CN109742850A - A method of telegram in reply of meeting an urgent need under the disaster scenario based on EMS - Google Patents
A method of telegram in reply of meeting an urgent need under the disaster scenario based on EMS Download PDFInfo
- Publication number
- CN109742850A CN109742850A CN201811475964.6A CN201811475964A CN109742850A CN 109742850 A CN109742850 A CN 109742850A CN 201811475964 A CN201811475964 A CN 201811475964A CN 109742850 A CN109742850 A CN 109742850A
- Authority
- CN
- China
- Prior art keywords
- telegram
- reply
- load
- path
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- Y04S10/52—Outage or fault management, e.g. fault detection or location
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811475964.6A CN109742850A (en) | 2018-12-04 | 2018-12-04 | A method of telegram in reply of meeting an urgent need under the disaster scenario based on EMS |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811475964.6A CN109742850A (en) | 2018-12-04 | 2018-12-04 | A method of telegram in reply of meeting an urgent need under the disaster scenario based on EMS |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109742850A true CN109742850A (en) | 2019-05-10 |
Family
ID=66358490
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811475964.6A Pending CN109742850A (en) | 2018-12-04 | 2018-12-04 | A method of telegram in reply of meeting an urgent need under the disaster scenario based on EMS |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109742850A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102916431A (en) * | 2012-09-20 | 2013-02-06 | 中国电力科学研究院 | Assisted decision making method for load transfer in regional power grid |
CN105470928A (en) * | 2015-09-21 | 2016-04-06 | 国电南瑞科技股份有限公司 | Zoned and layered load transferring method based on urban power transmission network fault recovery |
CN107730093A (en) * | 2017-09-27 | 2018-02-23 | 广东电网有限责任公司佛山供电局 | A kind of System and method in power grid accident telegram in reply path |
CN107769151A (en) * | 2017-10-19 | 2018-03-06 | 广东电网有限责任公司珠海供电局 | A kind of 110kV bus loss of pressure telegram in reply method |
-
2018
- 2018-12-04 CN CN201811475964.6A patent/CN109742850A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102916431A (en) * | 2012-09-20 | 2013-02-06 | 中国电力科学研究院 | Assisted decision making method for load transfer in regional power grid |
CN105470928A (en) * | 2015-09-21 | 2016-04-06 | 国电南瑞科技股份有限公司 | Zoned and layered load transferring method based on urban power transmission network fault recovery |
CN107730093A (en) * | 2017-09-27 | 2018-02-23 | 广东电网有限责任公司佛山供电局 | A kind of System and method in power grid accident telegram in reply path |
CN107769151A (en) * | 2017-10-19 | 2018-03-06 | 广东电网有限责任公司珠海供电局 | A kind of 110kV bus loss of pressure telegram in reply method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109713793B (en) | Power supply online state evaluation system and method for transformer substation | |
CN104835376B (en) | There is the dispatcher training system system of prepared auto restart automatic safety device action simulation | |
CN104835078B (en) | Consider that the trend of prepared auto restart action determines method in static security analysis system | |
CN104835077B (en) | The static security analysis system of function is supported with dispatcher's prediction failure | |
CN209232119U (en) | A kind of box-type substation monitoring and alarming system based on cloud service platform | |
CN104809659B (en) | Intelligent advanced application system suitable for districted dispatch system | |
CN106451384B (en) | Power grid self-healing DSS based on scheduling emergency preplan | |
CN104967216B (en) | A kind of substation and its monitoring system and its monitoring method | |
KR20190119207A (en) | An artificial intelligence-based parameter setting value automatic calculation protection relays | |
CN110148937A (en) | A kind of large-area power-cuts event intelligence deduction method based on Bayesian network | |
CN104836329B (en) | Local-level dispatch supporting system capable of improving analyzing and processing capability of dispatcher during accident generation | |
CN104898460B (en) | Suitable for the online static security analysis system of districted dispatch system | |
CN109193947A (en) | Power distribution room monitoring method, device, server and computer readable storage medium | |
CN108460517A (en) | A kind of power distribution network management-control method and device | |
CN106451760B (en) | A kind of 500kV substation centralized control system telemetry intelligence (TELINT) method for real-time monitoring | |
CN109683571B (en) | Modeling method and device for hydropower station monitoring system | |
CN109742850A (en) | A method of telegram in reply of meeting an urgent need under the disaster scenario based on EMS | |
CN108539740B (en) | Power grid accident forecast simulation system and method thereof | |
CN105762932B (en) | A kind of intelligent substation intelligent warning system based on Plugin Mechanism | |
CN109768619A (en) | Monitoring information automatic debugging system and adjustment method | |
CN104914813B (en) | The multi-platform synchronous method of prepared auto restart model in static security analysis system | |
Kandaperumal et al. | Microgrids as a resilience resource in the electric distribution grid | |
CN114792200A (en) | Scheduling accident plan generating and checking method based on expert knowledge base | |
CN207819457U (en) | Intelligent network lotus control system | |
Li et al. | Hardware implementation of a four-terminal HVDC test-bed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20191209 Address after: 510600 No. 757 Dongfeng East Road, Guangzhou, Guangdong, Yuexiu District Applicant after: GUANGDONG POWER GRID Co.,Ltd. Applicant after: FOSHAN POWER SUPPLY BUREAU OF GUANGDONG POWER GRID Co.,Ltd. Address before: 510000 No. 757 Dongfeng East Road, Guangzhou, Guangdong, Yuexiu District Applicant before: GUANGDONG POWER GRID Co.,Ltd. Applicant before: FOSHAN POWER SUPPLY BUREAU OF GUANGDONG POWER GRID Co.,Ltd. Applicant before: DONGFANG ELECTRONICS Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190510 |
|
RJ01 | Rejection of invention patent application after publication |