controlling the same, loading station, and semiconductor manufacturing apparatus
KR20060084154A (en) Vent system for semiconductor deposition equipment
JP2014195008A (en) Vacuum treatment apparatus and method for operating vacuum treatment apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190514