CN109768619A - Monitoring information automatic debugging system and adjustment method - Google Patents
Monitoring information automatic debugging system and adjustment method Download PDFInfo
- Publication number
- CN109768619A CN109768619A CN201811380759.1A CN201811380759A CN109768619A CN 109768619 A CN109768619 A CN 109768619A CN 201811380759 A CN201811380759 A CN 201811380759A CN 109768619 A CN109768619 A CN 109768619A
- Authority
- CN
- China
- Prior art keywords
- substation
- debugging
- monitoring information
- monitoring
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The present invention discloses monitoring information automatic debugging system and adjustment method.Monitoring information automatic debugging system mainly includes EMS system, substation's module and debugs main system automatically.Automatic debugging main system generates debugging task, and substation's module is made to send a warning message respectively to EMS system and automatic debugging main system.Automatic debugging main system compares warning information, to complete to debug, and generates debugging report.The key step of adjustment method are as follows: 1) create debugging task, and be handed down to substation's module.2) substation's module generates driving signal according to debugging task.Master control is driven to send monitoring alarm content to EMS system and automatic debugging main system according to monitoring information point table.3) debugging main system compares the monitoring alarm content of EMS system record and carries out variance analysis automatically, to evaluate the signal debugging situation between substation and EMS system, and generates debugging report.The present invention realizes the automatic debugging of supervisory control of substation information, and efficiency greatly improves.
Description
Technical field
The present invention relates to converting station debugging fields, specifically monitoring information automatic debugging system and adjustment method.
Background technique
Substation equipment field adjustable is one of very important work before substation puts into operation, for substation equipment
Debugging, when commissioning staff's commissioning device will check the alternating voltage, electric current, active and reactive, frequency, accident of substation equipment
Tripping, switching value, protection act, protection involution, monitoring alarm, monitoring involution etc., and substation equipment is adjusted, is adjusted
Examination, the printing of parameter preset.The prior art on substation equipment using display screen is installed, and all operations or information inspection are all
It is to be carried out based on display screen.
The debugging efforts of traditional intelligent substation monitoring information access, at least need 2 staff simultaneously in power transformation
The monitoring of the monitoring alarm content and EMS record standing and operated respectively with EMS system, and issued using phone verification substation
The consistency of warning content, to complete debugging efforts, efficiency is very low.
Summary of the invention
Present invention aim to address problems of the prior art.
To realize the present invention purpose and the technical solution adopted is that such, monitoring information automatic debugging system, it is main to wrap
It includes EMS system, substation's module and debugs main system automatically.
Long-range monitoring information point is arranged in the EMS system, the monitoring information of long-range monitoring information point is acquired, to generate
EMS system monitoring information point table.
The EMS system monitoring information point table mainly includes monitoring information point serial number and the corresponding monitoring letter of monitoring information point
Breath.
Monitoring information point is arranged in substation's module, the monitoring information of monitoring information point is acquired, to generate substation
Monitoring information point table.
The supervisory control of substation information point table mainly includes monitoring information point serial number and the corresponding monitoring letter of monitoring information point
Breath
After substation's module checks supervisory control of substation information point table and EMS system monitoring information point table, by substation
The corresponding relationship and supervisory control of substation information point table of monitoring information point table and EMS system monitoring information point table are sent to automatic debugging
Main system.
The automatic debugging main system receives EMS system monitoring information point table and is handed down to substation's module.
The automatic debugging main system is closed according to supervisory control of substation information point table and the corresponding of EMS system monitoring information point table
System generates debugging task.
Debugging task is handed down to substation's module by the automatic debugging main system, and substation's module generates monitoring alarm letter
Breath.
Substation's module sends monitoring alarm information to EMS system and automatic debugging main system respectively.
The debugging task includes the debug point table being made of several monitoring information points.
The debugging task mainly includes debug point serial number and the corresponding debugging task of debug point.
The prison of monitoring alarm information and EMS system record that the automatic debugging main system comparison is sent by substation's module
Control warning information.If the monitoring alarm information that the monitoring alarm information and the EMS system that are sent by substation's module receive is identical,
Information debugging is correct between substation and EMS system, if it is different, sending error message to EMS system when substation's commencement of commercial operation.
The automatic debugging main system debugging is completed, and debugging report is generated.
The automatic debugging main system mainly includes computer storage, PC display screen, database, debugging management main mould
Block, telemetry intelligence (TELINT) management submodule I, telemetry intelligence (TELINT) manage submodule II, remote signalling information management submodule I, remote signalling information management
Submodule II, debugging task management submodule I and debugging task manage submodule II.
Computer storage storing data library, debugging management main module, telemetry intelligence (TELINT) management submodule I, telemetering letter
Breath management submodule II, remote signalling information management submodule I, remote signalling information management submodule II, debugging task management submodule I and
The content of debugging task management submodule II.
The PC display screen shows that debugging management main module, telemetry intelligence (TELINT) management submodule I, telemetry intelligence (TELINT) manage submodule
II, remote signalling information management submodule I, remote signalling information management submodule II, debugging task management submodule I and debugging task management
The interface of submodule II.
The debugging management main module mainly shows several power supply bureaus.
Each power supply bureau includes several substations in list there are drop-down list.
Each substation includes several substation intervals in list there are drop-down list.
Substation's link telemetry intelligence (TELINT) management submodule I, remote signalling information management submodule I and debugging task management
Module I.
The telemetry intelligence (TELINT) management submodule I shows substation's telemetry intelligence (TELINT).
The remote signalling information management submodule I shows substation's remote signalling information.
Substation's telemetry intelligence (TELINT) mainly includes monitoring information point serial number, telemetry intelligence (TELINT) description and affiliated substation.
Substation's remote signalling information mainly includes monitoring information point serial number, the description of remote signalling information and affiliated substation.
The debugging task management submodule I shows converting station debugging task.
The substation interval link telemetry intelligence (TELINT) manages submodule II, remote signalling information management submodule II, debugging task
Manage submodule II.
The telemetry intelligence (TELINT) management submodule II shows substation interval telemetry intelligence (TELINT).
The remote signalling information management submodule II shows substation interval remote signalling information.
Substation interval telemetry intelligence (TELINT) mainly includes monitoring information point serial number, telemetry intelligence (TELINT) description and affiliated substation
Interval.
The substation interval remote signalling information mainly includes monitoring information point serial number, the description of remote signalling information and affiliated substation
Interval.
The debugging task management submodule II shows substation interval debugging task.
The debugging task management submodule I has creation button.
Converting station debugging task passes through the creation of creation button or addition.
The debugging task management submodule I and debugging task management submodule II all have newly-increased button.
Monitoring information point is added in debugging task by newly-increased button.
Based on the adjustment method of monitoring information automatic debugging system, mainly comprise the steps that
1) n monitoring information point is set in substation, establishes supervisory control of substation information point set A=[a1,a2..., an], and
It is saved in supervisory control of substation information point table.
2) in n long-range monitoring information points of EMS system setting, EMS system monitoring information point set B=[b is established1,b2...,
bn], and be saved in EMS system monitoring information point table.
3) main system being debugged automatically, the EMS system monitoring information point table in EMS system is handed down to substation's module.
4) substation's module checks EMS system monitoring information point table and supervisory control of substation information point table, and generate EMS system
The corresponding relationship of monitoring information point table and supervisory control of substation information point table.
Substation's module uploads to supervisory control of substation information point table and corresponding relationship and supervisory control of substation information point table certainly
In dynamic debugging main system.
5) main system is debugged automatically and debugging task is created according to supervisory control of substation information point table and corresponding relationship, and be handed down to
Substation's module.
6) substation's module generates driving signal according to debugging task.
Master control is driven to send monitoring alarm information to EMS system and automatic debugging main system according to driving signal.
7) automatic debugging main system is right on the basis of the monitoring alarm content that itself is directly received and passes through completeness check
Than EMS system record monitoring alarm content and carry out variance analysis, to complete to debug.
8) after the completion of debugging, automatic main system of debugging generates debugging report.
The solution have the advantages that unquestionable.The present invention realizes the automatic debugging of substation, changes artificial
The ineffective way of monitoring information is checked by phone, a medium scale substation, manual debug time is about 7 days, is used
After the automatic debugging system and method, debug time shortens about 2 days, and efficiency greatly improves.
Detailed description of the invention
Fig. 1 is monitoring information automatic debugging system structure;
Fig. 2 is the debugging management main module for showing telemetry intelligence (TELINT);
Fig. 3 is the debugging management main module for showing remote signalling information;
Fig. 4 is the debugging management main module for showing debugging task.
Specific embodiment
Below with reference to embodiment, the invention will be further described, but should not be construed the above-mentioned subject area of the present invention only
It is limited to following embodiments.Without departing from the idea case in the present invention described above, according to ordinary skill knowledge and used
With means, various replacements and change are made, should all include within the scope of the present invention.
Embodiment 1:
Referring to Fig. 1 to Fig. 4, monitoring information automatic debugging system mainly includes EMS system, substation's module and automatic tune
Try main system.
Long-range monitoring information point is arranged in the EMS system, generates EMS system monitoring information point table, and acquires long-range monitoring
The monitoring alarm information that information point issues.
The EMS system monitoring information point table mainly includes monitoring information point serial number and the corresponding monitoring letter of monitoring information point
Breath.
EMS Energy Management System is modern power network dispatch automated system (containing hardware and software) general name.Its major function is by base
Two parts of plinth function and application function form.Basic function include: data acquisition and monitoring system (SCADA system), automatically
Generation Control (AGC) and economic dispatch control (EDC), Power system state estimation (StateEstimator), safety analysis
(SecurityAnalysis), dispatcher's stimulating and training system (DTS).Application function includes: data acquisition and monitoring
(SCADA), Automatic Generation Control (AGC) and plan, network application are analyzed.
EMS Energy Management System is with the following functions:
I) short message of abnormal data is reminded.
II) the scheduling operational of specification key equipment (electric power) (planned prompt is alarmed without plan).
III) multi signal point global analysis and mutually check and correction.
IV Real-time Balancing) is carried out to energy consumption, energy-output ratio can be predicted.
Substation's module setting monitoring information point generates supervisory control of substation information point table, acquires and in EMS system
Send the monitoring alarm information of monitoring information point.
The supervisory control of substation information point table mainly includes monitoring information point serial number and the corresponding monitoring letter of monitoring information point
Breath.
After substation's module checks supervisory control of substation information point table and EMS system monitoring information point table, by substation
The corresponding relationship and supervisory control of substation information point table of monitoring information point table and EMS system monitoring information point table are sent to automatic debugging
Main system.
The automatic debugging main system receives EMS system monitoring information point table and is handed down to substation's module.
The automatic debugging main system is closed according to supervisory control of substation information point table and the corresponding of EMS system monitoring information point table
System generates debugging task.
Debugging task is handed down to substation's module by the automatic debugging main system, makes substation's module respectively to EMS system
System and automatic debugging main system send a warning message.
The debugging task (wherein including several monitoring information points) mainly includes that debug point serial number and debug point are corresponding
Debugging task.
The alarm of warning information and EMS system record that the automatic debugging main system comparison is sent by substation's module is believed
Breath to complete to debug, and generates debugging report.
The automatic debugging main system mainly includes computer storage, PC display screen, database, debugging management main mould
Block, telemetry intelligence (TELINT) management submodule I, telemetry intelligence (TELINT) manage submodule II, remote signalling information management submodule I, remote signalling information management
Submodule II, debugging task management submodule I and debugging task manage submodule II.
Computer storage storing data library, debugging management main module, telemetry intelligence (TELINT) management submodule I, telemetering letter
Breath management submodule II, remote signalling information management submodule I, remote signalling information management submodule II, debugging task management submodule I and
The content of debugging task management submodule II.
The PC display screen shows that debugging management main module, telemetry intelligence (TELINT) management submodule I, telemetry intelligence (TELINT) manage submodule
II, remote signalling information management submodule I, remote signalling information management submodule II, debugging task management submodule I and debugging task management
The interface of submodule II.
The debugging management main module mainly shows several power supply bureaus.
Each power supply bureau includes several substations in list there are drop-down list.
Each substation includes several substation intervals in list there are drop-down list.
It, will be according to the part such as inlet wire, main transformer high pressure, main transformer low pressure, main transformer, low-pressure line-outgoing respectively in Power Plant Design and construction
It is composed, every part is known as an interval.Such as inlet wire interval, exactly since the end of the route end, with line side
Earthing knife-switch, line side disconnecting link, switch-side earthing knife-switch, switch, bus bar side disconnecting link, bus earthing knife-switch are composed, all electrical equipment compositions
Inlet wire interval.
Substation interval is the set of one group of equipment.
Substation's link telemetry intelligence (TELINT) management submodule I, remote signalling information management submodule I and debugging task management
Module I.
The telemetry intelligence (TELINT) management submodule I shows substation's telemetry intelligence (TELINT).
The remote signalling information management submodule I shows substation's remote signalling information.
Substation's telemetry intelligence (TELINT) mainly includes monitoring information point serial number, telemetry intelligence (TELINT) description and affiliated substation.
Substation's remote signalling information mainly includes monitoring information point serial number, the description of remote signalling information and affiliated substation.
Telemetering (telemetry intelligence (TELINT)): long-range measurement.Operating parameter is acquired and transmits, including the various electrical quantity (electricity on route
The magnitudes such as pressure, electric current, power) and load uncertainty etc. is a kind of to be transmitted to the close-in measurement value of object parametric at a distance
Measuring station realizes the technology of telemeasurement.
Remote signalling (remote signalling information): remote signal.Various protections and switching value are acquired and transmitted, remote testing is primarily referred to as and opens
The current state of pass, such as whether closing a floodgate, if energy storage etc..
Information is remotely controlled (remote information): long-range control.Remote control command, mainly divide-shut brake are received and performed, to long-range
Some equipment are remotely controlled.
Remote regulating (remote regulating information): remote adjustment.Remote regulating order is received and performed, remote debugging is carried out to long-range equipment,
Such as regulator generator output power.
The debugging task management submodule I shows converting station debugging task.
The substation interval link telemetry intelligence (TELINT) manages submodule II, remote signalling information management submodule II, debugging task
Manage submodule II.
The telemetry intelligence (TELINT) management submodule II shows substation interval telemetry intelligence (TELINT).
The remote signalling information management submodule II shows substation interval remote signalling information.
Substation interval telemetry intelligence (TELINT) mainly includes monitoring information point serial number, telemetry intelligence (TELINT) description and affiliated substation
Interval.
The substation interval remote signalling information mainly includes monitoring information point serial number, the description of remote signalling information and affiliated substation
Interval.
The debugging task management submodule II shows substation interval debugging task.
The debugging task management submodule I has creation button.
Converting station debugging task passes through the creation of creation button or addition.
The debugging task includes the debug point table being made of several monitoring information points.
The debugging task mainly include the telemeterings such as active and reactive substation, frequency, voltage, electric current, oil temperature, air pressure amount,
Remote signals and several remote controls and the remote regulating signals such as switch tool position, protection act and involution, accident be total.
The debugging task management submodule I and debugging task management submodule II all have newly-increased button.
Monitoring information point is added in debugging task by newly-increased button.
Embodiment 2:
Based on the adjustment method of monitoring information automatic debugging system, mainly comprise the steps that
1) n monitoring information point is set in substation, establishes supervisory control of substation information point set A=[a1,a2..., an], and
It is saved in supervisory control of substation information point table.
In general, monitoring information point table is the summary sheet for acquiring substation operation, the specific point for monitoring data.
Should include following content:
I) equipment running status point: the switch (breaker) at substation interval, the state point of disconnecting link (disconnecting switch) are opened
Close the title and its auxiliary contact of disconnecting link.
II) equipment operating parameter point: busbar voltage (including phase voltage, line voltage), frequency;Voltage, the electricity of electric power incoming line
Stream, active power, reactive power;(transformer can want high voltage side current to the electric current of each load spacer, can also be with high and low pressure side all
Want), active power, reactive power;The electric current at mother interval.
III) equipment measuring parameter point: the active and reactive electric energy of electric power incoming line;The active energy of load spacer.
IV) various equipment acquire in substation telemetering, remote signalling, the title of remote pulse, definition and sequence list operate equipment
Defined remote control, the title of remote regulating, definition and sequence list.
2) in n long-range monitoring information points of EMS system setting, EMS system monitoring information point set B=[b is established1,b2...,
bn], and be saved in EMS system monitoring information point table.
3) main system being debugged automatically, the EMS system monitoring information point table in EMS system is handed down to substation's module.
4) substation's module checks EMS system monitoring information point table and supervisory control of substation information point table, and generate EMS system
The corresponding relationship of monitoring information point table and supervisory control of substation information point table.
Substation's module uploads to supervisory control of substation information point table and corresponding relationship and supervisory control of substation information point table certainly
In dynamic debugging main system.
5) main system is debugged automatically and debugging task is created according to supervisory control of substation information point table and corresponding relationship, and be handed down to
Substation's module.
6) substation's module generates driving signal according to debugging task.
The driving master control of substation sends monitoring alarm letter to EMS system and automatic debugging main system according to driving signal
Breath.
7) automatic debugging main system is right on the basis of the monitoring alarm content that itself is directly received and passes through completeness check
Than EMS system record monitoring alarm content and carry out variance analysis, to complete to debug.
8) after the completion of debugging, automatic main system of debugging generates debugging report.
Claims (8)
1. monitoring information automatic debugging system, it is characterised in that: mainly include the EMS system, substation's module and automatic tune
Try main system.
Long-range monitoring information point table is arranged in the EMS system, the monitoring information of long-range monitoring information point is acquired, to generate EMS
System monitoring warning content;
Monitoring information point table is arranged in substation's module, and monitoring information point table and EMS monitoring information point table is made to form corresponding pass
System;Substation's module send monitoring alarm content in EMS system;
After substation's module checks supervisory control of substation information point table and EMS system monitoring information point table, by supervisory control of substation
The corresponding relationship and supervisory control of substation information point table of information point table and EMS system monitoring information point table are sent to automatic debugging principal series
System;
Substation's module sends monitoring alarm information to EMS system and automatic debugging main system respectively;The automatic debugging principal series
System generates debugging task according to the corresponding relationship of supervisory control of substation information point table and EMS system monitoring information point table;
The automatic debugging main system receives EMS system monitoring information point table, and is handed down to substation's module;
Debugging task is handed down to substation's module by the automatic debugging main system, and substation's module generates monitoring alarm information;
The monitoring that the monitoring alarm information and EMS system that the automatic debugging main system comparison is sent by substation's module receive is accused
Alert information;If the monitoring alarm information that the monitoring alarm information and the EMS system that are sent by substation's module receive is identical, power transformation
The information debugging between EMS system of standing is correct, if it is different, sending error message to EMS system when substation's commencement of commercial operation;
The automatic debugging main system debugging is completed, and debugging report is generated.
2. monitoring information automatic debugging system according to claim 1, it is characterised in that: if the debugging task include by
The debug point table of dry monitoring information point composition.
3. monitoring information automatic debugging system according to claim 1 or 2, it is characterised in that: the automatic debugging principal series
System mainly includes computer storage, PC display screen, database, debugging management main module, telemetry intelligence (TELINT) management submodule I, distant
Measurement information manages submodule II, remote signalling information management submodule I, remote signalling information management submodule II, debugging task and manages submodule
Block I and debugging task manage submodule II;
Computer storage storing data library, debugging management main module, telemetry intelligence (TELINT) manage submodule I, telemetry intelligence (TELINT) pipe
Manage submodule II, remote signalling information management submodule I, remote signalling information management submodule II, debugging task management submodule I and debugging
The content of task management submodule II;
The PC display screen show debugging management main module, telemetry intelligence (TELINT) management submodule I, telemetry intelligence (TELINT) management submodule II,
Remote signalling information management submodule I, remote signalling information management submodule II, debugging task management submodule I and debugging task management
The interface of module ii;
The debugging management main module mainly shows several power supply bureaus;
Each power supply bureau includes several substations in list there are drop-down list;
Each substation includes several substation intervals in list there are drop-down list;
Substation's link telemetry intelligence (TELINT) management submodule I, remote signalling information management submodule I and debugging task manage submodule
I;
The telemetry intelligence (TELINT) management submodule I shows substation's telemetry intelligence (TELINT);
The remote signalling information management submodule I shows substation's remote signalling information;
The debugging task management submodule I shows converting station debugging task;
The substation interval link telemetry intelligence (TELINT) manages submodule II, remote signalling information management submodule II, debugging task management
Submodule II;
The telemetry intelligence (TELINT) management submodule II shows substation interval telemetry intelligence (TELINT);
The remote signalling information management submodule II shows substation interval remote signalling information;
The debugging task management submodule II shows substation interval debugging task.
4. monitoring information automatic debugging system according to claim 3, it is characterised in that:
Substation's telemetry intelligence (TELINT) mainly includes monitoring information point serial number, telemetry intelligence (TELINT) description and affiliated substation;
Substation's remote signalling information mainly includes monitoring information point serial number, the description of remote signalling information and affiliated substation;
Substation interval telemetry intelligence (TELINT) mainly includes between monitoring information point serial number, telemetry intelligence (TELINT) description and affiliated substation
Every;
The substation interval remote signalling information mainly includes between monitoring information point serial number, the description of remote signalling information and affiliated substation
Every.
5. monitoring information automatic debugging system according to claim 1 or 3 and adjustment method, it is characterised in that: the tune
Trying task management submodule I has creation button;
Converting station debugging task passes through the creation of creation button or addition.
6. monitoring information automatic debugging system according to claim 1 and adjustment method, it is characterised in that: the debugging is appointed
Business management submodule I and debugging task management submodule II all have newly-increased button;
Monitoring information point is added in debugging task by newly-increased button.
7. monitoring information automatic debugging system according to claim 1, it is characterised in that:
The EMS system monitoring information point table mainly includes monitoring information point serial number and the corresponding monitoring information of monitoring information point;
The supervisory control of substation information point table mainly includes monitoring information point serial number and the corresponding monitoring information of monitoring information point
The debugging task mainly includes debug point serial number and the corresponding debugging task of debug point.
8. the adjustment method based on monitoring information automatic debugging system described in claim 1 to 7, which is characterized in that mainly include
Following steps:
1) n monitoring information point is set in substation, establishes supervisory control of substation information point set A=[a1,a2..., an], and save
Into supervisory control of substation information point table;
2) in n long-range monitoring information points of EMS system setting, EMS system monitoring information point set B=[b is established1,b2..., bn],
And it is saved in EMS system monitoring information point table;
3) main system being debugged automatically, the EMS system monitoring information point table in EMS system is handed down to substation's module;
4) substation's module checks EMS system monitoring information point table and supervisory control of substation information point table, and generate EMS system monitoring
The corresponding relationship of information point table and supervisory control of substation information point table;
Substation's module believes supervisory control of substation information point table and EMS system monitoring information point table corresponding relationship and supervisory control of substation
Breath point table uploads in automatic debugging main system;
5) main system is debugged automatically and debugging task is created according to supervisory control of substation information point table and corresponding relationship, and be handed down to power transformation
It stands module;
6) substation's module generates driving signal according to debugging task;
Substation's module drive master control sends monitoring alarm information to EMS system and automatic debugging main system;
7) automatic debugging main system is on the basis of the monitoring alarm content that itself is directly received and passes through completeness check, comparison
The monitoring alarm content of EMS system record simultaneously carries out variance analysis, to complete to debug;
8) after the completion of debugging, automatic main system of debugging generates debugging report.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811380759.1A CN109768619B (en) | 2018-11-20 | 2018-11-20 | Automatic debugging system and debugging method for monitoring information |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811380759.1A CN109768619B (en) | 2018-11-20 | 2018-11-20 | Automatic debugging system and debugging method for monitoring information |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109768619A true CN109768619A (en) | 2019-05-17 |
CN109768619B CN109768619B (en) | 2020-12-01 |
Family
ID=66449611
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811380759.1A Active CN109768619B (en) | 2018-11-20 | 2018-11-20 | Automatic debugging system and debugging method for monitoring information |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109768619B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111652500A (en) * | 2020-05-29 | 2020-09-11 | 广东电网有限责任公司 | Automatic duty-on auxiliary system and equipment based on scheduling and report generation method thereof |
CN114020674A (en) * | 2021-10-27 | 2022-02-08 | 成都交大许继电气有限责任公司 | Cascading device and communication method of telecontrol terminal |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4718079A (en) * | 1986-06-30 | 1988-01-05 | Giuseppe Rabito | Remote unit monitoring system |
CN104716741A (en) * | 2015-02-13 | 2015-06-17 | 华东理工大学 | Transformer substation remote monitoring system and method |
CN204425045U (en) * | 2015-01-20 | 2015-06-24 | 武汉工程大学 | Transformer station's wireless monitoring device |
CN105098988A (en) * | 2015-08-26 | 2015-11-25 | 国家电网公司 | Regulation information acceptance check method based on replacing service |
CN205489816U (en) * | 2016-04-06 | 2016-08-17 | 湖州强力软件技术服务有限公司 | Automatic information debugging auxiliary assembly of transformer substation |
CN106712300A (en) * | 2017-02-08 | 2017-05-24 | 长园深瑞继保自动化有限公司 | Intelligent master station and sub-station multi-level anti-misoperation locking system |
CN106787169A (en) * | 2016-11-23 | 2017-05-31 | 国网福建省电力有限公司 | A kind of method of multi-data source comparison techniques diagnosis transformer station remote measurement failure |
-
2018
- 2018-11-20 CN CN201811380759.1A patent/CN109768619B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4718079A (en) * | 1986-06-30 | 1988-01-05 | Giuseppe Rabito | Remote unit monitoring system |
CN204425045U (en) * | 2015-01-20 | 2015-06-24 | 武汉工程大学 | Transformer station's wireless monitoring device |
CN104716741A (en) * | 2015-02-13 | 2015-06-17 | 华东理工大学 | Transformer substation remote monitoring system and method |
CN105098988A (en) * | 2015-08-26 | 2015-11-25 | 国家电网公司 | Regulation information acceptance check method based on replacing service |
CN205489816U (en) * | 2016-04-06 | 2016-08-17 | 湖州强力软件技术服务有限公司 | Automatic information debugging auxiliary assembly of transformer substation |
CN106787169A (en) * | 2016-11-23 | 2017-05-31 | 国网福建省电力有限公司 | A kind of method of multi-data source comparison techniques diagnosis transformer station remote measurement failure |
CN106712300A (en) * | 2017-02-08 | 2017-05-24 | 长园深瑞继保自动化有限公司 | Intelligent master station and sub-station multi-level anti-misoperation locking system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111652500A (en) * | 2020-05-29 | 2020-09-11 | 广东电网有限责任公司 | Automatic duty-on auxiliary system and equipment based on scheduling and report generation method thereof |
CN114020674A (en) * | 2021-10-27 | 2022-02-08 | 成都交大许继电气有限责任公司 | Cascading device and communication method of telecontrol terminal |
Also Published As
Publication number | Publication date |
---|---|
CN109768619B (en) | 2020-12-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105373655B (en) | A kind of method of one electrical secondary system connection figure of organic association Intelligent transformer station | |
CN109713793B (en) | Power supply online state evaluation system and method for transformer substation | |
CN103545922B (en) | Based on the intelligent alarm inference method of many scene analysis | |
CN103441572B (en) | Substation equipment method for supervising | |
CN106872856B (en) | Power distribution network fault active first-aid repair system and method based on multi-element fault collection | |
CN107167704B (en) | Power distribution network fault diagnosis system and method based on CIM model | |
CN101409008B (en) | Integrated system for monitor, management and remotely meter-reading of power distribution network | |
CN102937685A (en) | Real-time simulation technique-based integrated testing platform for substation | |
CN109697912B (en) | Power distribution network operation and maintenance training system | |
CN204758748U (en) | Cubical switchboard intelligent integrated monitoring devices | |
CN110086251B (en) | Monitoring method and system for improving operation safety of power grid | |
CN103683511A (en) | Method and system for processing fault of integrated monitoring platform based on power distribution network | |
CN104104151B (en) | The cut-in method of distribution terminal facility information | |
Knezev et al. | Automated circuit breaker monitoring | |
CN109768619A (en) | Monitoring information automatic debugging system and adjustment method | |
CN103279520B (en) | Power substation secondary system failure reconnaissance method | |
CN108964259A (en) | A kind of power grid intelligence control system | |
CN106340963A (en) | Electric power distribution room intelligent commission maintenance monitoring system | |
CN112861421A (en) | Intelligent analysis early warning system and method for power equipment | |
CN102375105A (en) | Simulation test system of substation equipment relay protection system | |
CN105119384A (en) | High risk and important client remote monitoring system | |
CN108667073A (en) | A kind of anti-isolated island method of photovoltaic based on dispatch automated system | |
Aljahani | An enhanced self-healing protection system in smart grid: using advanced and intelligent devices and applying hierarchical routing in sensor network technique | |
CN205622598U (en) | Monitoring system for photovoltaic power station | |
Li et al. | Configuration and Debugging Method of Communication between Dispatching Master Station and Substation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |