CN109722993B - 一种用于调整钢箱梁二维平面位置的调整方法 - Google Patents
一种用于调整钢箱梁二维平面位置的调整方法 Download PDFInfo
- Publication number
- CN109722993B CN109722993B CN201811633567.7A CN201811633567A CN109722993B CN 109722993 B CN109722993 B CN 109722993B CN 201811633567 A CN201811633567 A CN 201811633567A CN 109722993 B CN109722993 B CN 109722993B
- Authority
- CN
- China
- Prior art keywords
- box girder
- steel box
- steel
- lug plate
- reaction frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
一种用于调整钢箱梁二维平面位置的调整方法,包括如下步骤:①将钢箱梁吊装放置于安装平台预拼装位置;②将钢箱梁耳板焊接在钢箱梁肋板上,将固定耳板焊接在安装平台上;③将导链两端分别挂在钢箱梁耳板和固定耳板上,并收紧导链;④组装由顶梁、底梁、反丝螺杆和紧固套筒组成的横向反力架,紧固套筒上制有紧固插孔;⑤将钢筋穿过紧固插孔,通过转动连接在反丝螺杆上的固定套筒收紧横向反力架,并将钢楔子放入横向反力架和钢箱梁之间;⑥通过导链实现钢箱梁顺桥方向移动调整;⑦通过敲击钢楔子实现钢箱梁横截面方向移动调整。本发明结构简单、便于操作、可重复利用,可用于任意重量和尺寸的钢结构二维平面内的位置调整。
Description
技术领域
本发明属于建筑钢结构安装领域,特别涉及一种用于调整钢箱梁二维平面位置的调整方法。
背景技术
大重量钢箱梁标准段高空安装就位时,需要对其进行二维平面内的位置调整。而采用常规吊车安装就位时,很难做到位置调整的精确度,而且需要长时间占用起重设备和人员,进而增加了施工成本。
发明内容
本发明的目的是提供一种用于调整钢箱梁二维平面位置的调整方法,使用该调整方法可对大重量的钢箱梁吊装段进行精确的就位。
如上构思,本发明的技术方案是:一种用于调整钢箱梁二维平面位置的调整方法,其特征在于:包括如下步骤:
①将钢箱梁吊装放置于安装平台预拼装位置;
②将钢箱梁耳板焊接在钢箱梁肋板上,将固定耳板焊接在安装平台上;
③将导链两端分别挂在钢箱梁耳板和固定耳板上,并收紧导链;
④组装由顶梁、底梁、反丝螺杆和紧固套筒组成的横向反力架;将横向反力架的底梁和顶梁分别点焊在安装平台与钢箱梁侧板上,在底梁中心点上部和顶梁中心点下部分别连接反丝螺杆,两个反丝螺杆之间连接紧固套筒,紧固套筒上制有紧固插孔;
⑤将钢筋穿过紧固插孔,通过转动连接在反丝螺杆上的紧固套筒收紧横向反力架,并将钢楔子放入横向反力架底梁和钢箱梁之间;
⑥通过导链实现钢箱梁顺桥方向移动调整;
⑦通过敲击钢楔子实现钢箱梁横截面方向移动调整。
本发明具有如下的优点和积极效果:
1、本发明通过转动反丝螺杆上的固定套筒收紧横向反力架,并将钢楔子放入横向反力架和钢箱梁之间、通过导链实现钢箱梁顺桥方向移动调整、通过敲击钢楔子实现钢箱梁横截面方向移动调整,可以对大重量的钢箱梁吊装段进行精确的就位。
2、本发明通用性强,可用于任意重量和尺寸的钢结构二维平面内的位置调整。
3、本发明结构简单、便于操作、可重复利用。
附图说明
图1是本发明用于调整钢箱梁二维平面位置的示意图;
图2是横向反力架的示意图;
图3是横向反力架底梁、钢楔子和钢箱梁的连接示意图。
图中:1—安装平台;2—钢箱梁;3—钢箱梁耳板;4—固定耳板;5—导链;6—横向反力架;7—钢楔子;8—底梁;9—顶梁;10—紧固套筒;11—紧固插孔;12—反丝螺杆。
具体实施方式
如图1、2、3所示:一种用于调整钢箱梁二维平面位置的调整方法,包括如下步骤:
①将钢箱梁吊装放置于安装平台预拼装位置;
②将钢箱梁耳板焊接在钢箱梁肋板上,将固定耳板焊接在安装平台上;
③将导链两端分别挂在钢箱梁耳板和固定耳板上,并收紧导链;
④组装由顶梁、底梁、反丝螺杆和紧固套筒组成的横向反力架;将横向反力架的底梁和顶梁分别点焊在安装平台与钢箱梁侧板上,底梁中心点上部和顶梁中心点下部分别连接反丝螺杆,两个反丝螺杆之间连接紧固套筒;紧固套筒上制有紧固插孔;
⑤将钢筋穿过紧固插孔,通过转动连接在反丝螺杆上的紧固套筒收紧横向反力架,并将钢楔子放入横向反力架底梁和钢箱梁之间;
⑥通过导链实现钢箱梁顺桥方向移动调整;
⑦通过敲击钢楔子实现钢箱梁横截面方向移动调整。
本发明结构简单、便于操作、可重复利用,可用于任意重量和尺寸的钢结构二维平面内的位置调整。
以上公开的本发明优选实施例只是用于帮助阐述本发明。优选实施例并没有详尽叙述所有的细节,也不限制该发明仅为所述的具体实施方式。显然,根据本说明书的内容,可作很多的修改和变化。本说明书选取并具体描述这些实施例,是为了更好地解释本发明的原理和实际应用,从而使所属技术领域技术人员能很好地理解和利用本发明。本发明仅受权利要求书及其全部范围和等效物的限制。
Claims (1)
1.一种用于调整钢箱梁二维平面位置的调整方法,其特征在于:包括如下步骤:
①将钢箱梁吊装放置于安装平台预拼装位置;
②将钢箱梁耳板焊接在钢箱梁肋板上,将固定耳板焊接在安装平台上;
③将导链两端分别挂在钢箱梁耳板和固定耳板上,并收紧导链;
④组装由顶梁、底梁、反丝螺杆和紧固套筒组成的横向反力架;将横向反力架的底梁和顶梁分别点焊在安装平台与钢箱梁侧板上,在底梁中心点上部和顶梁中心点下部分别连接反丝螺杆,两个反丝螺杆之间连接紧固套筒,紧固套筒上制有紧固插孔;
⑤将钢筋穿过紧固插孔,通过转动连接在反丝螺杆上的紧固套筒收紧横向反力架,并将钢楔子放入横向反力架底梁和钢箱梁之间;
⑥通过导链实现钢箱梁顺桥方向移动调整;
⑦通过敲击钢楔子实现钢箱梁横截面方向移动调整。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811633567.7A CN109722993B (zh) | 2018-12-29 | 2018-12-29 | 一种用于调整钢箱梁二维平面位置的调整方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811633567.7A CN109722993B (zh) | 2018-12-29 | 2018-12-29 | 一种用于调整钢箱梁二维平面位置的调整方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109722993A CN109722993A (zh) | 2019-05-07 |
CN109722993B true CN109722993B (zh) | 2021-02-05 |
Family
ID=66296757
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811633567.7A Active CN109722993B (zh) | 2018-12-29 | 2018-12-29 | 一种用于调整钢箱梁二维平面位置的调整方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109722993B (zh) |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3695716B2 (ja) * | 2003-02-03 | 2005-09-14 | 川田建設株式会社 | 床版分離装置 |
CN201443042U (zh) * | 2008-12-25 | 2010-04-28 | 路桥华南工程有限公司 | 一种用于顶推复杂竖曲线梁的可调式滑块 |
CN201486156U (zh) * | 2009-05-15 | 2010-05-26 | 中国十七冶建设有限公司 | 大型钢构件之间间隙精确调整装置 |
CN102041899A (zh) * | 2009-10-22 | 2011-05-04 | 中冶天工建设有限公司 | 工业厂房杯口基础重型柱子轴线偏差调整方法 |
CN202323727U (zh) * | 2011-11-16 | 2012-07-11 | 中铁十三局集团电务工程有限公司 | 钢箱梁水平位置调整装置 |
CN106758831B (zh) * | 2016-12-14 | 2018-09-21 | 中铁十九局集团第二工程有限公司 | 跨铁路桥转体连续梁施工方法 |
-
2018
- 2018-12-29 CN CN201811633567.7A patent/CN109722993B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN109722993A (zh) | 2019-05-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201943007U (zh) | 活动支架不变幅架梁吊机 | |
CN104963413A (zh) | 一种墙板安装连接件及其安装墙板的方法 | |
CN203173749U (zh) | 液压复式起重机塔架组装整体式竖向自顶升装置 | |
CN109722993B (zh) | 一种用于调整钢箱梁二维平面位置的调整方法 | |
CN219794276U (zh) | 一种装配式梁柱抗震结构 | |
CN110159051B (zh) | 变电构架 | |
CN102372228B (zh) | 大跨度吊车梁平移安装方法 | |
CN210066499U (zh) | 一种悬索桥钢梁空中精准对接系统 | |
CN214177210U (zh) | 一种水泥光伏支架 | |
CN210396223U (zh) | 一种光伏电站杆塔加固装置 | |
CN210684975U (zh) | 一种内嵌式弱连接构造 | |
CN210366509U (zh) | 一种可整体吊装安装的施工升降机 | |
CN210439157U (zh) | 一种组合式牛腿支撑结构 | |
CN108755384B (zh) | 一种带轨道悬臂拼装钢桁架桥及其施工方法 | |
CN203079591U (zh) | 塔吊附墙钢结构转换连接支座 | |
CN205296409U (zh) | 一种双面固定防脱钢架连接件 | |
CN217193533U (zh) | 一种钢箱梁焊接辅助工具 | |
CN210737905U (zh) | 一种新型钢梁的建筑横梁结构 | |
CN220351531U (zh) | 一种用于大型钢叠梁高空精准安装的调节装置 | |
CN217128708U (zh) | 一种龙骨的吊点错位调整结构 | |
CN203514195U (zh) | 防腐木人行桥面结构 | |
CN219823408U (zh) | 有限高度内屈曲约束支撑构件快速精准吊装结构 | |
CN218758000U (zh) | 一种钢结构栓接杆件对位调整装置 | |
CN219431098U (zh) | 装配式铝合金楔形玻璃卡槽 | |
CN216973732U (zh) | 一种组合拼接式钢结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |