CN109753048A - The automatic Test driver automotive engine system of high-speed rail signalling arrangement - Google Patents

The automatic Test driver automotive engine system of high-speed rail signalling arrangement Download PDF

Info

Publication number
CN109753048A
CN109753048A CN201811517994.9A CN201811517994A CN109753048A CN 109753048 A CN109753048 A CN 109753048A CN 201811517994 A CN201811517994 A CN 201811517994A CN 109753048 A CN109753048 A CN 109753048A
Authority
CN
China
Prior art keywords
test
layer
assignment
module
test assignment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811517994.9A
Other languages
Chinese (zh)
Other versions
CN109753048B (en
Inventor
李士祥
郭伟
臧一佩
张�浩
许镇
赵琳
吕方瑶
董志通
邹杪
郝建
雷群
于凯
刘晓斌
徐超
王鹏
郑长宗
卫永康
张素阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Railway Sciences Corp Ltd CARS
Signal and Communication Research Institute of CARS
Beijing Ruichi Guotie Intelligent Transport Systems Engineering Technology Co Ltd
Beijing Huatie Information Technology Development Corp
Original Assignee
China Academy of Railway Sciences Corp Ltd CARS
Signal and Communication Research Institute of CARS
Beijing Ruichi Guotie Intelligent Transport Systems Engineering Technology Co Ltd
Beijing Huatie Information Technology Development Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Railway Sciences Corp Ltd CARS, Signal and Communication Research Institute of CARS, Beijing Ruichi Guotie Intelligent Transport Systems Engineering Technology Co Ltd, Beijing Huatie Information Technology Development Corp filed Critical China Academy of Railway Sciences Corp Ltd CARS
Priority to CN201811517994.9A priority Critical patent/CN109753048B/en
Publication of CN109753048A publication Critical patent/CN109753048A/en
Application granted granted Critical
Publication of CN109753048B publication Critical patent/CN109753048B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Debugging And Monitoring (AREA)

Abstract

The invention discloses a kind of automatic Test driver automotive engine system of high-speed rail signalling arrangement, it include: the leading engine for being set to automatic testing service device end, and it is set to separate in simulated test device and hold up, the simulated test device quantity is one or more, is respectively provided with one in each simulated test device and separates and holds up;The leading engine obtains the test data of background data base by database interface, is packaged into after test assignment to serialize stream, is sent to separate accordingly and hold up;It separates the serializing stream held up and will received and is deserialized as test assignment, and the test logic processing module in simulated test device is called to execute test assignment, after getting the test result provided after the response of tested real equipment by test result comparison module, test result is serialized to and is sent to leading engine, background data base is backfilled by database interface by leading engine.The system is applicable to the test of a variety of real equipments, and versatility is stronger, and can reduce the load of leading engine place server.

Description

The automatic Test driver automotive engine system of high-speed rail signalling arrangement
Technical field
The present invention relates to railway equipment automatic test technology fields more particularly to a kind of high-speed rail signalling arrangement to test drive automatically Dynamic automotive engine system.
Background technique
High-speed rail train control system key signal equipment mainly includes interlocking (CBI), train control center (TCC), radio block center (RBC) and temporary speed limitation server (TSRS).The connection of these device software logical AND route site types is close, carries out in engineer application It is related to mass data establishment when software design, the data test and interface testing work for being largely directed to organized data is generated in test Make.Mainly artificial establishment test cases tests organized data and interface in traditional scheme, and testing efficiency is low, does not have It can regression.
Automatic test replaces manually reading good cycle tests prepared in advance by computer software technology, tested from trend Equipment input action condition is handed down to equipment under test and executes test instruction, automatic to collect equipment under test the result of the action and carry out just True sex determination.High-speed rail signalling arrangement data-interface testing field introduces automatic test technology, can mitigate the labour of tester Intensity improves test job efficiency.
At present both at home and abroad to the test of high-speed rail signalling arrangement based on manual testing, some equipment (such as CBI and TCC) Partial test item realizes the data-driven based on test script and tests automatically, i.e. test data and test script separation, by surveying Data-driven test script is tried, testing and control is carried out to measurand.As shown in Figure 1, for currently based on the data of test script Drive automatic testing scheme.The defect of the program is: 1) test result compares carries out in automatic testing engine, causes automatic Testing engine couples closely with test logic, poor universality, for example the automatic testing engine for testing true TCC cannot be used for Test true CBI equipment.2) automatic testing engine logic business is excessively concentrated, and the operand that test result compares and controlling is imitated The linear relation with increase of true test equipment quantity, the load balancing of server where being unfavorable for automatic testing engine.3) automatic to survey Need to separately design dedicated communication protocol between examination engine and simulated test device (emulation CBI, emulating TSRS etc.), poor universality, Increase the maintenance difficulties of entire Auto-Test System.
Summary of the invention
The object of the present invention is to provide a kind of automatic Test driver automotive engine system of high-speed rail signalling arrangement, are applicable to a variety of true The test of real equipment, versatility are stronger.
The purpose of the present invention is what is be achieved through the following technical solutions:
A kind of automatic Test driver automotive engine system of high-speed rail signalling arrangement, comprising: be set to the master at automatic testing service device end Engine, and be set to separate in simulated test device and hold up, the simulated test device quantity is one or more, each emulation It it is respectively provided with one in test equipment separates and hold up;
The leading engine obtains the test data of background data base by database interface, is packaged into after test assignment with sequence Columnization stream is sent to separate accordingly and hold up;
It separates the serializing stream held up and will received and is deserialized as test assignment, and call the test in simulated test device Logic processing module executes test assignment, is provided after getting tested real equipment and responding by test result comparison module After test result, test result is serialized to and is sent to leading engine, back-end data is backfilled by database interface by leading engine Library.
As seen from the above technical solution provided by the invention, for test separate hold up with test it is logically independent, lead to It is strong with property, it can be adapted for the automatic test of respective high-speed rail signalling arrangement;Each simulated test device executes test assignment, according to survey Test result calculates test result, separates and holds up reception test result and feed back to leading engine, i.e., test result correctness, which compares, divides Cloth carries out, the load of server where reducing leading engine.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, required use in being described below to embodiment Attached drawing be briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for this For the those of ordinary skill in field, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing.
Fig. 1 is the automatic test philosophy schematic diagram of the data-driven based on test script that background of invention provides;
Fig. 2 is a kind of schematic diagram of the automatic Test driver automotive engine system of high-speed rail signalling arrangement provided in an embodiment of the present invention;
Fig. 3 is the hierarchical diagram of leading engine provided in an embodiment of the present invention;
Fig. 4 is the schematic diagram of test assignment layer provided in an embodiment of the present invention;
Fig. 5 separates the hierarchical diagram held up to be provided in an embodiment of the present invention;
Fig. 6 is the schematic diagram of test assignment layer provided in an embodiment of the present invention.
Specific embodiment
With reference to the attached drawing in the embodiment of the present invention, technical solution in the embodiment of the present invention carries out clear, complete Ground description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on this The embodiment of invention, every other implementation obtained by those of ordinary skill in the art without making creative efforts Example, belongs to protection scope of the present invention.
The embodiment of the present invention provides a kind of automatic Test driver automotive engine system of high-speed rail signalling arrangement, as shown in Fig. 2, main packet It includes: being set to the leading engine at automatic testing service device end, and be set to separate in simulated test device and hold up, the emulation testing Number of devices is one or more, is respectively provided with one in each simulated test device and separates and holds up;
The leading engine obtains the test data of background data base by database interface, is packaged into after test assignment with sequence Columnization stream is sent to separate accordingly and hold up;
It separates the serializing stream held up and will received and is deserialized as test assignment, and call the test in simulated test device Logic processing module executes test assignment, is provided after getting tested real equipment and responding by test result comparison module After test result, test result is serialized to and is sent to leading engine, back-end data is backfilled by database interface by leading engine Library.
In the embodiment of the present invention, the structure function held up is identical, and master draws for set separating in each simulated test device It holds up only one to run in testing service device, be described in detail respectively below for leading engine with separating to hold up.
One, leading engine.
As shown in figure 3, the leading engine specifically includes that test assignment layer, First rayization and unserializing layer, first-class Data analysis layer and the first TCP/IP transport network layer.
1, test assignment layer is sent to First ray and inverted sequence for read test data and after being packaged into test assignment Columnization layer, and backfilled from the background after receiving the test result that First ray layer and unserializing layer return by database interface Database.
As shown in figure 4, the test assignment layer includes: test assignment management module (Fig. 4 a), test object module (figure 4b), first thread pond module (Fig. 4 c) and survey object handles module (Fig. 4 d);Wherein:
The test assignment management module is called for generating test assignment by database interface read test data Test object module sends test assignment;It is also used to receive the test result of test object module return, and is connect by database Test result is backfilled database by mouth.
The test object processing module, for taking out and surveying from test object queue heads in test object queue not empty Object is tried, calls the corresponding module instance of test object to do respective handling, then rear of queue is added in the test object handled.
The test object module has corresponded to multiple test objects (i.e. simulated test device), each test object corresponding one A module instance, each module instance are stored in test assignment list, while calling sequence for receiving corresponding test assignment Change interface and test assignment is converted into flow data, recalls first-class data analysis layer and sent out by the first TCP/IP transport network layer It send to corresponding separate and holds up;As shown in fig 4e, it is also used to have data receiver in TCP/IP transport network layer, calls flow data processing Layer receives data, receives the test result corresponding to corresponding test object of unserializing interface output, and is associated with test assignment Test assignment is corresponded in list, reinforms the test result that test assignment management module handles corresponding test assignment.
First thread pond module, for creating multiple test object processing threads, after thread operation at each self-loopa The test object in test object queue (TO queue) is managed, realizes leading engine asynchronous process test result function.
2, First rayization and unserializing layer, provide serializing and unserializing two interfaces, and serializing interface will be surveyed The test assignment of examination task layer output is converted into binary flow data, and unserializing interface will be from separating the binary stream held up Data conversion is at test result.
3, first-class data analysis layer, realizes the processing that sends and receives of flow data, when sending data First rayization with The output recurrent wrIting of unserializing layer is all sent completely until flow data;Circular test receives data length when reception, connects First rayization and unserializing layer are sent to after the completion of receiving.
4, the first TCP/IP transport network layer is called for first-class data analysis layer, realize leading engine and separating hold up between base It is sent and received in the data of the TCP/IP network transmission protocol.
Two, it separates and holds up
As shown in figure 5, it is described separate to hold up specifically include that test assignment adaptation layer, the second serializing and unserializing layer, the Second-rate data analysis layer and the 2nd TCP/IP transport network layer.
1, test assignment adaptation layer, the test for obtaining the unserializing of the second serializing and the output of unserializing layer Task is sent to test logic processing module, and the test result that test result comparison module provides is sent to the second sequence Change and unserializing layer.
As shown in fig. 6, the test assignment adaptation layer includes: external interface module (Fig. 6 a), the second thread pool module (figure 6b), test task process module (Fig. 6 c) and test assignment receiving module (Fig. 6 d);Wherein:
The external interface module, for executing notification interface by test assignment and calling survey after receiving test assignment It tries logic processing module and executes test assignment, and provide task action result receiving interface to test result comparison module;
The test assignment receiving module, for calling second when the 2nd TCP/IP transport network layer has data receiver Flow data process layer receives data, and is converted to test assignment by unserializing interface, then test assignment is added to test Task tail of the queue waits test assignment to handle thread process;
The second thread pool module, for creating multiple test assignment processing threads, after thread operation at each self-loopa The test assignment in test assignment queue is managed, handles the test assignment received, and wait test assignment implementing result to be returned;
The test task process module, for taking out and surveying from test assignment queue heads in test assignment queue not empty Trial business executes notification interface by test assignment and test logic processing module is called to execute survey if newly test assignment is received Trial business, records corresponding test assignment time-out start time, and test assignment is finally rejoined tail of the queue waiting and is handled next time; If test result has returned, test result data is generated, is sent to leading engine, which is disposed, and no longer joins the team; If test assignment waits time-out, test timeout datum is generated, is sent to leading engine, which is disposed, and no longer joins the team; If having not timed out, which rejoins tail of the queue, continues waiting for.
2, the second serializing and unserializing layer, provide serializing and unserializing two interfaces, and serializing interface will be surveyed Test result is converted into binary flow data, and unserializing interface appoints the binary stream data conversion from leading engine at test Business.
3, second data analysis layer, realizes the processing that sends and receives of flow data, when sending data the second serializing with The output recurrent wrIting of unserializing layer is all sent completely until flow data;Circular test receives data length when reception, connects The second serializing and unserializing layer are sent to after the completion of receiving.
4, the 2nd TCP/IP transport network layer is called for second data analysis layer, realize leading engine and separating hold up between base It is sent and received in the data of the TCP/IP network transmission protocol.
It will be understood by those skilled in the art that hereinbefore described " first, second " is only used for distinguishing two objects, together When, the tested true TCC in Fig. 2 is also only example, can be other tested real equipments in practical applications.
In addition, leading engine and separating hold up included in serializing and unserializing layer, flow data process layer and TCP/ IP network transport layer functionality is essentially identical, distinguishes and is that handled data are slightly distinguished.
Above scheme of the embodiment of the present invention mainly obtain it is following the utility model has the advantages that
1, for test separate hold up with test it is logically independent, it is versatile.It separates to hold up and general test assignment is provided holds Row notification interface sends test data to " test logical process ";General task action result receiving interface is provided for " test As a result compare " it calls, receive test data implementing result, the automatic test suitable for respective high-speed rail signalling arrangement.
2, test result correctness compares distributed progress, reduces server load where leading engine.Each emulation testing is set It is standby to execute test assignment, go out test result according to test result calculations, separates and hold up reception test result and feed back to leading engine.
3, automatic testing service device and simulated test device use puppy parc, easy to maintain, convenient for extension.Using sequence Change and the flow data processing technique based on TCP/IP communication transmit variety classes test data.Various signalling arrangements are able to satisfy to survey Automatic data interaction between testing service device and simulated test device in examination.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Within the technical scope of the present disclosure, any changes or substitutions that can be easily thought of by anyone skilled in the art, It should be covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be with the protection model of claims Subject to enclosing.

Claims (5)

1. a kind of automatic Test driver automotive engine system of high-speed rail signalling arrangement characterized by comprising be set to automatic testing service The leading engine at device end, and be set to separate in simulated test device and hold up, the simulated test device quantity is one or more, It it is respectively provided with one in each simulated test device separates and hold up;
The leading engine obtains the test data of background data base by database interface, is packaged into after test assignment to serialize Stream is sent to separate accordingly and hold up;
It separates the serializing stream held up and will received and is deserialized as test assignment, and call the test logic in simulated test device Processing module executes test assignment, the test provided after getting tested real equipment and responding by test result comparison module As a result after, test result is serialized to and is sent to leading engine, background data base is backfilled by database interface by leading engine.
2. the automatic Test driver automotive engine system of a kind of high-speed rail signalling arrangement according to claim 1, which is characterized in that described Leading engine includes: test assignment layer, First rayization and unserializing layer, first-class data analysis layer and the first TCP/IP net Network transport layer;Wherein:
The test assignment layer is sent to First ray and antitone sequence for read test data and after being packaged into test assignment Pass through number of units after database interface backfill after changing layer, and reception First ray layer and the test result of unserializing layer return According to library;
The First rayization and unserializing layer, provide serializing and unserializing two interfaces, and serializing interface will be tested The test assignment of task layer output is converted into binary flow data, and unserializing interface will be from separating the binary system fluxion held up According to being converted into test result;
The first-class data analysis layer, realizes the processing that sends and receives of flow data, First rayization and anti-when sending data The output recurrent wrIting of layer is serialized until flow data is all sent completely;Circular test receives data length when reception, receives It is sent to First rayization and unserializing layer after the completion;
The first TCP/IP transport network layer is called for first-class data analysis layer, realizes that leading engine and separating is based between holding up The data of the TCP/IP network transmission protocol send and receive.
3. the automatic Test driver automotive engine system of a kind of high-speed rail signalling arrangement according to claim 2, which is characterized in that described Test assignment layer includes: test assignment management module, test object module, first thread pond module and surveys object handles module; Wherein:
The test assignment management module calls test for generating test assignment by database interface read test data Object module sends test assignment;It is also used to receive the test result of test object module return, and will by database interface Test result backfills database;
The test object processing module, for taking out test pair from test object queue heads in test object queue not empty As calling the corresponding module instance of test object to do respective handling, then rear of queue is added in the test object handled;
The test object module has corresponded to multiple test objects, the corresponding module instance of each test object, each module Example is stored in test assignment list, while calling sequence interface converts test assignment for receiving corresponding test assignment At flow data, recalls first-class data analysis layer corresponding separate is sent to by the first TCP/IP transport network layer and hold up;Also For receive unserializing interface output corresponding to corresponding test object test result and be associated with it is right in test assignment list Test assignment is answered, the test result that test assignment management module handles corresponding test assignment is reinformed;
First thread pond module, for creating multiple test object processing threads, respectively circular treatment is surveyed after thread operation The test object in object queue is tried, realizes leading engine asynchronous process test result function.
4. the automatic Test driver automotive engine system of a kind of high-speed rail signalling arrangement according to claim 1, which is characterized in that described Separate hold up include: test assignment adaptation layer, second serializing with unserializing layer, second data analysis layer and the 2nd TCP/ IP network transport layer;Wherein:
The test assignment adaptation layer, the test for obtaining the unserializing of the second serializing and the output of unserializing layer are appointed Business is sent to test logic processing module, and the test result that test result comparison module provides is sent to the second serializing With unserializing layer;
Second serializing and unserializing layer, provide serializing and unserializing two interfaces, and serializing interface will be tested As a result it is converted into binary flow data, unserializing interface appoints the binary stream data conversion from leading engine at test Business;
The second data analysis layer, realizes the processing that sends and receives of flow data, when sending data the second serializing with it is anti- The output recurrent wrIting of layer is serialized until flow data is all sent completely;Circular test receives data length when reception, receives It is sent to the second serializing and unserializing layer after the completion;
The 2nd TCP/IP transport network layer is called for second data analysis layer, realizes that leading engine and separating is based between holding up The data of the TCP/IP network transmission protocol send and receive.
5. the automatic Test driver automotive engine system of a kind of high-speed rail signalling arrangement according to claim 4, which is characterized in that described Test assignment adaptation layer includes: that external interface module, the second thread pool module, test task process module and test assignment receive Module;Wherein:
The external interface module, for executing notification interface by test assignment and test being called to patrol after receiving test assignment It collects processing module and executes test assignment, and provide task action result receiving interface to test result comparison module;
The test assignment receiving module, for calling the second fluxion when the 2nd TCP/IP transport network layer has data receiver Data are received according to process layer, and test assignment are converted to by unserializing interface, then test assignment is added to test assignment Tail of the queue waits test assignment to handle thread process;
The second thread pool module, for creating multiple test assignment processing threads, respectively circular treatment is surveyed after thread operation The test assignment in task queue is tried, handles the test assignment received, and wait test assignment implementing result to be returned;
The test task process module, for taking out test from test assignment queue heads and appointing in test assignment queue not empty Business executes notification interface by test assignment and test logic processing module execution test is called to appoint if newly test assignment is received Business, records corresponding test assignment time-out start time, and test assignment is finally rejoined tail of the queue waiting and is handled next time;If surveying Test result has returned, and generates test result data, is sent to leading engine, which is disposed, and no longer joins the team;If surveying Trial business waits time-out, generates test timeout datum, is sent to leading engine, which is disposed, and no longer joins the team;If not Time-out, the test assignment rejoin tail of the queue, continue waiting for.
CN201811517994.9A 2018-12-12 2018-12-12 Automatic test driving engine system of high-speed rail signal equipment Active CN109753048B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811517994.9A CN109753048B (en) 2018-12-12 2018-12-12 Automatic test driving engine system of high-speed rail signal equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811517994.9A CN109753048B (en) 2018-12-12 2018-12-12 Automatic test driving engine system of high-speed rail signal equipment

Publications (2)

Publication Number Publication Date
CN109753048A true CN109753048A (en) 2019-05-14
CN109753048B CN109753048B (en) 2020-12-29

Family

ID=66403776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811517994.9A Active CN109753048B (en) 2018-12-12 2018-12-12 Automatic test driving engine system of high-speed rail signal equipment

Country Status (1)

Country Link
CN (1) CN109753048B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111061249A (en) * 2019-12-16 2020-04-24 卡斯柯信号(北京)有限公司 Automatic test system of enhanced train control system wireless block controller
CN111860719A (en) * 2020-07-21 2020-10-30 上海仪电数字技术股份有限公司 Serialization processing method for product to be tested

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201114125Y (en) * 2007-07-26 2008-09-10 山东省计算中心 Distributed type wireless local area network safety detector
CN102289209A (en) * 2011-05-16 2011-12-21 北京全路通信信号研究设计院有限公司 CTCS-3 (China train control system) level train control testing simulation system
CN103675552A (en) * 2013-12-23 2014-03-26 北京交大思诺科技有限公司 Testing system and method for interference resistance of cab signaling equipment
CN103926843A (en) * 2014-04-03 2014-07-16 卡斯柯信号有限公司 General simulation method and system for rail transit signal system
CN104239216A (en) * 2014-10-14 2014-12-24 北京全路通信信号研究设计院有限公司 Software data testing method and system
CN107450353A (en) * 2017-09-22 2017-12-08 北京中科智汇科技有限公司 Row control ground installation emulation test system and method
CN107968729A (en) * 2017-12-22 2018-04-27 中国铁道科学研究院通信信号研究所 A kind of railway signal data flow storage management system
CN107992624A (en) * 2017-12-22 2018-05-04 百度在线网络技术(北京)有限公司 Parse method, apparatus, storage medium and the terminal device of serialized data
US20180321667A1 (en) * 2016-05-09 2018-11-08 StrongForce IoT Portfolio 2016, LLC Methods and systems for data processing in an industrial internet of things data collection environment with large data sets

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201114125Y (en) * 2007-07-26 2008-09-10 山东省计算中心 Distributed type wireless local area network safety detector
CN102289209A (en) * 2011-05-16 2011-12-21 北京全路通信信号研究设计院有限公司 CTCS-3 (China train control system) level train control testing simulation system
CN103675552A (en) * 2013-12-23 2014-03-26 北京交大思诺科技有限公司 Testing system and method for interference resistance of cab signaling equipment
CN103926843A (en) * 2014-04-03 2014-07-16 卡斯柯信号有限公司 General simulation method and system for rail transit signal system
CN104239216A (en) * 2014-10-14 2014-12-24 北京全路通信信号研究设计院有限公司 Software data testing method and system
US20180321667A1 (en) * 2016-05-09 2018-11-08 StrongForce IoT Portfolio 2016, LLC Methods and systems for data processing in an industrial internet of things data collection environment with large data sets
CN107450353A (en) * 2017-09-22 2017-12-08 北京中科智汇科技有限公司 Row control ground installation emulation test system and method
CN107968729A (en) * 2017-12-22 2018-04-27 中国铁道科学研究院通信信号研究所 A kind of railway signal data flow storage management system
CN107992624A (en) * 2017-12-22 2018-05-04 百度在线网络技术(北京)有限公司 Parse method, apparatus, storage medium and the terminal device of serialized data

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
QIN L I: "Research on the Reliability Analysis Method of the Testing and Commissioning System for High-Speed Railway", 《CHINA RAILWAY SCIENCE》 *
周栓林, 吕豪英: "铁路信号动态检测数据管理系统", 《铁道通信信号》 *
王蕾: "基于数据驱动的软件自动化测试框架系统的研究与实现", 《教育技术导刊》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111061249A (en) * 2019-12-16 2020-04-24 卡斯柯信号(北京)有限公司 Automatic test system of enhanced train control system wireless block controller
CN111860719A (en) * 2020-07-21 2020-10-30 上海仪电数字技术股份有限公司 Serialization processing method for product to be tested
CN111860719B (en) * 2020-07-21 2023-10-27 上海仪电数字技术股份有限公司 Serialization processing method for product to be tested

Also Published As

Publication number Publication date
CN109753048B (en) 2020-12-29

Similar Documents

Publication Publication Date Title
CN100449497C (en) Parallel computer and method for locating hardware faults in a parallel computer
DE69713856T2 (en) Integrated semiconductor memory device and communication method therefor
CN106314825B (en) A kind of integrated test system of parallel automation satellite
CN100589420C (en) Function operation packaging based automatization test script implementing method and apparatus
CN105847463A (en) Automatic addressing system of electric car single cell acquisition module and addressing method thereof
CN102393738A (en) Diagnostic device and test method of automobile electronic control unit (ECU)
CN101853201A (en) Software parallel test method and tool based on coloring petri net
CN105528290A (en) Construction method of script-based embedded software simulation and test integrated platform
CN105933173A (en) Electric power system intelligent device automatic testing system
CN109753048A (en) The automatic Test driver automotive engine system of high-speed rail signalling arrangement
CN103488564B (en) A kind of distributed real-time testing system multi-channel test data compression and merging method
CN112461062B (en) Automatic measurement and control system based on carrier rocket integrated test distributed test
CN108762735A (en) Management method and device, storage medium, the terminal of workflow engine
CN109041023A (en) A kind of bluetooth equipment test method and system
CN114707236A (en) Model-based virtual-real combined simulation test method
CN109699023A (en) The automatic test data encapsulation of high-speed rail signalling arrangement and processing method
CN101668036B (en) Simulating system of distributed device and method for processing service by simulating distributed device
CN114896108A (en) Test verification system
CN109308068B (en) Carrier rocket equivalent device system
CN108153837A (en) A kind of real-time data acquisition and storage method and its system for EMU debugging
CN107741909A (en) A kind of automated testing method and system for distributed block storage
CN110232013A (en) Test method, device and controller and medium
CN114281672A (en) Task distribution device based on distributed test system and cooperative control method thereof
CN101639516B (en) Data processing method, controller and system
CN106649124B (en) A kind of parallel dynamic symbol execution method and system based on Actor model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant