CN107769151A - A kind of 110kV bus loss of pressure telegram in reply method - Google Patents

A kind of 110kV bus loss of pressure telegram in reply method Download PDF

Info

Publication number
CN107769151A
CN107769151A CN201710979881.XA CN201710979881A CN107769151A CN 107769151 A CN107769151 A CN 107769151A CN 201710979881 A CN201710979881 A CN 201710979881A CN 107769151 A CN107769151 A CN 107769151A
Authority
CN
China
Prior art keywords
telegram
reply
condition
unit
bus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710979881.XA
Other languages
Chinese (zh)
Inventor
林桂辉
吴海雄
杨锐雄
梁苑
甘德树
陈奕兴
黄志新
凌华保
廖石江
成江东
赵勇
潘凯岩
王伟
董文杰
于丹丹
李绥荣
高天亮
徐艳
赵友国
黄明辉
吴昌川
阎同东
谭大帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Zhuhai Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Zhuhai Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority to CN201710979881.XA priority Critical patent/CN107769151A/en
Publication of CN107769151A publication Critical patent/CN107769151A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/02Details
    • H02H3/06Details with automatic reconnection
    • H02H3/063Details concerning the co-operation of many similar arrangements, e.g. in a network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02HEMERGENCY PROTECTIVE CIRCUIT ARRANGEMENTS
    • H02H3/00Emergency protective circuit arrangements for automatic disconnection directly responsive to an undesired change from normal electric working condition with or without subsequent reconnection ; integrated protection
    • H02H3/02Details
    • H02H3/06Details with automatic reconnection
    • H02H3/066Reconnection being a consequence of eliminating the fault which caused disconnection
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/14Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Small-Scale Networks (AREA)

Abstract

The present invention relates to power system applied technical field, more particularly, to a kind of 110kV bus loss of pressure telegram in reply method, a telegram in reply unit is correspondingly arranged to every 110kV bus, bus telegram in reply is carried out automatically by electric power scheduling automatization system;Remote measure and communication data are obtained first, charge condition, barring condition and the trigger condition of unit of sending a telegram in reply are judged simultaneously afterwards, when unit of sending a telegram in reply is in discharge condition, trigger condition is set up, barring condition is invalid, further the operation condition for unit of sending a telegram in reply is judged, when operation condition is set up, system then automatically generates telegram in reply strategy and performed, after 110kV buses telegram in reply, when the situation for having line current out-of-limit in its telegram in reply path used occurs, meet cutting load condition, now system automatically generates Emergency Control Strategy and performs the strategy.The present invention reduces the time of troubleshooting, reduce load loss, and easily operated and maintenance, and be easy to automatic management.

Description

A kind of 110kV bus loss of pressure telegram in reply method
Technical field
The present invention relates to power system applied technical field, more particularly, to a kind of 110kV bus loss of pressure telegram in reply side Method.
Background technology
The main task of electric power system dispatching personnel is to ensure that safe and stable, economic, the high-quality operation of system, with its people The development of economy and power network scale, reliability and economy to Operation of Electric Systems propose higher requirement, power network scale Expansion, electric network composition becomes increasingly complex.Become to stop transport for the 220kV station owners occurred in power network and cause showing for 110kV bus loss of pressure As needing to judge a large amount of signals and substantial amounts of remote measure and communication when telegram in reply is handled, artificially being judged by dispatcher, no Only easily error, and treatment effeciency is very low, can not ensure the timely recovery of failure.To ensure the reliability service of power network, subtracting Light dispatcher's work load, there is an urgent need to study to become to stop transport suitable for 220kV station owners to cause the processing side of 110kV bus loss of pressure Method.
The content of the invention
The present invention is to overcome at least one defect described in above-mentioned prior art, there is provided a kind of 110kV bus loss of pressure telegram in reply Method, digital & analog signal signal is automatically processed by electric power scheduling automatization system, and automatically generate corresponding telegram in reply strategy And perform, it can quickly and accurately realize the decompression telegram in reply of 110kV buses.
In order to solve the above technical problems, present invention employs following technical scheme:
A kind of 110kV bus loss of pressure telegram in reply method, a telegram in reply unit is correspondingly arranged to every 110kV bus, by power scheduling Automated system performs following operation, comprises the following steps:
S1:Remote measure and communication data are read, step S2 is performed after delay process;
S2:Telegram in reply unit charge condition, barring condition and trigger condition are judged, comprised the steps, and following step It is synchronous to perform:
S21:Judge whether telegram in reply unit charge condition meets, if satisfied, it is charged state then to put telegram in reply unit, if not satisfied, Telegram in reply cell discharge is then put, and judges whether telegram in reply unit discharges and terminates, if electric discharge does not terminate, step S3 is performed, if electric discharge Terminate, then return to step S1;
S22:Judge whether telegram in reply unit barring condition meets, if satisfied, the unit locking that will then send a telegram in reply, and return to step S1, if It is unsatisfactory for, then unlocks telegram in reply unit, and perform step S3;
S23:Judge whether telegram in reply unit triggers condition meets, if satisfied, it is the state that can trigger then to put telegram in reply unit, and perform step Rapid S3, if not satisfied, then return to step S1;
S3:To cell discharge state of sending a telegram in reply, triggering state and blocking judged, when telegram in reply cell discharge do not terminate, locates In triggerable state and it is non-latching when, then perform step S4, otherwise return to step S1;
S4:Judge whether telegram in reply unit operation condition meets, if satisfied, step S5 is then performed, if not satisfied, then return to step S1;
S5:Telegram in reply strategy is automatically generated, and performs generated telegram in reply strategy, step S6 is performed after strategy execution of sending a telegram in reply;
S6:Judge whether cutting load condition meets, if satisfied, then generating Emergency Control Strategy and performing, if not satisfied, then returning to step Rapid S1.
The present invention obtains to remote measure and communication data first, afterwards simultaneously to charge condition, the locking bar of unit of sending a telegram in reply Part and trigger condition are judged, when unit of sending a telegram in reply is in discharge condition, trigger condition is set up, barring condition is invalid, are entered One step is judged the operation condition for unit of sending a telegram in reply, and when operation condition is set up, system then automatically generates telegram in reply strategy and held OK, after 110kV buses telegram in reply, when the situation for having line current out-of-limit in its telegram in reply path used occurs, i.e., satisfaction is cut negative Lotus condition, now system automatically generate Emergency Control Strategy and perform the strategy.
Further, unit charge condition of sending a telegram in reply, which is set up, need to meet following condition:First, bus corresponding to this telegram in reply unit In there is pressure condition, second, the main transformer switch of bus corresponding with this telegram in reply unit connection has electric current, third, this telegram in reply unit pair The bus answered has telegram in reply path, and one and only one switch is in hot standby state in path of sending a telegram in reply, and rest switch is closed form State.
Further, send a telegram in reply the 110kV that path is stood for the 110kV buses at 220kV stations where telegram in reply unit to another 220kV 110kV circuits and the 110kV switch that bus is passed through, and the 110kV switches in path of sending a telegram in reply pertain only to two 220kV with circuit Stand.
Further, unit barring condition of sending a telegram in reply, which is set up, need to meet following condition:Send a telegram in reply what 220kV where unit stood It is no more than 10 minutes after 110kV bus bus bar differential prptection operation involutions or main transformer has back-up protection to be no more than 10 points after acting involution Clock.
Further, unit triggers condition of sending a telegram in reply sets up one of them that need to meet following condition:Where telegram in reply unit It is no more than 10 minutes after the 220kV bus bar differential prptection operation involutions at 220kV stations;The main transformer main protection at 220kV stations where telegram in reply unit It is no more than 10 minutes after acting involution;The 220kV buses at 220kV stations are in decompression state where telegram in reply unit.
Further, unit operation condition of sending a telegram in reply, which is set up, need to meet following condition:Send a telegram in reply what 220kV where unit stood 110kV buses are in decompression state, and the switch no current connected with the 110kV buses at 220kV stations where telegram in reply unit.
Further, send a telegram in reply the comprising the following steps that of strategy generating:
S51:Deploy search from the 110kV equipment of 110kV buses corresponding to telegram in reply unit, obtain path of sending a telegram in reply, and disconnect telegram in reply 110kV switches on path;
S52:Nargin is chosen in the telegram in reply path that step S51 is obtained(The rated current of circuit subtracts the current flow of circuit)It is maximum 110kV switch and closed procedure is performed to it.
Further, after 110kV buses telegram in reply, there is line current out-of-limit in its telegram in reply path used(Circuit is worked as Preceding electric current is more than its rated current)Situation when occurring, system then generates Emergency Control Strategy, Emergency Control Strategy generation specific steps It is as follows:
S61:Equipment corresponding to cutting load condition point is obtained, searches for obtain all 110kV line switchings and 10kV by the equipment and Wiretap, step S62 is performed afterwards;
S62:The switch searched is traveled through, meets additional conditions and additional delay condition when switch, and the switch Current state is equal to dbjective state, then the switch is added into policy sequence, until the electricity for the switch that switch traversal is completed or chosen When the summation of stream is not less than the telegram in reply out-of-limit value in path, step S63 is performed;
S63:The switch of access strategy sequence is ranked up, first by the payload sequence of switch, sorted by priority afterwards, Step S64 is performed afterwards;
S64:Emergency Control Strategy is performed, switching off for policy sequence will be added by putting in order.
Further, priority is by manually setting, and the more high preferential addition Emergency Control Strategy sequence of then explanation of priority is excellent First level is zero and represents that this switch can not add Emergency Control Strategy sequence.
Further, the executive mode of telegram in reply strategy and Emergency Control Strategy is as follows:If system operation in closed loop mode, is Unite automatic implementation strategy;If system operation, in open loop mode, system makes prompting, system side performs plan after manual confirmation Slightly.
Compared with prior art, beneficial effect is:The barring condition of system cycle detection and each telegram in reply unit of monitoring, charging Whether condition, trigger condition, operation condition are set up, and telegram in reply strategy is automatically generated when meeting respective conditions, and event is carried out than artificial Barrier processing shortens the time, reduces load loss, and easily operated and maintenance, and be easy to automatic management;Corresponding 110kV buses set telegram in reply unit, do not influence the topological structure of former power network, while be easy to the extension of system and systemic-function.
Brief description of the drawings
Fig. 1 is the particular flow sheet of the present invention in one embodiment.
Fig. 2 is the Emergency Control Strategy product process figure of the present invention in one embodiment.
Embodiment
The present invention is described further below in conjunction with the accompanying drawings, it is necessary to illustrate, being given for example only property of accompanying drawing illustrates, It is not intended that the limitation to this patent.
As shown in figure 1, a kind of 110kV bus loss of pressure telegram in reply method, it is single that a telegram in reply is correspondingly arranged to every 110kV bus Member, following operation is performed by electric power scheduling automatization system, comprised the following steps:
S1:Remote measure and communication data are read, step S2 is performed after delay process;
S2:Telegram in reply unit charge condition, barring condition and trigger condition are judged, comprised the steps, and following step It is synchronous to perform:
S21:Judge whether telegram in reply unit charge condition meets, if satisfied, it is charged state then to put telegram in reply unit, if not satisfied, Telegram in reply cell discharge is then put, and judges whether telegram in reply unit discharges and terminates, if electric discharge does not terminate, step S3 is performed, if electric discharge Terminate, then return to step S1;
S22:Judge whether telegram in reply unit barring condition meets, if satisfied, the unit locking that will then send a telegram in reply, and return to step S1, if It is unsatisfactory for, then unlocks telegram in reply unit, and perform step S3;
S23:Judge whether telegram in reply unit triggers condition meets, if satisfied, it is the state that can trigger then to put telegram in reply unit, and perform step Rapid S3, if not satisfied, then return to step S1;
S3:To cell discharge state of sending a telegram in reply, triggering state and blocking judged, when telegram in reply cell discharge do not terminate, locates In triggerable state and it is non-latching when, then perform step S4, otherwise return to step S1;
S4:Judge whether telegram in reply unit operation condition meets, if satisfied, step S5 is then performed, if not satisfied, then return to step S1;
S5:Telegram in reply strategy is automatically generated, and performs generated telegram in reply strategy, step S6 is performed after strategy execution of sending a telegram in reply;
S6:Judge whether cutting load condition meets, if satisfied, then generating Emergency Control Strategy and performing, if not satisfied, then returning to step Rapid S1.
Further, unit charge condition of sending a telegram in reply, which is set up, need to meet following condition:First, bus corresponding to this telegram in reply unit In there is pressure condition, i.e., its three-phase voltage is all higher than 10V;Second, the main transformer switch of bus connection corresponding with this telegram in reply unit has Electric current, i.e. its three-phase current are all higher than 10A;Third, bus corresponding to this telegram in reply unit has telegram in reply path, and have in path of sending a telegram in reply And only one switch is in hot standby state, rest switch is closure state.
Wherein, the 110kV buses that telegram in reply path is stood for the 110kV buses at 220kV stations where telegram in reply unit to another 220kV 110kV circuits and the 110kV switch passed through, and the 110kV switches in path of sending a telegram in reply pertain only to two 220kV stations with circuit.
Further, unit barring condition of sending a telegram in reply, which is set up, need to meet following condition:Send a telegram in reply what 220kV where unit stood It is no more than 10 minutes after 110kV bus bus bar differential prptection operation involutions or main transformer has back-up protection to be no more than 10 points after acting involution Clock.
Further, unit triggers condition of sending a telegram in reply sets up one of them that need to meet following condition:Where telegram in reply unit It is no more than 10 minutes after the 220kV bus bar differential prptection operation involutions at 220kV stations;The main transformer main protection at 220kV stations where telegram in reply unit It is no more than 10 minutes after acting involution;The 220kV buses at 220kV stations are in decompression state where telegram in reply unit.
Further, unit operation condition of sending a telegram in reply, which is set up, need to meet following condition:Send a telegram in reply what 220kV where unit stood 110kV buses are in decompression state, and the switch no current connected with the 110kV buses at 220kV stations where telegram in reply unit.
Further, send a telegram in reply the comprising the following steps that of strategy generating:
S51:Deploy search from the 110kV equipment of 110kV buses corresponding to telegram in reply unit, obtain path of sending a telegram in reply, and disconnect telegram in reply 110kV switches on path;
S52:Nargin is chosen in the telegram in reply path that step S51 is obtained(The rated current of circuit subtracts the current flow of circuit)It is maximum 110kV switch and closed procedure is performed to it.
Further, as shown in Fig. 2 after 110kV buses telegram in reply, there is line current out-of-limit in its telegram in reply path used (The current flow of circuit is more than its rated current)Situation when occurring, system then generates Emergency Control Strategy, Emergency Control Strategy life Into comprising the following steps that:
S61:Equipment corresponding to cutting load condition point is obtained, searches for obtain all 110kV line switchings and 10kV by the equipment and Wiretap, step S62 is performed afterwards;
S62:The switch searched is traveled through, meets additional conditions and additional delay condition when switch, and the switch Current state is equal to dbjective state, then the switch is added into policy sequence, until the electricity for the switch that switch traversal is completed or chosen When the summation of stream is not less than the telegram in reply out-of-limit value in path, step S63 is performed;
S63:The switch of access strategy sequence is ranked up, first by the payload sequence of switch, sorted by priority afterwards, Step S64 is performed afterwards;
S64:Emergency Control Strategy is performed, switching off for policy sequence will be added by putting in order.
Further, priority is by manually setting, and for an integer more than or equal to zero, priority is more high, illustrates Preferential to add Emergency Control Strategy sequence, priority is zero and represents that this switch can not add Emergency Control Strategy sequence.
Further, the executive mode of telegram in reply strategy and Emergency Control Strategy is as follows:If system operation in closed loop mode, is Unite automatic implementation strategy;If system operation, in open loop mode, system makes prompting, system side performs plan after manual confirmation Slightly.
The present invention obtains to remote measure and communication data first, afterwards simultaneously to charge condition, the locking bar of unit of sending a telegram in reply Part and trigger condition are judged, when unit of sending a telegram in reply is in discharge condition, trigger condition is set up, barring condition is invalid, are entered One step is judged the operation condition for unit of sending a telegram in reply, and when operation condition is set up, system then automatically generates telegram in reply strategy and held OK, after 110kV buses telegram in reply, when the situation for having line current out-of-limit in its telegram in reply path used occurs, i.e., satisfaction is cut negative Lotus condition, now system automatically generate Emergency Control Strategy and perform the strategy.
Obviously, the above embodiment of the present invention is only intended to clearly illustrate example of the present invention, and is not pair The restriction of embodiments of the present invention.For those of ordinary skill in the field, may be used also on the basis of the above description To make other changes in different forms.There is no necessity and possibility to exhaust all the enbodiments.It is all this All any modification, equivalent and improvement made within the spirit and principle of invention etc., should be included in the claims in the present invention Protection domain within.

Claims (10)

  1. A kind of method 1. 110kV bus loss of pressure is sent a telegram in reply, it is characterised in that it is single that a telegram in reply is correspondingly arranged to every 110kV bus Member, following operation is performed by electric power scheduling automatization system, comprised the following steps:
    S1:Remote measure and communication data are read, step S2 is performed after delay process;
    S2:Telegram in reply unit charge condition, barring condition and trigger condition are judged, comprised the steps, and following step It is synchronous to perform:
    S21:Judge whether telegram in reply unit charge condition meets, if satisfied, it is charged state then to put telegram in reply unit, if not satisfied, Telegram in reply cell discharge is then put, and judges whether telegram in reply unit discharges and terminates, if electric discharge does not terminate, step S3 is performed, if electric discharge Terminate, then return to step S1;
    S22:Judge whether telegram in reply unit barring condition meets, if satisfied, the unit locking that will then send a telegram in reply, and return to step S1, if It is unsatisfactory for, then unlocks telegram in reply unit, and perform step S3;
    S23:Judge whether telegram in reply unit triggers condition meets, if satisfied, it is the state that can trigger then to put telegram in reply unit, and perform step Rapid S3, if not satisfied, then return to step S1;
    S3:To cell discharge state of sending a telegram in reply, triggering state and blocking judged, when telegram in reply cell discharge do not terminate, locates In triggerable state and it is non-latching when, then perform step S4, otherwise return to step S1;
    S4:Judge whether telegram in reply unit operation condition meets, if satisfied, step S5 is then performed, if not satisfied, then return to step S1;
    S5:Telegram in reply strategy is automatically generated, and performs generated telegram in reply strategy, step S6 is performed after strategy execution of sending a telegram in reply;
    S6:Judge whether cutting load condition meets, if satisfied, then generating Emergency Control Strategy and performing, if not satisfied, then returning to step Rapid S1.
  2. A kind of 2. 110kV bus loss of pressure telegram in reply method according to claim 1, it is characterised in that:Described telegram in reply unit Charge condition, which is set up, need to meet following condition:When bus corresponding to this telegram in reply unit be in have pressure condition, second, with this telegram in reply The main transformer switch that bus corresponding to unit connects has electric current, third, bus corresponding to this telegram in reply unit has telegram in reply path, and sends a telegram in reply One and only one switch is in hot standby state in path, and rest switch is closure state.
  3. A kind of 3. 110kV bus loss of pressure telegram in reply method according to claim 2, it is characterised in that:The telegram in reply path is The 110kV circuits that the 110kV buses at 220kV stations where telegram in reply unit are passed through to the 110kV buses that another 220kV stands with 110kV is switched, and the 110kV switches in path of sending a telegram in reply pertain only to two 220kV stations with circuit.
  4. A kind of 4. 110kV bus loss of pressure telegram in reply method according to claim 1, it is characterised in that:Described telegram in reply unit Barring condition, which is set up, need to meet following condition:After the 110kV bus bus bar differential prptection operation involutions at 220kV stations where telegram in reply unit not It is no more than 10 minutes after having back-up protection action involution more than 10 minutes or main transformer.
  5. A kind of 5. 110kV bus loss of pressure telegram in reply method according to claim 1, it is characterised in that:Described telegram in reply unit Trigger condition sets up one of them that need to meet following condition:The 220kV bus bar differential prptection operations at 220kV stations are answered where telegram in reply unit It is no more than 10 minutes after returning;The main transformer main protection at 220kV stations where unit of sending a telegram in reply is no more than 10 minutes after acting involution;Telegram in reply is single The 220kV buses at 220kV stations are in decompression state where first.
  6. A kind of 6. 110kV bus loss of pressure telegram in reply method according to claim 1, it is characterised in that:Described telegram in reply unit Operation condition, which is set up, need to meet following condition:The 110kV buses at 220kV stations are in decompression state where telegram in reply unit, and with answering The switch no current of the 110kV buses connection at 220kV stations where electric unit.
  7. A kind of 7. 110kV bus loss of pressure telegram in reply method according to claim 1, it is characterised in that:The telegram in reply strategy is raw Into comprise the following steps that:
    S51:Deploy search from the 110kV equipment of 110kV buses corresponding to telegram in reply unit, obtain path of sending a telegram in reply, and disconnect telegram in reply 110kV switches on path;
    S52:The maximum 110kV of nargin is chosen in the telegram in reply path that step S51 is obtained to switch and perform closed procedure to it.
  8. A kind of 8. 110kV bus loss of pressure telegram in reply method according to claim 1, it is characterised in that:Emergency Control Strategy generates Comprise the following steps that:
    S61:Equipment corresponding to cutting load condition point is obtained, searches for obtain all 110kV line switchings and 10kV by the equipment and Wiretap, step S62 is performed afterwards;
    S62:The switch searched is traveled through, meets additional conditions and additional delay condition when switch, and the switch Current state is equal to dbjective state, then the switch is added into policy sequence, until the electricity for the switch that switch traversal is completed or chosen When the summation of stream is not less than the telegram in reply out-of-limit value in path, step S63 is performed;
    S63:The switch of access strategy sequence is ranked up, first by the payload sequence of switch, sorted by priority afterwards, Step S64 is performed afterwards;
    S64:Emergency Control Strategy is performed, switching off for policy sequence will be added by putting in order.
  9. A kind of 9. 110kV bus loss of pressure telegram in reply method according to claim 8, it is characterised in that:The priority is by people Work is set, and the more high then explanation of priority is preferential to add Emergency Control Strategy sequence, and priority is zero and represents that this switch can not add Emergency Control Strategy sequence.
  10. A kind of 10. 110kV bus loss of pressure telegram in reply method according to claim any one of 1-9, it is characterised in that:It is described multiple The executive mode of electric strategy and Emergency Control Strategy is as follows:If system operation is in closed loop mode, the automatic implementation strategy of system;If it is System operates in open loop mode, then system makes prompting, system side's implementation strategy after manual confirmation.
CN201710979881.XA 2017-10-19 2017-10-19 A kind of 110kV bus loss of pressure telegram in reply method Pending CN107769151A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710979881.XA CN107769151A (en) 2017-10-19 2017-10-19 A kind of 110kV bus loss of pressure telegram in reply method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710979881.XA CN107769151A (en) 2017-10-19 2017-10-19 A kind of 110kV bus loss of pressure telegram in reply method

Publications (1)

Publication Number Publication Date
CN107769151A true CN107769151A (en) 2018-03-06

Family

ID=61269086

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710979881.XA Pending CN107769151A (en) 2017-10-19 2017-10-19 A kind of 110kV bus loss of pressure telegram in reply method

Country Status (1)

Country Link
CN (1) CN107769151A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109742850A (en) * 2018-12-04 2019-05-10 广东电网有限责任公司 A method of telegram in reply of meeting an urgent need under the disaster scenario based on EMS
CN110233468A (en) * 2019-05-21 2019-09-13 国网河北省电力有限公司衡水供电分公司 The processing method of 110kV power grid bus-bar fault and loss of voltage failure
CN114139737A (en) * 2021-11-19 2022-03-04 广东电网有限责任公司电力调度控制中心 Optimization method suitable for station bus voltage loss
CN114142439A (en) * 2021-11-18 2022-03-04 广东电网有限责任公司电力调度控制中心 Power restoration method based on station bus voltage loss

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101951016A (en) * 2010-04-22 2011-01-19 广东电网公司 Wide area information-based automatic standby power supply switching adaptive modeling and controlling method
CN102075005A (en) * 2011-01-18 2011-05-25 广东电网公司电力科学研究院 Processing method for 110KV zone automatic standby power switching action on basis of EMS (Engine Management System) system
CN102185372A (en) * 2011-05-16 2011-09-14 广东电网公司深圳供电局 Method and device for generating backup automatic switchover control model based on EMS (energy management system)
CN102508053A (en) * 2011-09-26 2012-06-20 广东电网公司电力科学研究院 Area backup automatic switch testing system based on digital simulation technology
CN102738891A (en) * 2012-07-03 2012-10-17 国电南瑞科技股份有限公司 Wide-area spare power automatic switching logic unified expression method and after-operation overload processing method
CN102751780A (en) * 2012-07-03 2012-10-24 国电南瑞科技股份有限公司 Wide area backup power auto-switch-on model self-adaptive generation method
CN104638603A (en) * 2015-03-26 2015-05-20 青岛飞鹏能源有限公司 Automatic reclosing method and device for power recovery

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101951016A (en) * 2010-04-22 2011-01-19 广东电网公司 Wide area information-based automatic standby power supply switching adaptive modeling and controlling method
CN102075005A (en) * 2011-01-18 2011-05-25 广东电网公司电力科学研究院 Processing method for 110KV zone automatic standby power switching action on basis of EMS (Engine Management System) system
CN102185372A (en) * 2011-05-16 2011-09-14 广东电网公司深圳供电局 Method and device for generating backup automatic switchover control model based on EMS (energy management system)
CN102508053A (en) * 2011-09-26 2012-06-20 广东电网公司电力科学研究院 Area backup automatic switch testing system based on digital simulation technology
CN102738891A (en) * 2012-07-03 2012-10-17 国电南瑞科技股份有限公司 Wide-area spare power automatic switching logic unified expression method and after-operation overload processing method
CN102751780A (en) * 2012-07-03 2012-10-24 国电南瑞科技股份有限公司 Wide area backup power auto-switch-on model self-adaptive generation method
CN104638603A (en) * 2015-03-26 2015-05-20 青岛飞鹏能源有限公司 Automatic reclosing method and device for power recovery

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李明等: ""一种基于智能电网的广域备自投方案"", 《电力系统保护与控制》 *
杨浚文等: ""一种基于EMS的广域备自投控制系统"", 《电力系统自动化》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109742850A (en) * 2018-12-04 2019-05-10 广东电网有限责任公司 A method of telegram in reply of meeting an urgent need under the disaster scenario based on EMS
CN110233468A (en) * 2019-05-21 2019-09-13 国网河北省电力有限公司衡水供电分公司 The processing method of 110kV power grid bus-bar fault and loss of voltage failure
CN114142439A (en) * 2021-11-18 2022-03-04 广东电网有限责任公司电力调度控制中心 Power restoration method based on station bus voltage loss
CN114142439B (en) * 2021-11-18 2023-12-01 广东电网有限责任公司电力调度控制中心 Power restoration method based on station bus voltage loss
CN114139737A (en) * 2021-11-19 2022-03-04 广东电网有限责任公司电力调度控制中心 Optimization method suitable for station bus voltage loss
CN114139737B (en) * 2021-11-19 2024-10-18 广东电网有限责任公司电力调度控制中心 Optimization method suitable for bus voltage loss of station

Similar Documents

Publication Publication Date Title
CN107769151A (en) A kind of 110kV bus loss of pressure telegram in reply method
CN103022994B (en) Method for achieving fault isolation and recovery of power distribution network with permeability distribution type power supply
CN106684810B (en) Cascade connection type mixed DC circuit breaker failure type identification closure control method and device
CN110912089B (en) Flexible direct-current power distribution system protection method based on local current mutation quantity polarity
CN105024361A (en) On-site feeder automatic protection method and application thereof
CN112165090A (en) Cooperative self-healing system and method
CN103414173A (en) Method for performing fault recovery on power distribution network based on ultra-short term load
CN108963990A (en) Route small current grounding fault processing method hand in hand based on transient power direction
CN110098602B (en) Power grid line fault isolation device and method
CN109245101B (en) Method for improving power supply reliability of series-supply transformer substation
CN111357162A (en) Fault handling in a DC power system
CN105514989B (en) A kind of urban distribution network service restoration method based on 10kV feeder line prepared auto restarts
CN107591784B (en) A kind of distribution statements based on collusion adaptive incomplete differential protection method of route
CN105098734B (en) Method for preventing override trip of 10kV switch and protection control device
CN104319743A (en) Method and device for quick backup protection of high-voltage side of main transformer based on station region information
CN112018733B (en) Regional differential protection method applied to feeder automation
CN108183489B (en) Load balance control method for tramcar engineering power supply system
CN114157018B (en) Distributed feeder automation recovery method based on line load rate and peer-to-peer communication
CN111585275B (en) Control method for intelligent ring opening and closing operation
CN114744765A (en) Self-healing method for distribution line fault
CN113937741A (en) Master-slave intelligent power distribution automation system
Isherwood et al. Distribution feeder protection and reconfiguration using multi-agent approach
CN110165641B (en) Superposition method of direct current circuit breaker in flexible direct current transmission system
CN114062973A (en) In-situ feeder automation reverse blocking principle based on hardware detection residual voltage blocking and application method thereof
Lu et al. Application Topology Configuration of Distributed Feeder Automation Based on IEC 61850

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180306

RJ01 Rejection of invention patent application after publication